DFWA and DFWB Raised Floor Replacement

Closed Solicitation Posted

Solicitation number
697DCK-22-R-00531
Agency
Southwestern Region Federal Aviation Administration, Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238330 Flooring Contractors
PSC
Z1BA Maintenance Of Air Traffic Control Towers
Place of performance
Dallas, Texas 75261, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to replace the raised flooring systems at the DFWA and DFWB Air Traffic Control Towers located at Dallas Fort Worth International Airport. The scope of work includes removing and replacing the existing ground level raised floors and carpet tile, as well as installing a proper grounding system for the new raised floors. The Department of Transportation Federal Aviation Administration Southwestern Region will evaluate proposals based on technical qualifications and price to select a contractor to perform this work. The deadline for questions is September 16, 2022, with responses due by September 30th, and final proposals are due by October 21, 2022.

This requirement has been set aside for total small business concerns. The primary NAICS code is 238210 and PSC code S206. The estimated value is between $350,000 to $500,000 to be completed within 120 calendar days at the DFW Airport facilities. This project aims to replace aging infrastructure at critical air traffic control sites to ensure continued safe airport operations.

Notice text

4 versions

Update #4 · Latest ·

October 19, 2022:  A clarification was requested for one of the answers posted on the Q&A attachment.  That clarification is hereby incorporated as the following attachment:  Additional Clarification to questions and answers.  The due date for proposals has not been extended. 
***************************************************************
Amendment 02: Purpose of amendment is to incoporate the Q&A attachment and update attachement J-2A DFWA Raised Floor Replacement Drawings Combined dated October 11, 2022.  The due date for proposals has not been extended.  

***************************************************************

Amendment 01: Purpose of amendment is to incoporate an update miletone, extend the due date, and provide clarification to clause 3.2.2.3-71.  All other terms and coniditions remain unchanged and in full effect. 

***************************************************************

The purpose of this project is to replace raised flooring in the DFWA and DFWB ATCT located at DFW Airport.

The Work of Project is defined by the Contract Documents and includes, but is not limited to the following:

1. Removal and replacement of ground level raised floor systems at the DFWA / B ATCT’s, removal and replacement of carpet tile in ground level offices at the DFWA / B ATCT’s, installation of proper grounding system for raised floor systems at the DFWA / B ATCT’s and other Work indicated in the Contract Documents.

Please see Attachment J-1 – Specifications, J-2 DFWA Drawings and J-3 DFWB Drawings, for the full scope of
work.

Update #3 ·

Amendment 02: Purpose of amendment is to incoporate the Q&A attachment and update attachement J-2A DFWA Raised Floor Replacement Drawings Combined dated October 11, 2022.  The due date for proposals has not been extended.  

***************************************************************

Amendment 01: Purpose of amendment is to incoporate an update miletone, extend the due date, and provide clarification to clause 3.2.2.3-71.  All other terms and coniditions remain unchanged and in full effect. 

***************************************************************

The purpose of this project is to replace raised flooring in the DFWA and DFWB ATCT located at DFW Airport.

The Work of Project is defined by the Contract Documents and includes, but is not limited to the following:

1. Removal and replacement of ground level raised floor systems at the DFWA / B ATCT’s, removal and replacement of carpet tile in ground level offices at the DFWA / B ATCT’s, installation of proper grounding system for raised floor systems at the DFWA / B ATCT’s and other Work indicated in the Contract Documents.

Please see Attachment J-1 – Specifications, J-2 DFWA Drawings and J-3 DFWB Drawings, for the full scope of
work.

Update #2 ·

Amendment 01: Purpose of amendment is to incoporate an update miletone, extend the due date, and provide clarification to clause 3.2.2.3-71.  All other terms and coniditions remain unchanged and in full effect. 

***************************************************************

The purpose of this project is to replace raised flooring in the DFWA and DFWB ATCT located at DFW Airport.

The Work of Project is defined by the Contract Documents and includes, but is not limited to the following:

1. Removal and replacement of ground level raised floor systems at the DFWA / B ATCT’s, removal and replacement of carpet tile in ground level offices at the DFWA / B ATCT’s, installation of proper grounding system for raised floor systems at the DFWA / B ATCT’s and other Work indicated in the Contract Documents.

Please see Attachment J-1 – Specifications, J-2 DFWA Drawings and J-3 DFWB Drawings, for the full scope of
work.

Update #1 ·

The purpose of this project is to replace raised flooring in the DFWA and DFWB ATCT located at DFW Airport.

The Work of Project is defined by the Contract Documents and includes, but is not limited to the following:

1. Removal and replacement of ground level raised floor systems at the DFWA / B ATCT’s, removal and replacement of carpet tile in ground level offices at the DFWA / B ATCT’s, installation of proper grounding system for raised floor systems at the DFWA / B ATCT’s and other Work indicated in the Contract Documents.

Please see Attachment J-1 – Specifications, J-2 DFWA Drawings and J-3 DFWB Drawings, for the full scope of
work.