Attachment F_ Construction Cost Breakdown Blank.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- Design and construct Chapel Addition Federal contract opportunity
- Solicitation number
- FA557525B0004
About this file
The file is a Construction Cost Breakdown Excel template for a design and construction project at Moron Air Base, Spain, specifically for a Chapel Addition and SAPR Office (Building 109). The detailed spreadsheet breaks down the project into comprehensive cost categories including civil works, architectural works, mechanical works, electrical works, and miscellaneous tasks. The cost estimate template provides line-item granularity for each project phase, with sections for design services (35%, 65%, 95%, and 100% design submissions), and construction activities ranging from utilities disconnection and geotechnical studies to specific structural, interior, and systems implementation tasks.
The related federal contract opportunity (Solicitation Number FA557525B0004) is a two-step sealed bidding process by the United States Air Force to design and construct a chapel addition. Technical proposals are due by 23 June 2025 at 10:00 hours local time, with only local sources in Spain eligible to bid. The project is specifically restricted to companies authorized to execute government works under Spanish law, with a preference for Spanish material, labor, and equipment. Offerors must submit a single technical proposal without pricing information, with successful candidates advancing to a sealed priced bid stage in the subsequent step.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment D_Concept Drawings 25-1005.pdf | ||
| Attachment B_ INRMP.pdf | ||
| Attachment C_ EFGS May 2014.pdf | ||
| Attachment E2_Record Drawings B109.pdf | ||
| Attachment G_ Schedule of Material Submittals Form.xlsx | XLSX spreadsheet | |
| Attachment A_Architectural Compatibility Guide-Jan25.pdf | ||
| 25B0004_Step 1 of 2 Step Sealed Bid Tech Proposal Instructions.pdf | ||
| Statement of Work 25-1005.pdf | ||
| Attachment E1_ Record Drawings B109.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||
| CNS CHAPEL ADDITION & SAPR OFFICE, B109 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 25-1005 | MORÓN AIR BASE, SPAIN | ||||||
| LINE | |||||||
| NO. | ITEM | QUANTITY | MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | ||
| (8) | TOTAL LINE COST | ||||||
| UNIT OF | |||||||
| MEASURE | UNIT | ||||||
| NUMBER | UNIT COST | TOTAL | |||||
| COST | UNIT COST | TOTAL |
COST
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (9) |
| SUMMARY |
RESUMEN
DESIGN SERVICES TOTAL (CLIN#1)
TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO
BASIC PACKAGE TOTAL (CLIN#2 CONSTRUCTION)
TOTAL PAQUETE BASICO
SUMMARY TOTAL
TOTAL RESUMEN
| TOTAL MATERIAL COST | ||
| TOTAL LABOR COST | ||
| TOTAL OTHER DIRECT COSTS | ||
| TOTAL DIRECT COST | ||
| OVERHEAD | % | |
| SUBTOTAL | ||
| PROFIT | % | |
| TOTAL PROJECT EUROS (SUMMARY) | ||
| $1.00 = | 0.9249 € | |
| TOTAL PROJECT US$ (SUMMARY) |
DATE: FIRM NAME:
TITLE:
BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular" &P of &N
DESIGN
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||
| CNS CHAPEL ADDITION &SAPR OFFICE, B109 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 25-1005 | MORÓN AIR BASE, SPAIN | ||||||
| LINE | |||||||
| NO. | ITEM | QUANTITY | MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | ||
| (8) | TOTAL LINE COST | ||||||
| UNIT OF | |||||||
| MEASURE | UNIT | ||||||
| NUMBER | UNIT COST | TOTAL | |||||
| COST | UNIT COST | TOTAL |
COST
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (9) |
| DESIGN SERVICES |
SERVICIOS DE REDACCIÓN DE PROYECTO
| 1 | 35% Design submission | ||
| Presentación del 35% del diseño | Ea | ||
| 2 | 65% Design submission | ||
| Presentación del 65% del diseño | Ea | ||
| 3 | 95% Design submission | ||
| Presentación del 95% del diseño | Ea | ||
| 4 | 100% Design submission | ||
| Presentación del 100% del diseño | Ea | ||
| TOTAL DESIGN SERVICES | |||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO | 0.00 |
| TOTAL MATERIAL COST | ||
| TOTAL LABOR COST | ||
| TOTAL DIRECT COSTS | ||
| OVERHEAD | % | |
| SUBTOTAL | ||
| PROFIT | % | |
| TOTAL PROJECT € (DESIGNE SERVICE) | ||
| $1.00 = | € 0.9249 | |
| TOTAL PROJECT US$ (DESIGNE SERVICE) |
DATE: FIRM NAME:
TITLE:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"Page &P of &N
BUILD
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||
| CNS CHAPEL ADDITION &SAPR OFFICE, B109 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 25-1005 | MORÓN AIR BASE, SPAIN | ||||||
| LINE | |||||||
| NO. | QUANTITY | MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | |||
| (8) | TOTAL LINE COST | ||||||
| UNIT OF | |||||||
| MEASURE | UNIT | ||||||
| NUMBER | UNIT COST | TOTAL | |||||
| COST | UNIT COST | TOTAL |
COST
(1) (2) (3) (4) (5) (6) (7) (9)
CIVIL WORKS.
TRABAJOS CIVILES
| 1 | Utilities disconnection | |
| Desconexion de los servicios Públicos | Ea | |
| 2 | Provide Georadar | |
| Proveer Georadar | Ea | |
| 3 | Carry out a GIS/topographic survey. | |
| Realizar un estudio SIG/topográfico | Ea | |
| 4 | Removal of the existing ditches, culverts, and discharge points, if required. | |
| Eliminación de las zanjas, alcantarillas y puntos de descarga existentes, si es necesario | Ea | |
| 5 | Divert non-potable water distribution line (irrigation). | |
| Desviar linea de distribucion de agua no potable (riego) | Ea | |
| 6 | Reroute fiber optic distribution line. |
Desviar linea de distribucion de fibra optica
| Ea | ||
| 7 | Eliminate the corresponding part of the existing French drainage system. | |
| Eliminar la parte que corresponda del dren frances existente | Ea | |
| 8 | Construction of new French drains and their connection to ditches. | |
| Construccion de nuevos drenes franceses y su conexion a cunetas | Ea | |
| 9 | Tree and shrub planting. | |
| Plantacion de arboles y arbustos | Ea | |
| TOTAL CIVIL WORKS. |
TOTAL TRABAJOS CIVILES
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
PRELIMINARY WORKS
TRABAJOS PRELIMINARES
| 10 | Geotechnical Study. | |
| Estudio geotecnico | Ea | |
| 11 | Sampling and analysis of materials suspected of containing lead-based paint in the action areas of the existing building. | |
| Muestreo y análisis de materiales sospechosos de contener pintura con plomo en las zonas de actuación del edificio existente. | Ea | |
| TOTAL PRELIMINARY WORKS |
TOTAL DE TRABAJOS PRELIMINARES
ESTRUCTURE WORKS.
TRABAJOS DE ESTUCTURA
| 12 | Excavation and levelling. | |
| Excavacion y explanacion | Ea | |
| 13 | Execution of foundations | |
| Ejecucion de cimientos | Ea | |
| 14 | Execution reinforced concrete structure. | |
| Ejecucion estructura de hormigon armado | m² | |
| 15 | Execution of reinforced concrete floor screed and its different layers. | |
| Ejecucion de solera de hormigon armado de suelo y sus diferentes capas | m² | |
| TOTAL ESTRUCTURE WORKS. |
TOTAL DE TRABAJOS DE ESTUCTURA
EXTERIOR WORKS.
TRABAJOS DE EXTERIOR
EXTERIOR WALLS.
MUROS EXTERIORES
| 16 | Exterior Skin. | |
| Revestimientos exteriores | m² | |
| 17 | Execution of exterior enclosure. | |
| Ejecucion de cerramiento exterior | m² | |
| 18 | Exterior windows. | |
| Ventanas exteriores | Ea | |
| 19 | Exterior Personel Doors. | |
| Puertas exteriores | Ea | |
| TOTAL EXTERIOR WALLS. |
TOTAL MUROS EXTERIORES
ROOFING.
CUBIERTAS
| 20 | Roof Covering. | |
| Sistema de cubricion | m² | |
| 21 | Roof Insulation and Fill. | |
| Aislamiento y formacion de pendiente. | m² | |
| 22 | Flashing and Trim. | |
| Remateria | Ea | |
| 23 | Other Roofing ( Fall Arresting System). | |
| Otros elementos Cubierta ( sistema anticaida) | Ea | |
| TOTAL ROOFING. |
TOTAL CUBIERTAS
INTERIORS.
INTERIORES
| 24 | Fixed Partitions. | |
| Particiones fijas | m² | |
| 25 | Movable partitions. | |
| Particiones moviles | m² | |
| 26 | Standars Interior Doors. |
Puertas Interiores
| Ud | |
| 27 | Fire Doors. |
Puertas Ignifugas
| Ud | ||
| 28 | Acoustic Doors. | |
| Puertas acusticas | Ud | |
| 29 | Toilet, kitchen & Bath Accessories. | |
| Accesorios de Aseos, cocina y baños | Ea | |
| 30 | Counter. | |
| Encimera | Ea | |
| TOTAL INTERIORS. |
TOTAL INTERIORES
INTERIORS FINISHES
ACABADOS INTERIORES
WALL FINISHES.
ACABADOS EN PARAMENTOS
| 31 | Plaster Wall Finishes. | |
| Enlucidos en paredes | m² | |
| 32 | Tile & Terrazzo Wall Finishes. | |
| Alicatados y aplacados en paramentos | m² | |
| 33 | Painting to Wall. | |
| Pintura en paramentos | m² | |
| FLOORING AND FLOOR FINISHES. |
SOLADOS Y ACABADOS DE SUELOS
| 34 | Tile Floor Finishes. | |
| Acabado enlosado en suelos | m² | |
| 35 | Carpet Floor Finishes. | |
| Acabado de moqueta en suelos | m² | |
| 36 | Granite Stone Floors. | |
| Suelos de piedra de granito | m² | |
| CEILING & CEILING FINISHES. |
TECHOS Y ACABADOS DE TECHOS
| 37 | Gypsum Wallboard Ceiling Finishes. | |
| Techos continuos de placas de yeso | m² | |
| 38 | Acoustical Ceiling Tiles & Panels. |
Techos de placas y paneles acústicos
| m² | |
| TOTAL INTERIORS FINISHES |
TOTAL DE ACABADOS INTERIORES
SELECTIVE BUILDING DEMOLITION
DEMOLICION SELECTIVA DE EDIFICIO
| 39 | Exterior closure. | |
| Cerramiento exteriores | Ea | |
| 40 | Roofing. | |
| Cubiertas | Ea | |
| 41 | Interior Construction & Finishes. | |
| Construcciones interiores y Acabados | Ea | |
| 42 | Mechanical System. | |
| Sistemas Mecánicos | Ea | |
| 43 | Electrical System. | |
| Sistemas eléctricos | Ea | |
| TOTAL SELECTIVE BUILDING DEMOLITION |
TOTAL DE DEMOLICION SELECTIVA DE EDIFICIO
TOTAL ARCHITECTURAL WORKS.
TOTAL TRABAJOS DE ARQUITECTURA
MECHANICAL WORKS.
TRABAJOS MECÁNICOS
| 44 | Install interior sewer system for toilets, breakroom and/or kitchen areas. | |
| Saneamiento interior para aseos, area de descanso y/o cocina | Ea | |
| 45 | Install interior plumbing system for potable and non-potable uses. | |
| Instalación fontanería interior para usos potable y no potable | Ea | |
| 46 | Exterior Underground Potable Water Lines. | |
| Líneas exteriores de agua potable enterradas | Ea | |
| 47 | Exterior Underground Non-Potable Water Lines. | |
| Líneas exteriores de agua no potable enterradas | Ea | |
| 48 | Exterior Underground Fire Suppression Water Lines. | |
| Líneas exteriores de agua para supresión de incendios enterradas | Ea | |
| 49 | Domestic Hot water system |
Sistema de producción de agua caliente sanitaria
| Reemplazar aparatos sanitarios y accesorios de aseo | Ea | |
| 50 | Fire Suppression system | |
| Sistema de supresión contraincendios | Ea | |
| 51 | Exterior sewer system. | |
| Saneamiento exterior | Ea | |
| 52 | HVAC system | |
| Sistemas de climatización y ventilación | Ea | |
| TOTAL MECHANICAL WORKS. |
TOTAL TRABAJOS MECÁNICOS
ELECTRICAL WORKS.
TRABAJOS ELECTRICOS
| 53 | Electrical Service & Distribution. | |
| Acometida y Distribución Eléctricas | ea | |
| 54 | Lighting & Branch Wiring | |
| Cableado de Derivación e Iluminación | ea | |
| 55 | Communication, Security & Alarm Systems | |
| Sistemas de Comunicaciiones, Seguridad y Alarma | ea | |
| 56 | Sistemas Eléctrcicos Especiales. | |
| Sistemas Eléctrcicos Especiales | ea | |
| TOTAL ELECTRICAL WORKS. |
TOTAL DE TRABAJOS ELECTRICOS
MISCELLANEOUS.
VARIOS
| 57 | Repair Elements Affected by the Project Execution | |
| Reparar elementos afectados por la ejecución del proyecto | Ea | |
| TOTAL MISCELLANEOUS. |
TOTAL VARIOS
WORK SUMMARY.
RESUMEN TRABAJOS
TOTAL CIVIL WORKS.
TOTAL TRABAJOS CIVILES
TOTAL ARCHITECTURAL WORKS.
TOTAL TRABAJOS DE ARQUITECTURA
TOTAL MECHANICAL WORKS.
TOTAL TRABAJOS MECÁNICOS
TOTAL ELECTRICAL WORKS.
TOTAL DE TRABAJOS ELECTRICOS
TOTAL MISCELLANEOUS.
TOTAL VARIOS
GRAND TOTAL
GRAN TOTAL
| TOTAL MATERIAL COST | ||||
| TOTAL LABOR COST | ||||
| TOTAL OTHER DIRECT COSTS | ||||
| TOTAL DIRECT COSTS | ||||
| OVERHEAD | % | |||
| SUBTOTAL | ||||
| PROFIT | % | |||
| TOTAL PROJECT EUROS (BASIC PKG) | ||||
| $1.00 = | 0.9249 € | |||
| TOTAL PROJECT US$ (BASIC PKG) | ||||
| DATE: | FIRM NAME: |
TITLE:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .