Attachment L-1 Mgt and Operations Scenario.docx
DOCX document 35 KB Posted
- Attached to
- EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II - RFI #4 - DRAFT REQUEST FOR PROPOSAL
- Solicitation number
- Not on record
About this file
This document is the Attachment L-1 Management Operations Scenario for a federal contract opportunity. It outlines a scenario in which the offeror must demonstrate their capability to handle an erratic test mission schedule while adhering to budget constraints. The scenario consists of Maritime and Land Range Test missions that run concurrently. The offeror must provide a strategy, key points, and critical techniques for meeting a -2% DBA expenditure goal while completing required maintenance. Additionally, the offeror must describe management techniques to balance RBA and DBA manpower and minimize overtime RBA charges given the fluid test mission schedule.
This scenario is part of the EGLIN OPERATION AND MAINTENANCE SERVICES (EOMS) II - RFI #4 - DRAFT REQUEST FOR PROPOSAL, which is a request for information from industry for planning purposes related to an upcoming solicitation. The EOMS II program is considering a possible 10-year contract term and a targeted start date of April 1, 2026. The government is seeking industry feedback on the draft RFP, including any areas of concern, ambiguities, or recommendations for improvement.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-1 Management Operations Scenario
Management Operations Scenario. The Offeror must demonstrate the capability to handle an erratic test mission schedule while adhering to budget constraints. This includes providing additional labor, equipment, and resources, while maintaining high-quality service and managing unexpected demands for short-notice and high-priority missions. The scenario consists of Maritime and Land Range Test missions. The Maritime and Land test periods run concurrently. The Offeror shall answer the associated Management and Operations Scenario Questions (Attachment L-1) in the Offeror's proposals, and the Government will evaluate the Offeror's proposal IAW Section M, paragraph M-2.2.5.4. Use the following mission designation and timing:
Table L3.2 – Mission Designation and Timing
Mission
Range
Instrumentation
Mission Type
Scheduled
| Pre-Mission |
| Post Mission |
| MSN 001 |
| Land range |
| Threat Systems |
| EW Training |
| 2000 - 0100 |
| 4 hrs |
| 1 hr |
| MSN 002 |
| Land range |
| Threat Systems |
| RWR Testing |
| 0800 L |
| 4 hrs |
| 1 hr |
| MSN 003 |
| Land range |
| Telemetry, Radar, Flight Termination, Cameras |
| Weapon Test, static target |
| 1200 L |
| 3hrs |
| 1 hr |
| MSN 004 |
| Water range |
| Telemetry, Radar |
| Aircraft Test |
| 1200 L |
| 3 hrs |
| 1 hr |
| MSN 005 |
| Water range |
| GRATV, Telemetry, Radar, Flight Termination |
| Weapon Test, static target |
| 1400 L |
| 3 hrs |
| 1 hr |
| MSN 006 |
| Land range |
| Telemetry, Radar, Flight Termination, Cameras |
| Weapon Test, moving target |
| 1400 L |
| 3hrs |
| 1 hr |
| MSN 007 |
| Land range |
| Threat Systems |
| EW Training |
| 2000 - 0100 |
| 4 hrs |
| 1 hr |
Given Eglin’s dynamic mission load:
1. Provide strategy, key points, and critical techniques for how you will meet the -2% DBA expenditure goal while completing required maintenance.
2. The test mission’s fluid schedule can result in workers charging DBA during normal business hours and then charging overtime RBA to support test missions. What management techniques will the Offeror employ to balance RBA and DBA manpower and minimize overtime RBA charges?