Attachment_4_-_Drawings.pdf
PDF 11 MB Posted
- Attached to
- GOGA MUWO CONSTRUCTION CONTRACT- CREEK
- Solicitation number
- 140P8623R0002
About this file
This solicitation is for a construction contract to perform salmon habitat enhancement work at Muir Woods National Monument in Marin County, California. The work includes installing three separate water diversion systems with channel work zones extending 400 to 450 linear feet each, totaling 3,100 linear feet of channel. Other efforts involve removing rock slope protection from banks, grading banks and the channel bed, and placing large woody debris structures. The contract also requires demolishing 460 linear feet of asphalt trail and a sewer line segment. The contractor must provide all labor, equipment, testing and supplies to complete the specified work following resource protection restrictions. The work must finish before late fall rains begin the salmon spawning season. The solicitation estimates the project value between $1,000,000 to $5,000,000. Interested offerors should access the full solicitation on SAM.gov and attend an optional site visit on March 10, 2023. Questions are due to the National Park Service contracting officer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SUB-SHEET DESCRIPTION
1 G1 TITLE SHEET (THIS SHEET)
2 G2 GENERAL NOTES AND BID OPTIONS
3 G3 SYMBOLOGY AND DEFINITIONS
4 G4 STOCKPILE AND STAGING AREAS
5 G5 ACCESS PLAN
6 G6 QUANTITIES
7 G7 QUANTITIES II
8 D1 DEMOLITION PLAN
9 C1 PLAN INDEX AND OVERVIEW
10 C2 SITE PLAN: AREA 7
11 C3 SITE PLAN: ACCESS TO AREAS 5 & 6
12 C4 SITE PLAN: AREA 6
13 C4B SITE PLAN: AREA 6 BID OPTION
14-15 C5-C6 SITE PLAN: ACCESS TO AREA 5
16 C7 SITE PLAN: AREA 5
17-19 C8-C10 LONGITUDINAL PROFILES
20-24 C11-C15 GRADING SECTIONS
25 C16 RSP TIE-BACK SECTIONS
26 C17 RSP BURIAL: AREA 6
27 C18 CHANNEL BED BACKFILL: AREA 6
28 C19 FABRIC PLACEMENT AND RSP REMOVAL DETAILS
29 W1 LWD SITE PLAN: AREA 7
30 W2 LWD SITE PLAN: AREA 6
31 W3 LWD SITE PLAN: AREA 5
32-36 W4-W8 LWD DETAILS: AREA 7
37-41 W9-W13 LWD DETAILS: AREA 6
42-44 W14-W16 LWD DETAILS: AREA 5
45 W17 SMALL WOOD AND PINNING DETAILS
SHEET INDEX
PARK BOUNDARY
LEGEND
PAVED ROAD
COUNTY LINE
TRAIL
CREEK
PARK HEADQUARTERS
RANGER STATION
INFORMATION CENTER
LIGHTHOUSE
PARKING
STATE PARK
ADJACENT NATIONAL PARK
ACCESS
FROM
STATE
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF PROJECT DRAWING NO.
PMIS/PKG NO.
OF
SHEET
SCALE OF MILES
10 0 10NORTHWESTERN
CALIFORNIA
SALMON HABITAT ENHANCEMENT, PHASE 2
MUIR WOODS
MARIN CALIFORNIA
RESTORATION
MUIR WOODS NATIONAL MONUMENT
PACIFIC WEST
180032
312237
100% DESIGNS 1/6/2023
THIS PROJECT
Engineering - Hydrology - Geomorphology - Water Resources
NTS
C ILIV
2/22/2023:
THESE PLANS HAVE BEEN REDLINED BY THE
ENGINEER OF RECORD TO REFLECT CHANGES IN
GRADING DUE TO CHANGES IN EXISTING SITE
CONDITIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAN FRANCISCO
AutoCAD SHX Text
FORT
AutoCAD SHX Text
FUNSTON
AutoCAD SHX Text
FORT
AutoCAD SHX Text
MASON
AutoCAD SHX Text
PRESIDO
AutoCAD SHX Text
ALCATRAZ
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
AutoCAD SHX Text
SAUSALITO
AutoCAD SHX Text
MUIR
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
STINSON
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
MUIR WOODS
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
TIBURON
AutoCAD SHX Text
MT. TAMALPAIS
AutoCAD SHX Text
STATE PARK
AutoCAD SHX Text
CAMINO
AutoCAD SHX Text
ALTO
AutoCAD SHX Text
ANGEL ISLAND
AutoCAD SHX Text
STATE PARK
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
CREST
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
SAN FRANCISCO
AutoCAD SHX Text
OAKLAND
AutoCAD SHX Text
BAY BRIDGE
AutoCAD SHX Text
RODEO
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
BAKER BEACH
AutoCAD SHX Text
CLIFF HOUSE
AutoCAD SHX Text
FORT POINT
AutoCAD SHX Text N.H.S.
AutoCAD SHX Text
PACIFIC
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
TO
AutoCAD SHX Text
OAKLAND
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(TOLL)
AutoCAD SHX Text
POINT
AutoCAD SHX Text
BONITA
AutoCAD SHX Text
SAN FRANCISCO BAY
AutoCAD SHX Text
GOLDEN GATE
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
(TOLL)
AutoCAD SHX Text
SAN FRANCISCO CO.
AutoCAD SHX Text
SAN MATEO CO.
AutoCAD SHX Text
MARION CO.
AutoCAD SHX Text
SAN FRANCISCO CO.
AutoCAD SHX Text
ALAMEDA CO.
AutoCAD SHX Text
SAN FRANCISCO CO.
AutoCAD SHX Text
TO
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
SAN FRANCISCO
AutoCAD SHX Text
TO
AutoCAD SHX Text
PACIFICA & SWEENEY
AutoCAD SHX Text
RIDGE AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TOMALES
AutoCAD SHX Text
PETALUMA
AutoCAD SHX Text
NOVATO
AutoCAD SHX Text
NAPA
AutoCAD SHX Text
FAIRFIELD
AutoCAD SHX Text
VALLEJO
AutoCAD SHX Text
CONCORD
AutoCAD SHX Text
WALNUT
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
HAYWARD
AutoCAD SHX Text
OAKLAND
AutoCAD SHX Text
BERKELEY
AutoCAD SHX Text
SAN RAFAEL
AutoCAD SHX Text
SAN
AutoCAD SHX Text
MATEO
AutoCAD SHX Text
PALO
AutoCAD SHX Text
ALTO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
FRANCISCO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
PABLO
AutoCAD SHX Text
BAY
AutoCAD SHX Text
PACIFIC
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text
MUIR WOODS
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
POINT
AutoCAD SHX Text
REYES
AutoCAD SHX Text N.S.
AutoCAD SHX Text
SWEENEY
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
MUIR WOODS NATIONAL MONUMENT
AutoCAD SHX Text
PO BOX 2515 MCKINLEYVILLE, CA 95519
AutoCAD SHX Text No. 50713
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
GENERAL NOTES AND BID OPTIONS
180032
2 45
JKA, BSP, JRP
JRP, THB
JKA
01/06/2023
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G2
GENERAL NOTES:
1. THE LANDOWNER IS NATIONAL PARK SERVICE. LANDOWNER CONTACT
INFORMATION
CAROLYN SHOULDERS, PROJECT MANAGER
GOLDEN GATE PARK RECREATION AREA
FORT MASON, BLG. 201
SAN FRANCISCO, CA 94123
PHONE: (415) 289-1841
2. PROJECT ENGINEER INFORMATION
JEFFREY K ANDERSON
NORTHERN HYDROLOGY AND ENGINEERING
PO BOX 2515
MCKINLEYVILLE, CA 95519
707-839-2195
3. ALL WORK SHALL COMPLY WITH THESE PLANS, SPECIFICATIONS, AND
NOTES.
4. THE PROJECT ENGINEER RESPONSIBLE FOR PREPARATION OF THESE
PLANS AND SPECIFICATIONS WILL NOT BE RESPONSIBLE FOR, OR LIABLE
FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL
CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED
BY THE PROJECT ENGINEER RESPONSIBLE FOR PREPARATION OF THESE
PLANS.
5. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER
RELATIVE THERETO IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON
THESE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT A
REQUEST FOR INFORMATION TO NPS FOR ADDITIONAL INFORMATION
BEFORE CONDUCTING WORK ON THAT PORTION OF THE PROJECT.
6. ALL REVISIONS TO THESE PLANS MUST BE MADE BY THE PROJECT
ENGINEER RESPONSIBLE FOR THE PLAN PREPARATION, AND SHALL
ACCURATELY BE SHOWN ON REVISED PLANS.
7. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT
(USA) (1-800-642-2444) SEVEN (7) CALENDAR DAYS PRIOR TO THE START OF
EACH GROUND DISTURBING PHASE AND SHALL BE RESPONSIBLE FOR
MAINTAINING A VALID USA LOCATION TAG THROUGH RENEWAL DURING
THE CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE A UTILITY FIELD MEETING AT WHICH TIME THE
CONTRACTOR SHALL EXPLAIN THE LIMITS AND IMPACTS OF WORK THAT
MAY AFFECT USA MEMBER UTILITIES.
8. THE MAJORITY OF THE UTILITIES WITHIN MUIR WOODS MONUMENT ARE
OWNED BY NPS. AS SUCH, VERY FEW UTILITIES WILL BE MARKED OUT BY
USA. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD LOCATE & MARK
ALL UTILITIES WITHIN THE PROJECT WORK AREA. FIELD LOCATION AND
MARKING SHALL BE PERFORMED PRIOR TO GROUND DISTURBANCE;
NOTIFY COR UPON COMPLETION OF FIELD LOCATION AND MARKING FOR
COR REVIEW AND APPROVAL.
9. CONDUCT ALL WORK WITHIN THE PERMISSIBLE WORK PERIOD IN
SPECIFICATION SECTION 011100. CONDUCT ALL WORK FOLLOWING AN
APPROVED DEWATERING AND WATER DIVERSION PLAN.
10. THE PROJECT IS LOCATED WITHIN AN OPERATING NATIONAL PARK. THE
PARK WILL REMAIN OPEN TO VISITORS 7 DAYS PER WEEK DURING THE
CONSTRUCTION PERIOD. THE CONTRACTOR MAY PROPOSE INTERMITTENT
TRAIL CLOSURES, BUT ALL TRAIL CLOSURES MUST BE APPROVED BY NPS.
TRAILS SHALL REMAIN OPEN TO THE PUBLIC TO THE EXTENT POSSIBLE.
11. ACCESS TO THE SITE, STAGING, AND STOCKPILE AREAS ARE HIGHLY
RESTRICTED.
12. NUMEROUS HISTORIC FEATURES OCCUR AT MUIR WOODS, INCLUDING
TRAILS, WOODEN FOOTBRIDGES ON THE MAIN TRAIL, AND MANY OTHERS,
AND NEITHER ACCESS NOR ACTIONS SHALL BE TAKEN EXCEPT WHERE
SHOWN, UNLESS OTHERWISE SPECIFICALLY APPROVED BY THE CO.
13. PROTECT EXISTING LOG CHECK DAMS AND ROCK GRADE CONTROL
STRUCTURES WHEREVER THEY OCCUR.
14. IF ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN
THE VICINITY SHALL BE HALTED, AND CONTRACTING OFFICER SHALL BE
NOTIFIED IMMEDIATELY.
15. THE CONTRACTOR SHALL USE ONLY DESIGNATED SPECIFIC SITES FOR
STORAGE OF EQUIPMENT AND MATERIALS AS SHOWN ON THESE PLANS
AND SPECIFICATIONS.
16. LINE AND GRADE: THE LAYOUT CONTROL, DIMENSIONS AND CONTOURS
SHOWN ARE INTENDED TO PROVIDE THE CONTRACTOR SUFFICIENT
INFORMATION TO LAYOUT AND PERFORM INITIAL STAKING OF THE
PROJECT. THE STAKES SHALL BE REVIEWED AND ADJUSTED WITH THE
CONTRACTING OFFICER PRIOR TO ANY GRADING. ADJUSTMENTS TO THE
GRADING WILL BE REQUIRED AS DIRECTED BY THE CONTRACTING
OFFICER TO ACHIEVE A FUNCTIONAL, RESTORED CREEK. CAD FILES WILL
BE MADE AVAILABLE FOR THE CONTRACTOR'S CONVENIENCE. IN THE
EVENT OF A CONFLICT, THE HARD COPY DRAWINGS SHALL GOVERN.
17. PLAN FEATURES ARE LABELLED ACCORDING TO THEIR CHANNEL
STATION. CHANNEL STATIONS ARE SHOWN IN UNITS OF FEET. FOR
EXAMPLE, CHANNEL STATION 30+00 IS 100 FEET UPSTREAM OF CHANNEL
STATION 29+00. CHANNEL STATION 35+37 IS 37 FEET UPSTREAM OF
CHANNEL STATION 35+00.
18. THE INTENT OF THE PROJECT EARTHWORK IS TO REUSE ALL MATERIAL
ON-SITE INCLUDING, BUT NOT LIMITED TO, SOIL, BED MATERIAL, AND
WOODY DEBRIS. ONLY THOSE MATERIALS SPECIFICALLY DESIGNATED
FOR OFF-SITE DISPOSAL SHOULD BE REMOVED FROM THE SITE.
19. COPIES OF ALL ENVIRONMENTAL PERMITS WILL BE PROVIDED TO THE
CONTRACTOR, AND MUST BE KEPT ON-SITE AT ALL TIMES DURING
CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN AT HIS/HER OWN
EXPENSE ALL PERMITS, LICENSES, INSURANCE POLICIES, ETC., NOT
ALREADY OBTAINED AS MAY BE NECESSARY TO COMPLY WITH STATE
AND LOCAL LAWS ASSOCIATED WITH THE PERFORMANCE OF THE WORK.
CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMITS.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF ALL
EQUIPMENT AND MATERIALS.
21. HEAVY EQUIPMENT IS PERMITTED FOR USE IN THE CHANNEL. ALL
EQUIPMENT USE SHALL FOLLOW AN APPROVED ACCESS PLAN.
22. METHODS OF PROTECTING THE CREEK, BANKS AND TERRESTRIAL AREAS
SHALL FOLLOW AN APPROVED ACCESS PLAN TO BE SUBMITTED BY
CONTRACTOR FOR NPS REVIEW AND APPROVAL.
23. ALL WORK REQUIRES SPECIFIED PROTECTIONS FOR WATER RESOURCES,
THE CHANNEL BED, ENDANGERED SPECIES, NOISE, AND VEGETATION, PER
SPECIFICATION SECTION 014500.
CONTRACT LINE ITEMS AND BID OPTIONS
C ILIV
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SYMBOLOGY AND DEFINITIONS
180032
3 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G3
<E> EXISTING
<P> PROPOSED
A ALDER
B BAY
BTTM BOTTOM
CHNL CHANNEL
CH### LOG SOURCED FROM THE CHANNEL
COR CONTRACTING OFFICER'S REPRESENTATIVE
CP CONTROL POINT
CP# CONTACT POSITION #
CLIN CONTRACT LINE ITEM NO.
CSP CALIFORNIA STATE PARK
CY CUBIC YARDS
DG DESIGN GRADE
DIA DIAMETER
DS DOWNSTREAM
EG EXISTING GRADE
ELEV ELEVATION
FT, ' FOOT
GS GROUND SURFACE
H HAZELNUT
H HORIZONTAL
I-## IMPORTED LOG
L# RSP SECTION ALONG LEFT BANK
L### LOG SOURCED FROM LEFT BANK
LWD LARGE WOODY DEBRIS
M MAPLE
MAX MAXIMUM
MIN MINIMUM
N NORTH
NA NOT APPLICABLE
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
P POOL
R REDWOOD
R# RSP SECTION ALONG RIGHT BANK
R### LOG SOURCED FROM RIGHT BANK
REF REFERENCE
RSP ROCK SLOPE PROTECTION
SF SQUARE FOOT
SPECS SPECIFICATIONS
STA STATION
SWD SMALL WOODY DEBRIS
TH THIMBLEBERRY
TO TAN OAK
TYP TYPICAL
US UPSTREAM
V VERTICAL
XS CROSS-SECTION
GENERAL ABBREVIATIONS
SHEET NUMBER WHERE
SECTION/DETAIL IS
DRAWN OR TAKEN
LETTER INDICATES SECTION OR
DETAIL, NUMBER INDICATES
SECTION OR DETAIL NUMBER
A#
FR/TO
XS1 = CHANNEL CROSS SECTION 1
D1 = DETAIL 1
RSP-A##-##+##
NAME LEGEND
CROSS-REFERENCE LEGEND
RSP STATION
NAME OF RSP, LETTER "L"OR "R"
INDICATES RSP EXISTS ON LEFT BANK
OR RIGHT BANK, RESPECTIVELY.
ROCK SLOPE
PROTECTION
MATERIAL DEFINITIONS
TREE
DESIGN LOG
BOARDWALK
LARGE WOOD
BOULDER
MAJOR CONTOUR [5 FT]
CONTROL POINT
RSP REMOVAL EXTENT (PLAN VIEW)
PROJECT "CREEK" ALIGNMENT
GRADING BOUNDARY
PLACED RSP
DESIGN ELEMENTS
ROCK GRADE CONTROL
EXISTING ELEMENTS
MINOR CONTOUR [1 FT]
WOOD GRADE CONTROL
DESIGN ALIGNMENT
WOODEN FENCE
SPOT ELEVATION
GRADING AREA (OVERVIEW)
SYMBOLOGY
UNDISTURBED CHANNEL BED MATERIAL
ROADS
TRAIL
BUILDING OUTLINE
ROCK CHECK DAM
PINNING LOGS
SWD POST PLACEMENT (OVERVIEW)
ESTIMATED DEPTH OF RSP
FABRIC TYPE 2 (DETAIL)
FABRIC TYPE 1 (DETAIL)EXISTING GROUND
RSP TO BE REMOVED (OVERVIEW)
BRIDGE
DESIGN GROUND
BACKING ROCK
RSP (OVERVIEW)
RIPARIAN AREA (BY OTHERS)
BACKFILLED CHANNEL BED MATERIAL
EQUIPMENT ACCESS (PLAN VIEW)
SEWER LINE
PROPERTY BOUNDARY
RELOCATED OR REUSED VEGETATION
FLOW STREAM FLOW DIRECTION
MAJOR CONTOUR [5 FT]
MINOR CONTOUR [1 FT]
EXISTING LARGE WOOD USED IN DESIGN
PHONE CABLE IN PIPE
PROFILES AND SECTIONS
PLAN VIEW/OVERVIEW
PROFILES AND SECTIONS
PLAN VIEW/OVERVIEW
RSP TO REMAIN (PLAN VIEW)
PLACED RSP
BACKFILLED SOIL
C ILIV
PANORAMIC HWY
M
UIR
W
OODS R
D
HWY 1
DEER PARK FIRE RD
Redwood Creek
FR
AN
K
VA
LL
EY
R D
ALICE EASTWOOD RD
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
STOCKPILE & STAGING AREAS
180032
4 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G4
1000 0 1000 2000
SCALE OF FEET
OVERVIEW MAP
Redwood Creek
<E> BATHROOM
ENTRANCE
PLAZA
<E> SEWER LINE
<E> FLAG POLE
VISITOR
CENTER
M U
IR
W
O O
D S N
A
TIO
N A
L M O
N U
M
EN
T M
O U
N
T TA
M A
LPA
IS STA
TE PA
R
K
PA
R C
EL N
O
. 02-106
N
PS LA
W
EN
FO
R
C
EM
EN
T A
N D
M A
N A
G
EM
EN
T A
R
EA
WATERSHED
MODEL
<E> MEDIAN (APPROX.
ALIGNMENT)
<P> TEMP.
FENCING
<P> CONSTRUCTION
ACCESS
<P> CONSTRUCTION ACCESS
TO AREAS 5 AND 6 TBD
BASED ON SITE CONDITIONS
WITH NPS APPROVAL
<P> STAGING
AREA
<E> SIDEWALK
30 0 30 60
SCALE OF FEET
AREA OF DETAIL: STAGING AT AREA 7
TEMPORARY USE OF PARKING SPACES RESTRICTED TO IMPORTING LOGS. SCHEDULE SPECIFIC USE DATES IN ADVANCE FOR APPROVAL BY NPS.
<P> GATE 2: USE BEFORE VISITING HOURS FOR MOBILIZATION/DEMOBILIZATION AND LARGE LOADS. VISITORS ACCESS RESTROOMS THROUGH
THIS ROUTE.
TEMPORARILY REMOVE FROM PLAZA AND VISITOR PATHWAY: 6 BACKLESS BENCHES, 4 BACKED BOLTED BENCHES, AND TRASH CANS.
RELOCATE WITH NPS COORDINATION: 8-10 BACKLESS BENCHES AND TRASH CANS TO VISITOR USE AREAS (SEE NOTE 2). STORE OTHERS AT PHOTO CORNER ON ADMIN RD (SHEET G5). REPLACE ALL TO ORIGINAL LOCATIONS AFTER CONSTRUCTION.
TEMPORARY PLACEMENT LOCATION FOR BACKLESS BENCHES.
REMOVE ALL <E> 6" X 6" WHEEL STOPS AND USE TEMPORARILY FOR CONTRACTOR ACCESS NEEDS OR DISCARD. RETAIN EXISTING PATHWAY THROUGH MEDIANS. RELOCATE <E> SPLIT RAIL FENCE TO ALIGNMENT OF NORTH WHEEL STOP. INSTALL FENCE POSTS IN GROUND SECURELY TO REMAIN IN PLACE AFTER WORK IS COMPLETED; CONCRETE FOOTINGS NOT LIKELY TO BE NEEDED.
KEY
<P> GATE 1: TWO-DOORED GATE THAT SWINGS OUT TO BLOCK PEDESTRIAN PATHWAY BRIEFLY. TO BE USED AS THE PRIMARY GATE.
<E> ADA PARKING
<P> GATE 3: CONTRACTOR ACCESS FOR IMPORT OF LWD. NPS WILL USE THIS GATE TO MAINTAIN BATHROOMS. ALLOW INTERMITTENT ACCESS
FOR RESTROOM CUSTODIANS.
GRADING
BOUNDARY
PROTECT OR TEMPORARILY REMOVE SPLIT RAIL FENCE ON CREEK SIDE OF STAGING AREA AS NEEDED; REPLACE AFTER WORK.
GENERAL STAGING AND STOCKPILING NOTES:
1. THE CONTRACTOR SHALL SET UP STAGING AT AREA 7 TO CLEARLY DEFINE AND ACCOMMODATE VISITOR ACCESS THROUGH THE ENTRANCE PLAZA. THE CONTRACTOR SHALL EMPLOY SAFETY MEASURES WHEN VEHICLES CROSS VISITOR USE AREAS.
2. MINIMIZE STAGING AREA AND MAXIMIZE VISITOR USE AREA WHERE POSSIBLE.
3. VEGETATED AREA NEXT TO STAGING AREA MAY NOT BE USED FOR WORKER FOOT TRAFFIC. USE DEFINED ACCESS ROUTES.
AVOID VEGETATED AREAS OR PLACE ORANGE FENCE TO ENSURE WORKERS AVOID IT.
INSTALL SCREENED CHAIN LINK FENCE TO CREATE A VISITOR PATH A MIN. OF 15’ WIDE BETWEEN THE RELOCATED SPLIT RAIL FENCE AND
CHAIN LINK FENCE.
AREA OF DETAIL: CONLON STOCKPILE AREA
30 0 30 60
SCALE OF FEET
ACCESS
BETWEEN
STOCKPILES
<E> PARKING LOT
TO CONLON AVE
TO MUIR
BEACH
NPS PROPERTY
(EAST SIDE OF
PANORAMIC HWY)
TO MILL
VALLEY &
HWY 101
CONLON LOT
STOCKPILE
AREA
AREA OF
DETAIL
STAGING
AT AREA 7
NPS LAW
ENFORCEMENT
AND
MANAGEMENT
AREA
MUIR WOODS
ENTRANCE
MUIR WOODS NATIONAL
MONUMENT BOUNDARY
<E> PP (APPROX)
TURN-OUTS ALONG EAST SIDE OF PANORAMIC
HWY BETWEEN HWY 1 AND ALICE EASTWOOD
RD AVAILABLE FOR MATERIAL TRANSFERS AS
DETERMINED UNDER ENCROACHMENT PERMIT
TO BE OBTAINED FROM MARIN COUNTY BY
CONTRACTOR
EXTENT OF
RIPRAP
REMOVAL
PROJECT REACH
DOUG FIR
REMOVAL
15 FT MIN.
8.5 FT 5 FT
8.5 FT
8.5 FT14 FT
36 FT111 FT
46 FT
10 FT MIN.
C ILIV
REVISION:
SHADED AREA
REMOVED FROM
DESIGN
CATHEDRAL GROVE
BOHEMIAN GROVE
MUIR WOODS
VISITOR CENTER RESTROOMS
HILLSIDE TRAIL
BRIDGE 3
BRIDGE 1.5
BRIDGE 1
15+00
20+00 25+00
30+0035+00
40+00
45+00
50+00
BRIDGE 2 MUIR WOODS RD
FRANK VALLEY RD
MOUNT TALMAPAIS STATE PARK
MUIR WOODS NATIONAL MONUMENT
WATER MAIN
SHUT OFF VALVE
(APPROX.)
ADMIN RD
CANOPY VIEW TRAIL
EAST. MAIN TRAIL
W
EST M
AIN TRAIL
"PHOTO CORNER"
STORE BENCHES
HERE (SEE SHEET G4)
EXISTING ROCK CHECK
DAM (CASCADE)
100 0 100
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
ACCESS PLAN
180032
5 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G5
GENERAL NOTES:
1. EQUIPMENT ACCESS IS STRICTLY LIMITED TO THE ROUTES SHOWN AND ARE PROHIBITED FROM
BOARDWALKS. EQUIPMENT MAY NOT DRIVE, OPERATE , OR STAGE ON GROUND SURFACE AREAS
EXCEPT ON THOSE SHOWN, WITH MINOR EXCEPTIONS AFTER REVIEW AND APPROVAL FROM NPS.
2. WORK SHALL BE CONDUCTED WITH EQUIPMENT SUITABLE FOR 8.5 FT WIDE ACCESS ROUTES.
3. CONTRACTOR SHALL COORDINATE WITH NPS FOR TEMPORARY TRAIL CLOSURES, AS SHOWN. NPS
WILL NOT CLOSE TRAIL SEGMENTS ON BOTH SIDES OF THE CREEK AT THE SAME TIME. ACCESS 4 IS THE ONLY TRAIL THAT MAY BE CLOSED IF WORK IS NOT CURRENTLY UNDERWAY. ALL OTHER ACCESS
ROUTES MUST REMAIN OPEN UNLESS CURRENTLY IN USE.
4. ACCESS 5 AND 8 ON WEST AND EAST MAIN TRAIL, RESP., SHALL NOT BE CLOSED AT THE SAME TIME.
5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING APPROVED TRAIL CLOSURES TO PREVENT VISITOR
ACCESS TO WORK ZONES.
6. PROTECT ALL ASPHALT ON TRAILS DURING USE, EXCEPT WHERE ASPHALT WILL BE REMOVED.
7. ALL FOOT TRAFFIC SHALL REMAIN WITHIN BOUNDARIES AT ACCESS ROUTES AND SHALL NOT USE
SHORT-CUTS THROUGH VEGETATION. TEMPORARY FENCING SHALL BE PLACED ALONG BOUNDARIES
OF ACCESS ROUTES THROUGH VEGETATED AREAS.
8. BRIDGE 1.5 IS NOT SUITABLE FOR HEAVY EQUIPMENT. REMOVE PRIOR TO HAULING. INSTALL
TEMPORARY CROSSING, AS NEEDED.
FLOW
INSTALL TRAIL CLOSURE FENCE WHEN ACCESS 8 ON EAST MAIN TRAIL IS IN USE. KEEP EAST
MAIN TRAIL OPEN TO VISITORS BY LIMITING PERIOD OF USE AND ALWAYS WHEN ACCESS 5
TRAIL ON WEST MAIN TRAIL IS CLOSED.
ALL FOOT TRAFFIC ON FLOODPLAIN IS LIMITED TO FENCED AREA ALONG ACCESS 2.
KEY
TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS.
REMOVE BOARDWALK RAMP FOR EQUIPMENT ACCESS TO ASPHALT TRAIL IN WORK ZONE;
PROTECT AND REPLACE.
LIMIT OF EQUIPMENT ACCESS ON TRAIL; TOO NARROW UPSTREAM OF THIS POINT.
PROTECT ASPHALT ON PAVED TRAILS (TYP). REPAIR DAMAGE.
VISITOR ACCESS TO HILLSIDE TRAIL SHALL ALWAYS REMAIN OPEN. CONTRACTOR
SHALL BRIEFLY PAUSE VISITOR TRAFFIC TO HILLSIDE TRAIL AS NEEDED TO
PROTECT VISITORS.
PLACE TRAIL CLOSURE FENCE WHEN AREA 6 IS IN USE. OPEN ONLY FOR CONTRACTOR USE.
PROHIBIT VISITOR ACCESS UNTIL AREA 6 IS COMPLETE AND BOARDWALK RAMP IS
REPLACED.
INSTALL TRAIL CLOSURE FENCE ON MAIN TRAIL WHEN ACCESS 5 TO AREA 5 IS USED. LEAVE
OPEN FOR VISITOR ACCESS DURING WORK TO THE EXTENT POSSIBLE AND ALWAYS WHEN
ACCESS 8 TRAIL ON EAST MAIN TRAIL IS CLOSED.
ACCESS 9 ACROSS
FLOODPLAIN FENCED
MAX. 3 FT WIDE FOOTPATH
TO PUMP AND DIVERSION
APPROX. UPSTREAM
EXTENT OF DEWATERING
(STA 46+85)
RAMP 5
LEFT BANK
(STA 45+35)
RAMP 4
RIGHT BANK
(STA 44+60)
ACCESS 7 IN CHANNEL
(STA 43+20 TO STA 46+85)
ACCESS 8 SHORT-TERM
WORK AREA ON TRAIL
(STA 43+20 TO STA 46+85)
APPROX. DOWNSTREAM
EXTENT OF DEWATERING
(STA 43+20)
ACCESS 6 AND STAGING AREA 3
ACROSS FLOODPLAIN MAX 8.5 FT
(STA 40+80 TO STA 45+80)
ACCESS 5 ON WEST MAIN TRAIL
UPSTREAM OF BRIDGE 2, AS
SHOWN
APPROX. UPSTREAM
EXTENT OF
DEWATERING
(STA 34+10)
ACCESS 4
IN CHANNEL
(STA 30+60 TO
STA 34+10)
ACCESS 4 AND STAGING AREA 2 ON WEST MAIN TRAIL
BETWEEN BRIDGE 1 AND BRIDGE 2, AS SHOWN,
INCLUDING SEGMENT OF ASPHALT TRAIL REMOVAL AREA
RAMP 3
RIGHT BANK
(STA 31+75)
APPROX. DOWNSTREAM
EXTENT OF DEWATERING
(STA 30+60)
10 11
EQUIPMENT PROHIBITED ON BOARDWALK.
PROTECT PIPE STEM.
ACCESS 2 ACROSS FLOODPLAIN MAX. 8.5 FT
WIDE FENCED FROM CHANNEL TO TRAIL
(STA 23+65 STA 28+70)
APPROX. UPSTREAM
DEWATERING EXTENT
(STA 25+05)
RAMP 2
RIGHT BANK
(STA 23+65)
STAGING AREA 1
(SEE SHEET G4 FOR
DETAIL)
APPROX. DOWNSTREAM
DEWATERING EXTENT
(STA 21+25)
RAMP 1
LEFT BANK
(STA 22+75)
ACCESS 1 IN CHANNEL
(STA 21+40 TO STA 25+05)
ACCESS 3 SPUR
ACROSS FLOODPLAIN
LEFT BANK
AREA 7 GRADING
BOUNDARY
FLOW
PROPERTY
BOUNDARY (TYP.)
AREA 6
GRADING
BOUNDARY
ROUTE EQUIPMENT THROUGH VEGETATED AREA AROUND UPSTREAM END OF
BOARDWALK. PLACE BARRIER ACROSS BOARDWALK RAMP.
AREA 5
GRADING
BOUNDARY
C ILIV
REVISION:
SHADED AREA
REMOVED FROM
DESIGN
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
QUANTITIES I
180032
6 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G6
TABLE 2. RSP VOLUMESTABLE 1. RSP DIMENSIONS
NOTES ON ASPHALT AND BASE ROCK VOLUME ESTIMATES:
· AREA 2: VOLUME OF ASPHALT AND BASE ROCK WAS ESTIMATED BASED ON STRATIGRAPHY
OBSERVED IN PITS THAT WERE DUG ADJACENT TO THE TRAIL. EXTENT OF BASE ROCK MAY BE WIDER
THAN ASPHALT. ACTUAL DIMENSIONS ALONG THE LENGTH OF THE TRAIL MAY VARY.
TABLE 3. ASPHALT AND TRAIL BASE ROCK VOLUMES
NOTE: NA = NOT APPLICABLE
NOTES ON METHODS FOR RSP VOLUME ESTIMATES (SEE ALSO: RSP DIMENSIONS TABLE, THIS SHEET):
· RSP L1 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO TWO SECTIONS: 1) A DOWNSTREAM ~65 FT LONG SECTION OF EMBEDDED ~1 FT DIA ROCK AND 2) AN UPSTREAM ~45 FT LONG SECTION ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING.
THE TOE OF THE UPSTREAM SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE RSP IN L1 IS ASSUMED TO BE EMBEDDED BELOW THE CHANNEL BED.
· RSP R1 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF WELL-EMBEDDED ~2 FT DIA ROCK. THE TOE OF THE RSP WAS COVERED IN A GRAVEL BAR DURING OBSERVATION, WHICH WAS NOT EXCAVATED OR EXPLORED TO
COFIRM DEPTH OF RSP. TWO LOCATIONS WERE PROBED BEHIND LAYER 1 AND NO SECOND LAYER WAS OBSERVED.
· R2 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING. THE TOE OF THE R2 SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE RSP IN R2 IS
ASSUMED TO BE EMBEDDED BELOW THE CHANNEL.
· RSP R2B: LAYER 1 ROCK IS ESTIMATED TO BE A SINGLE ~40 FT LONG SECTION CONSISTING OF A SINGLE LAYER OF ~1.5 FT DIA ROCK, ORIGINATING FROM THE NORTH END OF BRIDGE 1.5 AND EXTENDING INTO THE UPSTREAM CHANNEL BANK.
· RSP L2: LAYER 1 ROCK WAS DIVIDED INTO FOUR SECTIONS: 1) AN UPSTREAM ~40 FT LONG SECTION OF WELL-EMBEDDED ~1 FT DIA ROCK, 2) A ~55 FT LONG SECTION OF ~2 FT DIA ROCK, INCLUDING A ~10 FT LENGTH OF LAUNCHED BOULDERS, 3) A FAILED ~15 FT LONG
SECTION OF ~1 FT DIA (REMAINING) ROCK THAT LAUNCHED BOULDERS INTO THE CHANNEL, AND 4) A DOWNSTREAM ~20 FT LONG SECTION OF EMBEDDED ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING.
· RSP R3 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH A ~10 FT LONG FAILURE, 2) A ~40 FT LONG SECTION OF ~1.5 FT DIA ROCK, WITH LAUNCHED ROCK ALONG THE TOE
OF THE BANK 3) ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH BOULDERS LAUNCHED IN THE CHANNEL. A SECOND LAYER WAS OBSERVED BY PROBING.
· RSP R6: LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~60 FT LONG SECTION OF WELL-EMBEDDED ~2 FT DIA ROCK, 2) A FAILED 20 FT LONG SECTION AND 3) A DOWNSTREAM ~50 FT LONG SECTION OF LOOSE ~2.5 FT DIA ROCK. LAYER 2 VOLUME
ASSUMES A SOLID 0.5 FT LAYER BEHIND THE DOWNSTREAM 75 FT OF LAYER 1. LAYER 2 ASSUMPTION IS BASED ON OBSERVATIONS OF 0.5 FT ROCK EMBEDDED IN THE BANK AT FAILURE LOCATIONS, THOUGH A SOLID LAYER WAS NOT OBSERVED AND 0.5 FT ROCK COULD BE CHINK MATERIAL, NOT A SECOND LAYER. PROBING 6 LOCATIONS (TO 1.5' DEPTH) BEHIND THE ROCK WAS NON-CONCLUSIVE. SUBSURFACE ROCK ESTIMATE ASSUMES SUBSURFACE ROCK ALONG THE DOWNSTREAM ~50 FT SECTION OF RSP ONLY (WHERE EMBEDDED
ROCK WAS OBSERVED IN CHANNEL BED).
GENERAL NOTES ON RSP VOLUMES:
· VOLUMES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY; CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL VOLUMES.
· ESTIMATED VOLUMES REPRESENT CURRENT RSP PLACEMENT ON THE BANKS, WHICH IS TIGHTLY INTERLOCKED WITH MINIMAL VOID SPACE. RSP VOLUME ESTIMATES WERE COMPUTED BY MULTIPLYING THE LENGTH, THICKNESS, AND SLOPE LENGTH (SEE RSP
DIMENSIONS TABLE, THIS SHEET).
· RSP SECTION LENGTH AND SLOPE LENGTH WERE SURVEYED AND SECTION THICKNESS WAS ESTIMATED BY PROBING 1.5 FT BELOW GROUND SURFACE ALONG THE TOP OF BANK BEHIND RSP SECTIONS.
· IT IS NOT KNOWN HOW FAR RSP SECTIONS EXTEND BELOW THE CHANNEL BED OR BANK. EXPLORATORY EXCAVATION SHALL BE CONDUCTED AT THE TOES OF ALL RSP SEGMENTS TO IDENTIFY POSSIBLE PRESENCE OF BURIED RSP. ALL SUBSURFACE ROCK SHALL BE
REMOVED AS PART OF THIS WORK, UNLESS THE TOP OF THE SUBSURFACE ROCK IS BELOW THE ELEVATIONS SPECIFIED IN THESE DRAWINGS. HISTORICAL PHOTOS DO NOT SHOW TRENCHING THAT WOULD INDICATE SUBSURFACE ROCK OR THAT RSP WAS CONSTRUCTED
WITH MORE LAYERS ON THE BANK THAN CURRENTLY VISIBLE.
C ILIV
SHEET NAME
CUT
VOLUME
(CY)
FILL
VOLUME
(CY)
C2 AREA 7 CHANNEL BED GRADING 150 150
C2 AREA 7 CHANNEL BED GRADING 93 123
C4 AREA 6 RSP BURIAL 188 56
C4 AREA 6 CHANNEL BED GRADING 108 240
C4B AREA 6 CHANNEL BED GRADING (BID OPTION B) 132 132
C7 AREA 5 CHANNEL BED GRADING 28 28
CHANNEL BED VOLUME TOTAL 474 474
CHANNEL BED VOLUME TOTAL 417 447
BID
OPTION SHEET BANK
CREEK
STATION (FT)
ARALIA
CALIFORNICA
(ELK CLOVER)
ATHYRIUM
FELIX-FEMINA
(LADY FERN)
WOODWARDIA
FIMBRIATA
(CHAIN FERN)
CAREX SP.
(SEDGE)
POLYSTICHUM
MUNITUM
(SWORD FERN)
RHODODENDRON
OCCIDENTALE
(WESTERN
AZALEA)
TOTAL
E
C2 LEFT 22+00 TO 23+00 18 28 0 0 3 0 49
C2 LEFT 22+00 TO 23+00 0 0 0 0 0 0 0
C2 LEFT 23+30 TO 24+40 1 8 0 5 22 0 36
C2 RIGHT 24+20 TO 24+80 1 28 1 5 16 0 51
AREA 7 SUBTOTAL 20 64 1 10 41 0 136
AREA 7 SUBTOTAL 2 36 1 10 38 0 87
D
C4 RIGHT 30+60 TO 33+60 0 60 3 18 40 1 122
C4 LEFT 31+30 TO 32+60 15 35 5 13 42 1 111
AREA 6 SUBTOTAL 15 95 8 31 82 2 233
C
C7 LEFT 44+40 TO 45+20 2 18 0 0 10 0 30
C7 RIGHT 43+50 TO 45+00 4 24 5 13 42 0 88
AREA 5 SUBTOTAL 6 42 5 13 52 0 118
PROJECT TOTALS 41 201 14 54 175 2 487
PROJECT TOTALS 23 173 14 54 172 2 438
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
QUANTITIES II
180032
7 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237G7
TABLE 5. ESTIMATED SOIL VOLUMES FOR BANK GRADING AFTER RSP REMOVAL
TABLE 4. ESTIMATED RSP BURIAL, RE-USE AND STOCKPILING VOLUMES
1. SOIL VOLUMES WERE ESTIMATED BY DIFFERENCING THE EXISTING AND DESIGN SURFACES UTILIZING AUTOCAD CIVIL3D, THEN SUBTRACTING THE ROCK VOLUME ESTIMATE TO REMOVE THE PORTION OF THE EXISTING SURFACE THAT IS ROCK. DUE TO THE UNKNOWN ROCK EXTENT INTO THE BANK, ACTUAL SOIL VOLUMES MAY
VARY.
TABLE 8. ESTIMATED CHANNEL BED VOLUMES
TABLE 6. PLANT SALVAGE LIST
1. ORIENT LOOKING DOWNSTREAM TO DETERMINE LEFT OR RIGHT BANKS
TABLE 10. QUANTITY AND DIMENSIONS OF IMPORTED PIN AND POST LOGS
TABLE 9. QUANTITY AND DIMENSIONS OF IMPORTED LWD
TABLE 7. EROSION CONTROL FABRIC
C ILIV
RSP REMOVED FROM
BANKS OR LAUNCH
(CY)
LAYER 1 RSP
RE-USE IN AREA 7
(CY)
RSP BURIAL AND
RE-USE IN AREA 6
(CY)
LAYER 1 RSP REUSE
IN AREA 5
(CY)
LAYER 2 RSP
RE-USE IN AREA 5
(CY)
STOCKPILE AT
CONLON LOT
(CY)
AREA 7 143 97 46
L1 RSP BANK TIE-BACK 16
CASCADE RSP TIE-BACK 81
AREA 6 296 197 55 13 31
BURY IN CHANNEL BED OR HAUL OFF SITE (BID OPTION B) 188
R2 RSP BANK TIE-BACK 9
AREA 5 74 68 6
BURIED BANK REVETMENT 123 19
TOTAL 513 97 197 123 19 77
SHEET
CREEK
STATION
(FT)
NAME
CUT
VOLUME
(CY)
FILL
VOLUME
(CY)
RE-USE IN
AREA 6
(CY)
STOCKPILE AT
CONLON LOT OR
HAUL OFF SITE
(BID OPTION A)
(CY)
C2 20+87 EXCAVATE CASCADE TIE-BACK AND BACKFILL RSP VOIDS 99 42
C2 23+80 GRADE BANK FOR LOWERED FLOODPLAIN 165 0
C2 24+50 EXCAVATE L1 TIE-BACK AND BACKFILL RSP VOIDS 23 12
AREA 7 SUBTOTAL 287 54 0 233
C4 30+62 EXCAVATE R2 TIE-BACK AND BACKFILL RSP VOIDS 16 10
C4 31+00 GRADE BANK FOR MEANDER BEND AT R2 6 10
C4 31+50 CREEK BANK FILL, TRAIL AND FLOODPLAIN GRADING 37 124
AREA 6 SUBTOTAL 59 144 0 0
C7 44+30 GRADE BANK AT R6 15 0
C7 44+95 EXCAVATE FOR RSP REVETMENT, FILL RSP VOIDS, REBUILD BANK 252 166
AREA 5 SUBTOTAL 267 166 85 16
SOIL VOLUME TOTAL 613 364 85 249
SHEET STA (FT) NAME FABRIC TYPE SLOPE LENGTH
(FT)
WIDTH
(FT)
C4, C19 DETAILS 30+62 TO 30+80 R2 RSP REMOVAL 1 & 2 10 18
TYPE LOCATION
AVERAGE
DIAMETER
(FT)
LENGTH
(FT)
ROOTBALL
(Y/N) NUMBER NUMBER
LWD AREA 7 2 30 Y 4 2
TOTAL IMPORTED LOGS WITHOUT ROOTBALLS 4 2
LWD AREA 7 2 30 N 11 10
TOTAL IMPORTED LOGS WITH ROOTBALLS 11 10
TOTAL IMPORTED LOGS 15 12
TYPE LOCATION
DIAMETER
(FT)
LENGTH
(FT)
ROOTBALL
(Y/N) NUMBER
PIN AREA 5 0.50 - 0.75 9 N 21
PIN AREA 6 0.50 - 0.75 9 N 42
PIN AREA 7 0.50 - 0.75 9 N 59
TOTAL PIN LOGS 122
POST AREA 5 0.33 - 0.50 6 N 8
POST AREA 6 0.33 - 0.50 6 N 20
POST AREA 7 0.33 - 0.50 6 N 5
TOTAL POST LOGS 33
BOHEMIAN
GROVE
MUIR WOODS
VISITOR
CENTER
RESTROOMS
L6
L5
L4
R6
R5
L3R4
R3
L2
R2
R1 L1
HILLSIDE TRAIL
CANOPY VIEW TRAIL
BRIDGE 2
BRIDGE 1.5
BRIDGE 1
R2B
AREA OF
DETAIL
15+00
20+00 25+00
30+00
35+00
40+00
45+00
EAST MAIN TRAIL
WEST MAIN TRAIL
TOP OF RAIL
BRIDGE DECK
PAVEMENT
SURFACE
EL
EV
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 49
6 TO 8 IN
ROCK (TYP.)
0.20' PAVEMENT
THICKNESS
PAVED
RAMP
0.35 GIRDER
OFFSET BACK ~1'
BRIDGE DECK
6" TO 1' ROCK
WING WALL
R2B RSP EXTENDS ALONG
UPSTREAM BANK AND
TIES INTO BRIDGE 1.5 ROCK
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
DEMOLITION PLAN
180032
8 45
JKA, BSP,JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237D1
SCALE OF FEET
1000100
1. REMOVAL OF RSP INCLUDES REMOVAL OF ALL ROCK ASSOCIATED WITH RSP
SECTION, INCLUDING ROCK BURIED IN THE CHANNEL BED AND/OR
ADDITIONAL LAYERS OF ROCK IN THE BANK.
2. CONTRACTOR SHALL USE METHODS TO REMOVE RSP FROM THE BANK T0
MINIMIZE BANK DISTURBANCE, CUTTING OF TREE ROOTS, SOIL LOSS, AND
VEGETATION DISTURBANCE. HERBACEOUS VEGETATION THAT WOULD
INTERFERE WITH RSP REMOVAL MAY BE REMOVED WITH CO APPROVAL, AN
NPS BIOMONITOR PRESENT AND USING METHODS THAT AVOID GROUND
DISTURBANCE.
3. ALL BANKS SHALL BE INSPECTED BY COR AFTER RSP LAYER 1 REMOVAL AND
AGAIN AFTER EACH SUBSEQUENT LAYER OF RSP IS REMOVED. ROCK
REMOVAL METHODS OR GRADING OF BANKS MAY BE MODIFIED TO AVOID
IMPACTS TO TREE ROOTS.
GENERAL RSP REMOVAL NOTES
1. CUTTING WOOD FOR ACCESS SHOULD BE AVOIDED WHERE POSSIBLE.
2. IF CUTTING WOOD IS NECESSARY, CUT WOOD TO THE LARGEST MOVEABLE SIZE AND
MINIMIZE REMOVAL OF BRANCHES. CUT WOOD AT LOCATION SPECIFIED ON DRAWINGS.
3. DO NOT CLEAR ANY VEGETATION EXCEPT THE TREE OR WOOD THAT IS IDENTIFIED FOR
REMOVAL.
4. PRIOR TO MOVING WOOD, LOCATE AND CLEARLY IDENTIFY THE WOOD TO BE MOVED AND
PATH THAT WOOD SHALL BE MOVED. IDENTIFY ANY INTERMEDIATE TEMPORARY PLACEMENT
LOCATIONS AND COORDINATE INSPECTIONS PRIOR TO MOVEMENT AND PLACEMENT WOOD
WITH BIOLOGICAL MONITOR.
5. RETAIN ANY CUT BRANCHES FOR USE AS SWD BELOW PLACED WOOD AS SHOWN ON
DRAWINGS.
GENERAL WOOD RELOCATION NOTES
1V:1H
XS 1
AREA 6 BRIDGE 1.5 PROFILE (APPROX. AT CREEK STA 31+50)
10 0 10 20
SCALE OF FEET
AREA OF DETAIL: AREA 6 BRIDGE 1.5
CUT AND RELOCATE LOG (SHEET C7).
KEY
REMOVE TRAIL (DETAIL, THIS SHEET AND SHEET C4).
XS 1
M U
IR
W
O O
D S
NA
TI
O
NA
L M
O
NU
M
EN
T
M O
U
NT
T
AM
AL
PA
IS
S
TA
TE
P
AR
K
PA
RC
EL
N O
. 0 2-
NP
S
LA
W
E
NF
O
RC
EM
EN
T
AN
D M
AN
AG
EM
EN
T
AR
EA
FLOW
MUIR WOODS NATIONAL MONUMENT
MOUNT TAMALPAIS STATE PARK
REMOVE RSP R6 (SHEET C7).
REMOVE SECTIONS OF RSP L1 AND RSP R1 (SHEET C2).
REMOVE RSP R3 (SHEET C4).
REMOVE A SECTION OF RSP R2, ROCK UNDERLYING BRIDGE 1.5, AND RSP R2B (SHEET C4).
DECONSTRUCT AND REMOVE BRIDGE 1.5 (DETAIL, THIS SHEET).
REMOVE RSP L2 (SHEET C4).
C ILIV
5 10
REMOVE ALDERS (SHEETS C4).
TOPPLE AND RETAIN THE ROOTBALLS OF 3 ALDERS AND 1 BAY FOR REUSE AS LWD
(SHEET C2).
