The file is a Schedule of Material Submittals form for the CNS Chapel Addition and SAPR Office project (Project Number QUUG 25-1005). The document outlines a comprehensive list of 16 required material submittals for the project, including key documentation such as warranty letters, construction schedules, work plans, quality control plans, environmental protection plans, and as-built drawings. Submission timelines are specified relative to Contract Award (CA) or Final Inspection (FI), with most items required within 7-15 days of those milestones.

The submittals are part of a two-step sealed bidding process for a design and construction project at Moron Air Base in Spain, solicited by the United States Air Force. The technical proposal deadline is 23 June 2025 at 10:00 hours local time, with only local sources in Spain authorized to bid. The project specifically involves designing and constructing an addition to the base chapel (Building 109), expanding its administrative area. Contractors must comply with Spanish legislative requirements for government works and are expected to prioritize Spanish materials, labor, and equipment when feasible.

View the file

Other files for this federal contract opportunity

Other files attached to Design and construct Chapel Addition, newest first.
File Type Posted
Attachment D_Concept Drawings 25-1005.pdf PDF
Attachment F_ Construction Cost Breakdown Blank.xlsx XLSX spreadsheet
Attachment B_ INRMP.pdf PDF
25B0004_Step 1 of 2 Step Sealed Bid Tech Proposal Instructions.pdf PDF
Statement of Work 25-1005.pdf PDF
Attachment E1_ Record Drawings B109.pdf PDF
Attachment C_ EFGS May 2014.pdf PDF
Attachment E2_Record Drawings B109.pdf PDF
Attachment A_Architectural Compatibility Guide-Jan25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 25-1005PROJECT TITLE

CNS CHAPEL ADDITION AND SAPR OFFICE, B109

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

PART 11 -GENERAL CONDITIONS
01Warranty letter1Acceptance+15
02Construction ScheduleCA+7
03Progress Schedule1CA+10
04Work PlanCA+7
05Mobility Plan1CA+15
06Project SignCA+15
07Quality Control Plan1CA+15
08Environmental Protection Plan1CA+15
09DD Form 13541FI+15
10Waste & construction debris management1Final Inspection
11As-Built drawings1FI+15
12Spatial Data1As Built+10
13Key Staff1CA+15
14Health and safety Plan1CA +15
PART 14 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES
15Design-Build Schedule1CA+10
16Monthly Updates1Every 1st of month
DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

File details come from the government source that posted it. Updated .