Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities, Tyndall Air Force Base, FL
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9127820R0028
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Tyndall Afb Fl 32403 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation requests proposals for the design and construction of two facilities at Tyndall Air Force Base in Florida. The scope includes a consolidated Weapons Evaluation Group headquarters facility totaling over 39,000 square feet and maintenance hangars and support buildings totaling over 134,000 square feet. Additional requirements are over 122,000 square feet of aircraft parking apron and utilities infrastructure. Proposals are due by April 29, 2021 and shall be submitted electronically through DoD SAFE. Evaluation will consider technical approach, past performance on projects up to eight years for prime contractors and six years for design firms, and price.
There is no set-aside designation. The primary NAICS code is 237910 for site preparation contractors and the predominant PSC code is V1A1 for construction of buildings. The soliciting agency is the Department of the Army Corps of Engineers Engineering District in Mobile, Alabama. The place of performance is Tyndall AFB. The selected offeror must begin work within eight days of award and complete all work within the proposed timeline. The government estimates project costs will likely exceed $10 million based on square footage and scope of requirements.
Notice text
This project is for the design and construction of two separate facilities: WEG HQ and WEG Maintenance Hangar and Apron Facilities.
WEG HQ: The 53rd WEG HQ facility consists of one consolidated facility. The Combined Group Headquarters, 894.84 SM = 9,605 SF, Squadron Operations, 3,657 SM = 39,252SF; and an Emergency Ops Center, 2,452 SM = 26,318 SF. The combined Weapons Evaluation Group (WEG) Headquarters, constituent Squadron Operations facility and emergency Operations Center included both SCIF and SAPF areas. This multi-story facility provides a consolidated facility with administrative areas for the 53d TSS, 53d WEG, and 83d Squadron Operations staff. The administrative areas will be supported by conferencing, meeting, and other special spaces. In addition to the admin areas, the squadron operations will provide mission planning, SAPF workspace, briefing, storage, and vault space. The project includes all utilities, site improvements, special foundations, pavements, detection/protection features, security enhancements, and other supporting work.
WEG Maintenance Hangar: The 53rd Weapons Evaluation Group (WEG) Hangar facility is consolidated with the WEG HQ and includes; Maintenance Hangar, 8,816 SM = 94,898 SF; Armament Research Testing, 150 SM = 1,610 SF; Aircraft Maintenance Shop, 1,434 SM = 15,434 SF; Aircraft Corrosion Control: 855 SM = 9,200 SF, and a Fuel Systems Maintenance Dock, 1,243 SM = 13,380 SF.
The Aircraft Maintenance Hangar and Maintenance Shop is for the QR/F-16 and E-9 Aircraft. The QF-16 Maintenance Hangar provides space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. Hangars support aircraft maintenance, repair, and inspection activities that are most efficiently done under complete cover. The QF-16 Maintenance Hangar will include 12 hangar bays for the QF-16 aircraft and building support facilities. The hangar bays will have a HEF system, 10-ton crane, large fan for ventilation per 6 bays. This project will require compliance with Intelligence Community Directive (ICD) 705 for the SCIF and SAPF areas.
The Armament/AGGTS/Lab is an Armament Research Testing facility attached to the Maintenance Hangar. This facility will accommodate the research, development, fabrication and testing of non-exploding, penetrating weapons made from heavy metals which are traditionally used against heavily armored targets. The Armament/AGGTS/Lab to use in conjunction with the QF-16 aircraft maintenance shop.
The Aircraft Corrosion Control provides an environmentally controlled area to wash aircraft. This aircraft corrosion control facility will include a covered aircraft wash rack.
The Fuel Systems Maintenance Dock is a space for an aircraft parking bay and support space for heating, plumbing, latrines, ventilation, compressed air, and fire detection and suppression. Maintenance docks provide protected space for aircraft maintenance. The fuel systems maintenance will include hangar space, administrative space, building support and fuel tank covered storage.
Supporting facilities include utilities (electric service, water, sewer, gas), pavements (paving, walks, curbs and gutters), storm drainage, site improvements and building information systems.
Apron Facilities: The 53 WEG Parking Apron consists of an aircraft Parking Apron, 11,447 S m = 122,864 SF. The new aircraft parking apron includes lighting. The apron includes subgrade, base and approximately 15 inches of Portland concrete cement. Additional pavement is required to support the WEG aircraft and provide area for aircraft operations outside of the obstruction free area. The apron provides aircraft parking, servicing, and loading. Apron lighting is also provided to support nighttime maintenance activities on the apron. The project includes all utilities, site improvements, soil remediation and cleanup. Privatized utility connection fees are included in their respective supporting facilities line items for electrical Gulf Coast Electric Cooperative (GCEC), water GCEC, and gas Peoples Gas Systems (PGS).
Files
| File | Type | Posted |
|---|---|---|
| W9127820R0028 AM01.pdf | ||
| 20R0028 PHASE ONE SPECS.PDF | ||
| EM 385-1-1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities, Tyndall Air Force Base, FL | Award Notice | |
| This notice | Solicitation | |
| Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities, Tyndall Air Force Base, FL | Pre-Solicitation | |
| Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities | Special Notice |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity