Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EK22B0011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Johnston, Iowa 50131, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids for water and sewer infrastructure repairs at three campgrounds within Saylorville Lake in Polk County, Iowa. A base bid is requested for work at Bob Shetler Campground, with optional bids for Cherry Glen and Prairie Flower Campgrounds. The work includes items such as directional drilling, trenching, valve and hydrant installation, sewer piping and manholes, lift station construction, concrete, asphalt, and site restoration. Bids are due by specified dates between August 2022 through September 2022 as listed in the solicitation documentation provided by the U.S. Army Corps of Engineers Rock Island District.

The opportunity is set aside for total small business concerns. Relevant NAICS codes may include 237110 (Water and Sewer Line and Related Structures Construction) and 237310 (Highway, Street, and Bridge Construction). No incumbent or current contractors are named. The government estimate for the base bid was $5,772,787.57. The place of performance will be the three specified campgrounds within Saylorville Lake in Polk County, Iowa.

Notice text

4 versions

Update #4 · Latest ·

The purpose of amendment 0003 is to extend the bid due date to 07 September 2022, update the bid due time to 10:00 AM and revise Spec Section 33 05 23 and a Drawing.

_____________________________________________________________________________

The purpose of amendment 0002 is to revise the Contract Duration, CLINs, Schedule of Prices, FAR Clauses: 5152.211-9000, 52.211-10 and 5152.211-9001, Spec Sections: 00 73 05, 01 20 00, 01 33 00 Submittal Register, 33 05 23 and Drawings/Plan Set.

_____________________________________________________________________________

The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022.

_____________________________________________________________________________

Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration.

Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration.

Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.

Update #3 ·

The purpose of amendment 0002 is to revise the Contract Duration, CLINs, Schedule of Prices, FAR Clauses: 5152.211-9000, 52.211-10 and 5152.211-9001, Spec Sections: 00 73 05, 01 20 00, 01 33 00 Submittal Register, 33 05 23 and Drawings/Plan Set.

_____________________________________________________________________________

The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022.

_____________________________________________________________________________

Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration.

Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration.

Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.

Update #2 ·

The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022.

_____________________________________________________________________________

Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration.

Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration.

Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.

Update #1 ·

Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration.

Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration.

Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Kelly Pierson OSS Shelton, Washington, United States · NAICS 237110 Indian Health Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors