Design and construct Chapel Addition
Closed Solicitation Posted
- Solicitation number
- FA557525B0004
- Agency
- Air Forces Europe and Africa Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Y1FE Construction Of Religious Facilities
- Place of performance
- Sevilla Andalusia 41530 Spain
- Points of contact
-
- Augustus Shinn augustus.shinn@us.af.mil (208) 828-3103
- Elia Portz elia.portz_cueli.1.es@us.af.mil +34955848017
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Air Force is soliciting technical proposals for a design and construction project to expand the administrative area of the Base Chapel (Building 109) at Moron Air Base in Spain. The contract, identified as FA5575-25-B-0004, will utilize a two-step sealed bidding method where contractors first submit technical proposals without pricing information. Only local sources registered to conduct construction business in Spain are eligible to bid, in compliance with the Defense and Cooperation Agreement between the United States and Spain. Technical proposals must be received by June 23, 2025, at 10:00 hours local time, and will be evaluated based on economic, financial, and professional solvency, with contractors required to demonstrate capabilities through Spanish classification certificates and commit to performing at least 20% of work directly. The government will review proposals and determine acceptability without requesting additional information, with successful offerors invited to submit sealed price bids in the second step.
The solicitation does not have a specific set-aside designation and does not mention current contractors or incumbent vendors. The project is located in Morón de la Frontera, Seville, Spain, and has a total estimated performance period of 542 calendar days, covering both design and construction phases. While specific award values are not disclosed, the project involves expanding the chapel and constructing a new Sexual Assault Prevention and Response (SAPR) area totaling approximately 153.80 m2. Contractors must adhere to both United States and Spanish construction codes, prioritize using Spanish materials, labor, and equipment when feasible, and comply with environmental and architectural compatibility guidelines established for the base. The project falls under the NAICS category 238990 (All Other Specialty Trade Contractors) and PSC category Y1FE (Construction of Religious Facilities).
Notice text
The United States Air Force solicits a Request for Technical Proposals for FA5575-25-B-0004 to design and construct an addition to the Base Chapel. This project aims to expand the administrative area of the chapel, building 109, at the Morón Air Base (Spain).
This requirement will be procured using FAR 14 and FAR 36, Sealed Bidding and Construction Contracts. The two-step sealed bidding method will be used.
The submission of the Technical Proposal is Step One. Only those contractors that have submitted an acceptable Technical Proposal will pass to Step Two and will be requested to submit a priced bid.
Offerors must follow the instructions in Attachment #1 Technical Proposal Instructions.
Offerors shall submit only one technical proposal containing all required evaluation criteria, to include all factors and any significant subfactors, as listed in the attachment Technical Proposal Instructions. The technical proposal shall NOT include prices or pricing information. The Government will review only one technical proposal per offeror.
Offerors shall submit proposals that are acceptable without additional explanation or information.
The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted.
The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.
Technical proposals must be received no later than 23 June 2025 at 10:00 hours local time. Technical proposals not received by the Contracting Construction Team by the exact date and time for receipt of proposals will not be considered.
A notice of unacceptability or acceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination. Offerors determined to have submitted an acceptable technical proposal will be able to proceed to Step Two, submission of a Sealed Priced Bid.
Offerors will be expected to submit their sealed priced bids within one or two weeks. The exact date and time of submission and bid opening will be notified in the Request for Bids.
No contract will result from this Request for technical Proposal. This is Step One of the Two Step Sealed Bidding.
In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (3) “The contractors must meet the requirements established by Spanish legislation for execution of government works. A breach of contract on the part of a contractor shall have the same consequences for the contractor for purposes of future contracting with the Spanish government as would occur with a breach of a contract with the Spanish public administration.” and (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements".
NOTE: THIS REQUEST FOR TECHNICAL PROPOSALS IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT, LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NON-LOCAL SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION.
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment D_Concept Drawings 25-1005.pdf | ||
| Attachment F_ Construction Cost Breakdown Blank.xlsx | XLSX spreadsheet | |
| Attachment B_ INRMP.pdf | ||
| 25B0004_Step 1 of 2 Step Sealed Bid Tech Proposal Instructions.pdf | ||
| Statement of Work 25-1005.pdf | ||
| Attachment E1_ Record Drawings B109.pdf | ||
| Attachment C_ EFGS May 2014.pdf | ||
| Attachment E2_Record Drawings B109.pdf | ||
| Attachment G_ Schedule of Material Submittals Form.xlsx | XLSX spreadsheet | |
| Attachment A_Architectural Compatibility Guide-Jan25.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities