C04_Attachment 2 - Schedule of Items.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Forest Wide Decommissioning Project
- Solicitation number
- 127EAX27Q0013
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items pricing template for the Forest Wide Decommissioning Project solicitation (127EAX27Q0013) issued by the Department of Agriculture Forest Service for the Tonto National Forest. The document outlines line items and quantities for the decommissioning of seven campgrounds and group sites in the Tonto Basin Ranger District and Globe Ranger District, with pricing structured as base and optional work.
The base price work (Items 0001-A through 0001-G) includes decommissioning of Schoolhouse Campground, Windy Hill Campground, Indian Point Campground, Cholla Campground, Bermuda Flat Campground, Grapevine Group Site, and Burnt Corral Group Site. Specific tasks across these sites include removal of septic systems, buildings (entry stations, toilet facilities), asphalt pulverization (ranging from 5,000 to 10,000 square yards), concrete pads, sidewalks, curbing, metal and concrete rubble, picnic tables, and fire rings, along with delivery and compaction of backfill material (50 to 200 cubic yards per site). The optional work (Item 0002) covers Jones Water Campground decommissioning, which includes removal of toilet vaults, culverts, retaining walls, signposts, vault toilet buildings, picnic tables, fire rings, barricades, and billboards. All line items currently show $0.00 unit prices and totals, indicating this is a blank template awaiting contractor pricing submission. The total base price and combined base plus option price are both shown as $0.00.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Forest Wide Campground Decommissioning Base Price | |||||
| Item Number | Description | Pay Unit | Qty | Unit Price | Total |
| 0001-A | Schoolhouse Campground | ||||
| a | Removal of Septic System and building | EA | 3 | $0.00 | $0.00 |
| b | Removal of Entry Station Building & Flagpole | EA | 1 | $0.00 | $0.00 |
| c | Removal of Flush Toilet Building | EA | 2 | $0.00 | $0.00 |
| d | Delivery and Compaction of Backfill Material | CY | 50 | $0.00 | $0.00 |
| e | Removal of Curb and Sidewalk | LS | 1 | $0.00 | $0.00 |
| f | Removal of Concrete Pads and Wheelstop | LS | 1 | $0.00 | $0.00 |
| g | Removal of existing Metal and Concrete Rubble | LS | 1 | $0.00 | $0.00 |
| h | Asphalt Pulverization | SY | 9,000 | $0.00 | $0.00 |
| Total 0001-A | $0.00 | ||||
| 0001-B | Windy Hill Campground | ||||
| a | Removal of Septic System and building | LS | 1 | $0.00 | $0.00 |
| b | Removal of Entry Station Building & Flagpole | EA | 1 | $0.00 | $0.00 |
| c | Removal of Coposting Toilet Building | EA | 2 | $0.00 | $0.00 |
| d | Removal of Fish cleaning Station | CY | 1 | $0.00 | $0.00 |
| e | Delivery and Compaction of Backfill Material | LS | 200 | $0.00 | $0.00 |
| f | Removal of Curb and Sidewalk | LS | 1 | $0.00 | $0.00 |
| g | Removal of Concrete Pad and Wheelstop (@ 70 units) | LS | 1 | $0.00 | $0.00 |
| h | Removal of existing Metal and Concrete Rubble | LS | 1 | $0.00 | $0.00 |
| i | Picnic Table and Fire Place (@ 25 units) | LS | 1 | $0.00 | $0.00 |
| j | Asphalt Pulverization | SY | 10,000 | $0.00 | $0.00 |
| Total 0001-B | $0.00 | ||||
| 0001-C | Indian Point Campground | ||||
| a | Removal of Vault Toilet Building | EA | 1 | $0.00 | $0.00 |
| b | Delivery and Compaction of Backfill Material | CY | 100 | $0.00 | $0.00 |
| c | Removal of Concrete Pad and Wheelstop | LS | 1 | $0.00 | $0.00 |
| d | Removal of curb and sidewalk | LS | 1 | $0.00 | $0.00 |
| e | Asphalt Pulverization | SY | 5,000 | $0.00 | $0.00 |
| Total 0001-C | $0.00 | ||||
| 0001-D | Cholla Campground | ||||
| a | Removal of Septic System at Bermuda Flat and Cholla Campground | EA | 2 | $0.00 | $0.00 |
| b | Removal of Entrance Station Building & Flagpole | EA | 1 | $0.00 | $0.00 |
| c | Removal of Fish cleaning Station (2 units) | LS | 1 | $0.00 | $0.00 |
| d | Backfill Material | CY | 200 | $0.00 | $0.00 |
| Total 0001-D | $0.00 | ||||
| 0001-E | Bermuda Flat Campground | ||||
| a | Removal of Entrance Station Building & Flagpole | LF | 1 | $0.00 | $0.00 |
| b | Backfill Material | CY | 100 | $0.00 | $0.00 |
| Total 0001-E | $0.00 | ||||
| 0001-F | Grapevine Group Site | ||||
| a | Removal of Fish cleaning Station | EA | 1 | $0.00 | $0.00 |
| b | Backfill Material | CY | 100 | $0.00 | $0.00 |
| Total 0001-F | $0.00 | ||||
| 0001-G | Burnt Corral Group Site | ||||
| a | Removal of Fish cleaning Station | EA | 1 | $0.00 | $0.00 |
| b | Backfill Material | CY | 100 | $0.00 | $0.00 |
| Total 0001-G | $0.00 | ||||
| Total Base Price | $0.00 |
| Optional CLIN | |||||
| 0002 | Jones Water Campground | ||||
| a | Removal of Remaining of Toilet Vault and Backfill | EA | 3 | $0.00 | $0.00 |
| b | Removal of Culvert and Backfill | LF | 4 | $0.00 | $0.00 |
| c | Removal of Retaining Walls | LF | 11 | $0.00 | $0.00 |
| d | Removal of Signpost | SF | 3 | $0.00 | $0.00 |
| e | Removal of Vault Toilet Building and Backfill | AE | 2 | $0.00 | $0.00 |
| f | Removal of Picnic Table & fire ring | EA | 11 | $0.00 | $0.00 |
| g | Disposal of Campground Barricade (2 units) | LS | 1 | $0.00 | $0.00 |
| h | Removal of Billboard | CY | 3 | $0.00 | $0.00 |
| i | Removal of Entrance Barricade | LS | 1 | $0.00 | $0.00 |
| Total | $0.00 |
Total Base + Option $0.00
File details come from the government source that posted it. Updated .