BRIDGE 1.5
CATHEDRAL
GROVE
MUIR WOODS
VISITOR CENTER
RESTROOMS
EXISTING ROCK CHECK
DAM (CASCADE)
L6
L5
L4
R6
R5
L3R4
R3
L2
R2
R1
L1
HILLSIDE TRAIL
BRIDGE 3
BRIDGE 2
BRIDGE 1.5
BRIDGE 1
DESIGN
AREA 5
DESIGN
AREA 6
DESIGN
AREA 7
SHEET C7
SHEET C2
SHEET C3
SHEET C4
SHEET C5
SHEET C6
109 110
R2B
15+00
20+00 25+00
30+00
35+00
40+00
45+00
50+00
FRANK VALLEY RD
CANOPY VIEW TRAIL
EAST MAIN TRAIL
W
EST M
AIN TRAIL
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
PLAN INDEX & OVERVIEW
180032
9 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C1200
SCALE OF FEET
1000100
SURVEY CONTROL NETWORK BY OBERKAMPER & ASSOCIATES, 2017. GEOMETRIC DATUM:NORTH AMERICAN DATUM OF 1983 - NAD83(2011) EPOCH 2010.00 REALIZIATION. PROJECTION:CALIFORNIA STATE PLANE COORDINATE SYSTEM (SPCS) ZONE III, U.S. SURVEY FT. VERTICAL DATUM:NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FT.
SURVEY CONTROL NETWORK
FLOW
M U
IR
W
O O
D S
NA
TI
O
NA
L M
O
NU
M
EN
T
M O
U
NT
T
AM
AL
PA
IS
S
TA
TE
P
AR
K
PA
RC
EL
N O
. 0 2-
NP
S
LA
W
E
NF
O
RC
EM
EN
T
AN
D M
AN
AG
EM
EN
T
AR
EA
MUIR WOODS NATIONAL MONUMENT
MOUNT TAMALPAIS STATE PARK
C ILIV
REVISION:
SHADED AREA
REMOVED FROM
DESIGN
25+00
20+70.69
25+45.92
400417
136 135
136137
138139
133.0131132
130.4
135.2
9.1
R
R
A A
A
A A
A A
A
AA
AAA A
A
M
M
B B
B
A
B
B
R
R
R
R
AA
RA
A
A
A
A
B
S
S
PROTECT SECTION OF SEWER LINE BETWEEN RESTROOM AND MANHOLE (APPROX.
ALIGNMENT).
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: AREA 7
180032
10 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C2
FLOW
<E> RESTROOM
ALT. B WOOD JAMS
<E> PHONE BOOTH
XS 3
C11
PROTECT <E> PIPE (APPROX. ALIGNMENT).
NO ACCESS IN CHANNEL UPSTREAM OF THIS POINT.
<P> ACCESS ROUTE TO BE LOCATED TO AVOID <E> STANDS OF ELYMUS CALIFORNICUS (TO
BE FLAGGED BY NPS). NO TREES SHALL BE REMOVED. TIE BACK BRANCHES TO EXTENTS
POSSIBLE, WITH MINOR TRIMMING, AS NECESSARY.
OBSERVE AND PROTECT <E> TREE AND ROOTS.
KEY
ENTRANCE
PLAZA
VISITOR
CENTER
BOARDWALK <E> FLAG
POLE
M U
IR W
O
O D
S N
ATIO
N
AL M
O
N U
M
EN
T
M O
U N
T TAM
ALPAIS STATE PARK
PARC
EL N
O . 02-106
N
PS LAW
EN
FO
RC
EM
EN
T AN
D M
AN
AG
EM
EN
T AREA
XS 4
C11
<E> MANHOLE
R1
L1XS 5
C16
STAGING AREA
<E> SEWER LINE
(LOCATION APPROXIMATE)
EXPOSED
BEDROCK
<E> "CASCADE"
ROCK CHECK DAM
DOWNSTREAM LIMIT OF
DEWATERING
UPSTREAM LIMIT OF
DEWATERING
<E> PLUGGED AND GROUTED
SEWER LINE
<E> SEWER LINE
<E> "MIDDLE" ROCK
CHECK DAM
<P> ACCESS ROUTE TO L1 RSP TIE-BACK (KEY NOTE 4 AND SHEET C16).
<E> PHONE CABLE
IN PIPE ( APPROX.)
DEMOLISH APPROX. 200 LF <E> PHONE CABLE IN CONDUIT, INCLUDING APPROX. 50 LF
SUBSURFACE (ALIGNMENT APPROX.). CUT TO AVOID REMOVAL UNDER ASPHALT OR TO
AVOID TREES DISTURBANCE.
SAW CUT GROUTED SEWER LINE 6-12" FROM <E> MANHOLE. IF PLUG BETWEEN CUT AND
MANHOLE IS LOOSENED OR REMOVED, RECAP THE CUT END WITH GROUT.
MARK <E> SEWER LINE ALIGNMENT PRIOR TO REMOVAL TO IDENTIFY ANY TREES THAT
MAY POTENTIALLY BE IMPACTED. DEMOLISH SEWER LINE BETWEEN <E> MANHOLES
AND BACKFILL WITH SOIL PER SPECIFICATIONS.
<E> GATE
<E> MANHOLE
<E> SEWER LINE
<E> DROP INLET
& CULVERT
POSSIBLE AREA TO STORE SALVAGED VEGETATION (LEFT BANK AND/OR CHANNEL).
15 0 15 30
SCALE OF FEET
LP1
C8
LP2
C8
<E> SPLIT RAIL FENCE
GENERAL NOTES:
1. SEE WOOD INSTALLATION SHEETS W1, W4-W8, AND W17
2. RSP REMOVAL TO BE HAULED TO CONLON LOT (SHEETS G4 AND G6)
REMOVE RSP AT L1 TIE-BACK LOCATION TO EXCAVATE TRENCH AND CONSTRUCT RSP
TIE-BACK INTO LEFT BANK (SHEET C16).
<P> ACCESS ROUTE TO CHANNEL AND UPSTREAM CONSTRUCTION AREAS 5 AND 6.
XS 2
C16
PROJECT SEWER LINE.
C ILIV
TOPPLE TREES WHOLE WITH ROOTBALLS INTACT FOR REUSE.
EXCAVATE SOIL AND CONSTRUCT CASCADE RSP TIE-BACK INTO LEFT BANK (SHEET C16).
<E> TEMPORARY
PARKING TO UNLOAD
IMPORTED LOGS TO
BE COORDINATED
WITH COR IN
ADVANCE
REVISION:
SHADED GRADING
AREA REMOVED FROM
DESIGN
REVISION:
LARGE WOOD REMOVED
FROM DESIGN
(SHEET W1)
REVISION:
LARGE WOOD REMOVED
FROM DESIGN (SHEET W1)
REVISION:
LARGE WOOD REMOVED
FROM DESIGN (SHEET W1)
REVISION:
INSTALL LARGE WOOD
WITH ROOTBALL
(SHEET W1)
BR
ID
G E
R303
R302 R301
CREEK STA 25+46 400417
139140141
142143
143 142
148 149
142143
CREEK STA 29+60
R
A
A
R
R
RA
A A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: ACCESS TO AREAS 5 & 6
180032
11 45
JKA, BSP, JRP
JRP, THB
JKA
01/06/2023
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C3
FLOW
15 0 15 30
SCALE OF FEET
TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS
KEY
CREATE TEMPORARY STABLE ACCESS NEXT TO <E> TREES. RESTORE GROUND TO ORIGINAL CONDITION
AFTER USE. DO NOT CUT HILLSLOPE. PROTECT BARK ON STANDING TREES. STORE DUFF AND
BRANCHES TO REPLACE AFTER WORK. USE LANDSCAPE CLOTH BENEATH ANY PLACED MATERIAL.
"BRIDGE 1" ROCK
CHECK DAM (E)
BOARDWALK (E)
SEWER LINE (E)
"MIDDLE" ROCK
CHECK DAM (E)
VISITOR
CENTER
MUIR WOODS NATIONAL MONUMENT
NO C
ONST
RUCTIO
N
ACCESS
T
O B
RID
GE 1
TEMP. CONSTRUCTION ACCESS ROUTE
MOUNT TAMALPAIS STATE PARK PARCEL NO. 02-106 NPS LAW ENFORCEMENT AND MANAGEMENT AREA
INSTALL TEMPORARY FENCE
TO BLOCK VISITOR ACCESS
WITH SIGN: "TRAIL CLOSED"
TRANSPLANT SINGLE AZALEA LOCATED AT R2 (SHEET C4) TO THIS AREA AND PROTECT. INSTALL WITH
EQUIPMENT OPERATING FROM TRAIL. COORDINATE WITH COR FOR FINAL LOCATION.
ALL FOOT TRAFFIC ON FLOODPLAIN IS LIMITED TO FENCED TEMP CONSTRUCTION ACCESS
ROUTE.4
C ILIV
RELOCATE LOGS OUT OF ACCESS ROUTE OR, IF BID OPTION G IS AWARDED, RELOCATE TO
AREA 6 TO INSTALL AS LWD.
BRIDGE 1.5
30+00
146147148
149 148 14
147 146 145 144
4 145
144 145146
138.5
145.1
139.9
143.0
140.0
145.6
141.0
148155
142 143 144
150155
139140 141141141 0
10020
149148144
145144
CREEK STA 29+60
CREEK STA 34+91
146 143
A
B
A
A
RR
R R
B
R
R
R
RR
R
R
Az B
AA
R
R
B
A
AA
A
H H
R R
Az
TH
Az
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: AREA 6
180032
12 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C4
FLOW
APPROXIMATE
DOWNSTREAM EXTENT OF
DEWATERING
ROCK
OUTCROP
<E> BOARDWALK: NO
CONSTRUCTION ACCESS
XS 11
C14
XS 7
C12
XS 6
C16
XS 10
C13
R3
L2
R2B
R2
15 0 15 30
SCALE OF FEET
XS 9
C13
APPROX. UPSTREAM
EXTENT OF DEWATERING
REMOVE <E> TRAIL
SAVE <E> ALDER & PROTECT ROOTS UPSTREAM (US) & DOWNSTREAM (DS) OF TRUNK: RSP
TO REMAIN 0-5 FT US; REMOVE RSP W/O TEARING ROOTS 5-6 FT US; REMOVE RSP WITH OBS.
OF ROOTS 6-12 US; RSP TO REMAIN 0-3 FT DS; REMOVE RSP W/ OBS.OF ROOTS 3-10 FT DS.
PROTECT AND SAVE <E> TREE AND ROOTS IN PLACE.
PROTECT <E> LOG GRADE CONTROL.
LOWER FLOODPLAIN.
SAVE AZALEA AND PROTECT ROOTS. ENSURE PLANT DOES NOT TOPPLE DURING RSP
REMOVAL. CONDUCT WITH NPS OBSERVATION.
GRADE NEW SOIL MOUND AT BASE OF REDWOOD TO SIMULATE NATURAL CONDITIONS.
REMOVE 18 <E> BOULDERS PLUS NUMEROUS COBBLE PIECES FROM CHANNEL BED IN
FRONT OF L2 RSP SECTION.
MOVE LOG FOR ACCESS AS NEEDED.
DEMOLISH AND DISPOSE OF BRIDGE 1.5 (SHEET D1). REMOVE AND REUSE OR BURY
UNDERLYING RSP AND COBBLE PER DESIGNS AND SPECIFICATIONS. FOLLOW GRADING
LINES TO FILL WITH CHANNEL BED MATERIAL AND BLEND WITH ADJACENT TOPOGRAPHY.
PROTECT REDWOOD AND ITS ROOTS.
REMOVE AND DISPOSE OF TWO IN-LINE CULVERTS. FOLLOW GRADING LINES TO FILL WITH
SOIL AND BACK-SLOPE FROM TOP OF CHANNEL BANK TO FLOODPLAIN. BLEND WITH
ADJACENT TOPOGRAPHY.
TIE BACK RSP INTO RIGHT BANK BEHIND UPSTREAM END OF REMAINING R2 RSP (SHEET
C16). INSTALL EROSION CONTROL FABRIC (SHEET C19, DETAIL 1) FROM TIE-BACK TO 18 FT
UPSTREAM OF REMAINING R2 RSP.
KEY
TEMPORARILY REMOVE ALL PARTS OF <E> BOARDWALK RAMP FOR EQUIPMENT ACCESS:
STORE, COVER ABOVE GROUND (E.G., ON <E> BOARDWALK), AND REPLACE (SEE SPECS FOR
DETAILS).
<E> DECK LENGTH
APPROX. 17 FT
8 10
LP4
C9
LP3
C9
PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP INTO
THE VEGETATED AREA.
GENERAL NOTES:
1. SEE WOOD INSTALLATION SHEETS W2, W9-W13, AND W17
XS 8
C12
C ILIV
AZALEA AT L2 WILL BE REMOVED AND REPLANTED BY NPS IN COORDINATION WITH
CONTRACTOR DURING RSP REMOVAL (SPEC SECTION 01 45 00). RELOCATE AZALEA AT R2:
PREPARE RELOCATION SITE FOR AZALEA PRIOR TO SALVAGING (SHEET C3 AND SPECS).
BRIDGE 1.5
30+00144
146147148
149 148 14
147 146 145 144
4 145
148155
142 143 144
150155
10020
CREEK STA 29+60
CREEK STA 34+91
144143142
143144
143142141
146 145
141141141 140139
A
B
A
A
RR
R R
B
R
R
R
RR
R
R
Az B
AA
R
R
B
A
AA
A
H H
R R
Az
TH
Az
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: AREA 6
180032
13 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C4B
FLOW
APPROXIMATE
DOWNSTREAM EXTENT OF
DEWATERING
ROCK
OUTCROP
<E> BOARDWALK: NO
CONSTRUCTION ACCESS
XS 11
C14
XS 7
C12
XS 5
C16
XS 10
C13
R3
L2
R2B
R2
15 0 15 30
SCALE OF FEET
XS 9
C13
APPROX. UPSTREAM
EXTENT OF DEWATERING
REMOVE <E> TRAIL
<E> DECK LENGTH
APPROX. 17.0 FT
8 10
LP4
C9
LP3
C9
GENERAL NOTES:
1. SEE WOOD INSTALLATION SHEETS W2, W9-W13, AND W17
BID OPTION B
XS 8
C12
C ILIV
SAVE <E> ALDER & PROTECT ROOTS UPSTREAM (US) & DOWNSTREAM (DS) OF TRUNK: RSP
TO REMAIN 0-5 FT US; REMOVE RSP W/O TEARING ROOTS 5-6 FT US; REMOVE RSP WITH OBS.
OF ROOTS 6-12 US; RSP TO REMAIN 0-3 FT DS; REMOVE RSP W/ OBS.OF ROOTS 3-10 FT DS.
PROTECT AND SAVE <E> TREE AND ROOTS IN PLACE.
PROTECT <E> LOG GRADE CONTROL.
LOWER FLOODPLAIN.
SAVE AZALEA AND PROTECT ROOTS. ENSURE PLANT DOES NOT TOPPLE DURING RSP
REMOVAL. CONDUCT WITH NPS OBSERVATION.
GRADE NEW SOIL MOUND AT BASE OF REDWOOD TO SIMULATE NATURAL CONDITIONS.
REMOVE 18 <E> BOULDERS PLUS NUMEROUS COBBLE PIECES FROM CHANNEL BED IN
FRONT OF L2 RSP SECTION.
MOVE LOG FOR ACCESS AS NEEDED.
DEMOLISH AND DISPOSE OF BRIDGE 1.5 (SHEET D1). REMOVE AND REUSE OR BURY
UNDERLYING RSP AND COBBLE PER DESIGNS AND SPECIFICATIONS. FOLLOW GRADING
LINES TO FILL WITH CHANNEL BED MATERIAL AND BLEND WITH ADJACENT TOPOGRAPHY.
PROTECT REDWOOD AND ITS ROOTS.
REMOVE AND DISPOSE OF TWO IN-LINE CULVERTS. FOLLOW GRADING LINES TO FILL WITH
SOIL AND BACK-SLOPE FROM TOP OF CHANNEL BANK TO FLOODPLAIN. BLEND WITH
ADJACENT TOPOGRAPHY.
TIE BACK RSP INTO RIGHT BANK BEHIND UPSTREAM END OF REMAINING R2 RSP (SHEET
C16). INSTALL EROSION CONTROL FABRIC (SHEET C19, DETAIL 1) FROM TIE-BACK TO 18 FT
UPSTREAM OF REMAINING R2 RSP.
KEY
TEMPORARILY REMOVE ALL PARTS OF <E> BOARDWALK RAMP FOR EQUIPMENT ACCESS:
STORE, COVER ABOVE GROUND (E.G., ON <E> BOARDWALK), AND REPLACE (SEE SPECS FOR
DETAILS).
PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP INTO
THE VEGETATED AREA.
AZALEA AT L2 WILL BE REMOVED AND REPLANTED BY NPS IN COORDINATION WITH
CONTRACTOR DURING RSP REMOVAL (SPEC SECTION 01 45 00). RELOCATE AZALEA AT R2:
PREPARE RELOCATION SITE FOR AZALEA PRIOR TO SALVAGING (SHEET C3 AND SPECS).
35+00
7148149
152151
149150 149
CREEK STA 39+08
CREEK STA 34+30
R RR
R400
R402
R401
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: ACCESS TO AREA 5
180032
14 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C5
FLOW
KEY
PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP
INTO THE VEGETATED AREA.
TREE TAG #157
15 0 15 30
SCALE OF FEET
C ILIV
WHEN UPSTREAM TRAIL IS IN USE FOR
EQUIPMENT ACCESS TO AREA 6: INSTALL
TEMPORARY FENCE TO BLOCK VISITOR
ACCESS WITH SIGN: "TRAIL CLOSED"
BR
ID
G E
40+00
R
R
149150
156157 154
158 157
CREEK STA 43+44
CREEK STA 38+21
B
R
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: ACCESS TO AREA 5
180032
15 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C6
FLOW
N O
C O
N
ST
RU
CT
IO
N
A
CC
ES
S
TO
B
RI
D
G E
15 0 15 30
SCALE OF FEET
LP5
C10
WHEN UPSTREAM TRAIL IS IN USE FOR
EQUIPMENT ACCESS TO AREA 6: INSTALL
TEMPORARY FENCE TO BLOCK VISITOR
ACCESS WITH SIGN: "TRAIL CLOSED"
WHEN UPSTREAM TRAIL IS IN USE FOR
EQUIPMENT ACCESS TO AREA 6: INSTALL
TEMPORARY FENCE TO BLOCK VISITOR
ACCESS WITH SIGN: "TRAIL CLOSED"
WHEN UPSTREAM TRAIL IS IN USE FOR
EQUIPMENT ACCESS TO AREA 6: INSTALL
TEMPORARY FENCE TO BLOCK VISITOR
ACCESS WITH SIGN: "TRAIL CLOSED"
KEY
VISITOR ACCESS TO HILLSIDE TRAIL SHALL REMAIN OPEN THROUGHOUT CONSTRUCTION.
THE CONTRACTOR SHALL BRIEFLY PAUSE VISITOR TRAFFIC TO HILLSIDE TRAIL AS NEEDED
TO PROTECT VISITORS.
C ILIV
45+00
156157 154
158 157
158 159
157158
162161
156 155
158 0
CREEK STA 42+70
CREEK STA 47+95
R
RR
R
B
B
TO
H H H H H H
B
R
BB
B
B
B
B
B
R R
R
R
TO TO
R
FLOW
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
SITE PLAN: AREA 5
180032
16 45
JKA, BSP, JRP
JRP, THB
JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C7
XS 14
C15
XS 13
C15 XS 12
C14
R6
INSTALL BURIED RSP IN LEFT BANK PER DESIGNS AND SPECIFICATIONS. EXISTING
CONTOURS WILL BE REESTABLISHED, AS FEASIBLE. SECTION OF RSP UPSTREAM OF LWD
L1012 TO BE INSTALLED PRIOR TO LOG RELOCATION BY OTHERS.
SAVE HAZELNUT TREES
REMOVE RSP FROM BANK AND CHANNEL BED
REMOVE RSP FROM BANK AND CHANNEL BED; GRADE BANK AS SHOWN IN SITE
PLAN AND CROSS-SECTION (SHEET C14)
SECTION OF RSP DOWNSTREAM OF LWD L1012 TO BE COMPLETED AFTER LOG
PLACEMENT (LOG RELOCATION BY OTHERS). MAINTAIN DEWATERING SYSTEM
DURING LOG PLACEMENT. SEE SPECIFICATIONS FOR DETAILS.
KEY
NO EQUIPMENT ACCESS
PROTECT <E> LOG GRADE CONTROL
APPROXIMATE
DOWNSTREAM
EXTENT OF
DEWATERING AND
EQUIPMENT ACCESS
APPROXIMATE UPSTREAM
EXTENT OF DEWATERING AND
EQUIPMENT ACCESS
APPROX
5.5 FT
TRAIL WIDTH LIMITATION NORTH OF CONSTRICTION BETWEEN REDWOODS. FOOT TRAFFIC
ONLY. LIMITED EQUIPMENT (<5.5 FT WIDE) ALLOWED PER NPS APPROVAL.
FO
OT
TR
AFF
IC
O
NLY
EQUIPMENT ACCESS ROUTE
15 0 15 30
SCALE OF FEET
LP5
C10
NO EQUIPMENT ACCESS
C ILIV
SMOOTH A RAMP FROM THE ROOTBALL OF
L1012 TO THE CONSTRUCTED POOL
CUT REDWOOD ALONG CUT LINE TO MAXIMIZE REMAINING LENGTH
EL
EV
A
TI
O N
(F T)
STATION (FT)
200210220230240250260270280290300310320330340350360370380390400410420
STA: 368
ELEV:133.0
STA: 362
ELEV:131.0
STA: 345
ELEV:134.0 STA: 308
ELEV:133.4
STA: 300
ELEV:131.0
STA: 279
ELEV:132.9
STA: 252
ELEV:132.5
STA: 245
ELEV:129.0
STA: 203
ELEV:133.2
STA: 222
ELEV:129.0
STA: 246
ELEV:129.7
EL
EV
A
TI
O N
(F T)
STATION (FT)
0102030405060708090100110120130140150160170180190200
STA: 118
ELEV:132.4
STA: 105
ELEV:128.0
STA: 78
ELEV:128.0
STA: 57
ELEV:130.9
STA: 38
ELEV:131.4
STA: 196
ELEV:133.5
EL
EV
A
TI
O N
(F T)
STATION (FT)
0102030405060708090100110115
STA: 111
ELEV:134.0
STA: 109
ELEV:134.5
STA: 94
ELEV:134.5
STA: 76
ELEV:134.0
STA: 25
ELEV:132.0
STA: 17
ELEV:131.5
STA: 3
ELEV:131.0
STA: 0
ELEV:129.7
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
LONGITUDINAL PROFILES: AREA 7
180032
17 45
BSP, BB
BD, JRP
JRP, BSP, JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C8
1V:2H
LP 1
C2
AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE
1V:2H
LP 1
C2
AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE
1V:2H
LP 2
C2
AREA 7 SIDE CHANNEL LONGITUDINAL PROFILE
AREA 7 SIDE CHANNEL
ALIGNMENT INGRESS
(LP2 STA 115)
AREA 7 SIDE CHANNEL
ALIGNMENT EGRESS
(LP2 STA 0)
FLOW
FLOW
FLOW
C ILIV
REVISION:
SHADED GRADING
AREA REMOVED FROM
DESIGN
A
TI
O N
(F T)
STATION (FT)
180190200210220230240250260270280290300310320330340350360
STA: 334
ELEV:144.8
STA: 310
ELEV:143.0
STA: 305
ELEV:141.0
STA: 273
ELEV:143.5
STA: 264
ELEV:144.0STA: 345
ELEV:143.8
STA: 322
ELEV:144.5
STA: 290
ELEV:141.0
EL
EV
A
TI
O N
(F T)
STATION (FT)
0102030405060708090100110120130140150160170180
STA: 57
ELEV:141.5
STA: 31
ELEV:138.5
STA: 17
ELEV:140.5
STA: 49
ELEV:138.5
STA: 158
ELEV:143.0
STA: 139
ELEV:139.5
STA: 125
ELEV:139.5
STA: 79
ELEV:143.0
EL
EV
A
TI
O N
(F T)
STATION (FT)
0102030405060708090100110120130138
STA: 99
ELEV:144.0
STA: 98
ELEV:144.4 STA: 62
ELEV:143.0
STA: 37
ELEV:140.0
STA: 14
ELEV:141.0
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
LONGITUDINAL PROFILES: AREA 6
180032
18 45
BSP, JRP, BB
BD
BSP, JRP, JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C9
1V:2H
LP3
C4
AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE
1V:2H
LP3
C4
AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE
1V:2H
LP4
C4
AREA 6 SIDE CHANNEL LONGITUDINAL PROFILE
FLOODPLAIN EGRESS (STA 0)
AREA 6 SIDE CHANNEL
ALIGNMENT EGRESS
(LP4 STA 0)
AREA 6 SIDE CHANNEL
ALIGNMENT INGRESS
(LP4 STA 138)
FLOW
FLOW
FLOW
C ILIV
A
TI
O N
(F T)
STATION (FT)
190200210220230240250260270280290300310320330340350
STA: 306
ELEV:158.4
STA: 226
ELEV:156.3
STA: 219
ELEV:157.0
EL
EV
A
TI
O N
(F T)
STATION (FT)
0102030405060708090100110120130140150160170180190
STA: 166
ELEV:156.5
STA: 148
ELEV:153.5
STA: 136
ELEV:155.5 STA: 111
ELEV:155.2
STA: 13
ELEV:154.0
STA: 157
ELEV:153.5
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
LONGITUDINAL PROFILE: AREA 5
180032
19 45
BSP, BB
BD
BSP, JRP, JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C10
1V:2H
LP5
C7
AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE
LP5
C7
AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE
1V:2H
FLOW
FLOW
C ILIV
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 50 60 62
STA: 17
ELEV:134.9
STA: 28
ELEV:134.4 STA: 40
ELEV:133.9
STA: 43
ELEV:133.5
STA: 44
ELEV:133.4
STA: 45
ELEV:133.5
STA: 48
ELEV:133.9
STA: 50
ELEV:133.9
EL
EV
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 50 60 65
STA: 6
ELEV:138.7
STA: 16
ELEV:134.5 STA: 19
ELEV:134.3
STA: 21
ELEV:134.5
STA: 23
ELEV:135.0
STA: 29
ELEV:135.2 STA: 32
ELEV:135.0 STA: 36
ELEV:133.9
STA: 40
ELEV:133.7
STA: 44
ELEV:133.9
STA: 48
ELEV:135.0
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
GRADING SECTIONS 3 & 4
180032
20 45
BSP, JRP, BD
BD, JRP
BSP, JRP, JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C11
1V:1H
CROSS SECTION AT AREA 7 DESIGN STA 183
(CREEK STA 22+80)
XS 3
C2
1V:1H
XS 4
C2
GRADING SECTION AT AREA 7 DESIGN STA 319
(CREEK STA 24+15)
ESTIMATED EXTENTS
OF L1 RSP
BUILD BAR WITH CHANNEL BED
MATERIAL TO DESIGN CONTOURS
AND LIMITS
GRADE SLOPE AND DAYLIGHT INTO <E>
GROUND, OBSERVING AND PROTECTING
TREE ROOTS AND STEMS UNLESS
MARKED FOR REMOVAL
FILL CHANNEL WITH BED
MATERIAL AND RAISE RIFFLE
ELEVATION
ESTIMATED EXTENTS OF R1 RSP
C ILIV
OUTSIDE OF POOL AREAS: UPPER
0.3 FT OF FILL MATERIAL SHALL
BE COMPOSED OF A SURFACE
MATERIAL CAP
OUTSIDE OF POOL AREAS: UPPER
0.3 FT OF FILL MATERIAL SHALL
BE COMPOSED OF A SURFACE
MATERIAL CAP
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 50 55
STA: 2
ELEV:144.4 STA: 10
ELEV:144.0
STA: 18
ELEV:142.4
STA: 25
ELEV:138.5
STA: 29
ELEV:138.5
STA: 35
ELEV:142.7
STA: 37
ELEV:142.7
STA: 52
ELEV:147.2
STA: 34
ELEV:138.2
STA: 33
ELEV:136.7
STA: 45
ELEV:148.0
EL
EV
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 50 60 64
STA: 55
ELEV:146.3
STA: 53
ELEV:146.8
STA: 43
ELEV:140.5
STA: 39
ELEV:140.3
STA: 41
ELEV:140.1
STA: 35
ELEV:143.0
STA: 33
ELEV:143.6STA: 29
ELEV:143.0
STA: 24
ELEV:143.0
STA: 21
ELEV:143.5
STA: 14
ELEV:144.0STA: 7
ELEV:144.0
GRADING SECTION AT AREA 6 DESIGN STA 40
(CREEK STA 31+00)
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD SALMON HABITAT ENHANCEMENT
AT MUIR WOODS, PHASE 2
GRADING SECTIONS 7 & 8
180032
21 45
BSP, JRP
BD, JRP
BSP, JRP, JKA
10/14/2022
MUIR WOODS NATIONAL MONUMENT
CALIFORNIA
312237C12
1V:1H
XS 7
C4
ESTIMATED EXTENTS OF
R2 RSP REMOVAL
EXCAVATE TRAIL ASPHALT
AND BASE ROCK
GRADING SECTION AT AREA 6 DESIGN STA 80
(CREEK STA 31+39)
1V:1H
XS 8
C4
ESTIMATED EXTENTS OF
BRIDGE 1.5 RSPESTIMATED EXTENTS OF
L2 RSP REMOVAL
INSTALL EROSION CONTROL
FABRIC TO PROTECT SOIL
BANK FILL PER PLANS AND
SPECIFICATIONS
BACKFILL BRIDGE 1.5 RSP CUT
WITH CHANNEL BED
MATERIAL AND BUILD UP TOP
OF BACK-SLOPED BANK
APPROX INTERFACE
BETWEEN CHANNEL
BED MATERIAL AND
SOIL BANK BACKFILL
APPROX. POSITION OF
<E> REDWOOD
C ILIV
OUTSIDE OF POOL AREAS: UPPER
0.3 FT OF FILL MATERIAL SHALL
BE COMPOSED OF A SURFACE
MATERIAL CAP (TYP.)
A
TI
O N
(F T)
STATION (FT)
0 10 20 30 40 44
1 1
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .