The file is a Schedule of Material Submittals form for the CNS Chapel Addition and SAPR Office project (Project Number QUUG 25-1005). The document outlines a comprehensive list of 16 required material submittals for the project, including key documentation such as warranty letters, construction schedules, work plans, quality control plans, environmental protection plans, and as-built drawings. Submission timelines are specified relative to Contract Award (CA) or Final Inspection (FI), with most items required within 7-15 days of those milestones.
The submittals are part of a two-step sealed bidding process for a design and construction project at Moron Air Base in Spain, solicited by the United States Air Force. The technical proposal deadline is 23 June 2025 at 10:00 hours local time, with only local sources in Spain authorized to bid. The project specifically involves designing and constructing an addition to the base chapel (Building 109), expanding its administrative area. Contractors must comply with Spanish legislative requirements for government works and are expected to prioritize Spanish materials, labor, and equipment when feasible.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment D_Concept Drawings 25-1005.pdf | ||
| Attachment F_ Construction Cost Breakdown Blank.xlsx | XLSX spreadsheet | |
| Attachment B_ INRMP.pdf | ||
| 25B0004_Step 1 of 2 Step Sealed Bid Tech Proposal Instructions.pdf | ||
| Statement of Work 25-1005.pdf | ||
| Attachment E1_ Record Drawings B109.pdf | ||
| Attachment C_ EFGS May 2014.pdf | ||
| Attachment E2_Record Drawings B109.pdf | ||
| Attachment A_Architectural Compatibility Guide-Jan25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 25-1005 | PROJECT TITLE |
CNS CHAPEL ADDITION AND SAPR OFFICE, B109
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| PART 11 -GENERAL CONDITIONS | |||
| 01 | Warranty letter | 1 | Acceptance+15 |
| 02 | Construction Schedule | CA+7 | |
| 03 | Progress Schedule | 1 | CA+10 |
| 04 | Work Plan | CA+7 | |
| 05 | Mobility Plan | 1 | CA+15 |
| 06 | Project Sign | CA+15 | |
| 07 | Quality Control Plan | 1 | CA+15 |
| 08 | Environmental Protection Plan | 1 | CA+15 |
| 09 | DD Form 1354 | 1 | FI+15 |
| 10 | Waste & construction debris management | 1 | Final Inspection |
| 11 | As-Built drawings | 1 | FI+15 |
| 12 | Spatial Data | 1 | As Built+10 |
| 13 | Key Staff | 1 | CA+15 |
| 14 | Health and safety Plan | 1 | CA +15 |
| PART 14 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES | |||
| 15 | Design-Build Schedule | 1 | CA+10 |
| 16 | Monthly Updates | 1 | Every 1st of month |
| DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
File details come from the government source that posted it. Updated .