Attachment_4_-_Drawings.pdf

PDF 11 MB Posted

Attached to
GOGA MUWO CONSTRUCTION CONTRACT- CREEK
Solicitation number
140P8623R0002
Issued by

About this file

This solicitation is for a construction contract to perform salmon habitat enhancement work at Muir Woods National Monument in Marin County, California. The work includes installing three separate water diversion systems with channel work zones extending 400 to 450 linear feet each, totaling 3,100 linear feet of channel. Other efforts involve removing rock slope protection from banks, grading banks and the channel bed, and placing large woody debris structures. The contract also requires demolishing 460 linear feet of asphalt trail and a sewer line segment. The contractor must provide all labor, equipment, testing and supplies to complete the specified work following resource protection restrictions. The work must finish before late fall rains begin the salmon spawning season. The solicitation estimates the project value between $1,000,000 to $5,000,000. Interested offerors should access the full solicitation on SAM.gov and attend an optional site visit on March 10, 2023. Questions are due to the National Park Service contracting officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET SUB-SHEET DESCRIPTION

1 G1 TITLE SHEET (THIS SHEET)

2 G2 GENERAL NOTES AND BID OPTIONS

3 G3 SYMBOLOGY AND DEFINITIONS

4 G4 STOCKPILE AND STAGING AREAS

5 G5 ACCESS PLAN

6 G6 QUANTITIES

7 G7 QUANTITIES II

8 D1 DEMOLITION PLAN

9 C1 PLAN INDEX AND OVERVIEW

10 C2 SITE PLAN: AREA 7

11 C3 SITE PLAN: ACCESS TO AREAS 5 & 6

12 C4 SITE PLAN: AREA 6

13 C4B SITE PLAN: AREA 6 BID OPTION

14-15 C5-C6 SITE PLAN: ACCESS TO AREA 5

16 C7 SITE PLAN: AREA 5

17-19 C8-C10 LONGITUDINAL PROFILES

20-24 C11-C15 GRADING SECTIONS

25 C16 RSP TIE-BACK SECTIONS

26 C17 RSP BURIAL: AREA 6

27 C18 CHANNEL BED BACKFILL: AREA 6

28 C19 FABRIC PLACEMENT AND RSP REMOVAL DETAILS

29 W1 LWD SITE PLAN: AREA 7

30 W2 LWD SITE PLAN: AREA 6

31 W3 LWD SITE PLAN: AREA 5

32-36 W4-W8 LWD DETAILS: AREA 7

37-41 W9-W13 LWD DETAILS: AREA 6

42-44 W14-W16 LWD DETAILS: AREA 5

45 W17 SMALL WOOD AND PINNING DETAILS

SHEET INDEX

PARK BOUNDARY

LEGEND

PAVED ROAD

COUNTY LINE

TRAIL

CREEK

PARK HEADQUARTERS

RANGER STATION

INFORMATION CENTER

LIGHTHOUSE

PARKING

STATE PARK

ADJACENT NATIONAL PARK

ACCESS

FROM

STATE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT DRAWING NO.

PMIS/PKG NO.

OF

SHEET

SCALE OF MILES

10 0 10NORTHWESTERN

CALIFORNIA

SALMON HABITAT ENHANCEMENT, PHASE 2

MUIR WOODS

MARIN CALIFORNIA

RESTORATION

MUIR WOODS NATIONAL MONUMENT

PACIFIC WEST

180032

312237

100% DESIGNS 1/6/2023

THIS PROJECT

Engineering - Hydrology - Geomorphology - Water Resources

NTS

C ILIV

2/22/2023:

THESE PLANS HAVE BEEN REDLINED BY THE

ENGINEER OF RECORD TO REFLECT CHANGES IN

GRADING DUE TO CHANGES IN EXISTING SITE

CONDITIONS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

FORT

AutoCAD SHX Text

FUNSTON

AutoCAD SHX Text

FORT

AutoCAD SHX Text

MASON

AutoCAD SHX Text

PRESIDO

AutoCAD SHX Text

ALCATRAZ

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

AutoCAD SHX Text

SAUSALITO

AutoCAD SHX Text

MUIR

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

STINSON

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

MUIR WOODS

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

TIBURON

AutoCAD SHX Text

MT. TAMALPAIS

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

CAMINO

AutoCAD SHX Text

ALTO

AutoCAD SHX Text

ANGEL ISLAND

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

RIDGE

AutoCAD SHX Text

CREST

AutoCAD SHX Text

BLVD.

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

BAY BRIDGE

AutoCAD SHX Text

RODEO

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

BAKER BEACH

AutoCAD SHX Text

CLIFF HOUSE

AutoCAD SHX Text

FORT POINT

AutoCAD SHX Text N.H.S.

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

TO

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(TOLL)

AutoCAD SHX Text

POINT

AutoCAD SHX Text

BONITA

AutoCAD SHX Text

SAN FRANCISCO BAY

AutoCAD SHX Text

GOLDEN GATE

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

(TOLL)

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

SAN MATEO CO.

AutoCAD SHX Text

MARION CO.

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

ALAMEDA CO.

AutoCAD SHX Text

SAN FRANCISCO CO.

AutoCAD SHX Text

TO

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

SAN FRANCISCO

AutoCAD SHX Text

TO

AutoCAD SHX Text

PACIFICA & SWEENEY

AutoCAD SHX Text

RIDGE AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TOMALES

AutoCAD SHX Text

PETALUMA

AutoCAD SHX Text

NOVATO

AutoCAD SHX Text

NAPA

AutoCAD SHX Text

FAIRFIELD

AutoCAD SHX Text

VALLEJO

AutoCAD SHX Text

CONCORD

AutoCAD SHX Text

WALNUT

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

HAYWARD

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

BERKELEY

AutoCAD SHX Text

SAN RAFAEL

AutoCAD SHX Text

SAN

AutoCAD SHX Text

MATEO

AutoCAD SHX Text

PALO

AutoCAD SHX Text

ALTO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

FRANCISCO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

PABLO

AutoCAD SHX Text

BAY

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

MUIR WOODS

AutoCAD SHX Text

NATIONAL

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text

POINT

AutoCAD SHX Text

REYES

AutoCAD SHX Text N.S.

AutoCAD SHX Text

SWEENEY

AutoCAD SHX Text

RIDGE

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

MUIR WOODS NATIONAL MONUMENT

AutoCAD SHX Text

PO BOX 2515 MCKINLEYVILLE, CA 95519

AutoCAD SHX Text No. 50713

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

GENERAL NOTES AND BID OPTIONS

180032

2 45

JKA, BSP, JRP

JRP, THB

JKA

01/06/2023

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G2

GENERAL NOTES:

1. THE LANDOWNER IS NATIONAL PARK SERVICE. LANDOWNER CONTACT

INFORMATION

CAROLYN SHOULDERS, PROJECT MANAGER

GOLDEN GATE PARK RECREATION AREA

FORT MASON, BLG. 201

SAN FRANCISCO, CA 94123

PHONE: (415) 289-1841

2. PROJECT ENGINEER INFORMATION

JEFFREY K ANDERSON

NORTHERN HYDROLOGY AND ENGINEERING

PO BOX 2515

MCKINLEYVILLE, CA 95519

707-839-2195

3. ALL WORK SHALL COMPLY WITH THESE PLANS, SPECIFICATIONS, AND

NOTES.

4. THE PROJECT ENGINEER RESPONSIBLE FOR PREPARATION OF THESE

PLANS AND SPECIFICATIONS WILL NOT BE RESPONSIBLE FOR, OR LIABLE

FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL

CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED

BY THE PROJECT ENGINEER RESPONSIBLE FOR PREPARATION OF THESE

PLANS.

5. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER

RELATIVE THERETO IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON

THESE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT A

REQUEST FOR INFORMATION TO NPS FOR ADDITIONAL INFORMATION

BEFORE CONDUCTING WORK ON THAT PORTION OF THE PROJECT.

6. ALL REVISIONS TO THESE PLANS MUST BE MADE BY THE PROJECT

ENGINEER RESPONSIBLE FOR THE PLAN PREPARATION, AND SHALL

ACCURATELY BE SHOWN ON REVISED PLANS.

7. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT

(USA) (1-800-642-2444) SEVEN (7) CALENDAR DAYS PRIOR TO THE START OF

EACH GROUND DISTURBING PHASE AND SHALL BE RESPONSIBLE FOR

MAINTAINING A VALID USA LOCATION TAG THROUGH RENEWAL DURING

THE CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE A UTILITY FIELD MEETING AT WHICH TIME THE

CONTRACTOR SHALL EXPLAIN THE LIMITS AND IMPACTS OF WORK THAT

MAY AFFECT USA MEMBER UTILITIES.

8. THE MAJORITY OF THE UTILITIES WITHIN MUIR WOODS MONUMENT ARE

OWNED BY NPS. AS SUCH, VERY FEW UTILITIES WILL BE MARKED OUT BY

USA. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD LOCATE & MARK

ALL UTILITIES WITHIN THE PROJECT WORK AREA. FIELD LOCATION AND

MARKING SHALL BE PERFORMED PRIOR TO GROUND DISTURBANCE;

NOTIFY COR UPON COMPLETION OF FIELD LOCATION AND MARKING FOR

COR REVIEW AND APPROVAL.

9. CONDUCT ALL WORK WITHIN THE PERMISSIBLE WORK PERIOD IN

SPECIFICATION SECTION 011100. CONDUCT ALL WORK FOLLOWING AN

APPROVED DEWATERING AND WATER DIVERSION PLAN.

10. THE PROJECT IS LOCATED WITHIN AN OPERATING NATIONAL PARK. THE

PARK WILL REMAIN OPEN TO VISITORS 7 DAYS PER WEEK DURING THE

CONSTRUCTION PERIOD. THE CONTRACTOR MAY PROPOSE INTERMITTENT

TRAIL CLOSURES, BUT ALL TRAIL CLOSURES MUST BE APPROVED BY NPS.

TRAILS SHALL REMAIN OPEN TO THE PUBLIC TO THE EXTENT POSSIBLE.

11. ACCESS TO THE SITE, STAGING, AND STOCKPILE AREAS ARE HIGHLY

RESTRICTED.

12. NUMEROUS HISTORIC FEATURES OCCUR AT MUIR WOODS, INCLUDING

TRAILS, WOODEN FOOTBRIDGES ON THE MAIN TRAIL, AND MANY OTHERS,

AND NEITHER ACCESS NOR ACTIONS SHALL BE TAKEN EXCEPT WHERE

SHOWN, UNLESS OTHERWISE SPECIFICALLY APPROVED BY THE CO.

13. PROTECT EXISTING LOG CHECK DAMS AND ROCK GRADE CONTROL

STRUCTURES WHEREVER THEY OCCUR.

14. IF ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN

THE VICINITY SHALL BE HALTED, AND CONTRACTING OFFICER SHALL BE

NOTIFIED IMMEDIATELY.

15. THE CONTRACTOR SHALL USE ONLY DESIGNATED SPECIFIC SITES FOR

STORAGE OF EQUIPMENT AND MATERIALS AS SHOWN ON THESE PLANS

AND SPECIFICATIONS.

16. LINE AND GRADE: THE LAYOUT CONTROL, DIMENSIONS AND CONTOURS

SHOWN ARE INTENDED TO PROVIDE THE CONTRACTOR SUFFICIENT

INFORMATION TO LAYOUT AND PERFORM INITIAL STAKING OF THE

PROJECT. THE STAKES SHALL BE REVIEWED AND ADJUSTED WITH THE

CONTRACTING OFFICER PRIOR TO ANY GRADING. ADJUSTMENTS TO THE

GRADING WILL BE REQUIRED AS DIRECTED BY THE CONTRACTING

OFFICER TO ACHIEVE A FUNCTIONAL, RESTORED CREEK. CAD FILES WILL

BE MADE AVAILABLE FOR THE CONTRACTOR'S CONVENIENCE. IN THE

EVENT OF A CONFLICT, THE HARD COPY DRAWINGS SHALL GOVERN.

17. PLAN FEATURES ARE LABELLED ACCORDING TO THEIR CHANNEL

STATION. CHANNEL STATIONS ARE SHOWN IN UNITS OF FEET. FOR

EXAMPLE, CHANNEL STATION 30+00 IS 100 FEET UPSTREAM OF CHANNEL

STATION 29+00. CHANNEL STATION 35+37 IS 37 FEET UPSTREAM OF

CHANNEL STATION 35+00.

18. THE INTENT OF THE PROJECT EARTHWORK IS TO REUSE ALL MATERIAL

ON-SITE INCLUDING, BUT NOT LIMITED TO, SOIL, BED MATERIAL, AND

WOODY DEBRIS. ONLY THOSE MATERIALS SPECIFICALLY DESIGNATED

FOR OFF-SITE DISPOSAL SHOULD BE REMOVED FROM THE SITE.

19. COPIES OF ALL ENVIRONMENTAL PERMITS WILL BE PROVIDED TO THE

CONTRACTOR, AND MUST BE KEPT ON-SITE AT ALL TIMES DURING

CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN AT HIS/HER OWN

EXPENSE ALL PERMITS, LICENSES, INSURANCE POLICIES, ETC., NOT

ALREADY OBTAINED AS MAY BE NECESSARY TO COMPLY WITH STATE

AND LOCAL LAWS ASSOCIATED WITH THE PERFORMANCE OF THE WORK.

CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMITS.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF ALL

EQUIPMENT AND MATERIALS.

21. HEAVY EQUIPMENT IS PERMITTED FOR USE IN THE CHANNEL. ALL

EQUIPMENT USE SHALL FOLLOW AN APPROVED ACCESS PLAN.

22. METHODS OF PROTECTING THE CREEK, BANKS AND TERRESTRIAL AREAS

SHALL FOLLOW AN APPROVED ACCESS PLAN TO BE SUBMITTED BY

CONTRACTOR FOR NPS REVIEW AND APPROVAL.

23. ALL WORK REQUIRES SPECIFIED PROTECTIONS FOR WATER RESOURCES,

THE CHANNEL BED, ENDANGERED SPECIES, NOISE, AND VEGETATION, PER

SPECIFICATION SECTION 014500.

CONTRACT LINE ITEMS AND BID OPTIONS

C ILIV

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SYMBOLOGY AND DEFINITIONS

180032

3 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G3

<E> EXISTING

<P> PROPOSED

A ALDER

B BAY

BTTM BOTTOM

CHNL CHANNEL

CH### LOG SOURCED FROM THE CHANNEL

COR CONTRACTING OFFICER'S REPRESENTATIVE

CP CONTROL POINT

CP# CONTACT POSITION #

CLIN CONTRACT LINE ITEM NO.

CSP CALIFORNIA STATE PARK

CY CUBIC YARDS

DG DESIGN GRADE

DIA DIAMETER

DS DOWNSTREAM

EG EXISTING GRADE

ELEV ELEVATION

FT, ' FOOT

GS GROUND SURFACE

H HAZELNUT

H HORIZONTAL

I-## IMPORTED LOG

L# RSP SECTION ALONG LEFT BANK

L### LOG SOURCED FROM LEFT BANK

LWD LARGE WOODY DEBRIS

M MAPLE

MAX MAXIMUM

MIN MINIMUM

N NORTH

NA NOT APPLICABLE

NPS NATIONAL PARK SERVICE

NTS NOT TO SCALE

P POOL

R REDWOOD

R# RSP SECTION ALONG RIGHT BANK

R### LOG SOURCED FROM RIGHT BANK

REF REFERENCE

RSP ROCK SLOPE PROTECTION

SF SQUARE FOOT

SPECS SPECIFICATIONS

STA STATION

SWD SMALL WOODY DEBRIS

TH THIMBLEBERRY

TO TAN OAK

TYP TYPICAL

US UPSTREAM

V VERTICAL

XS CROSS-SECTION

GENERAL ABBREVIATIONS

SHEET NUMBER WHERE

SECTION/DETAIL IS

DRAWN OR TAKEN

LETTER INDICATES SECTION OR

DETAIL, NUMBER INDICATES

SECTION OR DETAIL NUMBER

A#

FR/TO

XS1 = CHANNEL CROSS SECTION 1

D1 = DETAIL 1

RSP-A##-##+##

NAME LEGEND

CROSS-REFERENCE LEGEND

RSP STATION

NAME OF RSP, LETTER "L"OR "R"

INDICATES RSP EXISTS ON LEFT BANK

OR RIGHT BANK, RESPECTIVELY.

ROCK SLOPE

PROTECTION

MATERIAL DEFINITIONS

TREE

DESIGN LOG

BOARDWALK

LARGE WOOD

BOULDER

MAJOR CONTOUR [5 FT]

CONTROL POINT

RSP REMOVAL EXTENT (PLAN VIEW)

PROJECT "CREEK" ALIGNMENT

GRADING BOUNDARY

PLACED RSP

DESIGN ELEMENTS

ROCK GRADE CONTROL

EXISTING ELEMENTS

MINOR CONTOUR [1 FT]

WOOD GRADE CONTROL

DESIGN ALIGNMENT

WOODEN FENCE

SPOT ELEVATION

GRADING AREA (OVERVIEW)

SYMBOLOGY

UNDISTURBED CHANNEL BED MATERIAL

ROADS

TRAIL

BUILDING OUTLINE

ROCK CHECK DAM

PINNING LOGS

SWD POST PLACEMENT (OVERVIEW)

ESTIMATED DEPTH OF RSP

FABRIC TYPE 2 (DETAIL)

FABRIC TYPE 1 (DETAIL)EXISTING GROUND

RSP TO BE REMOVED (OVERVIEW)

BRIDGE

DESIGN GROUND

BACKING ROCK

RSP (OVERVIEW)

RIPARIAN AREA (BY OTHERS)

BACKFILLED CHANNEL BED MATERIAL

EQUIPMENT ACCESS (PLAN VIEW)

SEWER LINE

PROPERTY BOUNDARY

RELOCATED OR REUSED VEGETATION

FLOW STREAM FLOW DIRECTION

MAJOR CONTOUR [5 FT]

MINOR CONTOUR [1 FT]

EXISTING LARGE WOOD USED IN DESIGN

PHONE CABLE IN PIPE

PROFILES AND SECTIONS

PLAN VIEW/OVERVIEW

PROFILES AND SECTIONS

PLAN VIEW/OVERVIEW

RSP TO REMAIN (PLAN VIEW)

PLACED RSP

BACKFILLED SOIL

C ILIV

PANORAMIC HWY

M

UIR

W

OODS R

D

HWY 1

DEER PARK FIRE RD

Redwood Creek

FR

AN

K

VA

LL

EY

R D

ALICE EASTWOOD RD

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

STOCKPILE & STAGING AREAS

180032

4 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G4

1000 0 1000 2000

SCALE OF FEET

OVERVIEW MAP

Redwood Creek

<E> BATHROOM

ENTRANCE

PLAZA

<E> SEWER LINE

<E> FLAG POLE

VISITOR

CENTER

M U

IR

W

O O

D S N

A

TIO

N A

L M O

N U

M

EN

T M

O U

N

T TA

M A

LPA

IS STA

TE PA

R

K

PA

R C

EL N

O

. 02-106

N

PS LA

W

EN

FO

R

C

EM

EN

T A

N D

M A

N A

G

EM

EN

T A

R

EA

WATERSHED

MODEL

<E> MEDIAN (APPROX.

ALIGNMENT)

<P> TEMP.

FENCING

<P> CONSTRUCTION

ACCESS

<P> CONSTRUCTION ACCESS

TO AREAS 5 AND 6 TBD

BASED ON SITE CONDITIONS

WITH NPS APPROVAL

<P> STAGING

AREA

<E> SIDEWALK

30 0 30 60

SCALE OF FEET

AREA OF DETAIL: STAGING AT AREA 7

TEMPORARY USE OF PARKING SPACES RESTRICTED TO IMPORTING LOGS. SCHEDULE SPECIFIC USE DATES IN ADVANCE FOR APPROVAL BY NPS.

<P> GATE 2: USE BEFORE VISITING HOURS FOR MOBILIZATION/DEMOBILIZATION AND LARGE LOADS. VISITORS ACCESS RESTROOMS THROUGH

THIS ROUTE.

TEMPORARILY REMOVE FROM PLAZA AND VISITOR PATHWAY: 6 BACKLESS BENCHES, 4 BACKED BOLTED BENCHES, AND TRASH CANS.

RELOCATE WITH NPS COORDINATION: 8-10 BACKLESS BENCHES AND TRASH CANS TO VISITOR USE AREAS (SEE NOTE 2). STORE OTHERS AT PHOTO CORNER ON ADMIN RD (SHEET G5). REPLACE ALL TO ORIGINAL LOCATIONS AFTER CONSTRUCTION.

TEMPORARY PLACEMENT LOCATION FOR BACKLESS BENCHES.

REMOVE ALL <E> 6" X 6" WHEEL STOPS AND USE TEMPORARILY FOR CONTRACTOR ACCESS NEEDS OR DISCARD. RETAIN EXISTING PATHWAY THROUGH MEDIANS. RELOCATE <E> SPLIT RAIL FENCE TO ALIGNMENT OF NORTH WHEEL STOP. INSTALL FENCE POSTS IN GROUND SECURELY TO REMAIN IN PLACE AFTER WORK IS COMPLETED; CONCRETE FOOTINGS NOT LIKELY TO BE NEEDED.

KEY

<P> GATE 1: TWO-DOORED GATE THAT SWINGS OUT TO BLOCK PEDESTRIAN PATHWAY BRIEFLY. TO BE USED AS THE PRIMARY GATE.

<E> ADA PARKING

<P> GATE 3: CONTRACTOR ACCESS FOR IMPORT OF LWD. NPS WILL USE THIS GATE TO MAINTAIN BATHROOMS. ALLOW INTERMITTENT ACCESS

FOR RESTROOM CUSTODIANS.

GRADING

BOUNDARY

PROTECT OR TEMPORARILY REMOVE SPLIT RAIL FENCE ON CREEK SIDE OF STAGING AREA AS NEEDED; REPLACE AFTER WORK.

GENERAL STAGING AND STOCKPILING NOTES:

1. THE CONTRACTOR SHALL SET UP STAGING AT AREA 7 TO CLEARLY DEFINE AND ACCOMMODATE VISITOR ACCESS THROUGH THE ENTRANCE PLAZA. THE CONTRACTOR SHALL EMPLOY SAFETY MEASURES WHEN VEHICLES CROSS VISITOR USE AREAS.

2. MINIMIZE STAGING AREA AND MAXIMIZE VISITOR USE AREA WHERE POSSIBLE.

3. VEGETATED AREA NEXT TO STAGING AREA MAY NOT BE USED FOR WORKER FOOT TRAFFIC. USE DEFINED ACCESS ROUTES.

AVOID VEGETATED AREAS OR PLACE ORANGE FENCE TO ENSURE WORKERS AVOID IT.

INSTALL SCREENED CHAIN LINK FENCE TO CREATE A VISITOR PATH A MIN. OF 15’ WIDE BETWEEN THE RELOCATED SPLIT RAIL FENCE AND

CHAIN LINK FENCE.

AREA OF DETAIL: CONLON STOCKPILE AREA

30 0 30 60

SCALE OF FEET

ACCESS

BETWEEN

STOCKPILES

<E> PARKING LOT

TO CONLON AVE

TO MUIR

BEACH

NPS PROPERTY

(EAST SIDE OF

PANORAMIC HWY)

TO MILL

VALLEY &

HWY 101

CONLON LOT

STOCKPILE

AREA

AREA OF

DETAIL

STAGING

AT AREA 7

NPS LAW

ENFORCEMENT

AND

MANAGEMENT

AREA

MUIR WOODS

ENTRANCE

MUIR WOODS NATIONAL

MONUMENT BOUNDARY

<E> PP (APPROX)

TURN-OUTS ALONG EAST SIDE OF PANORAMIC

HWY BETWEEN HWY 1 AND ALICE EASTWOOD

RD AVAILABLE FOR MATERIAL TRANSFERS AS

DETERMINED UNDER ENCROACHMENT PERMIT

TO BE OBTAINED FROM MARIN COUNTY BY

CONTRACTOR

EXTENT OF

RIPRAP

REMOVAL

PROJECT REACH

DOUG FIR

REMOVAL

15 FT MIN.

8.5 FT 5 FT

8.5 FT

8.5 FT14 FT

36 FT111 FT

46 FT

10 FT MIN.

C ILIV

REVISION:

SHADED AREA

REMOVED FROM

DESIGN

CATHEDRAL GROVE

BOHEMIAN GROVE

MUIR WOODS

VISITOR CENTER RESTROOMS

HILLSIDE TRAIL

BRIDGE 3

BRIDGE 1.5

BRIDGE 1

15+00

20+00 25+00

30+0035+00

40+00

45+00

50+00

BRIDGE 2 MUIR WOODS RD

FRANK VALLEY RD

MOUNT TALMAPAIS STATE PARK

MUIR WOODS NATIONAL MONUMENT

WATER MAIN

SHUT OFF VALVE

(APPROX.)

ADMIN RD

CANOPY VIEW TRAIL

EAST. MAIN TRAIL

W

EST M

AIN TRAIL

"PHOTO CORNER"

STORE BENCHES

HERE (SEE SHEET G4)

EXISTING ROCK CHECK

DAM (CASCADE)

100 0 100

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

ACCESS PLAN

180032

5 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G5

GENERAL NOTES:

1. EQUIPMENT ACCESS IS STRICTLY LIMITED TO THE ROUTES SHOWN AND ARE PROHIBITED FROM

BOARDWALKS. EQUIPMENT MAY NOT DRIVE, OPERATE , OR STAGE ON GROUND SURFACE AREAS

EXCEPT ON THOSE SHOWN, WITH MINOR EXCEPTIONS AFTER REVIEW AND APPROVAL FROM NPS.

2. WORK SHALL BE CONDUCTED WITH EQUIPMENT SUITABLE FOR 8.5 FT WIDE ACCESS ROUTES.

3. CONTRACTOR SHALL COORDINATE WITH NPS FOR TEMPORARY TRAIL CLOSURES, AS SHOWN. NPS

WILL NOT CLOSE TRAIL SEGMENTS ON BOTH SIDES OF THE CREEK AT THE SAME TIME. ACCESS 4 IS THE ONLY TRAIL THAT MAY BE CLOSED IF WORK IS NOT CURRENTLY UNDERWAY. ALL OTHER ACCESS

ROUTES MUST REMAIN OPEN UNLESS CURRENTLY IN USE.

4. ACCESS 5 AND 8 ON WEST AND EAST MAIN TRAIL, RESP., SHALL NOT BE CLOSED AT THE SAME TIME.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING APPROVED TRAIL CLOSURES TO PREVENT VISITOR

ACCESS TO WORK ZONES.

6. PROTECT ALL ASPHALT ON TRAILS DURING USE, EXCEPT WHERE ASPHALT WILL BE REMOVED.

7. ALL FOOT TRAFFIC SHALL REMAIN WITHIN BOUNDARIES AT ACCESS ROUTES AND SHALL NOT USE

SHORT-CUTS THROUGH VEGETATION. TEMPORARY FENCING SHALL BE PLACED ALONG BOUNDARIES

OF ACCESS ROUTES THROUGH VEGETATED AREAS.

8. BRIDGE 1.5 IS NOT SUITABLE FOR HEAVY EQUIPMENT. REMOVE PRIOR TO HAULING. INSTALL

TEMPORARY CROSSING, AS NEEDED.

FLOW

INSTALL TRAIL CLOSURE FENCE WHEN ACCESS 8 ON EAST MAIN TRAIL IS IN USE. KEEP EAST

MAIN TRAIL OPEN TO VISITORS BY LIMITING PERIOD OF USE AND ALWAYS WHEN ACCESS 5

TRAIL ON WEST MAIN TRAIL IS CLOSED.

ALL FOOT TRAFFIC ON FLOODPLAIN IS LIMITED TO FENCED AREA ALONG ACCESS 2.

KEY

TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS.

REMOVE BOARDWALK RAMP FOR EQUIPMENT ACCESS TO ASPHALT TRAIL IN WORK ZONE;

PROTECT AND REPLACE.

LIMIT OF EQUIPMENT ACCESS ON TRAIL; TOO NARROW UPSTREAM OF THIS POINT.

PROTECT ASPHALT ON PAVED TRAILS (TYP). REPAIR DAMAGE.

VISITOR ACCESS TO HILLSIDE TRAIL SHALL ALWAYS REMAIN OPEN. CONTRACTOR

SHALL BRIEFLY PAUSE VISITOR TRAFFIC TO HILLSIDE TRAIL AS NEEDED TO

PROTECT VISITORS.

PLACE TRAIL CLOSURE FENCE WHEN AREA 6 IS IN USE. OPEN ONLY FOR CONTRACTOR USE.

PROHIBIT VISITOR ACCESS UNTIL AREA 6 IS COMPLETE AND BOARDWALK RAMP IS

REPLACED.

INSTALL TRAIL CLOSURE FENCE ON MAIN TRAIL WHEN ACCESS 5 TO AREA 5 IS USED. LEAVE

OPEN FOR VISITOR ACCESS DURING WORK TO THE EXTENT POSSIBLE AND ALWAYS WHEN

ACCESS 8 TRAIL ON EAST MAIN TRAIL IS CLOSED.

ACCESS 9 ACROSS

FLOODPLAIN FENCED

MAX. 3 FT WIDE FOOTPATH

TO PUMP AND DIVERSION

APPROX. UPSTREAM

EXTENT OF DEWATERING

(STA 46+85)

RAMP 5

LEFT BANK

(STA 45+35)

RAMP 4

RIGHT BANK

(STA 44+60)

ACCESS 7 IN CHANNEL

(STA 43+20 TO STA 46+85)

ACCESS 8 SHORT-TERM

WORK AREA ON TRAIL

(STA 43+20 TO STA 46+85)

APPROX. DOWNSTREAM

EXTENT OF DEWATERING

(STA 43+20)

ACCESS 6 AND STAGING AREA 3

ACROSS FLOODPLAIN MAX 8.5 FT

(STA 40+80 TO STA 45+80)

ACCESS 5 ON WEST MAIN TRAIL

UPSTREAM OF BRIDGE 2, AS

SHOWN

APPROX. UPSTREAM

EXTENT OF

DEWATERING

(STA 34+10)

ACCESS 4

IN CHANNEL

(STA 30+60 TO

STA 34+10)

ACCESS 4 AND STAGING AREA 2 ON WEST MAIN TRAIL

BETWEEN BRIDGE 1 AND BRIDGE 2, AS SHOWN,

INCLUDING SEGMENT OF ASPHALT TRAIL REMOVAL AREA

RAMP 3

RIGHT BANK

(STA 31+75)

APPROX. DOWNSTREAM

EXTENT OF DEWATERING

(STA 30+60)

10 11

EQUIPMENT PROHIBITED ON BOARDWALK.

PROTECT PIPE STEM.

ACCESS 2 ACROSS FLOODPLAIN MAX. 8.5 FT

WIDE FENCED FROM CHANNEL TO TRAIL

(STA 23+65 STA 28+70)

APPROX. UPSTREAM

DEWATERING EXTENT

(STA 25+05)

RAMP 2

RIGHT BANK

(STA 23+65)

STAGING AREA 1

(SEE SHEET G4 FOR

DETAIL)

APPROX. DOWNSTREAM

DEWATERING EXTENT

(STA 21+25)

RAMP 1

LEFT BANK

(STA 22+75)

ACCESS 1 IN CHANNEL

(STA 21+40 TO STA 25+05)

ACCESS 3 SPUR

ACROSS FLOODPLAIN

LEFT BANK

AREA 7 GRADING

BOUNDARY

FLOW

PROPERTY

BOUNDARY (TYP.)

AREA 6

GRADING

BOUNDARY

ROUTE EQUIPMENT THROUGH VEGETATED AREA AROUND UPSTREAM END OF

BOARDWALK. PLACE BARRIER ACROSS BOARDWALK RAMP.

AREA 5

GRADING

BOUNDARY

C ILIV

REVISION:

SHADED AREA

REMOVED FROM

DESIGN

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

QUANTITIES I

180032

6 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G6

TABLE 2. RSP VOLUMESTABLE 1. RSP DIMENSIONS

NOTES ON ASPHALT AND BASE ROCK VOLUME ESTIMATES:

· AREA 2: VOLUME OF ASPHALT AND BASE ROCK WAS ESTIMATED BASED ON STRATIGRAPHY

OBSERVED IN PITS THAT WERE DUG ADJACENT TO THE TRAIL. EXTENT OF BASE ROCK MAY BE WIDER

THAN ASPHALT. ACTUAL DIMENSIONS ALONG THE LENGTH OF THE TRAIL MAY VARY.

TABLE 3. ASPHALT AND TRAIL BASE ROCK VOLUMES

NOTE: NA = NOT APPLICABLE

NOTES ON METHODS FOR RSP VOLUME ESTIMATES (SEE ALSO: RSP DIMENSIONS TABLE, THIS SHEET):

· RSP L1 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO TWO SECTIONS: 1) A DOWNSTREAM ~65 FT LONG SECTION OF EMBEDDED ~1 FT DIA ROCK AND 2) AN UPSTREAM ~45 FT LONG SECTION ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING.

THE TOE OF THE UPSTREAM SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE RSP IN L1 IS ASSUMED TO BE EMBEDDED BELOW THE CHANNEL BED.

· RSP R1 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF WELL-EMBEDDED ~2 FT DIA ROCK. THE TOE OF THE RSP WAS COVERED IN A GRAVEL BAR DURING OBSERVATION, WHICH WAS NOT EXCAVATED OR EXPLORED TO

COFIRM DEPTH OF RSP. TWO LOCATIONS WERE PROBED BEHIND LAYER 1 AND NO SECOND LAYER WAS OBSERVED.

· R2 (SECTION TO BE REMOVED): LAYER 1 ROCK IS A SINGLE ~70 FT LONG SECTION CONSISTING OF ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING. THE TOE OF THE R2 SECTION (TO BE REMOVED) WAS EXPOSED; THEREFORE, NONE OF THE RSP IN R2 IS

ASSUMED TO BE EMBEDDED BELOW THE CHANNEL.

· RSP R2B: LAYER 1 ROCK IS ESTIMATED TO BE A SINGLE ~40 FT LONG SECTION CONSISTING OF A SINGLE LAYER OF ~1.5 FT DIA ROCK, ORIGINATING FROM THE NORTH END OF BRIDGE 1.5 AND EXTENDING INTO THE UPSTREAM CHANNEL BANK.

· RSP L2: LAYER 1 ROCK WAS DIVIDED INTO FOUR SECTIONS: 1) AN UPSTREAM ~40 FT LONG SECTION OF WELL-EMBEDDED ~1 FT DIA ROCK, 2) A ~55 FT LONG SECTION OF ~2 FT DIA ROCK, INCLUDING A ~10 FT LENGTH OF LAUNCHED BOULDERS, 3) A FAILED ~15 FT LONG

SECTION OF ~1 FT DIA (REMAINING) ROCK THAT LAUNCHED BOULDERS INTO THE CHANNEL, AND 4) A DOWNSTREAM ~20 FT LONG SECTION OF EMBEDDED ~2 FT DIA ROCK. A SECOND LAYER WAS OBSERVED BY PROBING.

· RSP R3 (SECTION TO BE REMOVED): LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH A ~10 FT LONG FAILURE, 2) A ~40 FT LONG SECTION OF ~1.5 FT DIA ROCK, WITH LAUNCHED ROCK ALONG THE TOE

OF THE BANK 3) ~70 FT LONG SECTION OF ~2 FT DIA ROCK, WITH BOULDERS LAUNCHED IN THE CHANNEL. A SECOND LAYER WAS OBSERVED BY PROBING.

· RSP R6: LAYER 1 ROCK WAS DIVIDED INTO THREE SECTIONS: 1) AN UPSTREAM ~60 FT LONG SECTION OF WELL-EMBEDDED ~2 FT DIA ROCK, 2) A FAILED 20 FT LONG SECTION AND 3) A DOWNSTREAM ~50 FT LONG SECTION OF LOOSE ~2.5 FT DIA ROCK. LAYER 2 VOLUME

ASSUMES A SOLID 0.5 FT LAYER BEHIND THE DOWNSTREAM 75 FT OF LAYER 1. LAYER 2 ASSUMPTION IS BASED ON OBSERVATIONS OF 0.5 FT ROCK EMBEDDED IN THE BANK AT FAILURE LOCATIONS, THOUGH A SOLID LAYER WAS NOT OBSERVED AND 0.5 FT ROCK COULD BE CHINK MATERIAL, NOT A SECOND LAYER. PROBING 6 LOCATIONS (TO 1.5' DEPTH) BEHIND THE ROCK WAS NON-CONCLUSIVE. SUBSURFACE ROCK ESTIMATE ASSUMES SUBSURFACE ROCK ALONG THE DOWNSTREAM ~50 FT SECTION OF RSP ONLY (WHERE EMBEDDED

ROCK WAS OBSERVED IN CHANNEL BED).

GENERAL NOTES ON RSP VOLUMES:

· VOLUMES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY; CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL VOLUMES.

· ESTIMATED VOLUMES REPRESENT CURRENT RSP PLACEMENT ON THE BANKS, WHICH IS TIGHTLY INTERLOCKED WITH MINIMAL VOID SPACE. RSP VOLUME ESTIMATES WERE COMPUTED BY MULTIPLYING THE LENGTH, THICKNESS, AND SLOPE LENGTH (SEE RSP

DIMENSIONS TABLE, THIS SHEET).

· RSP SECTION LENGTH AND SLOPE LENGTH WERE SURVEYED AND SECTION THICKNESS WAS ESTIMATED BY PROBING 1.5 FT BELOW GROUND SURFACE ALONG THE TOP OF BANK BEHIND RSP SECTIONS.

· IT IS NOT KNOWN HOW FAR RSP SECTIONS EXTEND BELOW THE CHANNEL BED OR BANK. EXPLORATORY EXCAVATION SHALL BE CONDUCTED AT THE TOES OF ALL RSP SEGMENTS TO IDENTIFY POSSIBLE PRESENCE OF BURIED RSP. ALL SUBSURFACE ROCK SHALL BE

REMOVED AS PART OF THIS WORK, UNLESS THE TOP OF THE SUBSURFACE ROCK IS BELOW THE ELEVATIONS SPECIFIED IN THESE DRAWINGS. HISTORICAL PHOTOS DO NOT SHOW TRENCHING THAT WOULD INDICATE SUBSURFACE ROCK OR THAT RSP WAS CONSTRUCTED

WITH MORE LAYERS ON THE BANK THAN CURRENTLY VISIBLE.

C ILIV

SHEET NAME

CUT

VOLUME

(CY)

FILL

VOLUME

(CY)

C2 AREA 7 CHANNEL BED GRADING 150 150

C2 AREA 7 CHANNEL BED GRADING 93 123

C4 AREA 6 RSP BURIAL 188 56

C4 AREA 6 CHANNEL BED GRADING 108 240

C4B AREA 6 CHANNEL BED GRADING (BID OPTION B) 132 132

C7 AREA 5 CHANNEL BED GRADING 28 28

CHANNEL BED VOLUME TOTAL 474 474

CHANNEL BED VOLUME TOTAL 417 447

BID

OPTION SHEET BANK

CREEK

STATION (FT)

ARALIA

CALIFORNICA

(ELK CLOVER)

ATHYRIUM

FELIX-FEMINA

(LADY FERN)

WOODWARDIA

FIMBRIATA

(CHAIN FERN)

CAREX SP.

(SEDGE)

POLYSTICHUM

MUNITUM

(SWORD FERN)

RHODODENDRON

OCCIDENTALE

(WESTERN

AZALEA)

TOTAL

E

C2 LEFT 22+00 TO 23+00 18 28 0 0 3 0 49

C2 LEFT 22+00 TO 23+00 0 0 0 0 0 0 0

C2 LEFT 23+30 TO 24+40 1 8 0 5 22 0 36

C2 RIGHT 24+20 TO 24+80 1 28 1 5 16 0 51

AREA 7 SUBTOTAL 20 64 1 10 41 0 136

AREA 7 SUBTOTAL 2 36 1 10 38 0 87

D

C4 RIGHT 30+60 TO 33+60 0 60 3 18 40 1 122

C4 LEFT 31+30 TO 32+60 15 35 5 13 42 1 111

AREA 6 SUBTOTAL 15 95 8 31 82 2 233

C

C7 LEFT 44+40 TO 45+20 2 18 0 0 10 0 30

C7 RIGHT 43+50 TO 45+00 4 24 5 13 42 0 88

AREA 5 SUBTOTAL 6 42 5 13 52 0 118

PROJECT TOTALS 41 201 14 54 175 2 487

PROJECT TOTALS 23 173 14 54 172 2 438

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

QUANTITIES II

180032

7 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237G7

TABLE 5. ESTIMATED SOIL VOLUMES FOR BANK GRADING AFTER RSP REMOVAL

TABLE 4. ESTIMATED RSP BURIAL, RE-USE AND STOCKPILING VOLUMES

1. SOIL VOLUMES WERE ESTIMATED BY DIFFERENCING THE EXISTING AND DESIGN SURFACES UTILIZING AUTOCAD CIVIL3D, THEN SUBTRACTING THE ROCK VOLUME ESTIMATE TO REMOVE THE PORTION OF THE EXISTING SURFACE THAT IS ROCK. DUE TO THE UNKNOWN ROCK EXTENT INTO THE BANK, ACTUAL SOIL VOLUMES MAY

VARY.

TABLE 8. ESTIMATED CHANNEL BED VOLUMES

TABLE 6. PLANT SALVAGE LIST

1. ORIENT LOOKING DOWNSTREAM TO DETERMINE LEFT OR RIGHT BANKS

TABLE 10. QUANTITY AND DIMENSIONS OF IMPORTED PIN AND POST LOGS

TABLE 9. QUANTITY AND DIMENSIONS OF IMPORTED LWD

TABLE 7. EROSION CONTROL FABRIC

C ILIV

RSP REMOVED FROM

BANKS OR LAUNCH

(CY)

LAYER 1 RSP

RE-USE IN AREA 7

(CY)

RSP BURIAL AND

RE-USE IN AREA 6

(CY)

LAYER 1 RSP REUSE

IN AREA 5

(CY)

LAYER 2 RSP

RE-USE IN AREA 5

(CY)

STOCKPILE AT

CONLON LOT

(CY)

AREA 7 143 97 46

L1 RSP BANK TIE-BACK 16

CASCADE RSP TIE-BACK 81

AREA 6 296 197 55 13 31

BURY IN CHANNEL BED OR HAUL OFF SITE (BID OPTION B) 188

R2 RSP BANK TIE-BACK 9

AREA 5 74 68 6

BURIED BANK REVETMENT 123 19

TOTAL 513 97 197 123 19 77

SHEET

CREEK

STATION

(FT)

NAME

CUT

VOLUME

(CY)

FILL

VOLUME

(CY)

RE-USE IN

AREA 6

(CY)

STOCKPILE AT

CONLON LOT OR

HAUL OFF SITE

(BID OPTION A)

(CY)

C2 20+87 EXCAVATE CASCADE TIE-BACK AND BACKFILL RSP VOIDS 99 42

C2 23+80 GRADE BANK FOR LOWERED FLOODPLAIN 165 0

C2 24+50 EXCAVATE L1 TIE-BACK AND BACKFILL RSP VOIDS 23 12

AREA 7 SUBTOTAL 287 54 0 233

C4 30+62 EXCAVATE R2 TIE-BACK AND BACKFILL RSP VOIDS 16 10

C4 31+00 GRADE BANK FOR MEANDER BEND AT R2 6 10

C4 31+50 CREEK BANK FILL, TRAIL AND FLOODPLAIN GRADING 37 124

AREA 6 SUBTOTAL 59 144 0 0

C7 44+30 GRADE BANK AT R6 15 0

C7 44+95 EXCAVATE FOR RSP REVETMENT, FILL RSP VOIDS, REBUILD BANK 252 166

AREA 5 SUBTOTAL 267 166 85 16

SOIL VOLUME TOTAL 613 364 85 249

SHEET STA (FT) NAME FABRIC TYPE SLOPE LENGTH

(FT)

WIDTH

(FT)

C4, C19 DETAILS 30+62 TO 30+80 R2 RSP REMOVAL 1 & 2 10 18

TYPE LOCATION

AVERAGE

DIAMETER

(FT)

LENGTH

(FT)

ROOTBALL

(Y/N) NUMBER NUMBER

LWD AREA 7 2 30 Y 4 2

TOTAL IMPORTED LOGS WITHOUT ROOTBALLS 4 2

LWD AREA 7 2 30 N 11 10

TOTAL IMPORTED LOGS WITH ROOTBALLS 11 10

TOTAL IMPORTED LOGS 15 12

TYPE LOCATION

DIAMETER

(FT)

LENGTH

(FT)

ROOTBALL

(Y/N) NUMBER

PIN AREA 5 0.50 - 0.75 9 N 21

PIN AREA 6 0.50 - 0.75 9 N 42

PIN AREA 7 0.50 - 0.75 9 N 59

TOTAL PIN LOGS 122

POST AREA 5 0.33 - 0.50 6 N 8

POST AREA 6 0.33 - 0.50 6 N 20

POST AREA 7 0.33 - 0.50 6 N 5

TOTAL POST LOGS 33

BOHEMIAN

GROVE

MUIR WOODS

VISITOR

CENTER

RESTROOMS

L6

L5

L4

R6

R5

L3R4

R3

L2

R2

R1 L1

HILLSIDE TRAIL

CANOPY VIEW TRAIL

BRIDGE 2

BRIDGE 1.5

BRIDGE 1

R2B

AREA OF

DETAIL

15+00

20+00 25+00

30+00

35+00

40+00

45+00

EAST MAIN TRAIL

WEST MAIN TRAIL

TOP OF RAIL

BRIDGE DECK

PAVEMENT

SURFACE

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 49

6 TO 8 IN

ROCK (TYP.)

0.20' PAVEMENT

THICKNESS

PAVED

RAMP

0.35 GIRDER

OFFSET BACK ~1'

BRIDGE DECK

6" TO 1' ROCK

WING WALL

R2B RSP EXTENDS ALONG

UPSTREAM BANK AND

TIES INTO BRIDGE 1.5 ROCK

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

DEMOLITION PLAN

180032

8 45

JKA, BSP,JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237D1

SCALE OF FEET

1000100

1. REMOVAL OF RSP INCLUDES REMOVAL OF ALL ROCK ASSOCIATED WITH RSP

SECTION, INCLUDING ROCK BURIED IN THE CHANNEL BED AND/OR

ADDITIONAL LAYERS OF ROCK IN THE BANK.

2. CONTRACTOR SHALL USE METHODS TO REMOVE RSP FROM THE BANK T0

MINIMIZE BANK DISTURBANCE, CUTTING OF TREE ROOTS, SOIL LOSS, AND

VEGETATION DISTURBANCE. HERBACEOUS VEGETATION THAT WOULD

INTERFERE WITH RSP REMOVAL MAY BE REMOVED WITH CO APPROVAL, AN

NPS BIOMONITOR PRESENT AND USING METHODS THAT AVOID GROUND

DISTURBANCE.

3. ALL BANKS SHALL BE INSPECTED BY COR AFTER RSP LAYER 1 REMOVAL AND

AGAIN AFTER EACH SUBSEQUENT LAYER OF RSP IS REMOVED. ROCK

REMOVAL METHODS OR GRADING OF BANKS MAY BE MODIFIED TO AVOID

IMPACTS TO TREE ROOTS.

GENERAL RSP REMOVAL NOTES

1. CUTTING WOOD FOR ACCESS SHOULD BE AVOIDED WHERE POSSIBLE.

2. IF CUTTING WOOD IS NECESSARY, CUT WOOD TO THE LARGEST MOVEABLE SIZE AND

MINIMIZE REMOVAL OF BRANCHES. CUT WOOD AT LOCATION SPECIFIED ON DRAWINGS.

3. DO NOT CLEAR ANY VEGETATION EXCEPT THE TREE OR WOOD THAT IS IDENTIFIED FOR

REMOVAL.

4. PRIOR TO MOVING WOOD, LOCATE AND CLEARLY IDENTIFY THE WOOD TO BE MOVED AND

PATH THAT WOOD SHALL BE MOVED. IDENTIFY ANY INTERMEDIATE TEMPORARY PLACEMENT

LOCATIONS AND COORDINATE INSPECTIONS PRIOR TO MOVEMENT AND PLACEMENT WOOD

WITH BIOLOGICAL MONITOR.

5. RETAIN ANY CUT BRANCHES FOR USE AS SWD BELOW PLACED WOOD AS SHOWN ON

DRAWINGS.

GENERAL WOOD RELOCATION NOTES

1V:1H

XS 1

AREA 6 BRIDGE 1.5 PROFILE (APPROX. AT CREEK STA 31+50)

10 0 10 20

SCALE OF FEET

AREA OF DETAIL: AREA 6 BRIDGE 1.5

CUT AND RELOCATE LOG (SHEET C7).

KEY

REMOVE TRAIL (DETAIL, THIS SHEET AND SHEET C4).

XS 1

M U

IR

W

O O

D S

NA

TI

O

NA

L M

O

NU

M

EN

T

M O

U

NT

T

AM

AL

PA

IS

S

TA

TE

P

AR

K

PA

RC

EL

N O

. 0 2-

NP

S

LA

W

E

NF

O

RC

EM

EN

T

AN

D M

AN

AG

EM

EN

T

AR

EA

FLOW

MUIR WOODS NATIONAL MONUMENT

MOUNT TAMALPAIS STATE PARK

REMOVE RSP R6 (SHEET C7).

REMOVE SECTIONS OF RSP L1 AND RSP R1 (SHEET C2).

REMOVE RSP R3 (SHEET C4).

REMOVE A SECTION OF RSP R2, ROCK UNDERLYING BRIDGE 1.5, AND RSP R2B (SHEET C4).

DECONSTRUCT AND REMOVE BRIDGE 1.5 (DETAIL, THIS SHEET).

REMOVE RSP L2 (SHEET C4).

C ILIV

5 10

REMOVE ALDERS (SHEETS C4).

TOPPLE AND RETAIN THE ROOTBALLS OF 3 ALDERS AND 1 BAY FOR REUSE AS LWD

(SHEET C2).

BRIDGE 1.5

CATHEDRAL

GROVE

MUIR WOODS

VISITOR CENTER

RESTROOMS

EXISTING ROCK CHECK

DAM (CASCADE)

L6

L5

L4

R6

R5

L3R4

R3

L2

R2

R1

L1

HILLSIDE TRAIL

BRIDGE 3

BRIDGE 2

BRIDGE 1.5

BRIDGE 1

DESIGN

AREA 5

DESIGN

AREA 6

DESIGN

AREA 7

SHEET C7

SHEET C2

SHEET C3

SHEET C4

SHEET C5

SHEET C6

109 110

R2B

15+00

20+00 25+00

30+00

35+00

40+00

45+00

50+00

FRANK VALLEY RD

CANOPY VIEW TRAIL

EAST MAIN TRAIL

W

EST M

AIN TRAIL

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

PLAN INDEX & OVERVIEW

180032

9 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C1200

SCALE OF FEET

1000100

SURVEY CONTROL NETWORK BY OBERKAMPER & ASSOCIATES, 2017. GEOMETRIC DATUM:NORTH AMERICAN DATUM OF 1983 - NAD83(2011) EPOCH 2010.00 REALIZIATION. PROJECTION:CALIFORNIA STATE PLANE COORDINATE SYSTEM (SPCS) ZONE III, U.S. SURVEY FT. VERTICAL DATUM:NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FT.

SURVEY CONTROL NETWORK

FLOW

M U

IR

W

O O

D S

NA

TI

O

NA

L M

O

NU

M

EN

T

M O

U

NT

T

AM

AL

PA

IS

S

TA

TE

P

AR

K

PA

RC

EL

N O

. 0 2-

NP

S

LA

W

E

NF

O

RC

EM

EN

T

AN

D M

AN

AG

EM

EN

T

AR

EA

MUIR WOODS NATIONAL MONUMENT

MOUNT TAMALPAIS STATE PARK

C ILIV

REVISION:

SHADED AREA

REMOVED FROM

DESIGN

25+00

20+70.69

25+45.92

400417

136 135

136137

138139

133.0131132

130.4

135.2

9.1

R

R

A A

A

A A

A A

A

AA

AAA A

A

M

M

B B

B

A

B

B

R

R

R

R

AA

RA

A

A

A

A

B

S

S

PROTECT SECTION OF SEWER LINE BETWEEN RESTROOM AND MANHOLE (APPROX.

ALIGNMENT).

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: AREA 7

180032

10 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C2

FLOW

<E> RESTROOM

ALT. B WOOD JAMS

<E> PHONE BOOTH

XS 3

C11

PROTECT <E> PIPE (APPROX. ALIGNMENT).

NO ACCESS IN CHANNEL UPSTREAM OF THIS POINT.

<P> ACCESS ROUTE TO BE LOCATED TO AVOID <E> STANDS OF ELYMUS CALIFORNICUS (TO

BE FLAGGED BY NPS). NO TREES SHALL BE REMOVED. TIE BACK BRANCHES TO EXTENTS

POSSIBLE, WITH MINOR TRIMMING, AS NECESSARY.

OBSERVE AND PROTECT <E> TREE AND ROOTS.

KEY

ENTRANCE

PLAZA

VISITOR

CENTER

BOARDWALK <E> FLAG

POLE

M U

IR W

O

O D

S N

ATIO

N

AL M

O

N U

M

EN

T

M O

U N

T TAM

ALPAIS STATE PARK

PARC

EL N

O . 02-106

N

PS LAW

EN

FO

RC

EM

EN

T AN

D M

AN

AG

EM

EN

T AREA

XS 4

C11

<E> MANHOLE

R1

L1XS 5

C16

STAGING AREA

<E> SEWER LINE

(LOCATION APPROXIMATE)

EXPOSED

BEDROCK

<E> "CASCADE"

ROCK CHECK DAM

DOWNSTREAM LIMIT OF

DEWATERING

UPSTREAM LIMIT OF

DEWATERING

<E> PLUGGED AND GROUTED

SEWER LINE

<E> SEWER LINE

<E> "MIDDLE" ROCK

CHECK DAM

<P> ACCESS ROUTE TO L1 RSP TIE-BACK (KEY NOTE 4 AND SHEET C16).

<E> PHONE CABLE

IN PIPE ( APPROX.)

DEMOLISH APPROX. 200 LF <E> PHONE CABLE IN CONDUIT, INCLUDING APPROX. 50 LF

SUBSURFACE (ALIGNMENT APPROX.). CUT TO AVOID REMOVAL UNDER ASPHALT OR TO

AVOID TREES DISTURBANCE.

SAW CUT GROUTED SEWER LINE 6-12" FROM <E> MANHOLE. IF PLUG BETWEEN CUT AND

MANHOLE IS LOOSENED OR REMOVED, RECAP THE CUT END WITH GROUT.

MARK <E> SEWER LINE ALIGNMENT PRIOR TO REMOVAL TO IDENTIFY ANY TREES THAT

MAY POTENTIALLY BE IMPACTED. DEMOLISH SEWER LINE BETWEEN <E> MANHOLES

AND BACKFILL WITH SOIL PER SPECIFICATIONS.

<E> GATE

<E> MANHOLE

<E> SEWER LINE

<E> DROP INLET

& CULVERT

POSSIBLE AREA TO STORE SALVAGED VEGETATION (LEFT BANK AND/OR CHANNEL).

15 0 15 30

SCALE OF FEET

LP1

C8

LP2

C8

<E> SPLIT RAIL FENCE

GENERAL NOTES:

1. SEE WOOD INSTALLATION SHEETS W1, W4-W8, AND W17

2. RSP REMOVAL TO BE HAULED TO CONLON LOT (SHEETS G4 AND G6)

REMOVE RSP AT L1 TIE-BACK LOCATION TO EXCAVATE TRENCH AND CONSTRUCT RSP

TIE-BACK INTO LEFT BANK (SHEET C16).

<P> ACCESS ROUTE TO CHANNEL AND UPSTREAM CONSTRUCTION AREAS 5 AND 6.

XS 2

C16

PROJECT SEWER LINE.

C ILIV

TOPPLE TREES WHOLE WITH ROOTBALLS INTACT FOR REUSE.

EXCAVATE SOIL AND CONSTRUCT CASCADE RSP TIE-BACK INTO LEFT BANK (SHEET C16).

<E> TEMPORARY

PARKING TO UNLOAD

IMPORTED LOGS TO

BE COORDINATED

WITH COR IN

ADVANCE

REVISION:

SHADED GRADING

AREA REMOVED FROM

DESIGN

REVISION:

LARGE WOOD REMOVED

FROM DESIGN

(SHEET W1)

REVISION:

LARGE WOOD REMOVED

FROM DESIGN (SHEET W1)

REVISION:

LARGE WOOD REMOVED

FROM DESIGN (SHEET W1)

REVISION:

INSTALL LARGE WOOD

WITH ROOTBALL

(SHEET W1)

BR

ID

G E

R303

R302 R301

CREEK STA 25+46 400417

139140141

142143

143 142

148 149

142143

CREEK STA 29+60

R

A

A

R

R

RA

A A

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: ACCESS TO AREAS 5 & 6

180032

11 45

JKA, BSP, JRP

JRP, THB

JKA

01/06/2023

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C3

FLOW

15 0 15 30

SCALE OF FEET

TEMPORARILY REMOVE FENCE RAILS FOR EQUIPMENT ACCESS

KEY

CREATE TEMPORARY STABLE ACCESS NEXT TO <E> TREES. RESTORE GROUND TO ORIGINAL CONDITION

AFTER USE. DO NOT CUT HILLSLOPE. PROTECT BARK ON STANDING TREES. STORE DUFF AND

BRANCHES TO REPLACE AFTER WORK. USE LANDSCAPE CLOTH BENEATH ANY PLACED MATERIAL.

"BRIDGE 1" ROCK

CHECK DAM (E)

BOARDWALK (E)

SEWER LINE (E)

"MIDDLE" ROCK

CHECK DAM (E)

VISITOR

CENTER

MUIR WOODS NATIONAL MONUMENT

NO C

ONST

RUCTIO

N

ACCESS

T

O B

RID

GE 1

TEMP. CONSTRUCTION ACCESS ROUTE

MOUNT TAMALPAIS STATE PARK PARCEL NO. 02-106 NPS LAW ENFORCEMENT AND MANAGEMENT AREA

INSTALL TEMPORARY FENCE

TO BLOCK VISITOR ACCESS

WITH SIGN: "TRAIL CLOSED"

TRANSPLANT SINGLE AZALEA LOCATED AT R2 (SHEET C4) TO THIS AREA AND PROTECT. INSTALL WITH

EQUIPMENT OPERATING FROM TRAIL. COORDINATE WITH COR FOR FINAL LOCATION.

ALL FOOT TRAFFIC ON FLOODPLAIN IS LIMITED TO FENCED TEMP CONSTRUCTION ACCESS

ROUTE.4

C ILIV

RELOCATE LOGS OUT OF ACCESS ROUTE OR, IF BID OPTION G IS AWARDED, RELOCATE TO

AREA 6 TO INSTALL AS LWD.

BRIDGE 1.5

30+00

146147148

149 148 14

147 146 145 144

4 145

144 145146

138.5

145.1

139.9

143.0

140.0

145.6

141.0

148155

142 143 144

150155

139140 141141141 0

10020

149148144

145144

CREEK STA 29+60

CREEK STA 34+91

146 143

A

B

A

A

RR

R R

B

R

R

R

RR

R

R

Az B

AA

R

R

B

A

AA

A

H H

R R

Az

TH

Az

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: AREA 6

180032

12 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C4

FLOW

APPROXIMATE

DOWNSTREAM EXTENT OF

DEWATERING

ROCK

OUTCROP

<E> BOARDWALK: NO

CONSTRUCTION ACCESS

XS 11

C14

XS 7

C12

XS 6

C16

XS 10

C13

R3

L2

R2B

R2

15 0 15 30

SCALE OF FEET

XS 9

C13

APPROX. UPSTREAM

EXTENT OF DEWATERING

REMOVE <E> TRAIL

SAVE <E> ALDER & PROTECT ROOTS UPSTREAM (US) & DOWNSTREAM (DS) OF TRUNK: RSP

TO REMAIN 0-5 FT US; REMOVE RSP W/O TEARING ROOTS 5-6 FT US; REMOVE RSP WITH OBS.

OF ROOTS 6-12 US; RSP TO REMAIN 0-3 FT DS; REMOVE RSP W/ OBS.OF ROOTS 3-10 FT DS.

PROTECT AND SAVE <E> TREE AND ROOTS IN PLACE.

PROTECT <E> LOG GRADE CONTROL.

LOWER FLOODPLAIN.

SAVE AZALEA AND PROTECT ROOTS. ENSURE PLANT DOES NOT TOPPLE DURING RSP

REMOVAL. CONDUCT WITH NPS OBSERVATION.

GRADE NEW SOIL MOUND AT BASE OF REDWOOD TO SIMULATE NATURAL CONDITIONS.

REMOVE 18 <E> BOULDERS PLUS NUMEROUS COBBLE PIECES FROM CHANNEL BED IN

FRONT OF L2 RSP SECTION.

MOVE LOG FOR ACCESS AS NEEDED.

DEMOLISH AND DISPOSE OF BRIDGE 1.5 (SHEET D1). REMOVE AND REUSE OR BURY

UNDERLYING RSP AND COBBLE PER DESIGNS AND SPECIFICATIONS. FOLLOW GRADING

LINES TO FILL WITH CHANNEL BED MATERIAL AND BLEND WITH ADJACENT TOPOGRAPHY.

PROTECT REDWOOD AND ITS ROOTS.

REMOVE AND DISPOSE OF TWO IN-LINE CULVERTS. FOLLOW GRADING LINES TO FILL WITH

SOIL AND BACK-SLOPE FROM TOP OF CHANNEL BANK TO FLOODPLAIN. BLEND WITH

ADJACENT TOPOGRAPHY.

TIE BACK RSP INTO RIGHT BANK BEHIND UPSTREAM END OF REMAINING R2 RSP (SHEET

C16). INSTALL EROSION CONTROL FABRIC (SHEET C19, DETAIL 1) FROM TIE-BACK TO 18 FT

UPSTREAM OF REMAINING R2 RSP.

KEY

TEMPORARILY REMOVE ALL PARTS OF <E> BOARDWALK RAMP FOR EQUIPMENT ACCESS:

STORE, COVER ABOVE GROUND (E.G., ON <E> BOARDWALK), AND REPLACE (SEE SPECS FOR

DETAILS).

<E> DECK LENGTH

APPROX. 17 FT

8 10

LP4

C9

LP3

C9

PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP INTO

THE VEGETATED AREA.

GENERAL NOTES:

1. SEE WOOD INSTALLATION SHEETS W2, W9-W13, AND W17

XS 8

C12

C ILIV

AZALEA AT L2 WILL BE REMOVED AND REPLANTED BY NPS IN COORDINATION WITH

CONTRACTOR DURING RSP REMOVAL (SPEC SECTION 01 45 00). RELOCATE AZALEA AT R2:

PREPARE RELOCATION SITE FOR AZALEA PRIOR TO SALVAGING (SHEET C3 AND SPECS).

BRIDGE 1.5

30+00144

146147148

149 148 14

147 146 145 144

4 145

148155

142 143 144

150155

10020

CREEK STA 29+60

CREEK STA 34+91

144143142

143144

143142141

146 145

141141141 140139

A

B

A

A

RR

R R

B

R

R

R

RR

R

R

Az B

AA

R

R

B

A

AA

A

H H

R R

Az

TH

Az

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: AREA 6

180032

13 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C4B

FLOW

APPROXIMATE

DOWNSTREAM EXTENT OF

DEWATERING

ROCK

OUTCROP

<E> BOARDWALK: NO

CONSTRUCTION ACCESS

XS 11

C14

XS 7

C12

XS 5

C16

XS 10

C13

R3

L2

R2B

R2

15 0 15 30

SCALE OF FEET

XS 9

C13

APPROX. UPSTREAM

EXTENT OF DEWATERING

REMOVE <E> TRAIL

<E> DECK LENGTH

APPROX. 17.0 FT

8 10

LP4

C9

LP3

C9

GENERAL NOTES:

1. SEE WOOD INSTALLATION SHEETS W2, W9-W13, AND W17

BID OPTION B

XS 8

C12

C ILIV

SAVE <E> ALDER & PROTECT ROOTS UPSTREAM (US) & DOWNSTREAM (DS) OF TRUNK: RSP

TO REMAIN 0-5 FT US; REMOVE RSP W/O TEARING ROOTS 5-6 FT US; REMOVE RSP WITH OBS.

OF ROOTS 6-12 US; RSP TO REMAIN 0-3 FT DS; REMOVE RSP W/ OBS.OF ROOTS 3-10 FT DS.

PROTECT AND SAVE <E> TREE AND ROOTS IN PLACE.

PROTECT <E> LOG GRADE CONTROL.

LOWER FLOODPLAIN.

SAVE AZALEA AND PROTECT ROOTS. ENSURE PLANT DOES NOT TOPPLE DURING RSP

REMOVAL. CONDUCT WITH NPS OBSERVATION.

GRADE NEW SOIL MOUND AT BASE OF REDWOOD TO SIMULATE NATURAL CONDITIONS.

REMOVE 18 <E> BOULDERS PLUS NUMEROUS COBBLE PIECES FROM CHANNEL BED IN

FRONT OF L2 RSP SECTION.

MOVE LOG FOR ACCESS AS NEEDED.

DEMOLISH AND DISPOSE OF BRIDGE 1.5 (SHEET D1). REMOVE AND REUSE OR BURY

UNDERLYING RSP AND COBBLE PER DESIGNS AND SPECIFICATIONS. FOLLOW GRADING

LINES TO FILL WITH CHANNEL BED MATERIAL AND BLEND WITH ADJACENT TOPOGRAPHY.

PROTECT REDWOOD AND ITS ROOTS.

REMOVE AND DISPOSE OF TWO IN-LINE CULVERTS. FOLLOW GRADING LINES TO FILL WITH

SOIL AND BACK-SLOPE FROM TOP OF CHANNEL BANK TO FLOODPLAIN. BLEND WITH

ADJACENT TOPOGRAPHY.

TIE BACK RSP INTO RIGHT BANK BEHIND UPSTREAM END OF REMAINING R2 RSP (SHEET

C16). INSTALL EROSION CONTROL FABRIC (SHEET C19, DETAIL 1) FROM TIE-BACK TO 18 FT

UPSTREAM OF REMAINING R2 RSP.

KEY

TEMPORARILY REMOVE ALL PARTS OF <E> BOARDWALK RAMP FOR EQUIPMENT ACCESS:

STORE, COVER ABOVE GROUND (E.G., ON <E> BOARDWALK), AND REPLACE (SEE SPECS FOR

DETAILS).

PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP INTO

THE VEGETATED AREA.

AZALEA AT L2 WILL BE REMOVED AND REPLANTED BY NPS IN COORDINATION WITH

CONTRACTOR DURING RSP REMOVAL (SPEC SECTION 01 45 00). RELOCATE AZALEA AT R2:

PREPARE RELOCATION SITE FOR AZALEA PRIOR TO SALVAGING (SHEET C3 AND SPECS).

35+00

7148149

152151

149150 149

CREEK STA 39+08

CREEK STA 34+30

R RR

R400

R402

R401

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: ACCESS TO AREA 5

180032

14 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C5

FLOW

KEY

PROTECT <E> BOARDWALK RAMP: EQUIPMENT ACCESS TO THE EAST OF THE RAMP

INTO THE VEGETATED AREA.

TREE TAG #157

15 0 15 30

SCALE OF FEET

C ILIV

WHEN UPSTREAM TRAIL IS IN USE FOR

EQUIPMENT ACCESS TO AREA 6: INSTALL

TEMPORARY FENCE TO BLOCK VISITOR

ACCESS WITH SIGN: "TRAIL CLOSED"

BR

ID

G E

40+00

R

R

149150

156157 154

158 157

CREEK STA 43+44

CREEK STA 38+21

B

R

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: ACCESS TO AREA 5

180032

15 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C6

FLOW

N O

C O

N

ST

RU

CT

IO

N

A

CC

ES

S

TO

B

RI

D

G E

15 0 15 30

SCALE OF FEET

LP5

C10

WHEN UPSTREAM TRAIL IS IN USE FOR

EQUIPMENT ACCESS TO AREA 6: INSTALL

TEMPORARY FENCE TO BLOCK VISITOR

ACCESS WITH SIGN: "TRAIL CLOSED"

WHEN UPSTREAM TRAIL IS IN USE FOR

EQUIPMENT ACCESS TO AREA 6: INSTALL

TEMPORARY FENCE TO BLOCK VISITOR

ACCESS WITH SIGN: "TRAIL CLOSED"

WHEN UPSTREAM TRAIL IS IN USE FOR

EQUIPMENT ACCESS TO AREA 6: INSTALL

TEMPORARY FENCE TO BLOCK VISITOR

ACCESS WITH SIGN: "TRAIL CLOSED"

KEY

VISITOR ACCESS TO HILLSIDE TRAIL SHALL REMAIN OPEN THROUGHOUT CONSTRUCTION.

THE CONTRACTOR SHALL BRIEFLY PAUSE VISITOR TRAFFIC TO HILLSIDE TRAIL AS NEEDED

TO PROTECT VISITORS.

C ILIV

45+00

156157 154

158 157

158 159

157158

162161

156 155

158 0

CREEK STA 42+70

CREEK STA 47+95

R

RR

R

B

B

TO

H H H H H H

B

R

BB

B

B

B

B

B

R R

R

R

TO TO

R

FLOW

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD

SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

SITE PLAN: AREA 5

180032

16 45

JKA, BSP, JRP

JRP, THB

JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C7

XS 14

C15

XS 13

C15 XS 12

C14

R6

INSTALL BURIED RSP IN LEFT BANK PER DESIGNS AND SPECIFICATIONS. EXISTING

CONTOURS WILL BE REESTABLISHED, AS FEASIBLE. SECTION OF RSP UPSTREAM OF LWD

L1012 TO BE INSTALLED PRIOR TO LOG RELOCATION BY OTHERS.

SAVE HAZELNUT TREES

REMOVE RSP FROM BANK AND CHANNEL BED

REMOVE RSP FROM BANK AND CHANNEL BED; GRADE BANK AS SHOWN IN SITE

PLAN AND CROSS-SECTION (SHEET C14)

SECTION OF RSP DOWNSTREAM OF LWD L1012 TO BE COMPLETED AFTER LOG

PLACEMENT (LOG RELOCATION BY OTHERS). MAINTAIN DEWATERING SYSTEM

DURING LOG PLACEMENT. SEE SPECIFICATIONS FOR DETAILS.

KEY

NO EQUIPMENT ACCESS

PROTECT <E> LOG GRADE CONTROL

APPROXIMATE

DOWNSTREAM

EXTENT OF

DEWATERING AND

EQUIPMENT ACCESS

APPROXIMATE UPSTREAM

EXTENT OF DEWATERING AND

EQUIPMENT ACCESS

APPROX

5.5 FT

TRAIL WIDTH LIMITATION NORTH OF CONSTRICTION BETWEEN REDWOODS. FOOT TRAFFIC

ONLY. LIMITED EQUIPMENT (<5.5 FT WIDE) ALLOWED PER NPS APPROVAL.

FO

OT

TR

AFF

IC

O

NLY

EQUIPMENT ACCESS ROUTE

15 0 15 30

SCALE OF FEET

LP5

C10

NO EQUIPMENT ACCESS

C ILIV

SMOOTH A RAMP FROM THE ROOTBALL OF

L1012 TO THE CONSTRUCTED POOL

CUT REDWOOD ALONG CUT LINE TO MAXIMIZE REMAINING LENGTH

EL

EV

A

TI

O N

(F T)

STATION (FT)

200210220230240250260270280290300310320330340350360370380390400410420

STA: 368

ELEV:133.0

STA: 362

ELEV:131.0

STA: 345

ELEV:134.0 STA: 308

ELEV:133.4

STA: 300

ELEV:131.0

STA: 279

ELEV:132.9

STA: 252

ELEV:132.5

STA: 245

ELEV:129.0

STA: 203

ELEV:133.2

STA: 222

ELEV:129.0

STA: 246

ELEV:129.7

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190200

STA: 118

ELEV:132.4

STA: 105

ELEV:128.0

STA: 78

ELEV:128.0

STA: 57

ELEV:130.9

STA: 38

ELEV:131.4

STA: 196

ELEV:133.5

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110115

STA: 111

ELEV:134.0

STA: 109

ELEV:134.5

STA: 94

ELEV:134.5

STA: 76

ELEV:134.0

STA: 25

ELEV:132.0

STA: 17

ELEV:131.5

STA: 3

ELEV:131.0

STA: 0

ELEV:129.7

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

LONGITUDINAL PROFILES: AREA 7

180032

17 45

BSP, BB

BD, JRP

JRP, BSP, JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C8

1V:2H

LP 1

C2

AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP 1

C2

AREA 7 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP 2

C2

AREA 7 SIDE CHANNEL LONGITUDINAL PROFILE

AREA 7 SIDE CHANNEL

ALIGNMENT INGRESS

(LP2 STA 115)

AREA 7 SIDE CHANNEL

ALIGNMENT EGRESS

(LP2 STA 0)

FLOW

FLOW

FLOW

C ILIV

REVISION:

SHADED GRADING

AREA REMOVED FROM

DESIGN

A

TI

O N

(F T)

STATION (FT)

180190200210220230240250260270280290300310320330340350360

STA: 334

ELEV:144.8

STA: 310

ELEV:143.0

STA: 305

ELEV:141.0

STA: 273

ELEV:143.5

STA: 264

ELEV:144.0STA: 345

ELEV:143.8

STA: 322

ELEV:144.5

STA: 290

ELEV:141.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180

STA: 57

ELEV:141.5

STA: 31

ELEV:138.5

STA: 17

ELEV:140.5

STA: 49

ELEV:138.5

STA: 158

ELEV:143.0

STA: 139

ELEV:139.5

STA: 125

ELEV:139.5

STA: 79

ELEV:143.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130138

STA: 99

ELEV:144.0

STA: 98

ELEV:144.4 STA: 62

ELEV:143.0

STA: 37

ELEV:140.0

STA: 14

ELEV:141.0

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

LONGITUDINAL PROFILES: AREA 6

180032

18 45

BSP, JRP, BB

BD

BSP, JRP, JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C9

1V:2H

LP3

C4

AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP3

C4

AREA 6 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

LP4

C4

AREA 6 SIDE CHANNEL LONGITUDINAL PROFILE

FLOODPLAIN EGRESS (STA 0)

AREA 6 SIDE CHANNEL

ALIGNMENT EGRESS

(LP4 STA 0)

AREA 6 SIDE CHANNEL

ALIGNMENT INGRESS

(LP4 STA 138)

FLOW

FLOW

FLOW

C ILIV

A

TI

O N

(F T)

STATION (FT)

190200210220230240250260270280290300310320330340350

STA: 306

ELEV:158.4

STA: 226

ELEV:156.3

STA: 219

ELEV:157.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0102030405060708090100110120130140150160170180190

STA: 166

ELEV:156.5

STA: 148

ELEV:153.5

STA: 136

ELEV:155.5 STA: 111

ELEV:155.2

STA: 13

ELEV:154.0

STA: 157

ELEV:153.5

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

LONGITUDINAL PROFILE: AREA 5

180032

19 45

BSP, BB

BD

BSP, JRP, JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C10

1V:2H

LP5

C7

AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE

LP5

C7

AREA 5 MAIN CHANNEL LONGITUDINAL PROFILE

1V:2H

FLOW

FLOW

C ILIV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 62

STA: 17

ELEV:134.9

STA: 28

ELEV:134.4 STA: 40

ELEV:133.9

STA: 43

ELEV:133.5

STA: 44

ELEV:133.4

STA: 45

ELEV:133.5

STA: 48

ELEV:133.9

STA: 50

ELEV:133.9

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 65

STA: 6

ELEV:138.7

STA: 16

ELEV:134.5 STA: 19

ELEV:134.3

STA: 21

ELEV:134.5

STA: 23

ELEV:135.0

STA: 29

ELEV:135.2 STA: 32

ELEV:135.0 STA: 36

ELEV:133.9

STA: 40

ELEV:133.7

STA: 44

ELEV:133.9

STA: 48

ELEV:135.0

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

GRADING SECTIONS 3 & 4

180032

20 45

BSP, JRP, BD

BD, JRP

BSP, JRP, JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C11

1V:1H

CROSS SECTION AT AREA 7 DESIGN STA 183

(CREEK STA 22+80)

XS 3

C2

1V:1H

XS 4

C2

GRADING SECTION AT AREA 7 DESIGN STA 319

(CREEK STA 24+15)

ESTIMATED EXTENTS

OF L1 RSP

BUILD BAR WITH CHANNEL BED

MATERIAL TO DESIGN CONTOURS

AND LIMITS

GRADE SLOPE AND DAYLIGHT INTO <E>

GROUND, OBSERVING AND PROTECTING

TREE ROOTS AND STEMS UNLESS

MARKED FOR REMOVAL

FILL CHANNEL WITH BED

MATERIAL AND RAISE RIFFLE

ELEVATION

ESTIMATED EXTENTS OF R1 RSP

C ILIV

OUTSIDE OF POOL AREAS: UPPER

0.3 FT OF FILL MATERIAL SHALL

BE COMPOSED OF A SURFACE

MATERIAL CAP

OUTSIDE OF POOL AREAS: UPPER

0.3 FT OF FILL MATERIAL SHALL

BE COMPOSED OF A SURFACE

MATERIAL CAP

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 55

STA: 2

ELEV:144.4 STA: 10

ELEV:144.0

STA: 18

ELEV:142.4

STA: 25

ELEV:138.5

STA: 29

ELEV:138.5

STA: 35

ELEV:142.7

STA: 37

ELEV:142.7

STA: 52

ELEV:147.2

STA: 34

ELEV:138.2

STA: 33

ELEV:136.7

STA: 45

ELEV:148.0

EL

EV

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 50 60 64

STA: 55

ELEV:146.3

STA: 53

ELEV:146.8

STA: 43

ELEV:140.5

STA: 39

ELEV:140.3

STA: 41

ELEV:140.1

STA: 35

ELEV:143.0

STA: 33

ELEV:143.6STA: 29

ELEV:143.0

STA: 24

ELEV:143.0

STA: 21

ELEV:143.5

STA: 14

ELEV:144.0STA: 7

ELEV:144.0

GRADING SECTION AT AREA 6 DESIGN STA 40

(CREEK STA 31+00)

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

CADD SALMON HABITAT ENHANCEMENT

AT MUIR WOODS, PHASE 2

GRADING SECTIONS 7 & 8

180032

21 45

BSP, JRP

BD, JRP

BSP, JRP, JKA

10/14/2022

MUIR WOODS NATIONAL MONUMENT

CALIFORNIA

312237C12

1V:1H

XS 7

C4

ESTIMATED EXTENTS OF

R2 RSP REMOVAL

EXCAVATE TRAIL ASPHALT

AND BASE ROCK

GRADING SECTION AT AREA 6 DESIGN STA 80

(CREEK STA 31+39)

1V:1H

XS 8

C4

ESTIMATED EXTENTS OF

BRIDGE 1.5 RSPESTIMATED EXTENTS OF

L2 RSP REMOVAL

INSTALL EROSION CONTROL

FABRIC TO PROTECT SOIL

BANK FILL PER PLANS AND

SPECIFICATIONS

BACKFILL BRIDGE 1.5 RSP CUT

WITH CHANNEL BED

MATERIAL AND BUILD UP TOP

OF BACK-SLOPED BANK

APPROX INTERFACE

BETWEEN CHANNEL

BED MATERIAL AND

SOIL BANK BACKFILL

APPROX. POSITION OF

<E> REDWOOD

C ILIV

OUTSIDE OF POOL AREAS: UPPER

0.3 FT OF FILL MATERIAL SHALL

BE COMPOSED OF A SURFACE

MATERIAL CAP (TYP.)

A

TI

O N

(F T)

STATION (FT)

0 10 20 30 40 44

1 1

This is the start of the file's text. The full file is on GovTribe.