Salmon habitat restoration goga NRA muwo
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P8623R0002
- Agency
-
Pacific West Region
National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This notice provides information on a competitive acquisition for salmon habitat restoration services at Muir Woods National Monument in California. The National Park Service seeks to award a firm fixed price construction contract to remove rock slope protection from creek banks, grade banks, install large woody debris structures, and remove an asphalt trail. Work will take place in three creek segments between June 2023 and November 2023 and require setting up three water diversion systems. Questions are due by January 12, 2023, with responses and the anticipated solicitation planned for release on January 28, 2023.
The acquisition is set aside 100% for small businesses under NAICS code 237990 (Other Heavy and Civil Engineering Construction). The contract value was not specified but work will be conducted over approximately 293 calendar days. Segments five and six will only be accessible after completion of segment seven. No incumbent or current contractors were named. Work will involve removing rock slope protection from three creek bank segments, grading banks, and installing structures using existing logs supplied by the National Park Service.
Notice text
2 versions
Update #2 · Latest ·
The purpose of this synopsis is to provide a notice to the public of information applicable to the U.S. National Park Service (NPS) Office of its requirement for salmon habitat enhancement at Muir Woods National Monument, CA.
Authority: NPS is issuing this synopsis in accordance with FAR Part 5.204 Pre-Solicitation Notice.
Description: This project is to conduct salmon habitat restoration actions in Redwood Creek at Muir Woods National Monument. The work requires use of heavy equipment within the channel, per drawings, to remove rock slope protection (RSP) from banks, grade some banks, install rock in tie-backs, install Large Woody Debris structures, and remove an asphalt trail. The work requires setting up three water diversion systems while meeting downstream flow and water quality requirements. The work entails slow and restricted access and many environmental protections for highly sensitive resources such as endangered salmon, understory vegetation, and redwood trees.
The Work occurs in three segments of the creek (Areas 5, 6 and 7). Two work areas (5 and 6) will not be accessible to equipment until Area 7 is fully dewatered. Actions by work area are as follows:
1. In Area 7, the most downstream Work Zone, adjacent to the entrance Plaza:
a. Install water diversion system for Area 7 and maintain dewatered work zone.
b. Remove two segments of rock slope protection (RSP) from channel banks (Segments L1 and R1). Dispose of RSP as follows:
Reuse some RSP in two tie-backs on the left bank, per designs.
Off-haul excess RSP from Area 7 to Conlon stockpile site.
c. Grade channel bank. Dispose of soils as follows:
Off-haul excess soil from staging area to Conlon stockpile site or,
If Bid Option A is awarded, off-haul soil from staging area to landfill in lieu of hauling to Conlon stockpile site.
d. Grade channel bed and toes of banks.
e. Remove obsolete sewer line in left bank and dispose.
f. Install Large Woody Debris structures. Use both existing and imported logs, provided by NPS, and pin logs provided by NPS. Install Small Woody Debris posts, provided by NPS.
g. If Bid Option E is awarded, salvage, store and replant native plants.
2. In Area 6, upstream of Bridge 1:
a. Install a water diversion system for Area 6 and maintain dewatered work zone
b. Remove three segments of RSP from channel banks (Segments L2, R2/R2B and R3). Dispose of RSP through three actions:
Haul some RSP to Area 5 for reuse, as needed
Place some RSP as grade control in segment of removed trail
Bury excess RSP in channel, per designs, or
If Bid Option B is awarded, off-haul excess RSP to the staging area and then to the Conlon stockpile site in lieu of burying RSP in channel.
c. Grade right bank at one location, left bank ¿alcove¿ at one location.
d. Grade channel bed and toes of banks.
e. Remove segment of asphalt trail, including:
Remove base rock and asphalt and off-haul to recycling/landfill facility.
Remove wooden footbridge and dispose.
Place soil where void occurs after trail removal and grade per designs; haul soil from Area 5 for use.
f. Install Large Woody Debris structures, per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.
g. Salvage and replant a mature azalea on the right bank. Salvage a second azalea from left bank for replanting by NPS.
h. If Bid Option D is awarded, salvage, store and replant native plants in the award.
3. In Area 5, upstream of Bridge 2 and the most-upstream Work Zone:
a. Install a water diversion system for Area 5 and maintain dewatered work zone.
b. Remove one segment of RSP from right bank (Segment R6). Dispose of RSP as follows:
Bury RSP in left bank, per designs. Sequence work with intervening placement of large log in channel by Others.
c. Grade one segment of right bank. Dispose of soil as follows:
Haul to Area 6 for use in regrading void where asphalt was removed.
4. Grade channel bed and toes of banks per designs.
5. Install Large Woody Debris structures per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.
6. If Bid Option C is awarded, salvage, store and replant native plants in the award.
Place of Performance: Muir Woods National Monument, CA.
Competitive Acquisition: It is anticipated that this will be a competitive acquisition 100% set-aside for small business participation. Contract Type: Firm Fixed Price Construction Contract.
Period of Performance: The anticipated period of performance is (293) two hundred ninety-three days from the notice to proceed (NTP) date.
Release of the Solicitation: It is anticipated that the release of Solicitation No. 140P8623R0002 is anticipated to be released around January 28, 2023.
Magnitude: IAW FAR 36.204(f), the magnitude of construction is between $1,000,000 and $5,000,000.
Should there be any issues arising for this solicitation, the Contracting Officer will provide an update via https://www.sam.gov.
Update #1 ·
The purpose of this synopsis is to provide a notice to the public of information applicable to the U.S. National Park Service (NPS) Office of its requirement for salmon habitat enhancement at Muir Woods National Monument, CA.
Authority: NPS is issuing this synopsis in accordance with FAR Part 5.204 Pre-Solicitation Notice.
Description: This project is to conduct salmon habitat restoration actions in Redwood Creek at Muir Woods National Monument. The work requires use of heavy equipment within the channel, per drawings, to remove rock slope protection (RSP) from banks, grade some banks, install rock in tie-backs, install Large Woody Debris structures, and remove an asphalt trail. The work requires setting up three water diversion systems while meeting downstream flow and water quality requirements. The work entails slow and restricted access and many environmental protections for highly sensitive resources such as endangered salmon, understory vegetation, and redwood trees.
The Work occurs in three segments of the creek (Areas 5, 6 and 7). Two work areas (5 and 6) will not be accessible to equipment until Area 7 is fully dewatered. Actions by work area are as follows:
1. In Area 7, the most downstream Work Zone, adjacent to the entrance Plaza:
a. Install water diversion system for Area 7 and maintain dewatered work zone.
b. Remove two segments of rock slope protection (RSP) from channel banks (Segments L1 and R1). Dispose of RSP as follows:
Reuse some RSP in two tie-backs on the left bank, per designs.
Off-haul excess RSP from Area 7 to Conlon stockpile site.
c. Grade channel bank. Dispose of soils as follows:
Off-haul excess soil from staging area to Conlon stockpile site or,
If Bid Option A is awarded, off-haul soil from staging area to landfill in lieu of hauling to Conlon stockpile site.
d. Grade channel bed and toes of banks.
e. Remove obsolete sewer line in left bank and dispose.
f. Install Large Woody Debris structures. Use both existing and imported logs, provided by NPS, and pin logs provided by NPS. Install Small Woody Debris posts, provided by NPS.
g. If Bid Option E is awarded, salvage, store and replant native plants.
2. In Area 6, upstream of Bridge 1:
a. Install a water diversion system for Area 6 and maintain dewatered work zone
b. Remove three segments of RSP from channel banks (Segments L2, R2/R2B and R3). Dispose of RSP through three actions:
Haul some RSP to Area 5 for reuse, as needed
Place some RSP as grade control in segment of removed trail
Bury excess RSP in channel, per designs, or
If Bid Option B is awarded, off-haul excess RSP to the staging area and then to the Conlon stockpile site in lieu of burying RSP in channel.
c. Grade right bank at one location, left bank ¿alcove¿ at one location.
d. Grade channel bed and toes of banks.
e. Remove segment of asphalt trail, including:
Remove base rock and asphalt and off-haul to recycling/landfill facility.
Remove wooden footbridge and dispose.
Place soil where void occurs after trail removal and grade per designs; haul soil from Area 5 for use.
f. Install Large Woody Debris structures, per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.
g. Salvage and replant a mature azalea on the right bank. Salvage a second azalea from left bank for replanting by NPS.
h. If Bid Option D is awarded, salvage, store and replant native plants in the award.
3. In Area 5, upstream of Bridge 2 and the most-upstream Work Zone:
a. Install a water diversion system for Area 5 and maintain dewatered work zone.
b. Remove one segment of RSP from right bank (Segment R6). Dispose of RSP as follows:
Bury RSP in left bank, per designs. Sequence work with intervening placement of large log in channel by Others.
c. Grade one segment of right bank. Dispose of soil as follows:
Haul to Area 6 for use in regrading void where asphalt was removed.
4. Grade channel bed and toes of banks per designs.
5. Install Large Woody Debris structures per designs. Use existing logs. Install pin logs provided by NPS. Haul pin logs from Plaza staging area. Install Small Woody Debris posts, provided by NPS.
6. If Bid Option C is awarded, salvage, store and replant native plants in the award.
Place of Performance: Muir Woods National Monument, CA.
Competitive Acquisition: It is anticipated that this will be a competitive acquisition 100% set-aside for small business participation. Contract Type: Firm Fixed Price Construction Contract.
Period of Performance: The anticipated period of performance is (293) two hundred ninety-three days from the notice to proceed (NTP) date.
Release of the Solicitation: It is anticipated that the release of Solicitation No. 140P8623R0002 is anticipated to be released around January 28, 2023. Should there be any issues arising for this solicitation, the Contracting Officer will provide an update via https://www.sam.gov.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Salmon habitat enhancement, phase 2, muir woods NA | Award Notice | |
| Goga muwo construction contract- creek | Solicitation | |
| This notice | Pre-Solicitation | |
| Salmon habitat restoration goga NRA muwo | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CA-humboldt BAY NWR-tide gate repair | — | Total Small Business | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| MN fergus falls WMD prking rehab | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity