This pre-solicitation notice seeks contractors to perform water and sewer repairs for the Des Moines River Basin in Polk County, Iowa. Work includes demolition and replacement of water valves, hydrants, and lines including a horizontal directional drilling under the river; sewer line installation including a line under the river; manhole rehabilitation and replacement; lift station installation; lagoon demolition and replacement; and site restoration. Contractors must be able to arrange site visits and the acquisition will use Lowest Price Technically Acceptable evaluation with a solicitation to issue on July 29, 2022 by the Department of the Army Corps of Engineers Rock Island District.

There is no set-aside designated for this opportunity. The primary NAICS code is 237110 with a size standard of $39.5 million. Estimated value ranges from $1-5 million. Work includes water and sewer repairs at Bob Shetler, Cherry Glen and Prairie Flower locations. Sewer work incorporates demolition and replacement of existing wastewater lagoon piping, structures and liner; excavation of lagoon cells; and new lagoon piping and structures.

Notice text

The water work includes, but is not limited to: demolition of existing gate valves and yard hydrants; horizontal directional drilling of water lines to include one boring under the river; installation of gate valves, yard hydrants, fire hydrants, blowoff assemblies, meter vaults; and site restoration.

The sewer work includes, but is not limited to: installation of gravity and pressure sewer lines; horizontal directional drilling of one sewer line under the river; rehabilitation and replacement of sanitary sewer manholes; installation of sanitary sewer duplex lift stations; sewage lagoon removal and disposal of existing wastewater and sludge; demolition of existing lagoon piping, lagoon structures and liner; excavation of existing lagoon cells; new lagoon piping and structures for the existing system; placement of erosion protection on lagoon slopes; trail removal and replacement; and site restoration

NAICS: 237110, Size Standard $39,500,000.00

Estimated Range: Between $1,000,000.00 and $5,000,000.00

Unrestricted, Lowest Price Technically Acceptable (IFB)

Site Inspection: Arrangements and POC information for this project will be included in the solicitation. 

Solicitation to be issued on/around 29 July 2022

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Upper mississippi river restoration (UMRR) pool 12 floodplain forest stage one (1) - habitat rehabilitation and enhancement project (HREP) Mississippi River Basin Pool 12, from Lock and Dam 12 near Bellevue, Iowa, to Lock and Dam 11 in Dubuque, Iowa and Jo Davies County, Illinois 52001 · NAICS 237990 ENDIST Rock Island No set-aside
LB Lateral Water Line and Facilities Replacement for Wastewater System NAICS 237110 — No set-aside
East Bear Creek Pumping Plant and Pipeline Moderni NAICS 237990 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors