Attachment_1_-_Revised_Specifications_3_08_2023_0002.pdf

PDF 2 MB Posted

Attached to
GOGA MUWO CONSTRUCTION CONTRACT- CREEK
Solicitation number
140P8623R0002
Issued by

About this file

This is a solicitation for a construction contract to conduct salmon habitat enhancement work at Muir Woods National Monument in Marin County, California. The work includes installing three separate water diversion systems across three channel work zones totaling approximately 3,100 linear feet. Additional work consists of removing rock slope protection from channel banks; grading banks and the channel bed; demolishing an asphalt trail and sewer line; reusing, relocating, and off-hauling soils and rocks; and installing large woody debris structures using tree trunks imported by the government and relocated on-site. The contractor must complete all work before late fall rains begin the salmon spawning season. The estimated contract value is between $1 million and $5 million. A mandatory site visit is scheduled for March 10, 2023, with questions due to the contracting officer. The full solicitation is available on SAM.gov under the opportunity number provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6. All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

PROJECT MANUAL

INCLUDING TECHNICAL SPECIFICATIONS

FOR

CONSTRUCTION

FOR THE

NATIONAL PARK SERVICE

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

100% Construction Documents

PMIS-GOGA 312237

February 2023

Civil Engineers and Geomorphologists:

Northern Hydrology and Engineering

PO Box 2515 McKinleyville, CA 95519

PH/FAX: (707) 839-2195

GOGA – 312237 1 Table of Contents

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 27 00 Definition of Contract Line Items

01 31 00 Project Management & Coordination

01 32 16 Construction Schedule

01 33 23 Submittal Procedures

01 33 23 List of Submittals

01 35 13 Archeological Protection

01 35 23 Safety Requirements

01 40 00 Quality Requirements

01 42 00 References

01 45 00 Environmental Protection

01 51 00 Temporary Services

01 52 13 Field Offices and Sheds

01 54 00 Traffic Control

01 56 00 Barriers

01 57 23 Storm Water Pollution Prevention

01 71 23 Field Engineering

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

DIVISION 02 – SELECTIVE DEMOLITION AND WOODY DEBRIS

02 41 13 Selective Demolition

02 93 50 Woody Debris

DIVISION 03 to DIVISION 30

Sections not used.

DIVISION 31 – EARTHWORK

31 05 15 Rock Work

31 20 00 Earth Moving

31 25 00 Erosion and Sediment Control

APPENDICES – Bound Separately

A – U.S. Fish and Wildlife Service Biological Opinion, Aug. 10, 2022.

B - National Marine Fisheries Service, Biological Opinion, Sept. 20, 2017.

C - U.S. Army Corps of Engineers Nationwide Permit 27, Section 404, July 13, 2022.

D - Regional Water Quality Control Board, Clean Water Act Section 401 Water Quality Certification, E – State Historic Preservation Office, Memorandum of Agreement, July 2018.

F - Storm Water Pollution Prevention Plan for Project, Oct. 2022

GOGA – 312237 2 Table of Contents

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK –GENERAL

1.0 SUMMARY

A. This Section includes the following:

1. Work Covered by the Contract Documents.

2. Actions Integral to the Work: Access and Sequencing

3. Permissible Work Windows

4. Work by Others under other contracts.

5. Government Furnished Materials.

6. Contractor use of Premises and Staging Areas

7. Public use of site.

8. Work Restrictions.

9. Special Construction Requirements.

1.1 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Muir Woods National Monument, Marin County, within the Golden Gate National Recreation Area (GGNRA), a unit of the National Park Service (NPS). Muir Woods is a protected old-growth redwood forest.

B. Most of the work is within the channel of Redwood Creek and on the channel banks.

C. The site supports multiple species named on the federal endangered species list: coho salmon, steelhead trout and Northern spotted owl, with the potential for the marbled murrelet and California red-legged frog to occur. Regulatory permits apply to their protection during the work.

D. This Project is a composite of one drawing set, Salmon Habitat Enhancement at Muir Woods, Phase 2, October 2022, and a single set of Division 1, Division 2 and Division 3 specifications.

E. Site Access: Access to the staging area for the Contractor shall be the entrance to the main visitor parking lot at Muir Woods National Monument, Muir Woods Road, Mill Valley, California 94941.

F. The Work occurs in three segments of the creek (Areas 5, 6 and 7), as follows:

1. In Area 7, the most downstream Work Zone, adjacent to the entrance Plaza:

a. Install water diversion system for Area 7 and maintain dewatered work zone.

b. Remove two segments of rock slope protection (RSP) from channel banks (Segments L1 and R1). Dispose of RSP as follows:

· Reuse some RSP in two tie-backs on the left bank, per designs.

· Off-haul excess RSP from Area 7 to Conlon stockpile site.

c. Grade channel bank. Dispose of soils as follows:

· Off-haul excess soil from staging area to Conlon stockpile site or, Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 2

· If Bid Option A is awarded, off-haul some or all soil from staging area to landfill in lieu of hauling to Conlon stockpile site.

d. Grade channel bed and toes of banks.

e. Remove obsolete sewer line in left bank and dispose.

f. Install Large Woody Debris structures. Use both existing and imported logs, provided by NPS, and pin logs provided by NPS. Install Small Woody Debris posts, provided by NPS.

g. If Bid Option E is awarded, salvage, store and replant the specific number of native plants in the award.

2. In Area 6, upstream of Bridge 1:

a. Install a water diversion system for Area 6 and maintain dewatered work zone

b. Remove three segments of RSP from channel banks (Segments L2, R2/R2B and R3). Dispose of RSP through three actions:

· Haul some RSP to Area 5 for reuse, as needed

· Place some RSP as grade control in segment of removed trail

· Bury excess RSP in channel, per designs, or

· If Bid Option B is awarded, off-haul some or all excess RSP to the staging area and then to the Conlon stockpile site in lieu of burying RSP in channel.

c. Grade right bank at one location, left bank “alcove” at one location.

d. Grade channel bed and toes of banks.

e. Remove segment of asphalt trail, including:

· Remove base rock and asphalt and off-haul to recycling/landfill facility.

· Remove wooden footbridge and dispose.

§ Place soil where void occurs after trail removal and grade per designs; haul soil from Area 5 for use.

f. Install Large Woody Debris structures, per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.

g. Salvage and replant a mature azalea on the right bank. Salvage a second azalea from left bank for replanting by NPS.

h. If Bid Option D is awarded, salvage, store and replant the specific number of native plants in the award.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 3

3. In Area 5, upstream of Bridge 2 and the most-upstream Work Zone:

a. Install a water diversion system for Area 5 and maintain dewatered work zone.

b. Remove one segment of RSP from right bank (Segment R6). Dispose of RSP as follows:

· Bury RSP in left bank, per designs. Sequence work with intervening placement of large log in channel by Others.

c. Grade one segment of right bank. Dispose of soil as follows:

· Haul to Area 6 for use in regrading void where asphalt was removed.

4. Grade channel bed and toes of banks per designs.

5. Install Large Woody Debris structures per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.

6. If Bid Option C is awarded, salvage, store and replant the specific number of native plants in the award.

G. All the items shown in these specification and drawings will be constructed under a single prime contract.

H. Items which are integral to this contract are described below:

1. Access Management and Protections

a. The Plaza staging area is accessible to Contractor vehicles.

b. The only road suitable to import equipment on oversized vehicles is via State Hwy

1. Caltrans has restrictions and requirements for oversized vehicles on a segment of this road. Caltrans will likely require a permit and California Highway Patrol escorts for an oversized vehicle, both of which require substantial advance submittals and scheduling. The Contractor shall apply to Caltrans for a permit, if needed, as soon as reasonably possible after contract award to avoid delays in the Work and to enable completion of the work within the permissible work window (Section 01 54 00 Traffic Control).

c. A separate water diversion system is required for each channel Work Zone.

Equipment may not enter a channel Work Zone until it is dewatered by the Contractor, with fish removed by NPS (Section 01 45 00 Environmental Protection).

d. The two upstream Work Zones, Areas 5 and 6, are accessible to equipment only by first completing the dewatering in Area 7, adjacent to the Plaza staging area. Per Section 01 45 00, Subsection 3.2.B, if NPS accepts a Contractor proposal to use an alternative route to Area 6 via the Admin Road, Area 7 would not have to be dewatered to access Areas 5 and 6.

e. Access from Area 7 to Area 6 requires preparation of an access route through a vegetated terrestrial area, temporary removal of a boardwalk segment at the

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 4

downstream end of Area 6, and protection of a segment of asphalt trail. Per Section 01 45 00, Subsection 3.2.B, the Contractor may propose an alternative route to Area 6 using the Admin Road shown on Sheet G5, subject to conditions and approvals by NPS.

f. Access from Area 6 to Area 5 is via an asphalt trail, which shall be protected, and requires crossing a narrow tributary where a small wooden footbridge shall be protected, modified or temporarily removed to support heavy equipment.

g. The Contractor shall use equipment suitable for access routes shown on drawings.

h. Each Work Zone has access restrictions and requirements, per drawings. A required pre-construction submittal for an Access Plan shall follow drawings and propose supplemental details (Section 01 45 00 Environmental Protection) for review by

NPS.

2. Work Window

a. The work items in this Contract shall be carefully sequenced and managed by the Contractor to complete the project in the permissible construction window.

b. The permissible work window for equipment in the channel or on creek banks is June 15 to Oct. 31. An extension of the work window past Oct. 31 is possible only if rains have not initiated the salmon spawning season and regulatory agencies provide approval to continue work. Work scheduling shall not assume an extension will be available.

c. Equipment work in the Plaza Staging Area and Conlon stockpile site and hand work on channel banks is permissible after October 31.

d. Substantial rains have occurred in September and October and could temporarily prevent work in the creek during such events. The Contractor shall leave leeway for possible temporary delays in the initial project schedule.

3. Sequencing

a. This project requires careful advance sequencing and on-going attention to sequencing of on-site actions.

b. The layout of water diversion pipes requires careful planning to avoid or minimize the need to relocate the diversion pipe during work because actions and/or access routes occur on both banks in all Work Zones, per drawings. See Section 01 45 00, Environmental Protection, Subsection 3.1 H, Pipe Layout in Relation to Work Activities.

c. Some actions in one Work Zone are integrated with actions in a different Work Zone, per drawings, such as:

· The Area 7 channel must be dewatered before equipment can access the upstream work zones, Areas 5 and 6. Use of an Alternative Route to Area 6 via the Admin Road, if proposed and accepted by NPS, would eliminate this requirement.

· Some installed LWD structures in Area 7 will obstruct the access route to upstream work zones. Therefore, full removal of equipment from upstream work zones must be completed before final installation of LWD in Area 7.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 5

Use of an Alternative Route to Area 6 would eliminate this requirement for Area 7; however, Area 6 work must planned to allow final installation of LWD in Area 6 and still maintain the established egress route without the need to use a new route to leave the work site.

· Materials to be off-hauled from upstream work zones, such as asphalt, or imported to upstream work zones, such as pin logs, must be transported through the Area 7 channel access. If the Alternative Route to Area 6 is used, materials would be transported through the Area 6 access instead of the Area 7 access.

· Some materials are transferred from Area 6 to Area 5 and vice-versa. Some Area 6 RSP is hauled to Area 5 for reuse, and soil from Area 5 is hauled to Area 6 for reuse.

d. Work at Area 5 requires careful sequencing in relation to closures of the main trail.

The main trail upstream of Bridge 2 shall not be closed on both sides of the creek at the same time.

· Equipment access to Area 5 uses the main trail on the west side (right bank) of the creek. When the west side trail is closed, the east side must always remain open to visitors.

· The burial of RSP in the left bank will require closure of the main trail on the east side (left bank) of the creek. The west side trail must remain open when the east side trail is closed.

· When work is conducted by Others to relocate the large log from the left bank, the trail at the top of the left bank (east side) will be closed, and the Contractor may not use the west side of the trail upstream of Bridge 2 at the same time.

e. Other sequencing issues pertain to:

· Coordinating delivery of pin logs by the Government so they are available for the Contractor to haul and install in upstream work zones as needed (see Section 02 93 50 Woody Debris).

· Work by Others during the Contract Period to relocate a large log in Area 5 after some earthwork by the Contractor but before completion of the Contractor’s earthwork (see Section 31 20 00 Earthmoving).

· To replant salvaged vegetation, if awarded per Bid Options C, D and/or E, sequence work in relation to LWD placement to retain equipment access to planting areas to the extent possible but planting by hand is permissible.

4. Environmental Protections

a. Environmental protections of the channel bed and banks, water quality, downstream flows, ground surface, endangered species, vegetation, trees, and trails are a critical component of all aspects of this work (Section 01 45 00 Environmental Protection).

b. Environmental protections are required as an on-going component of the work.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 6

5. Work by Others During Contract Period

a. A large log (Log No. L1012) on the left bank in Area 5 will be relocated into the channel by Others, who will use cables and grip hoists to move the log. See Section 31 20 00 Earthmoving for interaction of Work by Others with earthmoving by the Contractor.

b. Work may be conducted by Others near the Conlon long-term stockpile site during the work period.

c. Work may be conducted by Others in other locations within Muir Woods during the work period.

1.2 GOVERNMENT-FURNISHED MATERIALS

A. Government will furnish products indicated.

Contractor is responsible for protecting Government-furnished items from damage during unloading, storage and handling

B. Government-Furnished Products:

1. All pin logs, including delivery to the staging area. The Contractor shall unload deliveries (See Section 02 9350 Woody Debris).

2. All large logs to be imported for use as LWD in Area 7, including delivery to the staging area. The Contractor shall unload deliveries (see Section 02 9350 Woody Debris).

3. Piles of Small Woody Debris to be placed near Work Zones for use under Large Woody Debris (see Section 02 9350 Woody Debris).

4. Posts for Small Woody Debris structures. Posts are stockpiled on a dirt road referred to as the “Admin Road” uphill from the visitor center.

5. A SWPP and associated inspections, per Section 01 57 23.

1.3 CONTRACTOR USE OF PREMISES, STAGING AREA AND ROADS

A. General: Contractor shall have full use of the areas identified in construction documents, with strict limits to the boundaries of disturbance for construction operations. The Contractor shall only use areas identified in drawings for staging, access, ramps, stockpiling, equipment storage and any other work activities unless additional areas are identified in an approved Access Plan.

B. Staging Area:

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 7

a. The primary staging area shall be at the Muir Woods Entrance Plaza, typically used by visitors as a gathering and waiting area.

b. The area of the Plaza available for staging shall be per drawings, with modifications as proposed in an approved in a Pre-Construction Access Plan Submittal (Section 01 45 00 Environmental Protection and Section 01 56 00 Barriers).

c. The Contractor shall establish Security fencing around the Plaza Staging Area so as to accommodate daily visitor access as follows:

· Allows a visitor route approximately 15 feet wide from the main lot to the Visitor Center and does not require pedestrian use of the adjacent ADA parking area.

· Retains area for lines of people in the area closest to the Visitor Center, approximately between the watershed model and the Visitor Center.

· Retains access to the Plaza restrooms.

· Allows room for lines of people waiting for shuttle pick-ups on the east side of the restrooms.

· Avoids impacts to the watershed model in the plaza.

· Anticipates opening of Security Fence gates in a manner to safely control pedestrian traffic (Section 01 56 00 Barriers).

d. Vehicular access to the Plaza staging area entails driving through the main visitor parking lot of Muir Woods. Contractor actions for safety, pedestrian and traffic management and communications are required during use (Section 01 45 00 Traffic).

f. Traffic back-ups at the entrance to the main lot can be avoided by arriving before visitor hours. The Contractor may access the site outside of visitor hours, but use of artificial lighting is prohibited.

C. Supplemental Staging Areas

a. Small staging areas specific to the two upstream Work Zones, Areas 5 and 6, shall be per drawings. They consist largely of paved trails that will be closed to visitors during the work.

b. The Contractor shall review drawings and propose modifications as part of a Pre- Construction Access Plan Submittal (Section 01 45 00 Environmental Protection).

c. Contractor employee parking and other supplemental staging is available at the Nursery Lot, about 0.3 miles down Muir Woods Road from the main entrance. The Contractor does not have exclusive use of the Nursery Lot (Section 01 54 00 Traffic Control).

d. Turn-outs along Panoramic Highway may be available for material transfers or similar uses if the Contractor obtains an encroachment permit from the Marin County Department of Public Works.

e. If turn-outs are to be used, use only turn-outs on the east side of Panoramic Highway, adjacent to NPS property, between Highway 1 and Muir Woods Road.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 8

f. If the Alternative Route to Area 6 is used, the Admin Road shall not be used for staging.

The adjoining dirt road may be used for some temporary placement of materials awaiting transport, but the dirt road shall remain accessible to others.

D. Existing Utilities

a. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs to a utility, repair utility at no additional expense to the Government.

b. If damage occurs to an unknown utility, repair utility.

c. Protect Water Supply Line under Main Trail in Area 5 and remove a connected decommissioned branch under the creek prior to RSP removal or earthwork (Section 02 41 13 Selective Demolition Subsection 3.3).

Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

Do not proceed with utility interruptions without Contracting Officer’s written permission.

E. Nonsmoking Site: Smoking is not permitted at the project site.

F. Construction Camp: Establishment of a camp within the park will not be permitted.

G. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment. The Contractor shall identify and follow all pertinent Caltrans and/or Marin County requirements for large vehicles and hauling on Highway 1 and Muir Woods Road. During movement of its vehicles on the roads, the Contractor is responsible for providing safe conditions for other drivers.

H. Any waste generated shall be removed daily from the work zone within Muir Woods. The Contractor shall keep all waste and contaminants contained at the staging area and shall use wildlife-proof trash receptacles with lids. Uneaten human food and trash shall not remain exposed in the work zone or staging area. The Contractor shall ensure that all workers dispose of food scraps, paper wrappers, food containers, cans, bottles, and other trash are deposited in covered or closed trash containers. The trash containers will be removed from the project site at the end of each working day.

1.6 PUBLIC USE OF SITE

A. The park will be open to visitors at 8 AM seven days per week during the work period, including holidays.

B. Visitors reserve and pay for parking spaces, including those in the main lot, in the ADA/EV parking areas adjacent to the Plaza Staging Area, and the Conlon lot.

C. Shuttle buses drop off visitors at the main lot adjacent to the Plaza restroom area during summer months. Commercial buses park on the west side of the main lot, closest to the creek.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 9

D. Visitation rates are typically highest during summer months. The lowest visitation rates during the work period are typically Tuesdays and Wednesdays after Labor Day.

E. A visitor restroom occurs in the Plaza adjacent to the Contractor’s staging area, and access to the restroom must be maintained.

F. Visitor vehicular traffic often backs up on Muir Woods Road at the entrance to the main lot and the nearby annex parking lot, where contracted parking attendants check parking reservations.

G. Trail closures in the work areas shall follow designs. NPS will not close trails near the work zone unless such closure is needed for public safety or to minimize frequent disruptions to the work

H. NPS will not be responsible for managing pedestrian or vehicular traffic (Section 01 54 00 Traffic) in the main lot or Plaza. However, NPS will provide staff on site to communicate to the public about the work and route visitors away from trail closures.

1.7 WORK RESTRICTIONS

A. On-Site Work Hours:

Work shall be performed during daylight working hours Monday through Friday or on weekends.

Weekend and Federal Holiday Work is permitted. Show planned weekend or holiday work on schedules and, if planned on short notice, provide advance notice to the COR.

1.8 SPECIAL CONSTRUCTION REQUIREMENTS

A. NPS will be responsible for biological, archeological, and Tribal monitoring required in specifications and regulatory permits. No persons working for the Contractor shall handle, harass, capture, or disturb federally listed salmonid or frog species. These actions are defined as “take” in the Biological Opinions and are prohibited, per Section 01450, Environmental Protection.

B. The Contractor shall be aware that representatives of regulatory agencies are likely to visit the site throughout the period of construction. Regulatory personnel are permitted on the site at all times without advance notice.

C. The Contractor shall be aware that representatives of the Press or other media may be visit during the work.

D. The Contractor shall be held responsible for fines or civil liabilities imposed by Regulatory Agencies as a result of the Contractor’s actions.

Modifications to Specifications, 03/08/2023, consist of a new Section 01 45 00 3.2.B Alternative Route to Area 6.

All changes are highlighted. The same modification is referenced in Section 01 11 00 Summary of Work.

GOGA - 312237 01 11 00 - 10

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

Section 01 27 00

GOGA - 312237 01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 001 – Mobilization and Demobilization (Lump Sum)

1. Pre-construction submittals and meetings.

2. Set-up and removal of staging area.

3. Import and export of equipment and materials.

4. Caltrans Permit and California Hwy Patrol escorts, as needed, for oversized vehicles on

Hwy 1.

5. On-site meetings and submittals during construction.

6. Trail closure management and coordination with NPS for closures.

7. Traffic management.

8. SWPP actions.

9. Close out.

10. Measurement for payment will be percent complete.

11. Payment will be made at the contract lump sum price.

B. Contract Line Item No. 002 – Install and Operate Dewatering and Water Diversion Systems (Lump Sum)

1. Install and operate water diversion systems in three separate channel work zones (Areas 5, 6 and 7) to maintain a dewatered channel during the work.

2. Operate the Area 7 water diversion system concurrently with one or, as needed, both of the others.

3. Coordinate with NPS for fish removal and fish protections during drawdown.

4. Monitor, document and report turbidity and water levels.

5. Establish methods to avoid discharge of turbid water from work zones during the work.

6. Remove all materials and equipment for water diversions after the work.

7. Measurement for payment will be percent complete.

8. Payment will be made at the contract lump sum price.

GOGA - 312237 01 27 00 - 2

C. Contract Line Item No. 003 – Selective Demolition, Earthmoving and Rock Work in Areas 5, 6 and 7 (Lump Sum)

1. Conduct access and protection measures both at and between work zones and to conduct work in the creek, per requirements, and remove/repair after work.

2. Remove six segments of Rock Slope Protection (RSP) from channel banks in three Work Zones: Segment R6 (Area 5); Segments L2, R2/R2B, and R3 (Area 6), and Segments L1, and R1 (Area 7).

3. Conduct exploratory trenching for toe rock at RSP segments and remove, if present, except where limits are specified.

4. To dispose of RSP:

a) At Area 7, reuse some RSP in two tie-back installations in the left bank, and off-haul excess RSP to Conlon stockpile site (Table 4, Sheet G7 on drawings).

b) At Area 6, reuse some RSP in one tie-back installation and haul some to Area 5 for reuse as needed (Table 4, Sheet G7 on drawings). Bury excess RSP in channel per designs. (See Bid Option for alternative to burial in channel.)

c) At Area 5, reuse RSP to place in left bank buried wall (Table 4, Sheet G7 on drawings).

· Accommodate work by Others to relocate large log No. 1012 on left bank before completing downstream end of buried wall.

5. Grade some channel banks per drawings:

a) At Area 7, terrace one segment of left bank (Sheet C2 on drawings).

b) At Area 6, grade one segment of right bank after removal of RSP and footbridge and install about 18 LF of erosion control fabric near tie-back. Grade one small backwater channel on the left bank (Sheet C4 on drawings).

c) At Area 5, grade a segment of the right bank after RSP removal (Sheet C7 on drawings).

6. To dispose of soils from excavations:

a) At Area 7, reuse some soils as needed to refill sewer line trench and to mix with RSP at tie-back installations. Off-haul excess to Plaza Staging Area and then to Conlon stockpile site, per Table 5 on Sheet G7 on drawings. (See Bid Option A for alternative to haul to landfill instead of Conlon stockpile site).

b) At Area 6, reuse soil from both Area 6 and Area 5 to fill and grade alignment where trail is removed (Table 5 on Sheet G7 on drawings).

c) At Area 5, haul soil from bank excavations to Area 6 for fill placement in trail removal alignment. Off-haul excess from either Area 5 or 6 to Plaza staging area and then to Conlon stockpile site. (See Bid Option A for alternative to haul to landfill instead of Conlon stockpile site).

7. Grade channel bed in each Work Zone, per drawings.

8. At Area 6, demolish asphalt trail and base rock and wooden footbridge, off-haul and dispose.

9. At Area 6, salvage and replant a mature azalea bush; and salvage a second smaller azalea bush for replanting by NPS (Sheet C4 on drawings).

GOGA - 312237 01 27 00 - 3

10. At Area 7, remove segment of obsolete sewer line and dispose.

11. Place and winterize stockpiled materials at Conlon stockpile site.

12. Establish grading stakes for earthmoving, rock work, and RSP burial.

13. Measurement for payment will be percent complete.

14. Payment will be made at the contract lump sum price.

D. Contract Line Item No. 0004. Install Woody Debris Structures (Lump Sum)

1. Install Large Woody Debris structures, per designs, as follows:

a) In Area 7, install both existing logs and logs imported by NPS.

b) In Area 6, install existing logs.

c) In Area 5, install existing logs, not including log No. 1012 to be relocated by Others.

2. Unload large logs imported by NPS and coordinate delivery schedule with NPS.

3. Unload Pin Logs imported by NPS and coordinate delivery schedule with NPS.

4. Haul Pin Logs to work sites and install at LWD structures per designs.

5. Install Posts, provided by NPS, for Small Woody Debris structures.

6. Place piles of Small Woody Debris under each Large Woody Debris structure, per specifications.

7. Establish layout stakes for large wood structures and sequence installation, per specifications.

8. Measurement for payment will be percent complete.

9. Payment will be made at the contract lump sum price.

3.2 LIST OF BID OPTIONS

A. Bid Option A. Haul soils to landfill (per Cubic Yard)

1. Haul soils from the Plaza staging area to a landfill in lieu of hauling to the Conlon stockpile site.

2. Soils to be off-hauled in this Bid Option are generated primarily from Area 7 (adjacent to the Plaza), with some from Area 5 (further upstream), as shown on Table 5 on Sheet G7 on drawings.

3. Quantities to be off-hauled may range from Zero (0) to 249 CY, as shown on Table 5 on Sheet G7 on drawings.

4. This bid option does not include the cost of hauling or temporary stockpiling at the Plaza staging area because that cost is included in CLIN 3.

5. Deduct the following cost from this option: the cost of hauling from the Plaza staging area to the Conlon stockpile site. Those are costs included in CLIN 3 that would not be incurred under this option for the quantity of soils hauled to a landfill.

6. NPS will identify the total quantity awarded under this Bid Option A within 65 days of contract award. Any quantity that is not to be hauled to a landfill per this Bid Option shall be hauled to the Conlon stockpile site, per CLIN 3.

GOGA - 312237 01 27 00 - 4

7. Measurement for payment will be based on tickets from landfill.

8. Payment will be made at the Bid Unit price.

B. Bid Option B. Off-Haul Excess RSP from Area 6 to the Conlon Stockpile Site in lieu of RSP Burial in Area 6 Channel (per Cubic Yard)

1. In lieu of burying excess RSP in the channel in Area 6, as included in CLIN 3, off-haul RSP from Area 6 to Plaza staging area and then to Conlon Stockpile Site (Table 4, Sheet G7 on drawings).

2. Does not include the RSP from Area 6 for definite off-haul to Conlon stockpile site or for reuse (Table 4, Sheet G7 on drawings).

3. Quantities to be hauled to the Conlon Stockpile site in lieu of burial may range from zero

(0) to 188 CY. Includes all sizes of rock removed from channel banks.

4. Use alternative channel bed grading plan on Sheet C4-B for Bid Option B. If only a portion of RSP is off-hauled, channel bed grading plan will partially follow Bid Option B Sheet, with final grading plan to be provided by NPS.

5. Measurement for payment will be based on truckloads from staging area to Conlon, per specifications.

6. NPS will identify the total quantity awarded under this Bid Option B within 65 days of contract award. Any quantity that is not to be hauled to the Conlon stockpile site per this Bid Option shall be buried in the channel, per CLIN 3.

7. Payment will be made at the Bid Unit price.

C. Bid Option C. Salvage, store and replant native plants in Area 5 (Lump Sum)

1. Salvage, store and replant 118 plants identified for salvage from channel banks in Area 5 (Sheet G6).

2. Actions may be conducted by equipment or by hand.

3. Replanting by hand after channel is rewatered is permissible after the October 31 end of work period in the channel, but plants shall be maintained until planted.

4. Salvaging will be considered 40% complete; replanting will be considered 100% complete.

5. Measurement for payment will be percent complete.

6. Payment will be made at the Lump Sum price.

D. Bid Option D. Salvage, store and replant native plants in Area 6 (Lump Sum)

1. Salvage, store and replant 231 plants identified for salvage from channel banks in Area 6 (Sheet G6).

2. This Bid Option does not include salvage of two azaleas or replanting of one azalea because those actions are included in CLIN 3.

3. Actions may be conducted by equipment or by hand.

4. Replanting by hand after channel is rewatered is permissible after the October 31 end of work period in the channel, but plants shall be maintained until planted.

5. Salvaging will be considered 40% complete; replanting will be considered 100% complete.

6. Measurement for payment will be percent complete.

7. Payment will be made at the Lump Sum price.

GOGA - 312237 01 27 00 - 5

E. Bid Option E. Salvage, store and replant native plants in Area 7 (Lump Sum)

1. Salvage, store and replant 87 plants identified for salvage from channel banks in Area 7 (Sheet G6).

2. Actions may be conducted by equipment or by hand.

3. Replanting by hand after channel is rewatered is permissible after the October 31 end of work period in the channel, but plants shall be maintained until planted.

4. Salvaging will be considered 40% complete; replanting will be considered 100% complete.

5. Measurement for payment will be percent complete.

6. Payment will be made at the Lump Sum price.

F. Bid Option F. Prepare As-Built Drawings (Lump Sum)

1. Conduct topographic surveys of finish grade in all areas of work in the channel and on banks, including placed wood, buried rock, sewer line removal, trail removal area and Conlon stockpiles.

2. Show extent of removals (RSP, trail) and extent of buried rock, tie-backs and similar.

3. Follow specifications for surveying and presentation requirements.

4. Prepare draft and final versions.

5. Survey work may be conducted after the October 31 end of work period in the channel but must precede substantial rain events after that time.

6. Final submittal is due within 6 weeks of substantial completion.

7. Measurement for payment will be percent complete.

8. Payment will be made at the contract lump sum price.

G. Bid Option G: Install additional log(s) in Large Woody Debris (LWD) Structures (per log)

1. Since trees may fall in Muir Woods after designs were completed, this Bid Option entails relocating a newly fallen log into the channel as part of an LWD structure in a nearby Work Zone.

2. A log will only be utilized if its dimensions are suitable for equipment already on site for other work. A log may be cut to dimensions to enable its relocation, with dimensions to be coordinated with NPS.

3. A log to be utilized would occur at a distance from a Work Zone similar to that of site logs shown on designs for other LWD structures. The log would occur near an access route already utilized for other work.

4. A log would be placed per LWD designs to be provided by NPS for the individual log.

5. Measurement for payment will be percent complete per log.

6. Payment will be made at the contract unit price per log.

END OF SECTION 01 27 00

GOGA - 312237 01 31 00 - 1

050512 PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on

Project including, but not limited to, the following:

1. Construction Coordination.

2. Sequencing Planning

3. Requests for Information (RFIs).

4. Project meetings.

5. Environmental Coordination.

B. This Section includes a requirement for the Contractor to provide a Project Management software program, with access to via an internet-connected device 24 hours a day, to be used by all project participants and collaborators for submittals and tracking (Part 2, Products).

C. Related Requirements:

1. Section 01 32 16 Construction Schedule for preparing and submitting Contractor’s construction schedule.

2. Section 01 45 00 Environmental Protection for submittals, access and sequencing

3. Section 01 54 00 Traffic Control

4. Section 01 71 23 Engineering and Layout for procedures for layout, documentation and review of earthwork and Large Wood

5. Section 01 73 00 Execution for procedures for coordinating general installation

6. Section 01 74 19 Construction Waste Management

7. Section 01 77 00 Closeout Procedures for coordinating closeout of the Contract.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction actions in sequence required to obtain the best results where one part of the Work depends on a different part of the Work.

2. Coordinate Work actions to retain access for equipment in each part of a Work Zone and to complete actions with minimal areas of impact.

3. Make adequate provisions to accommodate work actions scheduled for later in the construction period.

4. Where availability of space is limited, coordinate sequence of actions to allow an efficient progression of activities and access for related installation, construction, earthwork or other activities.

GOGA - 312237 01 31 00 - 2

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, construction schedules, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Master Contractor's Construction Schedule and subsequent Weekly

Construction Schedules.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences

7. Scheduled deliveries, especially by oversized vehicles

8. Project closeout activities.

9. Securing of necessary permits and compliance reporting with regulatory requirements.

1.3 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference, unless timing of submittal is otherwise specified. Contracting

Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Baseline Schedule.

3. A comprehensive breakdown of the Schedule of Values, incorporating cost breakdowns by

Contract Line Items and specific categories as requested by the CO

4. A list of Subcontractors and their roles for this project.

5. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

6. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

7. Site-Specific Accident Prevention Plan.

8. A draft and final Dewatering and Water Diversion Plan (per Section 01450)

9. Draft and Final Access Plan.

10. Quality Control Plan.

11. Traffic Management Plan

12. Copy of Caltrans permit application for oversized vehicles, if needed

13. Waste Management Plan

14. The signature page from the SWPPP with the Contractor’s signature demonstrating that the SWPPP has been read and accepted for this work.

15. Copies of letters notifying subcontractors of SWPPP requirements and SWPPP signature pages from each subcontractor demonstrating that the SWPPP has been read and accepted for this work.

16. Spill Prevention and Refueling Plan.

17. Billing Information and Meter Readings on Electrical Panels at Muir Woods, if to be used

GOGA - 312237 01 31 00 - 3

B. All items listed must be provided to the Contracting Officer before the Pre-Construction

Conference is held.

C. Some items listed shall be provided in draft for review by NPS prior to the Pre-Construction

Conference, with a final revised version due before the Pre-Construction Conference. See Table

1 Section 01 33 23 List of Submittals.

D. If all of these documents have not been received one week prior to the scheduled Pre-Construction

Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the

Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

E. Submit items via the electronic Project Management software program to be provided by the

Contractor (Section 01 31 00, Part 2), with either automatic or supplemental email notifications to the CO and COR.

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the

Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on

Project Management Software program provided by the Contractor. The Contractor shall provide notice to the CO and COR via email when an RFI has be submitted on the website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI: Submit RFI’s on the Contractor’s Project Management Software Program as follows:

GOGA - 312237 01 31 00 - 4

1. Enter the project name and RFI No in the header.

2. Enter the details of the question and attach related documents.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Engineer’s actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the

Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.5 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Payments to Contractor.

9. Payroll reports.

10. Contract time.

11. Liquidated damages.

12. Contractor Performance Evaluation.

13. Notice to proceed.

14. Correspondence procedures.

15. Environmental requirements

16. Interactions with NPS Biologists (Fish, Vegetation, Bio-Monitor)

17. Interactions with archeologist

18. Interactions with Work by Others

19. Visitor Access Management

20. Acceptance/rejection of work.

21. Progress meetings.

22. Submittal procedures.

23. As-constructed drawings

GOGA - 312237 01 31 00 - 5

24. Saturday, Sunday, and holiday work.

25. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Meeting minutes. The Contractor shall prepare minutes of weekly minutes and distribute them in draft form a minimum of two days before the next weekly meeting. Minutes shall be submitted via the Project Management software (Part 2).

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of delivery schedules.

d. Construction Schedule update (provide updated CPM). Submit schedule update on

Project Management Software and, if internet access on site is limited during meetings, on paper at the meetings, if requested by COR.

e. Work in progress and projected, including

1) Advance review of access before entering new Work Zone

2) Advance review of technical requirements for earthwork

3) Advance review of layout and installation sequence of Large Wood

4) Advance communications for traffic control and trail closures

f. Inspections of work in progress and projected

g. Requests for information (RFI) and other issues.

h. Modifications.

i. Status of Project Record Drawings.

j. Other business relating to work.

C. Pre-Work Conferences: Conduct a pre-work conference at Project site before each new construction activity that requires on-site coordination with the COR and/or Project Engineer, such as dewatering of each work zone, layout, grading, excavation, large woody debris installation, review of access routes, plant salvage.

1. Attendees: Attendees will vary by action. At a minimum, they shall include Contractor and COR. Other attendees may include NPS Fish Biologist(s), Vegetation Manager, Biological Monitor and/or Project Engineer. Advise COR of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Environmental Protections

b. Contract Documents.

c. Options.

d. Submittals

e. Related RFIs.

GOGA - 312237 01 31 00 - 6

f. Related Change Orders.

g. Purchases.

h. Deliveries.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Compatibility of materials.

n. Acceptability of substrates.

o. Temporary facilities and controls.

p. Space and access limitations.

q. Regulations of authorities having jurisdiction.

r. Testing and inspecting requirements.

s. Coordination with other work.

t. Protection of adjacent work.

u. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with work if the conference cannot be successfully concluded.