Eglin operation and maintenance services (eoms) II - RFI #4 - draft request for proposal

Closed Special Notice Posted

Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Eglin AFB, Florida 32542, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Test Center (AFTC) has issued a Request for Information (RFI) for the Eglin Operation and Maintenance Services (EOMS) II program, which is the follow-on contract to the current EOMS contract. The EOMS II program will provide operation and maintenance services in support of research, development, test, evaluation, and training missions involving military aerospace equipment and weapons at the Eglin Test & Training Complex and potentially other associated facilities.

The purpose of this RFI is to gather industry feedback on a draft Request for Proposal (RFP) for the EOMS II acquisition. The government is seeking input on any areas of concern, ambiguities, or recommendations for improvement in the draft RFP. Responses to the RFI are due by 1600 CST on December 17, 2024. The EOMS II contract is anticipated to have a term of up to 10 years, with a targeted start date of April 1, 2026. The acquisition strategy and contract type are still being assessed, but the current EOMS contract is a Cost-Plus-Award-Fee/Cost-Plus-Fixed-Fee vehicle. Foreign participation will not be authorized for this procurement.

Notice text

5 versions

Update #5 · Latest ·

REQUEST FOR INFORMATION (RFI) No. 4 Updated 25 Nov 2024  See Update Notes Below

EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II

DRAFT REQUEST FOR PROPOSAL

THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is issued for the purpose of developing a viable solicitation that will best communicate the Government’s requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm’s ability to submit an offer if, or when, a solicitation is released. Foreign participation will not be authorized if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be posted on SAM.gov website, https://sam.gov/content/home.

GENERAL INFORMATION: The Eglin Operation and Maintenance Services (EOMS) II Program is in the process of developing the acquisition strategy for the follow-on to the current EOMS contract, FA2486-16-C-0002, to be known as EOMS II. Services may be performed at the following locations: Eglin Test & Training Complex and deployed locations. In addition to these locations, the EOMS II Program is considering the possibility of including similar workload performed at other facilities associated with the ETTC, the Air Force Test Center (AFTC) enterprise, as well as other Geographically Separated Units – locations TBD.  The current Cost-Plus-Award-Fee (CPAF)/Cost-Plus-Fixed-Fee (CPFF) contract was awarded under a full and open competition for all work described in Attachment 1, EOMS Performance Work Statement (PWS); however, the EOMS II Program is assessing all strategy options and contract types for the EOMS II acquisition. The EOMS II Program anticipates a possible term of up to 10 years, possibly including options. Contract start date is targeted for 01 April 2026.

BACKGROUND:  The purpose of the EOMS II Program is to provide operation and maintenance services in support of research and development, test and evaluation, and training missions involving military aerospace equipment and military weapons. The new EOMS II procurement is for services including operation, maintenance, and improvement of facilities, equipment, and instrumentation that support mission preparation, design, execution, and data production. Major support areas include General Support Services, Range Support Services, Range Instrumentation Systems, Explosive Test Facilities, and Major Ground Test Facilities (MGTFs).  While most test and training activities will occur at Eglin AFB, some may require support at other locations both inside and outside the continental United States.

PURPOSE:  This RFI is issued for the purpose of communicating the EOMS II Program’s requirements to industry and request industry feedback. The EOMS II Program intends to use information gathered from these interactions to gain an awareness of capabilities, determine interested parties, and to support formulation of an acquisition strategy.  Early industry involvement is critical to the success of this contemplated acquisition.

1. The Government has attached a draft Request for Proposal (RFP) and we are seeking industry feedback on the Draft RFP.  Specifically, we request that you review the provided draft RFP.  Identify any specific areas of concern, or ambiguities. Provide any recommendations for improvement.  Submit any questions or clarifications you may have regarding the Draft RFP Plan.  Your inquiries are invaluable to us, as we will compile them and analyze them to make changes to the RFP as needed.  

2. Email your responses to this RFI to the EOMS II Procuring Contracting Officer (PCO), Mr. Ronald Wilson, at ronald.wilson.22@us.af.mil.  Multiple submissions of questions or recommendations throughout the draft review period are encouraged so that the Government can make changes and formulate responses throughout the review period.  The Government will to the maximum extent practicable post responses to questions to sam.gov for potential offerors to review.  When responding to this RFI, format all emails with the subject line EOMS II – Response to Draft RFP_Company Name.

All responses must be received by 1600 CST, 5 Dec 2024.

Note that official information regarding this acquisition will be provided by the PCO. Any information received from other sources should not be relied upon as official.

Update 1:  Sections L&M have been substantially revised.  

Added Revised Attachment 20 Section L Draft_Revised 19 Nov 2024

Added Revised Attachment 21 Section M Draft_Revised 19 Nov 2024

Update 2:  Added Missing Attachment L-2 Sustainment and Modernization Scenario

Update 3: Extended response date to 5 Dec 2024

Update #4 ·

REQUEST FOR INFORMATION (RFI) No. 4 Updated 22 Nov 2024  See Update Notes Below

EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II

DRAFT REQUEST FOR PROPOSAL

THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is issued for the purpose of developing a viable solicitation that will best communicate the Government’s requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm’s ability to submit an offer if, or when, a solicitation is released. Foreign participation will not be authorized if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be posted on SAM.gov website, https://sam.gov/content/home.

GENERAL INFORMATION: The Eglin Operation and Maintenance Services (EOMS) II Program is in the process of developing the acquisition strategy for the follow-on to the current EOMS contract, FA2486-16-C-0002, to be known as EOMS II. Services may be performed at the following locations: Eglin Test & Training Complex and deployed locations. In addition to these locations, the EOMS II Program is considering the possibility of including similar workload performed at other facilities associated with the ETTC, the Air Force Test Center (AFTC) enterprise, as well as other Geographically Separated Units – locations TBD.  The current Cost-Plus-Award-Fee (CPAF)/Cost-Plus-Fixed-Fee (CPFF) contract was awarded under a full and open competition for all work described in Attachment 1, EOMS Performance Work Statement (PWS); however, the EOMS II Program is assessing all strategy options and contract types for the EOMS II acquisition. The EOMS II Program anticipates a possible term of up to 10 years, possibly including options. Contract start date is targeted for 01 April 2026.

BACKGROUND:  The purpose of the EOMS II Program is to provide operation and maintenance services in support of research and development, test and evaluation, and training missions involving military aerospace equipment and military weapons. The new EOMS II procurement is for services including operation, maintenance, and improvement of facilities, equipment, and instrumentation that support mission preparation, design, execution, and data production. Major support areas include General Support Services, Range Support Services, Range Instrumentation Systems, Explosive Test Facilities, and Major Ground Test Facilities (MGTFs).  While most test and training activities will occur at Eglin AFB, some may require support at other locations both inside and outside the continental United States.

PURPOSE:  This RFI is issued for the purpose of communicating the EOMS II Program’s requirements to industry and request industry feedback. The EOMS II Program intends to use information gathered from these interactions to gain an awareness of capabilities, determine interested parties, and to support formulation of an acquisition strategy.  Early industry involvement is critical to the success of this contemplated acquisition.

1. The Government has attached a draft Request for Proposal (RFP) and we are seeking industry feedback on the Draft RFP.  Specifically, we request that you review the provided draft RFP.  Identify any specific areas of concern, or ambiguities. Provide any recommendations for improvement.  Submit any questions or clarifications you may have regarding the Draft RFP Plan.  Your inquiries are invaluable to us, as we will compile them and analyze them to make changes to the RFP as needed.  

2. Email your responses to this RFI to the EOMS II Procuring Contracting Officer (PCO), Mr. Ronald Wilson, at ronald.wilson.22@us.af.mil.  Multiple submissions of questions or recommendations throughout the draft review period are encouraged so that the Government can make changes and formulate responses throughout the review period.  The Government will to the maximum extent practicable post responses to questions to sam.gov for potential offerors to review.  When responding to this RFI, format all emails with the subject line EOMS II – Response to Draft RFP_Company Name.

All responses must be received by 1600 CST, 27 Nov 2024.

Note that official information regarding this acquisition will be provided by the PCO. Any information received from other sources should not be relied upon as official.

Update 1:  Sections L&M have been substantially revised.  

Added Revised Attachment 20 Section L Draft_Revised 19 Nov 2024

Added Revised Attachment 21 Section M Draft_Revised 19 Nov 2024

Update 2:  Added Missing Attachment L-2 Sustainment and Modernization Scenario

Update #3 ·

REQUEST FOR INFORMATION (RFI) No. 4 Updated 19 Nov 2024  See Update Notes Below

EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II

DRAFT REQUEST FOR PROPOSAL

THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is issued for the purpose of developing a viable solicitation that will best communicate the Government’s requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm’s ability to submit an offer if, or when, a solicitation is released. Foreign participation will not be authorized if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be posted on SAM.gov website, https://sam.gov/content/home.

GENERAL INFORMATION: The Eglin Operation and Maintenance Services (EOMS) II Program is in the process of developing the acquisition strategy for the follow-on to the current EOMS contract, FA2486-16-C-0002, to be known as EOMS II. Services may be performed at the following locations: Eglin Test & Training Complex and deployed locations. In addition to these locations, the EOMS II Program is considering the possibility of including similar workload performed at other facilities associated with the ETTC, the Air Force Test Center (AFTC) enterprise, as well as other Geographically Separated Units – locations TBD.  The current Cost-Plus-Award-Fee (CPAF)/Cost-Plus-Fixed-Fee (CPFF) contract was awarded under a full and open competition for all work described in Attachment 1, EOMS Performance Work Statement (PWS); however, the EOMS II Program is assessing all strategy options and contract types for the EOMS II acquisition. The EOMS II Program anticipates a possible term of up to 10 years, possibly including options. Contract start date is targeted for 01 April 2026.

BACKGROUND:  The purpose of the EOMS II Program is to provide operation and maintenance services in support of research and development, test and evaluation, and training missions involving military aerospace equipment and military weapons. The new EOMS II procurement is for services including operation, maintenance, and improvement of facilities, equipment, and instrumentation that support mission preparation, design, execution, and data production. Major support areas include General Support Services, Range Support Services, Range Instrumentation Systems, Explosive Test Facilities, and Major Ground Test Facilities (MGTFs).  While most test and training activities will occur at Eglin AFB, some may require support at other locations both inside and outside the continental United States.

PURPOSE:  This RFI is issued for the purpose of communicating the EOMS II Program’s requirements to industry and request industry feedback. The EOMS II Program intends to use information gathered from these interactions to gain an awareness of capabilities, determine interested parties, and to support formulation of an acquisition strategy.  Early industry involvement is critical to the success of this contemplated acquisition.

1. The Government has attached a draft Request for Proposal (RFP) and we are seeking industry feedback on the Draft RFP.  Specifically, we request that you review the provided draft RFP.  Identify any specific areas of concern, or ambiguities. Provide any recommendations for improvement.  Submit any questions or clarifications you may have regarding the Draft RFP Plan.  Your inquiries are invaluable to us, as we will compile them and analyze them to make changes to the RFP as needed.  

2. Email your responses to this RFI to the EOMS II Procuring Contracting Officer (PCO), Mr. Ronald Wilson, at ronald.wilson.22@us.af.mil.  Multiple submissions of questions or recommendations throughout the draft review period are encouraged so that the Government can make changes and formulate responses throughout the review period.  The Government will to the maximum extent practicable post responses to questions to sam.gov for potential offerors to review.  When responding to this RFI, format all emails with the subject line EOMS II – Response to Draft RFP_Company Name.

All responses must be received by 1600 CST, 27 Nov 2024.

Note that official information regarding this acquisition will be provided by the PCO. Any information received from other sources should not be relied upon as official.

Update 1:  Sections L&M have been substantially revised.  

Added Revised Attachment 20 Section L Draft_Revised 19 Nov 2024

Added Revised Attachment 21 Section M Draft_Revised 19 Nov 2024

Update #2 ·

REQUEST FOR INFORMATION (RFI) No. 4

EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II

DRAFT REQUEST FOR PROPOSAL

THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is issued for the purpose of developing a viable solicitation that will best communicate the Government’s requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm’s ability to submit an offer if, or when, a solicitation is released. Foreign participation will not be authorized if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be posted on SAM.gov website, https://sam.gov/content/home.

GENERAL INFORMATION: The Eglin Operation and Maintenance Services (EOMS) II Program is in the process of developing the acquisition strategy for the follow-on to the current EOMS contract, FA2486-16-C-0002, to be known as EOMS II. Services may be performed at the following locations: Eglin Test & Training Complex and deployed locations. In addition to these locations, the EOMS II Program is considering the possibility of including similar workload performed at other facilities associated with the ETTC, the Air Force Test Center (AFTC) enterprise, as well as other Geographically Separated Units – locations TBD.  The current Cost-Plus-Award-Fee (CPAF)/Cost-Plus-Fixed-Fee (CPFF) contract was awarded under a full and open competition for all work described in Attachment 1, EOMS Performance Work Statement (PWS); however, the EOMS II Program is assessing all strategy options and contract types for the EOMS II acquisition. The EOMS II Program anticipates a possible term of up to 10 years, possibly including options. Contract start date is targeted for 01 April 2026.

BACKGROUND:  The purpose of the EOMS II Program is to provide operation and maintenance services in support of research and development, test and evaluation, and training missions involving military aerospace equipment and military weapons. The new EOMS II procurement is for services including operation, maintenance, and improvement of facilities, equipment, and instrumentation that support mission preparation, design, execution, and data production. Major support areas include General Support Services, Range Support Services, Range Instrumentation Systems, Explosive Test Facilities, and Major Ground Test Facilities (MGTFs).  While most test and training activities will occur at Eglin AFB, some may require support at other locations both inside and outside the continental United States.

PURPOSE:  This RFI is issued for the purpose of communicating the EOMS II Program’s requirements to industry and request industry feedback. The EOMS II Program intends to use information gathered from these interactions to gain an awareness of capabilities, determine interested parties, and to support formulation of an acquisition strategy.  Early industry involvement is critical to the success of this contemplated acquisition.

1. The Government has attached a draft Request for Proposal (RFP) and we are seeking industry feedback on the Draft RFP.  Specifically, we request that you review the provided draft RFP.  Identify any specific areas of concern, or ambiguities. Provide any recommendations for improvement.  Submit any questions or clarifications you may have regarding the Draft RFP Plan.  Your inquiries are invaluable to us, as we will compile them and analyze them to make changes to the RFP as needed.  

2. Email your responses to this RFI to the EOMS II Procuring Contracting Officer (PCO), Mr. Ronald Wilson, at ronald.wilson.22@us.af.mil.  Multiple submissions of questions or recommendations throughout the draft review period are encouraged so that the Government can make changes and formulate responses throughout the review period.  The Government will to the maximum extent practicable post responses to questions to sam.gov for potential offerors to review.  When responding to this RFI, format all emails with the subject line EOMS II – Response to Draft RFP_Company Name.

All responses must be received by 1600 CST, 27 Nov 2024.

Note that official information regarding this acquisition will be provided by the PCO. Any information received from other sources should not be relied upon as official.

Update #1 ·

REQUEST FOR INFORMATION (RFI) No. 4

EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II

DRAFT REQUEST FOR PROPOSAL

THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is issued for the purpose of developing a viable solicitation that will best communicate the Government’s requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm’s ability to submit an offer if, or when, a solicitation is released. Foreign participation will not be authorized if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be posted on SAM.gov website, https://sam.gov/content/home.

GENERAL INFORMATION: The Eglin Operation and Maintenance Services (EOMS) II Program is in the process of developing the acquisition strategy for the follow-on to the current EOMS contract, FA2486-16-C-0002, to be known as EOMS II. Services may be performed at the following locations: Eglin Test & Training Complex and deployed locations. In addition to these locations, the EOMS II Program is considering the possibility of including similar workload performed at other facilities associated with the ETTC, the Air Force Test Center (AFTC) enterprise, as well as other Geographically Separated Units – locations TBD.  The current Cost-Plus-Award-Fee (CPAF)/Cost-Plus-Fixed-Fee (CPFF) contract was awarded under a full and open competition for all work described in Attachment 1, EOMS Performance Work Statement (PWS); however, the EOMS II Program is assessing all strategy options and contract types for the EOMS II acquisition. The EOMS II Program anticipates a possible term of up to 10 years, possibly including options. Contract start date is targeted for 01 April 2026.

BACKGROUND:  The purpose of the EOMS II Program is to provide operation and maintenance services in support of research and development, test and evaluation, and training missions involving military aerospace equipment and military weapons. The new EOMS II procurement is for services including operation, maintenance, and improvement of facilities, equipment, and instrumentation that support mission preparation, design, execution, and data production. Major support areas include General Support Services, Range Support Services, Range Instrumentation Systems, Explosive Test Facilities, and Major Ground Test Facilities (MGTFs).  While most test and training activities will occur at Eglin AFB, some may require support at other locations both inside and outside the continental United States.

PURPOSE:  This RFI is issued for the purpose of communicating the EOMS II Program’s requirements to industry and request industry feedback. The EOMS II Program intends to use information gathered from these interactions to gain an awareness of capabilities, determine interested parties, and to support formulation of an acquisition strategy.  Early industry involvement is critical to the success of this contemplated acquisition.

1. The Government has attached a draft Request for Proposal (RFP) and we are seeking industry feedback on the Draft RFP.  Specifically, we request that you review the provided draft RFP.  Identify any specific areas of concern, or ambiguities. Provide any recommendations for improvement.  Submit any questions or clarifications you may have regarding the Draft RFP Plan.  Your inquiries are invaluable to us, as we will compile them and analyze them to make changes to the RFP as needed.  

2. Email your responses to this RFI to the EOMS II Procuring Contracting Officer (PCO), Mr. Ronald Wilson, at ronald.wilson.22@us.af.mil.  Multiple submissions of questions or recommendations throughout the draft review period are encouraged so that the Government can make changes and formulate responses throughout the review period.  The Government will to the maximum extent practicable post responses to questions to sam.gov for potential offerors to review.  When responding to this RFI, format all emails with the subject line EOMS II – Response to Draft RFP_Company Name.

All responses must be received by 1600 CST, 17 Dec 2024.

Note that official information regarding this acquisition will be provided by the PCO. Any information received from other sources should not be relied upon as official.

Files

File Type Posted
Attachment L-2 Sustainment and Modernization Scenario.docx DOCX document
Attachment 20 Section L Draft_Revised 19 Nov 24.pdf PDF
Attachment 20 Section M Draft_Revised 19 Nov 24.pdf PDF
A012 Munitions Inventory Expenditure Report.pdf PDF
Attachment 08 Bay County SCA WD 2015-4559 Rev 26.pdf PDF
Attachment 16 Walton County SCA WD 2015-5731 Rev 27.pdf PDF
A014 Vehicle Inventory Enviromental Report.pdf PDF
Attachment 15 Walton County DBA FL20240275 (Hwy).pdf PDF
Attachment 13 Walton County DBA FL20230102 (Heavy).pdf PDF
A023 Quality Manual.pdf PDF
Attachment 11 Okaloosa County DBA FL20240261 (Hwy).pdf PDF
Attachment 09 Okaloosa County DBA FL20230127 (Heavy).pdf PDF
A013 Annual Munitions Expenditure Report.pdf PDF
Attachment 07 Bay County DBA FL20240239 (Hwy).pdf PDF
Attachment 06 Bay County DBA FL20230105 (Heavy).pdf PDF
A006 Equipment Status Report.pdf PDF
Attachment 10 Okaloosa County DBA FL20230217 (Bldg).pdf PDF
A027 Improvements.pdf PDF
A005 Mission Support Data Report.pdf PDF
A009 Environmental Protection Tier II Data.pdf PDF
A018 Product and Service Rate Validation Report.pdf PDF
A016 Cyber Monthly Report.pdf PDF
A026 RMF.pdf PDF
A025 Phase In Transition Plan.pdf PDF
A024 GRATV Maintenance Plan.pdf PDF
A007 Accidient Report.pdf PDF
A010 Budget Cost Status Report.pdf PDF
A019 Phase Out Transition Plan.pdf PDF
A002 Labor Hour Data Report.pdf PDF
A008 Public Health BioEnv EN Report.pdf PDF
A003 MTC Manpower Report.pdf PDF
A001 Contractor Personnel Assignments Data.pdf PDF
Attachment L-1 Mgt and Operations Scenario.docx DOCX document
Attachment 19 DoD SER SAP Addendum EOMS II.docx DOCX document
Attachment 12 Okaloosa County SCA WD 2015-4531 Rev 27.pdf PDF
Attachment 01 PWS.pdf PDF
Attachment 14 Walton County DBA FL20230231 (Bldg).pdf PDF
Attachment 17 Eglin CBA-2024-123.pdf PDF
Attachment 05 Bay County DBA FL20230005 (Bldg).pdf PDF
EOMS II Attachment L-4 Cost Model Prime Spreadsheet.xlsx XLSX spreadsheet
A022 Quality Assurance Program.pdf PDF
Attachment 20 Section L Draft.pdf PDF
A011 UXO Monthly Status Report.pdf PDF
Attachment 18 EOMS II DD Form 254.pdf PDF
A015 Maintenance of Land Test Areas.pdf PDF
Attachment 03 EOMS 2 Award Fee Plan.docx DOCX document
A004 Mission Failure Report.pdf PDF
EOMS II Attachment L-3 SB Participation Template.docx DOCX document
A017 Cost Analysis Report.pdf PDF
A028 Facility Earning Unit Mapping.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Depot Maintenance Applications Consolidated 3 Dayton, Ohio 45420, United States · NAICS 541511 AFLCMC Wright Patterson AFB Competitive 8(a)

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity