Goga muwo construction contract- creek

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140P8623R0002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service at Muir Woods National Monument is seeking a contractor to complete salmon habitat enhancement work along approximately 3,100 linear feet of creek channels. The work includes installing three water diversion systems, removing rock slope protection from banks, grading banks and beds, installing large woody debris structures, demolishing an asphalt trail and sewer line, and reusing or disposing of soils and rocks. The contractor must complete all work by late fall before salmon spawning season begins and obtain all necessary permits. The contract will be awarded on a firm-fixed price basis, with proposals due by March 24, 2023. A mandatory site visit is scheduled for March 10, 2023.

This is a total small business set-aside solicitation, with an estimated value between $1 million to $5 million. The NAICS code is 237990 and PSC code R499, with work to be performed at Muir Woods National Monument in Marin County, California. The period of performance is from May 1, 2023 to January 31, 2024.

Notice text

3 versions

Update #3 · Latest ·

SALMON HABITAT ENHANCEMENT, PHASE 2, MUIR WOODS NATIONAL MONUMENT, MARIN COUNTY, CALIFORNIA

Amendment 0002 provides Revised Specifications (Attachment 1). See Attachment 1 - Revised Specifications dated 3.8.2023.

All other terms and conditions remain unchanged.

The National Park Service (NPS) at Muir Woods National Monument (MUWO), located in Marin County, California, has a requirement for installation of three separate water diversion systems for three channel work zones, each extending about 400 to 450 LF, within a total reach of channel extending about 3,100 LF. Work includes removal of rock slope protection (RSP) from channel banks, grading some channel banks and the channel bed, and installing large tree trunks per designs as Large Woody Debris (LWD) structures. Some tree trunks will be imported by the government for off-loading and installation by the contractor. Other trunks will be relocated on site. Work includes demolition and disposal of 460 LF of asphalt trail and a segment of sewer line in a riparian zone. Some soils and RSP will be reused on site, and some will be off-hauled. Work follows restrictions on access to protect resources. Work must be complete before late fall rains initiate the start of salmon spawning season. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.

Per FAR 36.204 the project range is estimated to be between $1,000,000 and $5,000,000.

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available in the System for Award Management (SAM.gov) under Contract Opportunities. Use search term 140P8623R0002, then click on the opportunity title hyperlink, then scroll down to the Attachments section. You can then download each attachment individually or download all attachments as a zip file. See Section J Attachment 1: Specifications, Attachment 2: Appendices A-E, Regulatory Permits, Attachment 3: Appendix F, Project SWPP, Attachment 4: Drawings, for a detailed description of the requirement. Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal.

A SITE VISIT is scheduled for Wednesday, March 15, 2023, at 9:00 a.m. Pacific Standard Time. RSVP in advance to Contracting Officer. See Section L for more information.

Submit any questions regarding this solicitation in writing to Contracting Officer Liset Gomez at liset_gomez@nps.gov and include solicitation number 140P8623R0002 in the subject line of the email.

Update #2 ·

SALMON HABITAT ENHANCEMENT, PHASE 2, MUIR WOODS NATIONAL MONUMENT, MARIN COUNTY, CALIFORNIA

Amendment 0001 is to reschedule Site Visit date from Friday, March 10, 2023 to Wednesday,March 15, 2023 at 9:00am. See Revised section L, Clause 52.236-27.

Additionally, this amendment provides Revised Specifications (Attachment 1). See Attachment 1 ¿ Revised Specifications.

All other terms and conditions remain unchanged.

The National Park Service (NPS) at Muir Woods National Monument (MUWO), located in Marin County, California, has a requirement for installation of three separate water diversion systems for three channel work zones, each extending about 400 to 450 LF, within a total reach of channel extending about 3,100 LF. Work includes removal of rock slope protection (RSP) from channel banks, grading some channel banks and the channel bed, and installing large tree trunks per designs as Large Woody Debris (LWD) structures. Some tree trunks will be imported by the government for off-loading and installation by the contractor. Other trunks will be relocated on site. Work includes demolition and disposal of 460 LF of asphalt trail and a segment of sewer line in a riparian zone. Some soils and RSP will be reused on site, and some will be off-hauled. Work follows restrictions on access to protect resources. Work must be complete before late fall rains initiate the start of salmon spawning season. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.

Per FAR 36.204 the project range is estimated to be between $1,000,000 and $5,000,000.

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available in the System for Award Management (SAM.gov) under Contract Opportunities. Use search term 140P8623R0002, then click on the opportunity title hyperlink, then scroll down to the Attachments section. You can then download each attachment individually or download all attachments as a zip file. See Section J Attachment 1: Specifications, Attachment 2: Appendices A-E, Regulatory Permits, Attachment 3: Appendix F, Project SWPP, Attachment 4: Drawings, for a detailed description of the requirement. Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal.

A SITE VISIT is scheduled for Friday, March 10, 2023, at 9:00 a.m. Pacific Standard Time. RSVP in advance to Contracting Officer. See Section L for more information.

Submit any questions regarding this solicitation in writing to Contracting Officer Liset Gomez at liset_gomez@nps.gov and include solicitation number 140P8623R0002 in the subject line of the email.

Update #1 ·

SALMON HABITAT ENHANCEMENT, PHASE 2, MUIR WOODS NATIONAL MONUMENT, MARIN COUNTY, CALIFORNIA

The National Park Service (NPS) at Muir Woods National Monument (MUWO), located in Marin County, California, has a requirement for installation of three separate water diversion systems for three channel work zones, each extending about 400 to 450 LF, within a total reach of channel extending about 3,100 LF. Work includes removal of rock slope protection (RSP) from channel banks, grading some channel banks and the channel bed, and installing large tree trunks per designs as Large Woody Debris (LWD) structures. Some tree trunks will be imported by the government for off-loading and installation by the contractor. Other trunks will be relocated on site. Work includes demolition and disposal of 460 LF of asphalt trail and a segment of sewer line in a riparian zone. Some soils and RSP will be reused on site, and some will be off-hauled. Work follows restrictions on access to protect resources. Work must be complete before late fall rains initiate the start of salmon spawning season. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.

Per FAR 36.204 the project range is estimated to be between $1,000,000 and $5,000,000.

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available in the System for Award Management (SAM.gov) under Contract Opportunities. Use search term 140P8623R0002, then click on the opportunity title hyperlink, then scroll down to the Attachments section. You can then download each attachment individually or download all attachments as a zip file. See Section J Attachment 1: Specifications, Attachment 2: Appendices A-E, Regulatory Permits, Attachment 3: Appendix F, Project SWPP, Attachment 4: Drawings, for a detailed description of the requirement. Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal.

A SITE VISIT is scheduled for Friday, March 10, 2023, at 9:00 a.m. Pacific Standard Time. RSVP in advance to Contracting Officer. See Section L for more information.

Submit any questions regarding this solicitation in writing to Contracting Officer Liset Gomez at liset_gomez@nps.gov and include solicitation number 140P8623R0002 in the subject line of the email.

Files

Show all 11

Notice history

Notice Type Posted
Salmon habitat enhancement, phase 2, muir woods NA Award Award Notice
This notice Latest solicitation Solicitation
Salmon habitat restoration goga NRA muwo Pre-Solicitation
Salmon habitat restoration goga NRA muwo Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
CA-humboldt BAY NWR-tide gate repair NAICS 236220 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors