The file is a Construction Cost Breakdown Excel template for a design and construction project at Moron Air Base, Spain, specifically for a Chapel Addition and SAPR Office (Building 109). The detailed spreadsheet breaks down the project into comprehensive cost categories including civil works, architectural works, mechanical works, electrical works, and miscellaneous tasks. The cost estimate template provides line-item granularity for each project phase, with sections for design services (35%, 65%, 95%, and 100% design submissions), and construction activities ranging from utilities disconnection and geotechnical studies to specific structural, interior, and systems implementation tasks.

The related federal contract opportunity (Solicitation Number FA557525B0004) is a two-step sealed bidding process by the United States Air Force to design and construct a chapel addition. Technical proposals are due by 23 June 2025 at 10:00 hours local time, with only local sources in Spain eligible to bid. The project is specifically restricted to companies authorized to execute government works under Spanish law, with a preference for Spanish material, labor, and equipment. Offerors must submit a single technical proposal without pricing information, with successful candidates advancing to a sealed priced bid stage in the subsequent step.

View the file

Other files for this federal contract opportunity

Other files attached to Design and construct Chapel Addition, newest first.
File Type Posted
Attachment D_Concept Drawings 25-1005.pdf PDF
Attachment B_ INRMP.pdf PDF
Attachment C_ EFGS May 2014.pdf PDF
Attachment E2_Record Drawings B109.pdf PDF
Attachment G_ Schedule of Material Submittals Form.xlsx XLSX spreadsheet
Attachment A_Architectural Compatibility Guide-Jan25.pdf PDF
25B0004_Step 1 of 2 Step Sealed Bid Tech Proposal Instructions.pdf PDF
Statement of Work 25-1005.pdf PDF
Attachment E1_ Record Drawings B109.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
CNS CHAPEL ADDITION & SAPR OFFICE, B109
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1005MORÓN AIR BASE, SPAIN
LINE
NO.ITEMQUANTITYMATERIAL COSTLABOR COSTOTHER DIRECT COSTS
(8)TOTAL LINE COST
UNIT OF
MEASUREUNIT
NUMBERUNIT COSTTOTAL
COSTUNIT COSTTOTAL

COST

(1)(2)(3)(4)(5)(6)(7)(9)
SUMMARY

RESUMEN

DESIGN SERVICES TOTAL (CLIN#1)

TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO

BASIC PACKAGE TOTAL (CLIN#2 CONSTRUCTION)

TOTAL PAQUETE BASICO

SUMMARY TOTAL

TOTAL RESUMEN

TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COST
OVERHEAD%
SUBTOTAL
PROFIT%
TOTAL PROJECT EUROS (SUMMARY)
$1.00 =0.9249 €
TOTAL PROJECT US$ (SUMMARY)

DATE: FIRM NAME:

TITLE:

BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular" &P of &N

DESIGN

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
CNS CHAPEL ADDITION &SAPR OFFICE, B109
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1005MORÓN AIR BASE, SPAIN
LINE
NO.ITEMQUANTITYMATERIAL COSTLABOR COSTOTHER DIRECT COSTS
(8)TOTAL LINE COST
UNIT OF
MEASUREUNIT
NUMBERUNIT COSTTOTAL
COSTUNIT COSTTOTAL

COST

(1)(2)(3)(4)(5)(6)(7)(9)
DESIGN SERVICES

SERVICIOS DE REDACCIÓN DE PROYECTO

135% Design submission
Presentación del 35% del diseñoEa
265% Design submission
Presentación del 65% del diseñoEa
395% Design submission
Presentación del 95% del diseñoEa
4100% Design submission
Presentación del 100% del diseñoEa
TOTAL DESIGN SERVICES
TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO0.00
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL DIRECT COSTS
OVERHEAD%
SUBTOTAL
PROFIT%
TOTAL PROJECT € (DESIGNE SERVICE)
$1.00 =€ 0.9249
TOTAL PROJECT US$ (DESIGNE SERVICE)

DATE: FIRM NAME:

TITLE:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular"Page &P of &N

BUILD

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
CNS CHAPEL ADDITION &SAPR OFFICE, B109
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1005MORÓN AIR BASE, SPAIN
LINE
NO.QUANTITYMATERIAL COSTLABOR COSTOTHER DIRECT COSTS
(8)TOTAL LINE COST
UNIT OF
MEASUREUNIT
NUMBERUNIT COSTTOTAL
COSTUNIT COSTTOTAL

COST

(1) (2) (3) (4) (5) (6) (7) (9)

CIVIL WORKS.

TRABAJOS CIVILES

1Utilities disconnection
Desconexion de los servicios PúblicosEa
2Provide Georadar
Proveer GeoradarEa
3Carry out a GIS/topographic survey.
Realizar un estudio SIG/topográficoEa
4Removal of the existing ditches, culverts, and discharge points, if required.
Eliminación de las zanjas, alcantarillas y puntos de descarga existentes, si es necesarioEa
5Divert non-potable water distribution line (irrigation).
Desviar linea de distribucion de agua no potable (riego)Ea
6Reroute fiber optic distribution line.

Desviar linea de distribucion de fibra optica

Ea
7Eliminate the corresponding part of the existing French drainage system.
Eliminar la parte que corresponda del dren frances existenteEa
8Construction of new French drains and their connection to ditches.
Construccion de nuevos drenes franceses y su conexion a cunetasEa
9Tree and shrub planting.
Plantacion de arboles y arbustosEa
TOTAL CIVIL WORKS.

TOTAL TRABAJOS CIVILES

ARCHITECTURAL WORKS

TRABAJOS DE ARQUITECTURA

PRELIMINARY WORKS

TRABAJOS PRELIMINARES

10Geotechnical Study.
Estudio geotecnicoEa
11Sampling and analysis of materials suspected of containing lead-based paint in the action areas of the existing building.
Muestreo y análisis de materiales sospechosos de contener pintura con plomo en las zonas de actuación del edificio existente.Ea
TOTAL PRELIMINARY WORKS

TOTAL DE TRABAJOS PRELIMINARES

ESTRUCTURE WORKS.

TRABAJOS DE ESTUCTURA

12Excavation and levelling.
Excavacion y explanacionEa
13Execution of foundations
Ejecucion de cimientosEa
14Execution reinforced concrete structure.
Ejecucion estructura de hormigon armadom²
15Execution of reinforced concrete floor screed and its different layers.
Ejecucion de solera de hormigon armado de suelo y sus diferentes capasm²
TOTAL ESTRUCTURE WORKS.

TOTAL DE TRABAJOS DE ESTUCTURA

EXTERIOR WORKS.

TRABAJOS DE EXTERIOR

EXTERIOR WALLS.

MUROS EXTERIORES

16Exterior Skin.
Revestimientos exterioresm²
17Execution of exterior enclosure.
Ejecucion de cerramiento exteriorm²
18Exterior windows.
Ventanas exterioresEa
19Exterior Personel Doors.
Puertas exterioresEa
TOTAL EXTERIOR WALLS.

TOTAL MUROS EXTERIORES

ROOFING.

CUBIERTAS

20Roof Covering.
Sistema de cubricionm²
21Roof Insulation and Fill.
Aislamiento y formacion de pendiente.m²
22Flashing and Trim.
RemateriaEa
23Other Roofing ( Fall Arresting System).
Otros elementos Cubierta ( sistema anticaida)Ea
TOTAL ROOFING.

TOTAL CUBIERTAS

INTERIORS.

INTERIORES

24Fixed Partitions.
Particiones fijasm²
25Movable partitions.
Particiones movilesm²
26Standars Interior Doors.

Puertas Interiores

Ud
27Fire Doors.

Puertas Ignifugas

Ud
28Acoustic Doors.
Puertas acusticasUd
29Toilet, kitchen & Bath Accessories.
Accesorios de Aseos, cocina y bañosEa
30Counter.
EncimeraEa
TOTAL INTERIORS.

TOTAL INTERIORES

INTERIORS FINISHES

ACABADOS INTERIORES

WALL FINISHES.

ACABADOS EN PARAMENTOS

31Plaster Wall Finishes.
Enlucidos en paredesm²
32Tile & Terrazzo Wall Finishes.
Alicatados y aplacados en paramentosm²
33Painting to Wall.
Pintura en paramentosm²
FLOORING AND FLOOR FINISHES.

SOLADOS Y ACABADOS DE SUELOS

34Tile Floor Finishes.
Acabado enlosado en suelosm²
35Carpet Floor Finishes.
Acabado de moqueta en suelosm²
36Granite Stone Floors.
Suelos de piedra de granitom²
CEILING & CEILING FINISHES.

TECHOS Y ACABADOS DE TECHOS

37Gypsum Wallboard Ceiling Finishes.
Techos continuos de placas de yesom²
38Acoustical Ceiling Tiles & Panels.

Techos de placas y paneles acústicos

m²
TOTAL INTERIORS FINISHES

TOTAL DE ACABADOS INTERIORES

SELECTIVE BUILDING DEMOLITION

DEMOLICION SELECTIVA DE EDIFICIO

39Exterior closure.
Cerramiento exterioresEa
40Roofing.
CubiertasEa
41Interior Construction & Finishes.
Construcciones interiores y AcabadosEa
42Mechanical System.
Sistemas MecánicosEa
43Electrical System.
Sistemas eléctricosEa
TOTAL SELECTIVE BUILDING DEMOLITION

TOTAL DE DEMOLICION SELECTIVA DE EDIFICIO

TOTAL ARCHITECTURAL WORKS.

TOTAL TRABAJOS DE ARQUITECTURA

MECHANICAL WORKS.

TRABAJOS MECÁNICOS

44Install interior sewer system for toilets, breakroom and/or kitchen areas.
Saneamiento interior para aseos, area de descanso y/o cocinaEa
45Install interior plumbing system for potable and non-potable uses.
Instalación fontanería interior para usos potable y no potableEa
46Exterior Underground Potable Water Lines.
Líneas exteriores de agua potable enterradasEa
47Exterior Underground Non-Potable Water Lines.
Líneas exteriores de agua no potable enterradasEa
48Exterior Underground Fire Suppression Water Lines.
Líneas exteriores de agua para supresión de incendios enterradasEa
49Domestic Hot water system

Sistema de producción de agua caliente sanitaria

Reemplazar aparatos sanitarios y accesorios de aseoEa
50Fire Suppression system
Sistema de supresión contraincendiosEa
51Exterior sewer system.
Saneamiento exteriorEa
52HVAC system
Sistemas de climatización y ventilaciónEa
TOTAL MECHANICAL WORKS.

TOTAL TRABAJOS MECÁNICOS

ELECTRICAL WORKS.

TRABAJOS ELECTRICOS

53Electrical Service & Distribution.
Acometida y Distribución Eléctricasea
54Lighting & Branch Wiring
Cableado de Derivación e Iluminaciónea
55Communication, Security & Alarm Systems
Sistemas de Comunicaciiones, Seguridad y Alarmaea
56Sistemas Eléctrcicos Especiales.
Sistemas Eléctrcicos Especialesea
TOTAL ELECTRICAL WORKS.

TOTAL DE TRABAJOS ELECTRICOS

MISCELLANEOUS.

VARIOS

57Repair Elements Affected by the Project Execution
Reparar elementos afectados por la ejecución del proyectoEa
TOTAL MISCELLANEOUS.

TOTAL VARIOS

WORK SUMMARY.

RESUMEN TRABAJOS

TOTAL CIVIL WORKS.

TOTAL TRABAJOS CIVILES

TOTAL ARCHITECTURAL WORKS.

TOTAL TRABAJOS DE ARQUITECTURA

TOTAL MECHANICAL WORKS.

TOTAL TRABAJOS MECÁNICOS

TOTAL ELECTRICAL WORKS.

TOTAL DE TRABAJOS ELECTRICOS

TOTAL MISCELLANEOUS.

TOTAL VARIOS

GRAND TOTAL

GRAN TOTAL

TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD%
SUBTOTAL
PROFIT%
TOTAL PROJECT EUROS (BASIC PKG)
$1.00 =0.9249 €
TOTAL PROJECT US$ (BASIC PKG)
DATE:FIRM NAME:

TITLE:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .