DCO TVS Abidjan Transport Project (ATP) A-E Service

Closed Solicitation Posted

Solicitation number
95332419E0001
Agency
Millennium Challenge Corporation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
PSC
Not on record
Place of performance
Abidjan, Cote D'Ivoire

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

***Refer to the attachments for the complete detail***
95332419E0001 Amendment 5
DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d'Ivoire
Synopsis

Amendment 5


The purpose of Amendment 5 is (1) to issue updated Terms of Reference (ToR) dated 20190131, (2) to respond to last set of questions received before the deadline, (3) to remove the requirement for the LOE Percentage by Deliverables, (4) to clarify MCC's evaluation for cost-cutting and/or value engineering methods, and (5) to extend the SF-330 submission deadline to 5:00pm ET on 14 February 2019 (Thursday).


Firms must acknowledge Amendments 1, 2, 3, 4, and 5 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, 3, 4, and 5"


Any changes to the previous version of the synopsis are highlighted in the body in yellow. Any changes to the previous version of the ToR are noted as Track Changes.


The following Amendment 5 Q & As and attached ToRs represent the most recent information and supplant any conflicting information from previous Amendments/versions.


Questions and Answers (Q & As):


1. Synopsis Evaluation Factor 3: Will concrete or gravel cement pavements be considered as similar to rolled compacted concrete in your analysis?


Response: Experience in cement treated base courses produced using a pug mill will be considered as similar.


2. ToR page 12 sec. 1.2.7.4: Article 1.2.7.4 refers to an Annex I-16 which is not present in the file. Can you specify the content of this Annex?


Response: This Annex I-16 refers to the Annex of the Compact, which is available on line at the following link: https://assets.mcc.gov/content/uploads/compact-cote-divoire.pdf


3. ToR page 12 sec. 1.2.7.4: The table on page 12 indicates the key elements that will be provided to the A & E by the agencies and their respective ministries: all available as-built files on project roads and all utilities, any existing traffic Models and studies, all available data including traffic counts, geotechnical characteristics, underground utilities...


Apart from the WSP's VGE integrated model, are there any other models that will be made available to the A & E?


Can you confirm that all existing elements related to the mentioned fields will be provided to the A & E by April 2019?


Response: The existing elements noted in the table are expected to be provided by April 2019, however note that some or all of the as-built files may not exist, especially with regards to the utilities.
In order to minimize uncertainties and therefore claims during construction, the exact positioning of all underground utilities with non-destructive and destructive methods (trenches to confirm) during the design is required.


4. ToR page 12 sec. 1.2.7.4: Apart from the MCLU/DGUF data, the table on page 11 does not mention any GIS data. Can you confirm that we will not have any other GIS database other than the one mentioned?


Response: Please see section 4.5.1 ArcGIS Platform for more information on what is being provided. MCC is not aware of the availability of any other readily available platform for the city of Abidjan.


5. ToR page 21 sec. 3.1.2.1.2: The A & E shall provide a justification for the selection of the modelling tool, including a preliminary cost estimate of data collection campaign and modelling tasks. Afterwards, the detailed methodology definition and detailed data collection will be presented to MCC, MCA-Côte d'Ivoire and local authorities for validation.


We understand that the whole traffic data collection campaign and modelling tasks will only be defined and estimated at that time, according to the analyses that will have been carried out on the available data and models.


Can you confirm that we fully understand the terms of reference and that it is not necessary to estimate levels of effort for these tasks?


Response: The A & E shall estimate and provide a detailed methodology by which it intends to collect and model the required data to be able to perform all of the activities required under Phase I.


During the Phase II, the selected A & E will be asked to include the costs associated with Section 3.1.2.1.1 Data Collection. Section 3.1.2.1.2 Modelling Tool Justification provides for any additional justified modifications that would not have been foreseen during the bidding process.


The ToR has been adjusted accordingly.


6. ToR page 23 sec. 3.1.2.2.4: The A & E shall ensure that the initial traffic (deviation) management model can accept any changes on the network with an almost real-time result.


Can you specify your expectations in terms of calculation time to satisfy this requirement for an almost real-time result?


Response: In order to achieve this task, it is expected that the A & E shall make use of a traffic model that can provide the dynamic re-distribution effect of any change in the network. For instance, if two lanes of a four-lane major artery in the vicinity of VGE are blocked, how would that effect the traffic flow on VGE?


7. ToR pages 30 sec. 3.1.5.4: Can you confirm that all the necessary elements will be provided for the A & E to perform the assessment of the existing Vridi bridge: calculation note, execution plans (including reinforcement and formwork plans), detailed inspection reports, history of interventions on the structure (reinforcement, resurfacing of pavements, etc.)?


Response: As built drawings, detailed inspection reports and history of interventions on the structure are not available.


8. ToR pages 46-57 sec. 4: The deliverable timeline is based on a 2 week review period by MCC, MCA-CI and CTCTR. How is the global timeline updated if the review organizations do not meet this 2 week deadline?


Response: The effect of a delay will be reviewed on a case by case basis and based on the A & E workplan. An equitable adjustment will be contemplated to the updated work plan.


9. ToR page 62 sec. 5.2.1: For the pavement engineer, will the experiences with concrete or gravel cement pavements be considered as similar to rolled compacted concrete experiences?


Response: Experience with conventional concrete pavements or pugmill-produced cement treated base shall be considered equivalent to RCC experience.


10. Provisions and Clauses: As part of the contract, can we be required to prove that we comply with the rules of US embargoes on our equipment and/or for our suppliers?


Response: Yes, MCC may ask to prove such compliance.


FAR 52.225-13 Restrictions on Certain Foreign Purchases prohibits contractors and subcontractors from acquiring supplies or services from entities subject to US economic sanctions. As required by FAR 52.203-13 Contractor Code of Business Ethics and Conduct, firms must establish appropriate internal controls to facility timely discover of any improper business conduct, including compliance to US economic sanctions. MCC may request the contractor to prove compliance and contractor must do so in timely manner.


11. Provisions and Clauses: We understand the contract will be composed of the clauses referred to in the document "Provisions and Clauses" and that we will find these clauses at www.acquisition.gov/
browse/index/far. But could you please indicate us if there will be additional clauses or other contract template not sent yet?


Response: MCC believes the "Provisions and Clauses" document lists all the applicable provisions and clauses.


12. Provisions and Clauses: We would like to introduce limitation of liability clause to the contract amount in aggregate. Could you please amend the particular conditions in this way?


Response: We will consider any special terms and conditions as long as it does not violate US law or other applicable contract clauses. The Bidder's terms and conditions must be proposed in Section H. Additional Information, unless it discloses any price/cost information. If so, it shall be proposed during the Phase II.


13. Provisions and Clauses: Could you please specify what are the insurances required?


Response: MCC does not require any specific insurance. However, the contractor should carry professional liability (errors and omissions) insurance, a common general liability insurance, and any other insurance applicable by law.


14. The pavement engineer should have at least 3 projects with rolled compacted concrete placement whereas the technology suggested for the project include high modulus asphalts (HMA) and rolled compacted concrete (RCC). Would other relevant experience also be considered for the pavement engineer, for instance high modulus asphalt concrete placement?


Response: High Modulus Asphalt Concrete is considered the same as high modulus asphalts.


15. Regarding the multimodal traffic demand and simulation model, we would like to know if the stakeholders/ the MCC have already identified the followings:
a. Recent household surveys,
b. Traffic counting, demand surveys and their respective dates,
c. Traffic models: area/ zoning, simulation period (peak hours only, full day, etc.), software(s) that were used and forecast periods.


If so, would it be then possible to circulate a list of the recent surveys and existing traffic modelling studies?


Response: The BNETD (Bureau National D'Études Techniques et de Développement), a government owned corporation, has performed household surveys and traffic counts, and has calibrated EMME version 2. Through an agreement to be signed by MCA-CI and the BNETD, the latter is committing to provide all data and some basic support at no cost, to the A & E. However note that this agreement has not been finalized.


16. Amendment 2 Q & A No. 7: In the Synopsis Section 1. Background, what does it mean by "The estimated cost range for the construction project is to exceed $10,000,000"?


A: This is simply a prescribed set of ranges per FAR 36.204.


What does it mean by "To exceed $10,000,000" is not a range or set of ranges. Can MCC provide a range estimate or are we to refer to the answer to Question 30 - "the estimated contract value for this A-E service is between $10,000,000 and $20,000,000"?


Response: FAR 36.204 suggests "the estimated price should be described in terms of one of the following price ranges" with "(h) More than $10,000,000" being the highest threshold.


A narrower estimate for this project is US$10 to $15 million.


17. Amendment 2 Q & A 15: Where in the SF-330 should firms incorporate the Commitment Letters?


A: You may include all the Commitment Letters as a separate attachment to the SF-330 Section E. Resumes of Key Personnel Proposed for this Contract. As a reminder, there is no page limit for Commitment Letters.


Amendment 2 Q & A 16: Does MCC want a confirmation of the A-E firm's commitment to this project from an authorized officer of the firm?


A: Yes. The Cover Letter shall include a statement from an executive of the proposing firm confirming their commitment to actualizing the proposed and negotiated plans, including the team members. Firms may simply include a statement in the signed Cover Letter, "Firm ABC confirms the commitment of carrying out our proposed and any negotiated technical plans, including mobilizing and maintaining the proposed team members."


Given that employees of a company have no legal authority to commit their time [such a commitment is legally binding only if it comes from a duly authorized officer of the firm] may we assume commitment letters from a firm's employees are no longer required so long as the firm provides a commitment for the proposed employees in the cover letter?


Response: Individuals working as consultants or subcontractor (anyone not an employee of the prime firm) must submit a signed commitment letter. Otherwise, firms are permitted to submit a signed blanket statement confirming the commitment and the availability of proposed employees of the firm. (If all the proposed personnel are employees of the prime firm, individually signed commitment letters are not required.) The resumes of the proposed personnel must clearly indicate that their current employer. If MCC is unable to identify whether or not a proposed team member is a current employee of the prime firm from her/his resume, MCC will assume the team member is not an employee of the prime firm.


18. Amendment 2 Q & A 26. Page 7 of ToR, asks for the LoEs less administrative effort. There may be uneven comparison by removing the administrative effort.


A: We have changed this requirement to propose the Total Estimated LoE Percentage per Deliverable. Refer to the Attachment c. LoEs by Deliverable. We are no longer seeking a total number of hours per deliverable. The sum of all the LoE percentages (including the Base Period and Option Period 1) must equal 100% and shall reflect the total hours, including both technical and administrative hours, in the calculation.


Changing the requirement for presenting actual LOE labor hours to percentages is, to a degree, a distinction without a difference. In order to compute percentages, the proposing firm would first need to calculate actual LOE hours, from which it could then derive percentage effort. In either case, the question arises as to whether it is proper to evaluate LOE labor in an SF 330 procurement which is intended to solicit Q & E and a management structure/approach, not to evaluate proposed level of effort?


Response: MCC believes that without the firm's hourly rates or specific LOE hours, MCC cannot infer or deduce a firm's price/cost from the LOE percentages. However, to ease the submission requirement, MCC is removing the LOE Percentage by Deliverables spreadsheet for this time.


19. Amendment 2 Q & A 28. Are firms permitted to propose cost-cutting and/or value engineering methods?


A: Yes. Firms may propose innovative cost-cutting and/or value engineering methods that can improve the Government's requirement in Section H. Additional Information. However, this synopsis phase is strictly a technical evaluation phase and SF-330 does not allow any cost information. Therefore, firms must take care not to submit any specific cost detail. General explanations of the methods are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited. MCC will not advise the firms whether or not their language would be permissible before the submission due date. Firms should consult the permissible language with their legal counsel.


The provided guidance specifically includes: "General explanations of the methods that are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited." How are firms going to provide detailed percentage level of effort, by labor category, by deliverable, without violating the prohibition that no information provided may facilitate inferences as to cost?


Response: Bidders are asked to provide technical explanation of cost-cutting and/or value engineering methods without disclosing pricing/cost information. During Phase I, MCC will evaluate the innovation and applicability of these methods, not the extent of cost savings, as part of Qualification Factor 2. However, this is not a required qualification. Innovative and applicable cost-cutting and/or value engineering methods will be given a greater consideration; but choosing not to present this information will not negatively affect the Bidder's evaluation rating for Factor 2.


As noted in MCC's response to Question no 18 above, LOE Percentage by Deliverables is no longer requested.


20. Amendment 2 Q & A 31. During the contract performance, it may be necessary for the contractor to access various areas of the project. What would happen if there are any accessibility issue?
A: If the said issue arises from the fault of the Government, we will absolutely consider modifying the contract for reasonable equitable adjustments. If the issue/delay could have been resolved or avoided by the contractor, any additional costs incurred would be assumed by the contractor.


Why is this issue being addressed in the context of an SF 330 technical submission? Issues such as accessibility should be addressed during cost negotiations with the selected firm. In any event, such issues would be properly addressed via negotiation of costing assumptions. Is it truly MCC's intent that such issues would be addressed via formal equitable adjustments to the contract?


Response: MCC is simply responding to a hypothetical question posed by an interested firm. MCC is not requesting firms to address the cost implication of such scenario in the SF-330 submission.


FAR 52.243-1 Changes-Fixed Price Alternate III paragraph (b) states that the Contracting Office shall make an equitable adjustment in the contract price, the delivery schedule, or both, in case of an increase or decrease in the cost of performance. Accordingly, if the cost of performance is increased by Government-caused delay, MCC will consider negotiating an equitable adjustment.


21. Amendment 2 Q & A 34. Regarding the key-experts and their presence on site, should we consider a minimum share of their man-days to be spent in Ivory Coast?


A: The firm shall propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment.


How does a firm "propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment" without specifying LOE labor hours, or LOE percentages which is prohibited?


Response: The A & E shall outline their approach to staffing the project in country and at home office, including key and non-key personnel throughout the requirement including associated logistics and arrangements.


22. TOR 1.2.6 Stakeholder Engagement, most specifically:


For the design phase, the A & E shall anticipate, at a minimum, the following:
1. A stakeholder set of approximately fifty (50) entities (excluding individuals and households affected by the Project who are part of the Resettlement Action Plan);
2. The review/validation of a minimum of seventy-five (75) products and/or deliverables;
3. The delivery of one hundred fifty (150) working sessions or workshops involving venue rental, including meals and coffee breaks for a minimum of thirty (30) participants; and,
4. A communications and invitation package for each workshop including printed material.


As part of the stakeholder engagement program, the A & E shall i) provide logistical support, ii) meet individually with stakeholders during preparation and/or as follow-up to the workshops, iii) publish and print materials including sketches, technical drawings or electronic media, iv) organize venues and send necessary invitations, v) prepare materials and present at the workshops, and vi) provide for any follow-up that is required. Further, the A & E shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials for all Stakeholder Engagement activities that are conducted under their contract scope.


2.1 Objectives of the Consultancy


The A & E services are comprised of one eight (8) month Base Period (Phase I), with a ten (10) month Option Period 1 (Phase II), both under a full fixed price basis.


The details outlined in 1.2.6, especially those bolded, suggest a significant number of unknowns and variables yet Section 2.1 dictates the work shall be performed on a fixed prices basis.


Under general contracting principles, fixed price contracts should not be used where there are contingencies and unknowns that render costing not suitable to fixed price contracting. Such would appear to be the case here. In order to protect itself from the inherent risk of fixed price bidding, the contractor would need to propose an inordinate number of labor hours and/or a slew of contingency assumptions. Further, the contactor would not be allowed a proposed MOD unless it could demonstrate there was a scope change. This might be problematic for the contractor since there may not be evidence of a scope change, rather the issue would be that the scope itself is full of contingencies and unknowns.


Would MCC consider changing to a T & M contract?


Response: No.


23. TOR 3.2.2 Social Safeguarding


This includes Stakeholder Engagement, ESIA preparation, and Resettlement Planning.


The Social Safeguarding component of the A & E's work will be very difficult to cost on a fix priced basis. The challenge is that much of the critical information for scoping these efforts (e.g. project designs, number and status of people to be resettled, and outputs from stakeholder meetings) will not be available at the time of bidding because these efforts are part of the project itself. The following two questions identify the challenge in more detail.


23(a). TOR 3.2.2.1 Preparation of Environmental and Social Impact Assessments


Per the TORs, "The A & E shall prepare an ESIA, Environmental and Social Management Plan (ESMP) and an environmental and social monitoring program for each of the road segments"


The dimensions of the ESIAs, will depend on studies and design work which will not have been completed at the time that the A & E is required to propose a cost for preparation of the ESIAs.


Lacking 3.1.5.5 Social Inclusion Analysis, 3.1.5.7 Conceptual Design; and 3.2.1.4 Preliminary Design Documents which will be completed as part of the ATP, the costing will be unreliable. This creates a significant financial risk for the A & E. How does MCC propose that this risk be mitigated?


Response: The A & E shall have to assess an estimate for these activities. We have supplied minimum requirements as we currently understand them. We also encourage Bidders to narrow risks further through direct observation using remote sensing. As in all instances where information is incomplete (in this case potentially due to not having final designs prior to scoping the ESIA, or full stakeholder mapping), the Bidder will have to make certain assumptions which should be stated transparently at the outset so that it is possible to understand what the proposal includes and what it does not include. These assumptions shall be presented to MCC for consideration.


23(b). 3.2.2.2 Involuntary Resettlement


This item identifies that the A & E will Prepare a Resettlement Action Plan (RAP) and a Livelihood Restoration Plan (LRP). The dimensions of the Resettlement Plan (especially the number of Potentially Affected People involved) can't be reliably estimated prior to completion of the Stakeholder Mapping exercise (part of the Inception Report) and the conceptual and engineering designs that are part of the project. According to the TOR's, Potentially Affected People (PAP) estimates provided: "are not based on any field work, i.e., no PAP census or interviews with PAPs or other stakeholders have been conducted. The estimates were also developed prior to the forced eviction of truckers from the port zone that occurred in November 2017."


Yet the A & E will be required to propose a cost for developing the individual project RAPs as well as LRPs before this requisite information is available. PAP estimates provided in the bid documents are likely to change significantly.


Costing will be difficult without the stakeholder mapping and the design work. This will in turn create a significant financial risk for the A & E.


Again, how does MCC propose that this risk be mitigated?


Response: The A & E shall have to assess an estimate for this activity. RAP implementation is however not part of this contract. We have supplied minimum requirements as we currently understand them. We also encourage Bidders to narrow risks further through direct observation using remote sensing. As in all instances where information is incomplete, the Bidder will have to make certain assumptions which should be stated transparently at the outset so that it is possible to understand what the proposal includes and what it does not include.


All other terms and conditions remain unchanged.


[End of Amendment 5]


Amendment 4


The purpose of Amendment 4 is (1) to issue updated Terms of Reference (ToR) dated 20190102 and (2) to clarify the submission deadline.


Firms must acknowledge Amendments 1, 2, 3, and 4 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, 3, and 4."


This version of the ToR updates the Section 1.2.6 Stakeholder Engagement to include a minimum level of anticipated stakeholder engagement work. The changes are highlighted in yellow and noted in Track Changes.


Due to the US Federal Government lapse in FY2019 Appropriations, MCC will shut down starting 3 January 2019 and thus the submission deadline may be affected. MCC's intent is for the submissions to be due by 5:00PM ET on 4 February 2019 (Monday); however if MCC is unable to timely address the questions (due by 1:00PM ET on 4 January 2019), then MCC may consider extending the submission deadline.


With a few exceptions, MCC will not be allowed to work during the furlough period (or also called "shutdown"). MCC will not be able to make amendments to this Synopsis until the US Federal Government reopens. Please check this Synopsis on FBO.gov after the US Federal Government reopens. If MCC decides to extend the submission deadline, MCC will make an amendment before the submission deadline or within 5 business days from the reopening date, whichever is later. Unless this Synopsis is amended, interested offerors shall assume that the questions and the submission deadlines remain unchanged.


The interested offerors are responsible for staying updated on the current US Government furlough/shutdown status and submit your SF-330 timely. Please check the US news and https://www.opm.gov/ regarding furlough/shutdown information.


Any changes to the previous version of the synopsis are highlighted in the body in yellow.


All other terms and conditions remain unchanged.


[End of Amendment 4]


Amendment 3


The purpose of Amendment 3 is (1) to extend the Submission Due Date to 5:00pm ET on 4 February 2019 (Friday), (2) to answer several questions posed by interested bidders, and (3) to issue updated Attachment a.1 Terms of Reference (ToR) 20181227 (Microsoft Word) [Official]. This Amendment 3 revises the answers to Amendment 2 Questions 1 and 2. Please note the information in this Amendment 3, including the Attachments, supplants any conflicting information you may found in previous versions of this Synopsis. Any changes to the previous version of the synopsis are highlighted in the body in yellow. Any changes to revised version of the ToR are noted in the Track Changes.


We have made some changes to the ToR, including the removal of one task (formerly 3.1.4.2) and its associated deliverable (Deliverable 14). We also added language regarding the bachelor's degrees for engineering positions at the senior level, namely that the degrees shall come from accredited engineering institutions. We provided the names of the accreditation institutions with links for verification in the US, Canada, France and international agreements (Washington Accords and CTI).


Firms must acknowledge Amendments 1, 2, and 3 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, and 3."


Questions and Answers (Q & As):


1. Requirements for the Pavement Engineer (s) (P. 58 of the ToR): "S/he shall have a Masters' degree in Civil Engineering with specialty in concrete pavements and high modulus asphalts." To our knowledge, this specialty is acquired rather after years of practice. Would you consider lowering the education requirement?
A: Section 5 paragraph 7 allows for the substitution of years of experience for a Master's degree.


2. TOR 5.2.1 page 57: Can PM/TL's two projects over $175 million count toward the requirement that s/he must have led at least three projects over the past 10 years? In other words, is three total projects acceptable, or is MCC looking for five total projects for the PM/TL?
A: The two (2) urban infrastructure projects valued at over $175 million can be counted as part of the three (3) projects over the last ten (10) years.


3. Can MCC provide a copy of WSP's VGE integrated model?
A: MCC would require a legal approval to release this model, which may significantly delay this procurement. We also don't believe this is critical for bidders to prepare their submission. Therefore, this will not be shared with the interested bidders. However, it will be made available to the awardee after the award.


4. Does a cost loaded implementation plan with WBS need to be provided for the purposes of this qualifications-based submittal?
A: No. this will need to be provided with the financials as part of the second phase of the procurement.


5. Who will have primary responsibility for developing the Stakeholder Engagement Plan - the ESOC or the A & E? (There seems to be conflicting references to SEP preparation on pages 9 and 16 of the TOR.)
A: The A & E has total responsibility for planning and conducting all Stakeholder Engagement for all activities that are conducted under their contract scope. The ESOC has responsibility for the Project-wide Stakeholder Engagement Plan as required under the IFC PS and MCC, of which the Stakeholder Engagement program of the A & E is a part. The ESOC will need to capture and document what the A & E does in the larger Project-wide Stakeholder Engagement Plan and the A & E will need to share information and collaborate with the ESOC on its approach and results. Note on page 17 of the ToR, it states, "The A & E shall provide a preliminary stakeholder engagement plan including stakeholder mapping for completing the requirement." Therefore, this is consistent and correct.


6. Who will have primary responsibility for developing the Training course - the ESOC or the A & E? (There seems to be conflicting references on pages 9 and 13 of the TOR.)
A: The two training courses and objectives are different. Additional clarification is provided in revised ToR with this Amendment. Each consultant is responsible for their own course content development.


7. Who shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials?
A: The A & E shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials for all Stakeholder Engagement activities that are conducted under their contract scope. Page 10 of the ToR has been modified to reflect this.


8. One of the requirements for the key personnel is to have a bachelor's degree in civil engineering and/or construction engineering. In some non-US countries, the degree is not called bachelor and not always civil, construction. Could the wording be modified to Bachelor's degree in Civil Engineering or similar?
A: Yes, this has been adjusted. Note that MCC reserves the exclusive right to evaluate what constitutes similar; as such the firm shall provide supporting evidence to help inform the MCC appropriately.


9. Can the A/E proposed different dates for the deliverables as long as the Base and Option Period do not go beyond the timeframe proposed by MCC? Also, can the A/E include additional deliverables not listed in the ToR?
A: Yes, the A & E is encouraged to propose different dates for deliverables. The A/E may propose additional deliverables, however the MCC reserves the right to accept or decline the proposal.


10. General Review and Approval Question. Please specify that the NTE Due dates provided in the schedules of the RFP are for DRAFT deliverables, which will begin the review "clock" ticking, and NOT for Final deliverables having undergone the 4-week pre-submission review process.
A: The dates provided are for approval of the deliverables. See Question No. 9 above. The A & E may modify the deliverables schedule as long as they fit in the period of performance provided.


11. It is stated that the A/E must possess an average of at least $100 million USD in total annual revenue over the last five years. Please clarify if the $100 million refers to revenue from design and/or from construction. Some design firms do not provide construction services.
A: This refers to annual revenue generated by the prime contractor's architecture and/or engineering design work.


12. TOR Page 44. 4.2 Deliverables. The RFP specifies that the official language of all deliverables is in French; however, also references translation requirements. Later, MCC requests that Monthly Reports be provided in both French & English. Please clarify language requirements for all primary deliverables as French only. (Only Deliverables 1 and 2 specifically note the French language requirement.)
A: Section 4.4.2.1 Base Period Deliverables notes that all deliverables are in French unless otherwise noted. This clarification has been extended to Section 4.4.2.2 Option Period 1 Deliverables.


13. TOR Page 44, 4.3 Review of Work. Please consider changing the deliverable review and time schedule to a set time frame, such as "Total deliverable review and finalization will be no more than 28 calendar days, which begins at the time the draft final is delivered to the MCC, MCA and appropriate organizations for review. Review organization have 14 calendar days to provide comments for inclusion or discussion, at which time the A & E has 14 days to include, discuss and revise the draft to Final. If reviewing organizations do not meet the 14-day deadline, the A & E is not obliged to include them. The A & E is responsible to keep record of and time stamp all received comments. This system does not preclude the A & E from eliciting informal feedback and comments during the drafting process."
A: This change has been provided in the ToR.


14. TOR Page 45. 4.3.1. and 4.3.2 CTCTR Monthly Progress & Design Review Meetings. MCC requires that the CTCTR meetings include videoconferencing. Please confirm that publicly available systems, such as Skype or Zoom can be used for this purpose.
A: Publicly available systems are permissible as long as they provide a high quality videoconferencing environment with proper audio and video quality for all participants.


15. TOR Page 46. Monthly reports. In this section of the RFP, MCC request that the monthly report must include a detailed time sheet for all personnel documenting in and out of country time. However, MCC has defined the contract terms as Firm Fixed Price, or FFP. Under FFP contracts, detailed time and costs are not required to be reviewed, presented or approved. Please clarify this requirement under the standard terms of a FFP contract structure.
A: This monthly report is to allow quality management by MCC. This is not to confirm the cost or invoice; this is to ensure that the contractor is providing a quality work as they proposed and negotiated.


16. TOR Page 44-47. Inception Report. The RFP states the draft Inception Report is due two weeks prior to the kick off meeting but the Abidjan Kick Off, and the final report is due within two weeks of the kick off meeting. Yet, the RFP states the Inception Report is Due at Week 10. The dates do not seem to coincide appropriately.
A: As noted in the Deliverables Timeline 4.4.2.1.10 Base Period Deliverable Timeline and 4.4.2.2.6 Option Period 1 Deliverable Timeline, the deliverable timelines are indicative and will be proposed and finalized by the A & E.


17. TOR Page 18. Task 3.1.2.1.1 Data Collection. Traffic counting data is not detailed in this task. Data is supposed to be collected for traffic counts, OD, safety assessment, injuries and fatalities, truck parking needs and land availability. Only OD survey is detailed. Other types of data seem to be rather requested in further tasks.
A: As noted in Section 3.1.2 Multimodal traffic demand and simulation model for the Project Zone of Influence, the objectives of the task are to perform data collection to develop a Traffic Demand and Simulation Model and develop a multimodal traffic demand and simulation model for trip generation, trip assignment, modal distribution and trip assignment. The A & E shall develop a methodology to accomplish this task accordingly.


18. TOR Page 27. 3.1.5.1 Conceptual Design. Traffic Assessment asks to perform a specific detailed traffic counts (during AM and PM peak periods, while it is not specified in Data Collection. Does this traffic count different from the one asked in Task 3.1.2.1.1 Data collection?
A: The A & E must propose, justify, and implement a data collection plan as part of the mandate. MCC believes traffic counts are necessary.


19. Data Collection. Can you confirm the Data collection for deliverable 4 includes only the road sections from figure 2 (excluding Boul de la Paix and Yopougon)?
A: The Project Zone of Influence is detailed under section 1.2.2 Project Zone of Influence. Figure 2 is provided as a partial reference material for the Project Zone of Influence.


20. Traffic Counting. Does the MCC expect the A/E to complete the traffic counting only with Deliverable 8-Conceptual Design at week 32?
A: Data collection results and simulations (to account for various network development scenarios or deviation plans) are required for the conceptual designs. The data collection may be performed earlier if needed.


21. Due Date. When is the Preliminary ESIA and Resettlement Report due and what is the required content?
A: The A & E shall include relevant ESIA and Resettlement information in the Preliminary Design Documents as outlined under Section 3.2.1.4. Deliverables found under section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included.


22. Deliverable. Can you clarify the requirements in terms of Preliminary ESIA and resettlement in Deliverable 8 and Deliverable 9? From the deliverable descriptions (section 3.1.5.7 and section 4.4.2.2.1.1), both deliverables 8 and 9 should include the preliminary ESIA and resettlement assessment. Please provide details of what is expected.
A: Section 3.1.5.7 Conceptual Design is modified to summary ESIA and resettlement assessments, while 3.2.1 Preliminary designs and its deliverables under Section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included. The Conceptual Design ESIA elements are meant to highlight the major aspects that may influence the overall design selection; the preliminary design is a more completed version of the selected conceptual design with more refined resettlement, environmental and social risks and measures identified.


23. Preliminary Estimates and types of PAP. What was the methodology used to estimate the preliminary number and type of PAP? What were the criteria used to distinguish permanently and temporarily displaced PAP?
A: It should be emphasized that the estimates of the number of PAPS are indicative only and NOT definitive. The presence of PAPs and the estimate of number of PAPS was assessed through counts made using satellite imagery coupled with windshield survey and intermittent on the ground counts. The difference between permanently displaced and temporarily displaced PAPS is that permanently displaced PAPs will not be able to resume their activities in their original location post-project completion.


24. Overlap ESOC-A & E. Could you clarify the responsibility of the A & E vs the ESOC:


a) The ESOC should develop training courses for the MCA and CTCTR, 6 courses X 16 h, all of them have the same topic as the 36h-classes provided by the A & E. Can you clarify the differences between both training programs?
A: The ESOC courses are generalized courses meant to provide a general awareness and understanding of each of the selected topics in anticipation of the A & E modules, which are meant to be more specialized and focused on providing the CTCTR with sufficient understanding to participate in the engineering design phase and to deliver the road projects during the Compact period as noted in paragraph 1 of 3.1.4.1 Training for the CTCTR.


b) Who, between the A & E and ESOC, is responsible to coordinate the engagement and effort of INP-HB and ENSEA?
A: The ESOC is responsible for engaging with the INP-HB and ENSEA for their six (6) modules, while the A & E is responsible for coordination with INP-HB and ENSEA, with support from MCA-CI, for its ten (10) modules.


c) What is the effort expected from INP-HB and ENSEA for those training programs? Should the A & E plan a budget for local professors in addition to international trainers?
A: The INP-HB and ENSEA have separate budgets from the A & E. Note that the A & E is expected to provide the training itself and not through professors from either institution. Note that professors from both institutions may be present during the modules.


[End of Amendment 3]


Amendment 2


The purpose of Amendment 2 is (1) to issue the details of the Synopsis Conference held on 27 November 2018, (2) to extend the Questions Due Date to 1:00pm ET on 4 January 2019 (Friday), and (3) to issue updated attachments. For the overview of the Conference, refer to the Synopsis Attachment f. Synopsis Conference Presentation. The highlights/questions from the synopsis are listed below in a form of questions and answers (Q & As).


This Amendment also includes the following attachments: Unofficial Terms of Reference in French 20181218, Updated LoEs by Deliverables, and Unofficial Synopsis Conference Presentation. The Unofficial Terms of Reference in French and the Unofficial Synopsis Conference Presentation are for reference purpose only. If there are any discrepancies among the documents, the information from the Official Terms of Reference and the Synopsis supplant the unofficial documents.


All other terms and conditions remain unchanged.


Firms must acknowledge Amendments 1 and 2 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1 and 2."


List of Synopsis Conference attendees:


a. Atkins Acuity
b. CP & Y
c. Egis Group
d. ERM Group
e. exp Global
f. IMC Worldwide
g. Ingérop
h. Jacobs Engineering Group
i. Louis Berger Group
j. Monkey Forest Consulting
k. Mott MacDonald
l. Rendel Limited
m. SETEC
n. Tetra Tech


Conference Questions and Answers (Q & As):


1. Would MCC consider extending the questions due date until the first week of January? Some of our international offices are closed until the first week.
A: Yes. The questions are now due by 1:00PM ET on 4 January 2019 (Friday).


2. Would MCC consider extending the SF-330 submission due date?
A: Yes. The submissions are now due by 5:00p ET on 4 February 2019 (Monday).


3. Would MCC consider cost plus incentive fee type contract?
A: No.


4. Will MCC provide a Microsoft Word version of the SF-330 template?
A: No. The SF-330 is managed and distributed by US GSA and they only have a PDF version available. After the Synopsis was posted, the CS realized that the Attachments E. SF-330 Part I and Part II Templates were corrupt. We will attempt to re-upload in this Amendment 2. However in case the upload fails again, MCC encourages the interested firms to download the templates directly from the GSA website:


https://www.gsa.gov/reference/forms?search_keyword=sf-330


5. How will MCC share any revised Synopsis Attachments?
A: MCC may update the Synopsis Attachments as needed and upload it as an Amendment on FBO.gov under this announcement 95332419E0001. Firms are required to reference and use the most up-to-date Attachments from the latest amendment for their submissions. Please periodically check the FBO announcement at the following link for any revised Attachments:


https://www.fbo.gov/spg/MCC/MCCMCC/MCCMCC01/95332419E0001/listing.html


6. How should firms confirm that the submission is valid for one year?
A: Firms may simply note "The submission is valid for one year" in the Cover Letter.


7. In the Synopsis Section 1. Background, what does it mean by "The estimated cost range for the construction project is to exceed $10,000,000"?
A: This is simply a prescribed set of ranges per FAR 36.204.


8. Is an SF-330 Part II required for each office where key personnel reside?
A: Yes. SF-330 Part II is required for each office that will be involved in this project.


(The complete SF-330 template has a set of instructions on how to complete the form. On page 4 of Instructions, it says to submit SF-330 Part II for the firm and each of its "branch office seeking work if the firm has branch offices.")


9. How soon does MCC expect to receive the top firm's cost proposal once the firms ranking is established?
A: Once the solicitation (RFP) is issued to the top firm, we will expect to receive the cost proposal in two weeks.


10. What is the expected award date?
A: MCC hopes to make the award in March of 2019.


11. Who does the MCC expect to be present at the presentation/interview?
A: The Team Lead must be present either in person or virtually (if virtually, she/he must have a reliable connection to communicate with MCC clearly). Ideally, MCC would like all the Key Personnel members to be present, but this is not required.


12. General Format. Please confirm that use of 11x17" paper for charts, graphics, and matrices is approved, and will only count as a single page within the allotted page count.
A: Yes. Up to five 11x17" with 1" margins pages will be permitted in Section H Additional Information for charts, graphics, matrices, or any other visual representations. These pages shall not include extensive written descriptions of your technical approach (as a general rule of thumb, if these pages reserved for visuals include paragraphs of information, we will disregard them during our evaluation). Each 11x17" page will count as one page towards the 30-page limit.


13. Are resumes only required for the six key personnel or do we need to include resumes for all personnel listed on the organizational chart?
A: The resumes must be submitted for both key and non-key personnel that are listed on the organizational chart.


14. Format of CV. In the RFP Public meeting, MCC specified offerors do not have to follow the Section E resume template; rather, should ensure that the required information is included in the CVs provided. Please confirm this to be correct. Also, please confirm there is no page limit, nor limit on number of CVs included in Section E.
A: That is correct. As long as the required information is included, Section E resume template is not required for submission. If Section E template is not used, the resumes shall be compiled and submitted as a separate electronic file, collective of all relevant resumes, on 8.5x11" paper with 1" margin. There is no page limit to resumes.


15. Where in the SF-330 should firms incorporate the Commitment Letters?
A: You may include all the Commitment Letters as a separate attachment to the SF-330 Section E. Resumes of Key Personnel Proposed for this Contract. As a reminder, there is no page limit for Commitment Letters.


16. Does MCC want a confirmation of the A-E firm's commitment to this project from an authorized officer of the firm?
A: Yes. The Cover Letter shall include a statement from an executive of the proposing firm confirming their commitment to actualizing the proposed and negotiated plans, including the team members. Firms may simply include a statement in the signed Cover Letter, "Firm ABC confirms the commitment of carrying out our proposed and any negotiated technical plans, including mobilizing and maintaining the proposed team members."


An attempt by the contractor to alter the technical plans after award may not be considered favorably by MCC and may result in a termination for default.


17. Would MCC consider limiting the number of projects under SF-330 Section F. Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract? How should firms reflect the multiple projects?
A: Yes. The total number of projects in Section F shall not exceed 10 projects. Firms must complete a copy of SF-330 Section F for each project proposed, i.e. if proposing 5 projects, the firm must complete the Section F five times, one for each project.


18. Can firms provide past performance references of the subcontractors?
A: Yes. MCC expects at least three (3) past performance references of the prime firm. The firm may choose to submit additional past performance references of its subcontractors if they have performed similar projects, in size and scope, in the past.


19. The Qualification Factor 4 asks for at least 3 past performance references in a format that differs from SF-330 Section F. Will MCC clarify this?
A: The Qualification Factor 4 has been revised to require at least 3 but no more than 10 past performance references to match the requires of SF-330 Section F (refer to Question no. 4 above). Firms must submit at least 3 references for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


The Qualification Factor 4 has been revised to reconcile SF-330 Section F.


20. Would MCC consider limiting the SF-330 Section G. Key Personnel Participation in Example Projects to the proposed Key Personnel only?
A: Yes. The Section G may comprise of example projects participated by the proposed Key Personnel only.


21. Section G. Section G states Key Personnel be included only in the matrix. Will MCC allow Key and other Core Technical Experts be included to illustrate experience level more appropriately?
A: The minimum requirement is to complete Section G of the proposed Key Personnel. However, firms are permitted to include other Core Technical Experts (no junior-level staff) in Section G to illustrate a more complete picture of its proposed team's professional qualifications. Doing so may result in a higher rating for the Evaluation Factor 1 Proposed team professional qualifications necessary for satisfactory performance of required services.


22. Can firms re-phrase the Team's roles as stated in the ToR?
A: No. As noted under 5.b. Submission Requirements and Instructions, "A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating."


23. How much of the contract would be performed before/after the Entry-into-Force (EIF)?
A: The EIF is the point in time when a Compact or Threshold Program Agreement comes into full legal force and effect and its term begins. MCC estimates the EIF may take place in middle of 2019, but there is no certainty as of now so we cannot estimated this performance split.


24. What is MCC's expectations on the team mobilization plan?
A: The team mobilization plan shall demonstrate the proposed teams mobilization and timing to complete the assignment per the proposed workplan and overall approach and methodology. Firms shall consider, among other items, how the proposed team will be initially mobilized to Abidjan to begin the assignment in earnest.


25. Subcontracting Plan. In an SF 330, a proper Subcontracting Plan is generally not included, due to the costing content required therein. Will MCC consider dropping this requirement for the SF 330 submission, until prior to negotiations at which time all costs, etc can be revealed?
A: MCC is not seeking a formal Subcontracting Plan with the cost information. MCC wishes to verify that the prime contract has a management plan on (1) how it will oversee the subcontractor's performance and (2) what its plans are in case of subpar performance.


26. Page 7 of ToR, asks for the LoEs less administrative effort. There may be uneven comparison by removing the administrative effort.
A: We have changed this requirement to propose the Total Estimated LoE Percentage per Deliverable. Refer to the Attachment c. LoEs by Deliverable. We are no longer seeking a total number of hours per deliverable. The sum of all the LoE percentages (including the Base Period and Option Period 1) must equal 100% and shall reflect the total hours, including both technical and administrative hours, in the calculation.


27. Is there a detailed contract deliverables review and approval process?
A: Yes, it can be found in the ToR Section 4. Deliverables and Documentation Requirements.


28. Are firms permitted to propose cost-cutting and/or value engineering methods?
A: Yes. Firms may propose innovative cost-cutting and/or value engineering methods that can improve the Government's requirement in Section H. Additional Information. However, this synopsis phase is strictly a technical evaluation phase and SF-330 does not allow any cost information. Therefore, firms must take care not to submit any specific cost detail. General explanations of the methods are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited. MCC will not advise the firms whether or not their language would be permissible before the submission due date. Firms should consult the permissible language with their legal counsel.


29. Would MCC consider giving a range for the expected number of team members? Firms could propose a very effective technical approach but it could be very expensive.
A: No. We want the interested firms to determine the most effective and efficient team structure.


30. Would MCC consider providing a range of the estimated contract value? Providing some parameter would assist firms to better prepare the submission.
A: Periodically, MCC updates our Business Forecast on our website. According to our Forecast, the estimated contract value for this A-E service is between $10,000,000 and $20,000,000 (https://www.mcc.gov/resources/doc/eport-business-forecast-fy-2018-mid-year).


This is a pure estimate and does not bound interested firms to prepare a technical approach within this range. This information is strictly for referential purpose and not a strict requirement. MCC expects the firms to submit the best, realistic, and fair and reasonable technical submissions based on their own assessment of MCC's requirement.


31. During the contract performance, it may be necessary for the contractor to access various areas of the project. What would happen if there are any accessibility issue?
A: If the said issue arises from the fault of the Government, we will absolutely consider modifying the contract for reasonable equitable adjustments. If the issue/delay could have been resolved or avoided by the contractor, any additional costs incurred would be assumed by the contractor.


32. Has there been any further determination on the site of the truck parking?
A: The World Bank is currently conducting a study. The site detail has not yet been established.


33. Regarding the Key personnel, the terms indicate the team leader should have led and manage two similar projects valued at 175 million USD each, which is fairly high threshold for projects dealing with urban networks requalification in developing countries; would any other relevant projects be considered in the evaluation of the team leaders if projects credentials are below that threshold, while still being significant for developing countries (for example: projects within the range of 75-80 million USD)?
A: No. But to clarify, the projects do not have to be from developing countries. The US$175 million is for any construction projects at such value. This is to ensure a team lead who have handled similar projects in size and scope as MCC's project.


34. Regarding the key-experts and their presence on site, should we consider a minimum share of their man-days to be spent in Ivory Coast?
A: The firm shall propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment.


35. Some project activities might imply generating and selecting some preferred options regarding these projects, and the consultant's level of effort might vary depending on the option(s) that will be selected (for example: Option period 1, activity 2 : "To prepare preliminary designs for the four road projects"); it is our understanding that these variance in the level of efforts would be discussed at a future stage of the selection process, once the preferred technical proposal has been selected; can you confirm this?
A: Yes. MCC is open to negotiating points such as this with the highest rated firm(s) during the solicitation phase.


36. In relation with Attachment c. Level of efforts by deliverables: it is our understanding that the total LOE estimation presented in that table will actually correspond to the total level of efforts of all activities specific to the deliverables; can you confirm our understanding? How would you recommend that LOE related to common tasks (such as project management, etc.) be considered?
A: LOE shall be presented for each deliverable as a percentage of the sum total of LOE for the Base and Option Period 1, including both direct and indirect (administrative) hours.


37. Levels of Effort (LOEs): we understand that the total man-hours of personnel should be provided by deliverable; do we also include support staff (administrative) and surveys team (traffic counts, technical and socio-environmental investigations...)?
A: Please note the required LoEs by Deliverables spreadsheet now requires the percentage of total LoEs, instead of number of hours. The percentages are to be the absolute total, including support staff.


38. The terms indicate the training sessions should be meant for groups of 30 to 50 attendees. Such a big group size may impact negatively the quality of the interaction and learning. Would it be possible to reconsider the size of the groups and to reduce them to 15 to 20 attendees or to expand the number of training sessions (i.e. more or less to double them) for that purpose?
A: MCC agrees the training would be more effective with smaller group size. MCC agrees that the class size shall not exceed 40 participants. MCC will evaluate the firms' approach on how they will implement the training sessions.


39. The proposal evaluation factors and criteria are very clear; in addition, how will the relative importance of each factor or criteria be assessed and evaluated, to produce the overall evaluation and ranking of the proposal?
A: MCC will use adjectival rating system per Synopsis Section 7. Evaluation Criteria. We will not use a numeric system to rank the important of the evaluation factors. Those firms that rate more highly on the more important factors, e.g. Professional Qualification, Methodology and Workplan, and Specialized Experience and Technical Competence, would be more favorable to MCC than those firms that rate more highly on the less important factors, e.g. Past Performance and Knowledge of the Locality.


40. Regarding the synopsis, English seems to be the working language. But based on ToR deliverables must be in French. Would you please confirm the submission could also be submitted in French?
A: The SF-330 submission must be in English.


41. Regarding the applicable standards for the conceptual and preliminary design, we understood from the terms of reference, that the A & E was expected to provide a list of relevant standards (for instance North American and European, cf page 16 and 30). However we found the sentence "Final Designs are per US Standards" confusing. Could you please clarify whether or not the A & E is expected to propose the most relevant standards, North American, European or local standards?
A: The final design standards are defined by level of completeness of the design per U.S. design standards.


42. The Evaluation Factor 3 requires the following, "An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation)." This restricts the competition to very large firms. Please confirm that the $500 million USD is the revenue of A-E/Construction services by the Prime Contractor only and whether or not MCC would consider easing this requirement.
A: This value is for the prime contractor only and MCC is not consider easing this requirement, which will help us ensure sufficient experience in similar size and scope as MCC's requirement.


[End of Amendment 2]


Amendment 1


The purpose of Amendment 1 is to issue the updated ToR. All other terms and conditions remain unchanged.


[End of Amendment 1]


1. Background


The Millennium Challenge Corporation (MCC) is a United States government-owned corporation created under Title VI of the Foreign Operations, Export Financing, and Related Programs Appropriations Act, 2004 and is responsible for the stewardship of the Millennium Challenge Account (MCA). MCC works with developing countries to promote sustainable economic growth to reduce poverty. Eligible countries develop specific investment programs in furtherance of the goal of economic development to be funded by MCC over a five-year period and implemented by the country partner.


The Compact with the Government of Côte d'Ivoire (GoCI), signed on 07 November 2017 will be implemented by the Millennium Challenge Account Cote d'Ivoire (MCA-CI). The Compact contains two projects:
• The Skills for Employability and Productivity Project, and
• The Abidjan Transport Project.


This requirement refers to the Abidjan Transport Project (ATP) only. The objective of the ATP is to reduce vehicle operating costs and travel times along targeted road segments, while improving overall pedestrian and vehicle mobility and safety.


The estimated cost range for the construction project is to exceed $10,000,000.


2. Purpose


The purpose of this synopsis 95332419E0001 is to select a highly qualified architecture-engineering firm (A-E firm) to provide architectural and engineering (A-E) service to MCC Transport and Vertical Structure (TVS) Abidjan Transport Project (ATP) in Abidjan, Côte d'Ivoire. The awardee shall develop and implement the ATP Compact Program in Côte d'Ivoire, which is to help improve the movement of goods and people in and around Abidjan.


This synopsis is procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.6 Architect-Engineer Contracting under the NAICS Code 541330 Engineering Services and PSC C1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways.


This requirement is full and open to all professional A-E firms (professionally licensed in the US or in their respective home country).


3. Contract Information


The Government anticipates awarding one firm-fixed price (FFP) and time-and-materials (T & M) hybrid contract.


This is a design-bid-build contract for the A-E service. The A-E firm selected for this service will not be eligible for the construction contract.


Anticipated Period of Performance:


The contract will include a Base Period of 8 months, an Option Period 1 of 10 months, and an Option Period 2 of 12 months. While the Contract will be awarded for the Base and Option Periods, the exercise of the option periods is at the sole discretion of MCC.


Base: 11 March 2019 - 10 November 2019
Option Period 1: 11 November 2019 - 10 September 2020
Option Period 2: 11 September 2020 - 10 October 2021


Anticipated Contract Line Item Number (CLIN) Information
ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Base: Deliverables 1 to 8 | 8 months (Award + 32 Weeks)
FFP
Contract Period: Base NTE Lot _______________ _______________
1001 OP 1: Deliverables 9 to 14 | Award + 10 months (Award + 72 Weeks)
FFP
Contract Period: Option 1 NTE Lot _______________ _______________
2001 OP 2: Technical Design Support | 12 months
T & M
Contract Period: Option 2 TBD Lot _______________ _______________
GRAND TOTAL NTE _______________


In accordance with clause MCC 52-232-72 Limitation of Funds-Incrementally Funded Contracts, funds in the amount of $X.XX have been allotted to this contract. MCC contemplates that the total available funds now obligated will cover the work to be performed through 10 October 2021. The contractor shall not perform work on the contract which exceeds the total amount actually allotted by the Government to the contract. The Government is not obligated to reimburse the contractor for costs incurred in excess of the total amount allotted by the Government to this contract. The contractor assumes the risk for any increased costs beyond what the Government obligates.


4. Scope of Project / Terms of Reference (ToR)


Refer to the Synopsis Attachment Terms of Reference (ToR) for the complete detail, including objectives, scopes, deliverables, and staffing.


5. Submission Instructions and Evaluation Procedures


5.a. Submission and Evaluation Overview


In accordance with FAR 36.6, the submission and evaluation procedures will be split into two phases: (1) the submission and evaluation of the bidders' qualifications and (2) the submission, evaluation, and negotiation of the highest qualified bidder's price proposal.


Phase 1: Synopsis: The submission and evaluation of the bidders' qualifications
Step 1: The bidders must submit completed SF-330 Part I and Part II to verify its qualifications.
Step 2: The MCC Evaluation Board will evaluate all responsive SF-330s and select, at a minimum, three most highly qualified A-E firms.
Step 3: MCC will invite those selected firms for an oral presentation / interview.
Step 4: The MCC Evaluation Board will rank the top three most qualified firms and make a recommendation to the designated selection authority.
Step 5: The selection authority will make the final determination on the ranking of the top three most qualified firms.


Phase 2: Solicitation: The submission, evaluation, and negotiation of cost/price proposal
Step 1: MCC will issue a solicitation in the form of Request for Proposal (RFP) to the top highest qualified A-E firm.
Step 2: The A-E firm will submit a complete cost/price proposal to MCC.
Step 3: MCC will evaluate the cost/price proposal and determine whether or not it is fair and reasonable.
Step 4: MCC may enter into a technical and/or cost/price negotiation with the firm.
Step 5: Once agreeable terms are reached, MCC will move forward with the award. If MCC and the firm cannot reach an agreement within a time specified by the contracting officer, MCC will terminate the negotiation and invite the second most qualified firm to submit a proposal. If MCC and the second qualified firm cannot reach an agreement, MCC will invite the third most qualified firm to submit a proposal. If an agreement is not reached with the third most qualified firm, the synopsis and solicitation will be cancelled and may be re-competed.


5.b. Submission Requirements and Instructions


The bidders must submit the following:
1. Cover Page, at a minimum including:
a. The solicitation number and title;
b. The bidding firm's official name;
c. The bidding firm's DUNS number;
d. Main point-of-contact who has signatory and negotiation authority with name, phone number, and email; and
e. Statement that the bid submission is valid for 1 year.
2. Completed SF-330 Part I Contract-Specific Qualifications (Section A through H); and
3. Completed SF-330 Part II General Qualifications.


The Cover Page is limited to 2 pages; the SF-330 Part I has no page limit, however the Section H Additional Information is limited to 30 pages; and the SF-330 Part II has no page limit. (SF-330 Part I Section E Resumes of Key Personnel Proposed for This Contract is not considered in the page limits provided.)


The Phase I Qualifications submission must not include any price/cost information as it will not be reviewed during our Phase I Qualifications evaluation.


The firms must provide all the necessary materials, equipment, personnel, etc. to satisfy the requirement. There is a possibility, however, that the MCA may offer an office space for limited number of contractor personnel. This will be separately negotiated before or after the award.


The submissions must clearly demonstrate in English the firm's qualifications and the understanding of the technical requirements for further consideration. Clarity and completeness are of the utmost importance. Therefore, the submissions, including all illustrative and graphical representations, must be presented in a practical, clear, and concise manner.


The narrative must provide the Government with a reasonable assurance that the firm has the necessary qualifications to fully satisfy the Government's requirements. A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating.


The Government recommends completing and signing the SF-330s electronically, rather than handwriting then scanning. If any part of the submission is not clearly readable, i.e. a document is not legible or comprehensible, the Government may either disregard the information in our evaluation or deem the submission unresponsive without an opportunity for re-submission.


The submissions must clearly demonstrate a thorough understanding of the Government's requirement, as well as convey the A-E firm's capability for transforming its understanding into successful performance.


5.c. Standard Form 330 (SF-330) and Required Submissions Documents


The SF-330 Parts I and II are standard documents used for the A-E firms to present their qualifications to the Government. Both parts and all its sections must be submitted electronically for award consideration. Only the SF-330 Part I Section D Organizational Chart of Proposed Team and Section H Additional Information may be submitted as Microsoft Word (.docx) and Microsoft Excel (.xlsx) documents (to allow graphical representations and to conveniently present additional information) as long as it does not exceed the page limits noted in 5.b. Submission Requirements and Instructions.


If a Word/Excel document is used, the font must be Calibri or Times New Roman size 11 or larger and page size must be 8.5x11" with 1" margin all around. The first page of Section H must be completed as the original SF-330 PDF document with the appropriate signature and the remaining pages may be presented in Word/Excel. All supplemental documents should clearly show sequential page numbers and the corresponding section title, e.g. "Section D Organizational Chart of Proposed Team" or "Section H Additional Information." All other sections must be completed within the SF-330 PDF. The firm may complete multiple copies of the PDFs for SF-330 Part I Sections A through H and Part II to ensure sufficient documentation of its qualifications.


In the synopsis phase, MCC will evaluate the following:


5.d. Submission Information


Firms are responsible for submitting electronic submissions, and any modifications or revisions, so as to reach the Government Official by the date and time specified below:
Date: Thursday, 14 February 2019
Time: 5:00 PM Eastern Time
Location: Millennium Challenge Corporation
Attn: Andrew Lee, Contract Specialist
mailto:leeae@mcc.gov


All questions regarding this synopsis must be emailed to Andrew Lee at leeae@mcc.gov by 1:00 PM Eastern Time on Friday, 4 January 2019. To assure timely and proper handling, the email question must state "95332419E0001 DCO TVS ATP A-E Service" in the subject line.


The Government will not answer any question or request received after the time specified above. Questions or requests for clarification that result in specific information necessary to respond to the synopsis will be provided to all firms. Therefore, questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to the firm's questions and requests, but will consider them and incorporate the responses and any changes to an amendment to the synopsis.


5.e. Blocked and Unacceptable Electronic File Types


Due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such firms must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their submission will be blocked, preventing receipt of the submission by MCC and potentially being precluded from award consideration.


The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:


.vbs (Microsoft Visual Basic script file)
.vbe (VBScript encoded script file)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (Word with macros)
.xlsm (Excel with macros)
.pptm (PowerPoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)


6. Qualification Factors


Qualification Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


Firms must submit resumes of its proposed team (both key and non-key personnel). Firms may choose to complete SF-330 Part I Section E. Resumes of Key Personnel Proposed for This Contract or submit Word documents as a part of SF-330 Part I Section H. Additional Information. The resumes must be chronological with the most recent information listed first. The resumes must contain, at a minimum, (1) name, (2) role in this contract, (3) years of experience, for both total years and the years at the submitting firm, (4) education, including the name of schools attended, the duration of enrollment, and the degree/certificate obtained, (5) current proposal registration, including title and location of registration, and (6) relevant employment experiences that are directly related to the requirement, including the name of company or agency, the period of employment, the title and job description of the individual, and the level of responsibility. The resumes may and should contain details of any design awards the proposed team members had won.


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


Firms must also submit at least three (3) references with full contact information for each of the proposed key personnel. The references shall all be directly relevant to the requirement and demonstrate individual past performance relative to the requirement:


1. Project Manager/Team Leader;
2. Traffic Demand Modeler;
3. Pavement Engineer(s);
4. Environmental Specialist;
5. Resettlement Specialist; and
6. Stakeholder Engagement Specialist.


The firm shall demonstrate how it proposes to organize, mobilize, and deploy its proposed project team to perform the tasks described under the requirement while maintaining appropriate stakeholder engagement to ensure that the objectives of the assignment are met, including keeping the major stakeholders involved on a routine basis;


The firm shall demonstrate how the Project Manager/Team Leader's experience demonstrates her/his ability to integrate and manage a large multi-disciplinary team, effectively communicate with project stakeholders and perform quality assurance/quality control (QA/QC) to satisfy the Government's requirements.


The firm shall demonstrate how the proposed team is adapted to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire and past experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials.


Firms must submit a signed commitment letter from each of its Key Personnel team member. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 2: Methodology and Workplan


In SF-330 Section H. Additional Information, firms must submit the following information to further demonstrate their qualifications:


1. Workplan, WBS, and LOE


a. Provide summary workplan with critical path clearly identified including all milestones, proposed design reviews workshops and CTCTR Monthly Progress Meetings;


b. Provide summary of the WBS (one page);


c. Provide a proposed deliverables schedule (firms shall provide their optimal delivery schedule for the base period and for option period 1); and,


d. [LOE Percentage by Deliverables is removed. However, as clarified in Amendment 2 question no. 34 and Amendment 5 question no. 21, firms must detail its approach on its staffing plans, including associated logistics and arrangements.]


2. Methodology


The methodology section shall indicate the role of the relevant team members and demonstrate the firm's understanding of specific aspects of the requirement.


Note that cutting and pasting and/or repeating from the terms of reference may result in a less than satisfactory evaluation.


(1) Traffic Demand and Simulation Modelling:
a. Detail the traffic demand and simulation modelling aspect of the assignment including the team and its role, the selection of the proposed traffic modelling software, calibration and simulations, data collection, and major challenges foreseen by the firm.


(2) Geometric Reconfiguration and Structural Rehabilitation Design:
a. Detail the geometric redesign and configuration and structural rehabilitation design methodology of the project roads; and


b. Detail the approach for the use of recovered materials, pollution prevention, and waste reduction to the maximum extent practicable in developing the design, e.g. pavement recycling approach.


(3) Technical Training and Coursework:
a. Detail the technical training and coursework aspect of the requirement including the team and assignments, the proposed training curriculum development and delivery approach with major challenges foreseen by the firm.


b. Detail an approach for delivery of the technical assistance for the Abidjan Road and Safety Prioritization.


(4) Mitigating Port Congestion:
a. Provide a methodology detailing the firm's approach to study and provide recommendations to alleviate congestion in and around the port, as well as identifying opportunities for private investment.


(5) Integration of Environmental, Resettlement, and Social Tasks with the Engineering Process:
a. Provide a methodology detailing the firm's proposed team and how the firm proposes to integrate the environmental, social and resettlement tasks of the requirement into the engineering process.


(6) Maintaining and Integrating Community Welfare and Needs:
a. Provide a methodology detailing how the firm proposes to:


i. Maintain host community welfare and safety during construction, including construction site efficiencies, coordination and communication with drivers, pedestrians and local business owners;


ii. Work with the community to develop measures to reduce impacts to the local populations from congestion and inconvenience caused by construction; and,


iii. Develop an urban architecture plan and streetscape for the proposed road segments that reflects community needs. The firm shall provide at least two (2) architectural transport/streetscape renderings (before and after architectural presentations) from the proposed team and brief description of how the participatory process was used and how this will be adapted to the requirement.


As a desired qualification under Qualification Factor 2, firms may choose to present innovative and applicable cost-cutting and/or value engineering methods. If so, the detail must be technical in nature and must not include price/cost information.


In SF-330 Section H, firms shall clearly distinguish the section for cost-cutting / value engineering portion.


3. Subcontracting Plan


The firms must submit its subcontracting plan to describe its relationship and the roles of any and all subcontractors.


The SF-330 Part II General Qualifications and a signed commitment letter must be completed for each subcontractor proposed. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


1. Firms relevant urban transport engineering experience including:


a. Firms role on the project and financial amount under direct management by the firm over the last ten (10) years including the total value of the resulting construction contract(s) over the last ten (10) years;


b. Indicate the average annual daily traffic and lane-kilometers on each project including city size for each over the last ten (10) years.


2. Firm's geometric reconfiguration and structural rehabilitation design experience, including pavement recycling and rolled compacted concrete (or similar), relevant to the project over the last ten (10) years;


3. Firm's urban traffic demand modelling and simulation experience and relevance to the project over the last ten (10) years;


4. Firms specialized experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials;


5. Firm's capability, including financial resources, to demonstrate the technical bench (i.e. backstopping, additional technical support if needed, replacement of personnel, etc.) and financial capability to satisfy the requirement. (Please do not detail any specific cost/price quote/proposal.)


6. Additional relevant supporting information.


Qualification Factor 4: Past performance on contracts with any government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The firms must submit at least three (3) and no more than ten (10) past performance references. At least 3 references must be for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


All past performance references must be in similar in size, scope, and complexity to this requirement which can speak to the following (the firm shall indicate each of the elements below in the past performance template provided):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or
d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


[Past performance reference format removed. Firms must submit past performance references as SF-330 Section F Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract. Firms must complete one copy of Section F for each reference they propose. This will not count towards the Section H page limit.]


The Government will consider the relevance of past performance references to the scope of this synopsis. Those past performance ratings that are not closely relevant to this requirement will receive a "Neutral" rating.


Firms shall ensure that all contact information is up to date and correct.


Note that Government evaluators may utilize various OCONUS, Federal, state, and local past performance databases including, but not limited to, Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS). Government evaluators reserve the right to contact any of the provided references to solicit additional information or clarification regarding the firm's past performance. The Contracting Officer and/or technical evaluators may research on any OCONUS, Federal, state, local, and commercial contract performance that is known to the Contracting Officer, but not included as a reference on the submitted qualifications package. Additionally, personal experience and evaluator knowledge may be utilized by the technical evaluation team members as long as there's sufficient supporting documentation.


Qualification Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


In SF-330 Section H. Additional Information, the firms must submit their understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire. The firms must detail the potential challenges and solutions to those challenges and shall propose other possible challenges they foresee by working on this project.


7. Evaluation Criteria


Award evaluations will be conducted in accordance with FAR 36.602 Selection of firms for architect-engineer contracts.


7.a. Basis for Qualification


The Government intends to award one hybrid firm-fixed price (FFP) and time-and-materials (T & M) contract with base period and two option periods to the firm that is determined to be a highly qualified and is fair and reasonable to the Government. For each evaluation factor, with an exception to the Evaluation Factor 5 Past Performance, the Government will perform a comparative analysis of the advantages and disadvantages, including their significance, and assign one of following adjectival ratings:


Technical Evaluation Ratings
Outstanding (O) The qualification exceeds the Government's expectations. The Government expects that the firm should result in outstanding effective, efficient, and economical performance under the contract. The submission contains several significant advantages and no more than a few minor disadvantages. The performance risk is deemed to be very low.
Satisfactory (S) The qualification meets the Government's expectations. The Government expects satisfactory performance under the contract. The submission contains many advantages and only a few minor disadvantages. The performance risk is deemed to be low.
Marginal (M) The qualification marginally satisfies the Government's expectations. The firm demonstrates a shallow understanding of the work to be accomplished. The submission contains several disadvantages and only a few advantages. The performance risk is deemed to be moderate to high.
Unsatisfactory (U) The qualification fails to meet the Government's expectations. The submission is incomplete, vague, incompatible, incomprehensible, and/or so incorrect as to be unsatisfactory. The submission contains significant disadvantages that are unacceptable. The performance risk is deemed to be very high.


MCC will use the following adjectival risk ratings to evaluate the firms' relevant Past Performance References:


Past Performance Evaluation Ratings
Low Risk The relevant Past Performance References have only positive reviews ("Satisfactory" or better using the CPARS standards) of the firm.
Moderate Risk The relevant Past Performance References have generally positive reviews ("Satisfactory" or better) with possibly some negative reviews ("Marginal" or worse) of the firm.
High Risk The relevant Past Performance References have mostly negative reviews ("Marginal" or worse) of the firm.
Neutral Offerors without relevant Past Performance References will be assigned "Neutral" rating, which is neither favorable nor unfavorable to the Offeror.


7.b. Evaluation Factors


All submissions will be evaluated based on the evaluation factors listed below in descending order starting with the most important factor:


Evaluation Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


The firm must demonstrate:


a. The comprehensiveness of the team structure (including key and non-key personnel proposed by the A & E) to complete the requirement;


b. The technical capability and qualifications of the proposed key personnel and non-key personnel to meet the requirement including references for key personnel; (additional non-key personnel proposed by the firm will not be evaluated individually but as a whole, however resumes shall be provided);


c. The proposed team (key and non-key personnel) mobilization, deployment, and approach to maintain satisfactory stakeholder engagement throughout the requirement including the role of the Project Manager/Team Leader;


d. The proposed teams approach to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire; and,


e. The proposed team member's relevant urban transport engineering experience with special consideration of energy conservation, pollution prevention, waste reduction, and the use of recovered materials.


Evaluation Factor 2: Methodology and Workplan


The Government will evaluate the rationale for the proposed workplan, WBS with LOEs, and methodology to meet the objectives outlined under the terms of reference.


1. Workplan, WBS and LOE


The Government will evaluate:


a. Comprehensiveness of the proposed workplan and WBS;


b. Integration of the environmental and social tasks into the engineering tasks throughout the requirement and understanding of the conditions and challenges of working in Abidjan, Côte d'Ivoire;


c. The firm's estimated level of effort for each deliverable to ensure the appropriate understanding of the Government's requirements and the realistic expectations by the firm; and,


d. The firms proposed deliverables schedule.


2. Methodology


The Government will evaluate the comprehensiveness of the proposed methodology, specifically:


a. Urban traffic demand and simulation modelling approach relevant to this assignment;


b. Geometric reconfiguration and structural rehabilitation design (road recycling and rolled compacted concrete) approach relevant to this assignment;


c. Technical training and coursework delivery relevant to this requirement;


d. Approach to mitigate port congestion relevant to this requirement;


e. Integration of environmental and social tasks into the engineering process throughout the requirement; and


f. Addressing community welfare and needs throughout the requirement.


As a part of desired qualification under Qualification Factor 2, any proposed cost-cutting and/or value engineering methods will be evaluated for its innovation and applicability to this project. A more favorable rating would be contemplated to those firms that propose innovative and applicable methods.


This is not a required qualification, therefore those firms that do not propose any cost-cutting and/or value engineering methods will not be penalized in their rating for this factor.


3. Subcontractor Plan


The Government will evaluate the thoroughness of the firm's proposed plan to ensure that it has comprehensive and methodical plans on how the firm will work with and manage its subcontractors.


Evaluation Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


The firms must possess:


1. A minimum of ten (10) years of comparable related experience in direct management of urban transport engineering in highly congested, urban environments in cities over 1 million people on at least five (5) transport projects (about 100 lane kilometers per year) with at least 50,000 vehicles/day;


2. At least three (3) previous experiences in the reuse of recovered materials in transport projects (i.e. pavement recycling) and at least two (2) previous experiences in rolled compacted concrete (or similar);


3. A minimum of five (5) years demonstrated experience in urban traffic demand modeling and simulation relevant to the assignment;


4. An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation); and,


5. A sufficient technical resource bench to satisfy the requirement.


The Government will evaluate the firm's specialized experience and technical competence in the type of work required. The Government will evaluate the firm's availability of resources, ability to timely deploy resources, ensure appropriate level of quality assurance and control, and ability to successfully deliver the project as required.


Evaluation Factor 4: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The Government will evaluate the performance under existing and prior contracts, including references with full contact information for:


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


The Government will focus on information that demonstrates quality performance relative to the size and complexity of the requirement under consideration.


The Government reserves the right to consider information from any other sources when evaluating the firm's qualifications and past performance.


Evaluation Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


The firms must demonstrate a clear understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire, including unique challenges and solutions.


8. Synopsis Conference


MCC will hold a Synopsis Conference to detail the Government's requirement, what we expect in the submission, and to answer any preliminary questions from the interested firms. The conference details are as follows:


Location: MCC Headquarter
1099 14th Street, NW, Suite 700
Washington, DC 20005
Date: Wednesday, 28 November 2018
Time: 2:00 PM Eastern Time


MCC will also host a teleconference of the event for those wishing to join us remotely. Those interested in attending the conference in person or via teleconference must email Andrew Lee at leeae@mcc.gov by 12:00pm ET on Tuesday, 27 November 2018 to allow sufficient time for the invitation. The email should contain a list of names, titles, and email addresses of those that wish to attend.


The highlights of the conference will be issued via an amendment to the synopsis.


[This Conference was held and is addressed in Synopsis Amendment 2. MCC will not hold another Synopsis Conference.]


9. Administrative Information


MCC may host a pre-submission conference to discuss the Government's requirements. A separate notice will be posted on FBO.gov under this synopsis for additional information.


After the close of the synopsis, the Government will notify those nonresponsive firms of their exclusion from further consideration if any part of the submission is missing or incomplete.


Once the MCC Evaluation Board selects at least three highly qualified firms, MCC will invite those firms for an oral presentation in person or via teleconference. Oral presentations are a crucial part of the evaluation. Those firms that cannot accommodate an oral presentation will not be considered for award.


Once the selection authority makes the final determination, those unsuccessful firms will be notified of their exclusion from further consideration. The solicitation will be first issued only to the most qualified firm. The second and third most qualified firms will be notified as such.


The firm may be invited in person or via teleconference for a technical and/or cost/price negotiation to reach an agreement.


The Government is not liable for any cost incurred by the firms for the preparation of the submission documents or for the in-person or teleconference meetings.


After the contract has been awarded, the contract information will be posted on FBO.gov and the firms will not be separately notified.


The Government hopes to award this A-E contract around March of 2019. Due to the extended furlough, the award may be delayed.


10. Attachments


a. 1. Terms of Reference (ToR) 20190131 (Microsoft Word) [Official]
2. Terms of Reference in French 20190131 (Microsoft Word) [Unofficial; for reference only]
b. Provisions and Clauses 20181119 (Microsoft Word)
c. [LOE Percentage by Deliverables Removed]
d. Commitment Letter Template 20181119 (Microsoft Word)
e. SF-330 Part I and Part II Templates 20181119 (Adobe PDF)
f. Synopsis Conference Presentation 20181224 (Microsoft PowerPoint) [Unofficial; for reference only]


[End of Document]


.

Update #4 ·

***Refer to the attachments for the complete detail***
95332419E0001 Amendment 4
DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d'Ivoire
Synopsis

Amendment 4


The purpose of Amendment 4 is (1) to issue updated Terms of Reference (ToR) dated 20190102 and (2) to clarify the submission deadline.


Firms must acknowledge Amendments 1, 2, 3, and 4 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, 3, and 4."


This version of the ToR updates the Section 1.2.6 Stakeholder Engagement to include a minimum level of anticipated stakeholder engagement work. The changes are highlighted in yellow and noted in Track Changes.


Due to the US Federal Government lapse in FY2019 Appropriations, MCC will shut down starting 3 January 2019 and thus the submission deadline may be affected. MCC's intent is for the submissions to be due by 5:00PM ET on 4 February 2019 (Monday); however if MCC is unable to timely address the questions (due by 1:00PM ET on 4 January 2019), then MCC may consider extending the submission deadline.


With a few exceptions, MCC will not be allowed to work during the furlough period (or also called "shutdown"). MCC will not be able to make amendments to this Synopsis until the US Federal Government reopens. Please check this Synopsis on FBO.gov after the US Federal Government reopens. If MCC decides to extend the submission deadline, MCC will make an amendment before the submission deadline or within 5 business days from the reopening date, whichever is later. Unless this Synopsis is amended, interested offerors shall assume that the questions and the submission deadlines remain unchanged.


The interested offerors are responsible for staying updated on the current US Government furlough/shutdown status and submit your SF-330 timely. Please check the US news and https://www.opm.gov/ regarding furlough/shutdown information.


Any changes to the previous version of the synopsis are highlighted in the body in yellow.


All other terms and conditions remain unchanged.


[End of Amendment 4]


Amendment 3


The purpose of Amendment 3 is (1) to extend the Submission Due Date to 5:00pm ET on 4 February 2019 (Friday), (2) to answer several questions posed by interested bidders, and (3) to issue updated Attachment a.1 Terms of Reference (ToR) 20181227 (Microsoft Word) [Official]. This Amendment 3 revises the answers to Amendment 2 Questions 1 and 2. Please note the information in this Amendment 3, including the Attachments, supplants any conflicting information you may found in previous versions of this Synopsis. Any changes to the previous version of the synopsis are highlighted in the body in yellow. Any changes to revised version of the ToR are noted in the Track Changes.


We have made some changes to the ToR, including the removal of one task (formerly 3.1.4.2) and its associated deliverable (Deliverable 14). We also added language regarding the bachelor's degrees for engineering positions at the senior level, namely that the degrees shall come from accredited engineering institutions. We provided the names of the accreditation institutions with links for verification in the US, Canada, France and international agreements (Washington Accords and CTI).


Firms must acknowledge Amendments 1, 2, and 3 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, and 3."


Questions and Answers (Q & As):


1. Requirements for the Pavement Engineer (s) (P. 58 of the ToR): "S/he shall have a Masters' degree in Civil Engineering with specialty in concrete pavements and high modulus asphalts." To our knowledge, this specialty is acquired rather after years of practice. Would you consider lowering the education requirement?
A: Section 5 paragraph 7 allows for the substitution of years of experience for a Master's degree.


2. TOR 5.2.1 page 57: Can PM/TL's two projects over $175 million count toward the requirement that s/he must have led at least three projects over the past 10 years? In other words, is three total projects acceptable, or is MCC looking for five total projects for the PM/TL?
A: The two (2) urban infrastructure projects valued at over $175 million can be counted as part of the three (3) projects over the last ten (10) years.


3. Can MCC provide a copy of WSP's VGE integrated model?
A: MCC would require a legal approval to release this model, which may significantly delay this procurement. We also don't believe this is critical for bidders to prepare their submission. Therefore, this will not be shared with the interested bidders. However, it will be made available to the awardee after the award.


4. Does a cost loaded implementation plan with WBS need to be provided for the purposes of this qualifications-based submittal?
A: No. this will need to be provided with the financials as part of the second phase of the procurement.


5. Who will have primary responsibility for developing the Stakeholder Engagement Plan - the ESOC or the A & E? (There seems to be conflicting references to SEP preparation on pages 9 and 16 of the TOR.)
A: The A & E has total responsibility for planning and conducting all Stakeholder Engagement for all activities that are conducted under their contract scope. The ESOC has responsibility for the Project-wide Stakeholder Engagement Plan as required under the IFC PS and MCC, of which the Stakeholder Engagement program of the A & E is a part. The ESOC will need to capture and document what the A & E does in the larger Project-wide Stakeholder Engagement Plan and the A & E will need to share information and collaborate with the ESOC on its approach and results. Note on page 17 of the ToR, it states, "The A & E shall provide a preliminary stakeholder engagement plan including stakeholder mapping for completing the requirement." Therefore, this is consistent and correct.


6. Who will have primary responsibility for developing the Training course - the ESOC or the A & E? (There seems to be conflicting references on pages 9 and 13 of the TOR.)
A: The two training courses and objectives are different. Additional clarification is provided in revised ToR with this Amendment. Each consultant is responsible for their own course content development.


7. Who shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials?
A: The A & E shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials for all Stakeholder Engagement activities that are conducted under their contract scope. Page 10 of the ToR has been modified to reflect this.


8. One of the requirements for the key personnel is to have a bachelor's degree in civil engineering and/or construction engineering. In some non-US countries, the degree is not called bachelor and not always civil, construction. Could the wording be modified to Bachelor's degree in Civil Engineering or similar?
A: Yes, this has been adjusted. Note that MCC reserves the exclusive right to evaluate what constitutes similar; as such the firm shall provide supporting evidence to help inform the MCC appropriately.


9. Can the A/E proposed different dates for the deliverables as long as the Base and Option Period do not go beyond the timeframe proposed by MCC? Also, can the A/E include additional deliverables not listed in the ToR?
A: Yes, the A & E is encouraged to propose different dates for deliverables. The A/E may propose additional deliverables, however the MCC reserves the right to accept or decline the proposal.


10. General Review and Approval Question. Please specify that the NTE Due dates provided in the schedules of the RFP are for DRAFT deliverables, which will begin the review "clock" ticking, and NOT for Final deliverables having undergone the 4-week pre-submission review process.
A: The dates provided are for approval of the deliverables. See Question No. 9 above. The A & E may modify the deliverables schedule as long as they fit in the period of performance provided.


11. It is stated that the A/E must possess an average of at least $100 million USD in total annual revenue over the last five years. Please clarify if the $100 million refers to revenue from design and/or from construction. Some design firms do not provide construction services.
A: This refers to annual revenue generated by the prime contractor's architecture and/or engineering design work.


12. TOR Page 44. 4.2 Deliverables. The RFP specifies that the official language of all deliverables is in French; however, also references translation requirements. Later, MCC requests that Monthly Reports be provided in both French & English. Please clarify language requirements for all primary deliverables as French only. (Only Deliverables 1 and 2 specifically note the French language requirement.)
A: Section 4.4.2.1 Base Period Deliverables notes that all deliverables are in French unless otherwise noted. This clarification has been extended to Section 4.4.2.2 Option Period 1 Deliverables.


13. TOR Page 44, 4.3 Review of Work. Please consider changing the deliverable review and time schedule to a set time frame, such as "Total deliverable review and finalization will be no more than 28 calendar days, which begins at the time the draft final is delivered to the MCC, MCA and appropriate organizations for review. Review organization have 14 calendar days to provide comments for inclusion or discussion, at which time the A & E has 14 days to include, discuss and revise the draft to Final. If reviewing organizations do not meet the 14-day deadline, the A & E is not obliged to include them. The A & E is responsible to keep record of and time stamp all received comments. This system does not preclude the A & E from eliciting informal feedback and comments during the drafting process."
A: This change has been provided in the ToR.


14. TOR Page 45. 4.3.1. and 4.3.2 CTCTR Monthly Progress & Design Review Meetings. MCC requires that the CTCTR meetings include videoconferencing. Please confirm that publicly available systems, such as Skype or Zoom can be used for this purpose.
A: Publicly available systems are permissible as long as they provide a high quality videoconferencing environment with proper audio and video quality for all participants.


15. TOR Page 46. Monthly reports. In this section of the RFP, MCC request that the monthly report must include a detailed time sheet for all personnel documenting in and out of country time. However, MCC has defined the contract terms as Firm Fixed Price, or FFP. Under FFP contracts, detailed time and costs are not required to be reviewed, presented or approved. Please clarify this requirement under the standard terms of a FFP contract structure.
A: This monthly report is to allow quality management by MCC. This is not to confirm the cost or invoice; this is to ensure that the contractor is providing a quality work as they proposed and negotiated.


16. TOR Page 44-47. Inception Report. The RFP states the draft Inception Report is due two weeks prior to the kick off meeting but the Abidjan Kick Off, and the final report is due within two weeks of the kick off meeting. Yet, the RFP states the Inception Report is Due at Week 10. The dates do not seem to coincide appropriately.
A: As noted in the Deliverables Timeline 4.4.2.1.10 Base Period Deliverable Timeline and 4.4.2.2.6 Option Period 1 Deliverable Timeline, the deliverable timelines are indicative and will be proposed and finalized by the A & E.


17. TOR Page 18. Task 3.1.2.1.1 Data Collection. Traffic counting data is not detailed in this task. Data is supposed to be collected for traffic counts, OD, safety assessment, injuries and fatalities, truck parking needs and land availability. Only OD survey is detailed. Other types of data seem to be rather requested in further tasks.
A: As noted in Section 3.1.2 Multimodal traffic demand and simulation model for the Project Zone of Influence, the objectives of the task are to perform data collection to develop a Traffic Demand and Simulation Model and develop a multimodal traffic demand and simulation model for trip generation, trip assignment, modal distribution and trip assignment. The A & E shall develop a methodology to accomplish this task accordingly.


18. TOR Page 27. 3.1.5.1 Conceptual Design. Traffic Assessment asks to perform a specific detailed traffic counts (during AM and PM peak periods, while it is not specified in Data Collection. Does this traffic count different from the one asked in Task 3.1.2.1.1 Data collection?
A: The A & E must propose, justify, and implement a data collection plan as part of the mandate. MCC believes traffic counts are necessary.


19. Data Collection. Can you confirm the Data collection for deliverable 4 includes only the road sections from figure 2 (excluding Boul de la Paix and Yopougon)?
A: The Project Zone of Influence is detailed under section 1.2.2 Project Zone of Influence. Figure 2 is provided as a partial reference material for the Project Zone of Influence.


20. Traffic Counting. Does the MCC expect the A/E to complete the traffic counting only with Deliverable 8-Conceptual Design at week 32?
A: Data collection results and simulations (to account for various network development scenarios or deviation plans) are required for the conceptual designs. The data collection may be performed earlier if needed.


21. Due Date. When is the Preliminary ESIA and Resettlement Report due and what is the required content?
A: The A & E shall include relevant ESIA and Resettlement information in the Preliminary Design Documents as outlined under Section 3.2.1.4. Deliverables found under section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included.


22. Deliverable. Can you clarify the requirements in terms of Preliminary ESIA and resettlement in Deliverable 8 and Deliverable 9? From the deliverable descriptions (section 3.1.5.7 and section 4.4.2.2.1.1), both deliverables 8 and 9 should include the preliminary ESIA and resettlement assessment. Please provide details of what is expected.
A: Section 3.1.5.7 Conceptual Design is modified to summary ESIA and resettlement assessments, while 3.2.1 Preliminary designs and its deliverables under Section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included. The Conceptual Design ESIA elements are meant to highlight the major aspects that may influence the overall design selection; the preliminary design is a more completed version of the selected conceptual design with more refined resettlement, environmental and social risks and measures identified.


23. Preliminary Estimates and types of PAP. What was the methodology used to estimate the preliminary number and type of PAP? What were the criteria used to distinguish permanently and temporarily displaced PAP?
A: It should be emphasized that the estimates of the number of PAPS are indicative only and NOT definitive. The presence of PAPs and the estimate of number of PAPS was assessed through counts made using satellite imagery coupled with windshield survey and intermittent on the ground counts. The difference between permanently displaced and temporarily displaced PAPS is that permanently displaced PAPs will not be able to resume their activities in their original location post-project completion.


24. Overlap ESOC-A & E. Could you clarify the responsibility of the A & E vs the ESOC:


a) The ESOC should develop training courses for the MCA and CTCTR, 6 courses X 16 h, all of them have the same topic as the 36h-classes provided by the A & E. Can you clarify the differences between both training programs?
A: The ESOC courses are generalized courses meant to provide a general awareness and understanding of each of the selected topics in anticipation of the A & E modules, which are meant to be more specialized and focused on providing the CTCTR with sufficient understanding to participate in the engineering design phase and to deliver the road projects during the Compact period as noted in paragraph 1 of 3.1.4.1 Training for the CTCTR.


b) Who, between the A & E and ESOC, is responsible to coordinate the engagement and effort of INP-HB and ENSEA?
A: The ESOC is responsible for engaging with the INP-HB and ENSEA for their six (6) modules, while the A & E is responsible for coordination with INP-HB and ENSEA, with support from MCA-CI, for its ten (10) modules.


c) What is the effort expected from INP-HB and ENSEA for those training programs? Should the A & E plan a budget for local professors in addition to international trainers?
A: The INP-HB and ENSEA have separate budgets from the A & E. Note that the A & E is expected to provide the training itself and not through professors from either institution. Note that professors from both institutions may be present during the modules.


[End of Amendment 3]


Amendment 2


The purpose of Amendment 2 is (1) to issue the details of the Synopsis Conference held on 27 November 2018, (2) to extend the Questions Due Date to 1:00pm ET on 4 January 2019 (Friday), and (3) to issue updated attachments. For the overview of the Conference, refer to the Synopsis Attachment f. Synopsis Conference Presentation. The highlights/questions from the synopsis are listed below in a form of questions and answers (Q & As).


This Amendment also includes the following attachments: Unofficial Terms of Reference in French 20181218, Updated LoEs by Deliverables, and Unofficial Synopsis Conference Presentation. The Unofficial Terms of Reference in French and the Unofficial Synopsis Conference Presentation are for reference purpose only. If there are any discrepancies among the documents, the information from the Official Terms of Reference and the Synopsis supplant the unofficial documents.


All other terms and conditions remain unchanged.


Firms must acknowledge Amendments 1 and 2 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1 and 2."


List of Synopsis Conference attendees:


a. Atkins Acuity
b. CP & Y
c. Egis Group
d. ERM Group
e. exp Global
f. IMC Worldwide
g. Ingérop
h. Jacobs Engineering Group
i. Louis Berger Group
j. Monkey Forest Consulting
k. Mott MacDonald
l. Rendel Limited
m. SETEC
n. Tetra Tech


Conference Questions and Answers (Q & As):


1. Would MCC consider extending the questions due date until the first week of January? Some of our international offices are closed until the first week.
A: Yes. The questions are now due by 1:00PM ET on 4 January 2019 (Friday).


2. Would MCC consider extending the SF-330 submission due date?
A: Yes. The submissions are now due by 5:00p ET on 4 February 2019 (Monday).


3. Would MCC consider cost plus incentive fee type contract?
A: No.


4. Will MCC provide a Microsoft Word version of the SF-330 template?
A: No. The SF-330 is managed and distributed by US GSA and they only have a PDF version available. After the Synopsis was posted, the CS realized that the Attachments E. SF-330 Part I and Part II Templates were corrupt. We will attempt to re-upload in this Amendment 2. However in case the upload fails again, MCC encourages the interested firms to download the templates directly from the GSA website:


https://www.gsa.gov/reference/forms?search_keyword=sf-330


5. How will MCC share any revised Synopsis Attachments?
A: MCC may update the Synopsis Attachments as needed and upload it as an Amendment on FBO.gov under this announcement 95332419E0001. Firms are required to reference and use the most up-to-date Attachments from the latest amendment for their submissions. Please periodically check the FBO announcement at the following link for any revised Attachments:


https://www.fbo.gov/spg/MCC/MCCMCC/MCCMCC01/95332419E0001/listing.html


6. How should firms confirm that the submission is valid for one year?
A: Firms may simply note "The submission is valid for one year" in the Cover Letter.


7. In the Synopsis Section 1. Background, what does it mean by "The estimated cost range for the construction project is to exceed $10,000,000"?
A: This is simply a prescribed set of ranges per FAR 36.204.


8. Is an SF-330 Part II required for each office where key personnel reside?
A: Yes. SF-330 Part II is required for each office that will be involved in this project.


(The complete SF-330 template has a set of instructions on how to complete the form. On page 4 of Instructions, it says to submit SF-330 Part II for the firm and each of its "branch office seeking work if the firm has branch offices.")


9. How soon does MCC expect to receive the top firm's cost proposal once the firms ranking is established?
A: Once the solicitation (RFP) is issued to the top firm, we will expect to receive the cost proposal in two weeks.


10. What is the expected award date?
A: MCC hopes to make the award in March of 2019.


11. Who does the MCC expect to be present at the presentation/interview?
A: The Team Lead must be present either in person or virtually (if virtually, she/he must have a reliable connection to communicate with MCC clearly). Ideally, MCC would like all the Key Personnel members to be present, but this is not required.


12. General Format. Please confirm that use of 11x17" paper for charts, graphics, and matrices is approved, and will only count as a single page within the allotted page count.
A: Yes. Up to five 11x17" with 1" margins pages will be permitted in Section H Additional Information for charts, graphics, matrices, or any other visual representations. These pages shall not include extensive written descriptions of your technical approach (as a general rule of thumb, if these pages reserved for visuals include paragraphs of information, we will disregard them during our evaluation). Each 11x17" page will count as one page towards the 30-page limit.


13. Are resumes only required for the six key personnel or do we need to include resumes for all personnel listed on the organizational chart?
A: The resumes must be submitted for both key and non-key personnel that are listed on the organizational chart.


14. Format of CV. In the RFP Public meeting, MCC specified offerors do not have to follow the Section E resume template; rather, should ensure that the required information is included in the CVs provided. Please confirm this to be correct. Also, please confirm there is no page limit, nor limit on number of CVs included in Section E.
A: That is correct. As long as the required information is included, Section E resume template is not required for submission. If Section E template is not used, the resumes shall be compiled and submitted as a separate electronic file, collective of all relevant resumes, on 8.5x11" paper with 1" margin. There is no page limit to resumes.


15. Where in the SF-330 should firms incorporate the Commitment Letters?
A: You may include all the Commitment Letters as a separate attachment to the SF-330 Section E. Resumes of Key Personnel Proposed for this Contract. As a reminder, there is no page limit for Commitment Letters.


16. Does MCC want a confirmation of the A-E firm's commitment to this project from an authorized officer of the firm?
A: Yes. The Cover Letter shall include a statement from an executive of the proposing firm confirming their commitment to actualizing the proposed and negotiated plans, including the team members. Firms may simply include a statement in the signed Cover Letter, "Firm ABC confirms the commitment of carrying out our proposed and any negotiated technical plans, including mobilizing and maintaining the proposed team members."


An attempt by the contractor to alter the technical plans after award may not be considered favorably by MCC and may result in a termination for default.


17. Would MCC consider limiting the number of projects under SF-330 Section F. Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract? How should firms reflect the multiple projects?
A: Yes. The total number of projects in Section F shall not exceed 10 projects. Firms must complete a copy of SF-330 Section F for each project proposed, i.e. if proposing 5 projects, the firm must complete the Section F five times, one for each project.


18. Can firms provide past performance references of the subcontractors?
A: Yes. MCC expects at least three (3) past performance references of the prime firm. The firm may choose to submit additional past performance references of its subcontractors if they have performed similar projects, in size and scope, in the past.


19. The Qualification Factor 4 asks for at least 3 past performance references in a format that differs from SF-330 Section F. Will MCC clarify this?
A: The Qualification Factor 4 has been revised to require at least 3 but no more than 10 past performance references to match the requires of SF-330 Section F (refer to Question no. 4 above). Firms must submit at least 3 references for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


The Qualification Factor 4 has been revised to reconcile SF-330 Section F.


20. Would MCC consider limiting the SF-330 Section G. Key Personnel Participation in Example Projects to the proposed Key Personnel only?
A: Yes. The Section G may comprise of example projects participated by the proposed Key Personnel only.


21. Section G. Section G states Key Personnel be included only in the matrix. Will MCC allow Key and other Core Technical Experts be included to illustrate experience level more appropriately?
A: The minimum requirement is to complete Section G of the proposed Key Personnel. However, firms are permitted to include other Core Technical Experts (no junior-level staff) in Section G to illustrate a more complete picture of its proposed team's professional qualifications. Doing so may result in a higher rating for the Evaluation Factor 1 Proposed team professional qualifications necessary for satisfactory performance of required services.


22. Can firms re-phrase the Team's roles as stated in the ToR?
A: No. As noted under 5.b. Submission Requirements and Instructions, "A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating."


23. How much of the contract would be performed before/after the Entry-into-Force (EIF)?
A: The EIF is the point in time when a Compact or Threshold Program Agreement comes into full legal force and effect and its term begins. MCC estimates the EIF may take place in middle of 2019, but there is no certainty as of now so we cannot estimated this performance split.


24. What is MCC's expectations on the team mobilization plan?
A: The team mobilization plan shall demonstrate the proposed teams mobilization and timing to complete the assignment per the proposed workplan and overall approach and methodology. Firms shall consider, among other items, how the proposed team will be initially mobilized to Abidjan to begin the assignment in earnest.


25. Subcontracting Plan. In an SF 330, a proper Subcontracting Plan is generally not included, due to the costing content required therein. Will MCC consider dropping this requirement for the SF 330 submission, until prior to negotiations at which time all costs, etc can be revealed?
A: MCC is not seeking a formal Subcontracting Plan with the cost information. MCC wishes to verify that the prime contract has a management plan on (1) how it will oversee the subcontractor's performance and (2) what its plans are in case of subpar performance.


26. Page 7 of ToR, asks for the LoEs less administrative effort. There may be uneven comparison by removing the administrative effort.
A: We have changed this requirement to propose the Total Estimated LoE Percentage per Deliverable. Refer to the Attachment c. LoEs by Deliverable. We are no longer seeking a total number of hours per deliverable. The sum of all the LoE percentages (including the Base Period and Option Period 1) must equal 100% and shall reflect the total hours, including both technical and administrative hours, in the calculation.


27. Is there a detailed contract deliverables review and approval process?
A: Yes, it can be found in the ToR Section 4. Deliverables and Documentation Requirements.


28. Are firms permitted to propose cost-cutting and/or value engineering methods?
A: Yes. Firms may propose innovative cost-cutting and/or value engineering methods that can improve the Government's requirement in Section H. Additional Information. However, this synopsis phase is strictly a technical evaluation phase and SF-330 does not allow any cost information. Therefore, firms must take care not to submit any specific cost detail. General explanations of the methods are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited. MCC will not advise the firms whether or not their language would be permissible before the submission due date. Firms should consult the permissible language with their legal counsel.


29. Would MCC consider giving a range for the expected number of team members? Firms could propose a very effective technical approach but it could be very expensive.
A: No. We want the interested firms to determine the most effective and efficient team structure.


30. Would MCC consider providing a range of the estimated contract value? Providing some parameter would assist firms to better prepare the submission.
A: Periodically, MCC updates our Business Forecast on our website. According to our Forecast, the estimated contract value for this A-E service is between $10,000,000 and $20,000,000 (https://www.mcc.gov/resources/doc/eport-business-forecast-fy-2018-mid-year).


This is a pure estimate and does not bound interested firms to prepare a technical approach within this range. This information is strictly for referential purpose and not a strict requirement. MCC expects the firms to submit the best, realistic, and fair and reasonable technical submissions based on their own assessment of MCC's requirement.


31. During the contract performance, it may be necessary for the contractor to access various areas of the project. What would happen if there are any accessibility issue?
A: If the said issue arises from the fault of the Government, we will absolutely consider modifying the contract for reasonable equitable adjustments. If the issue/delay could have been resolved or avoided by the contractor, any additional costs incurred would be assumed by the contractor.


32. Has there been any further determination on the site of the truck parking?
A: The World Bank is currently conducting a study. The site detail has not yet been established.


33. Regarding the Key personnel, the terms indicate the team leader should have led and manage two similar projects valued at 175 million USD each, which is fairly high threshold for projects dealing with urban networks requalification in developing countries; would any other relevant projects be considered in the evaluation of the team leaders if projects credentials are below that threshold, while still being significant for developing countries (for example: projects within the range of 75-80 million USD)?
A: No. But to clarify, the projects do not have to be from developing countries. The US$175 million is for any construction projects at such value. This is to ensure a team lead who have handled similar projects in size and scope as MCC's project.


34. Regarding the key-experts and their presence on site, should we consider a minimum share of their man-days to be spent in Ivory Coast?
A: The firm shall propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment.


35. Some project activities might imply generating and selecting some preferred options regarding these projects, and the consultant's level of effort might vary depending on the option(s) that will be selected (for example: Option period 1, activity 2 : "To prepare preliminary designs for the four road projects"); it is our understanding that these variance in the level of efforts would be discussed at a future stage of the selection process, once the preferred technical proposal has been selected; can you confirm this?
A: Yes. MCC is open to negotiating points such as this with the highest rated firm(s) during the solicitation phase.


36. In relation with Attachment c. Level of efforts by deliverables: it is our understanding that the total LOE estimation presented in that table will actually correspond to the total level of efforts of all activities specific to the deliverables; can you confirm our understanding? How would you recommend that LOE related to common tasks (such as project management, etc.) be considered?
A: LOE shall be presented for each deliverable as a percentage of the sum total of LOE for the Base and Option Period 1, including both direct and indirect (administrative) hours.


37. Levels of Effort (LOEs): we understand that the total man-hours of personnel should be provided by deliverable; do we also include support staff (administrative) and surveys team (traffic counts, technical and socio-environmental investigations...)?
A: Please note the required LoEs by Deliverables spreadsheet now requires the percentage of total LoEs, instead of number of hours. The percentages are to be the absolute total, including support staff.


38. The terms indicate the training sessions should be meant for groups of 30 to 50 attendees. Such a big group size may impact negatively the quality of the interaction and learning. Would it be possible to reconsider the size of the groups and to reduce them to 15 to 20 attendees or to expand the number of training sessions (i.e. more or less to double them) for that purpose?
A: MCC agrees the training would be more effective with smaller group size. MCC agrees that the class size shall not exceed 40 participants. MCC will evaluate the firms' approach on how they will implement the training sessions.


39. The proposal evaluation factors and criteria are very clear; in addition, how will the relative importance of each factor or criteria be assessed and evaluated, to produce the overall evaluation and ranking of the proposal?
A: MCC will use adjectival rating system per Synopsis Section 7. Evaluation Criteria. We will not use a numeric system to rank the important of the evaluation factors. Those firms that rate more highly on the more important factors, e.g. Professional Qualification, Methodology and Workplan, and Specialized Experience and Technical Competence, would be more favorable to MCC than those firms that rate more highly on the less important factors, e.g. Past Performance and Knowledge of the Locality.


40. Regarding the synopsis, English seems to be the working language. But based on ToR deliverables must be in French. Would you please confirm the submission could also be submitted in French?
A: The SF-330 submission must be in English.


41. Regarding the applicable standards for the conceptual and preliminary design, we understood from the terms of reference, that the A & E was expected to provide a list of relevant standards (for instance North American and European, cf page 16 and 30). However we found the sentence "Final Designs are per US Standards" confusing. Could you please clarify whether or not the A & E is expected to propose the most relevant standards, North American, European or local standards?
A: The final design standards are defined by level of completeness of the design per U.S. design standards.


42. The Evaluation Factor 3 requires the following, "An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation)." This restricts the competition to very large firms. Please confirm that the $500 million USD is the revenue of A-E/Construction services by the Prime Contractor only and whether or not MCC would consider easing this requirement.
A: This value is for the prime contractor only and MCC is not consider easing this requirement, which will help us ensure sufficient experience in similar size and scope as MCC's requirement.


[End of Amendment 2]


Amendment 1


The purpose of Amendment 1 is to issue the updated ToR. All other terms and conditions remain unchanged.


[End of Amendment 1]


1. Background


The Millennium Challenge Corporation (MCC) is a United States government-owned corporation created under Title VI of the Foreign Operations, Export Financing, and Related Programs Appropriations Act, 2004 and is responsible for the stewardship of the Millennium Challenge Account (MCA). MCC works with developing countries to promote sustainable economic growth to reduce poverty. Eligible countries develop specific investment programs in furtherance of the goal of economic development to be funded by MCC over a five-year period and implemented by the country partner.


The Compact with the Government of Côte d'Ivoire (GoCI), signed on 07 November 2017 will be implemented by the Millennium Challenge Account Cote d'Ivoire (MCA-CI). The Compact contains two projects:
• The Skills for Employability and Productivity Project, and
• The Abidjan Transport Project.


This requirement refers to the Abidjan Transport Project (ATP) only. The objective of the ATP is to reduce vehicle operating costs and travel times along targeted road segments, while improving overall pedestrian and vehicle mobility and safety.


The estimated cost range for the construction project is to exceed $10,000,000.


2. Purpose


The purpose of this synopsis 95332419E0001 is to select a highly qualified architecture-engineering firm (A-E firm) to provide architectural and engineering (A-E) service to MCC Transport and Vertical Structure (TVS) Abidjan Transport Project (ATP) in Abidjan, Côte d'Ivoire. The awardee shall develop and implement the ATP Compact Program in Côte d'Ivoire, which is to help improve the movement of goods and people in and around Abidjan.


This synopsis is procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.6 Architect-Engineer Contracting under the NAICS Code 541330 Engineering Services and PSC C1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways.


This requirement is full and open to all professional A-E firms (professionally licensed in the US or in their respective home country).


3. Contract Information


The Government anticipates awarding one firm-fixed price (FFP) and time-and-materials (T & M) hybrid contract.


This is a design-bid-build contract for the A-E service. The A-E firm selected for this service will not be eligible for the construction contract.


Anticipated Period of Performance:


The contract will include a Base Period of 8 months, an Option Period 1 of 10 months, and an Option Period 2 of 12 months. While the Contract will be awarded for the Base and Option Periods, the exercise of the option periods is at the sole discretion of MCC.


Base: 11 March 2019 - 10 November 2019
Option Period 1: 11 November 2019 - 10 September 2020
Option Period 2: 11 September 2020 - 10 October 2021


Anticipated Contract Line Item Number (CLIN) Information
ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Base: Deliverables 1 to 8 | 8 months (Award + 32 Weeks)
FFP
Contract Period: Base NTE Lot _______________ _______________
1001 OP 1: Deliverables 9 to 14 | Award + 10 months (Award + 72 Weeks)
FFP
Contract Period: Option 1 NTE Lot _______________ _______________
2001 OP 2: Technical Design Support | 12 months
T & M
Contract Period: Option 2 TBD Lot _______________ _______________
GRAND TOTAL NTE _______________


In accordance with clause MCC 52-232-72 Limitation of Funds-Incrementally Funded Contracts, funds in the amount of $X.XX have been allotted to this contract. MCC contemplates that the total available funds now obligated will cover the work to be performed through 10 October 2021. The contractor shall not perform work on the contract which exceeds the total amount actually allotted by the Government to the contract. The Government is not obligated to reimburse the contractor for costs incurred in excess of the total amount allotted by the Government to this contract. The contractor assumes the risk for any increased costs beyond what the Government obligates.


4. Scope of Project / Terms of Reference (ToR)


Refer to the Synopsis Attachment Terms of Reference (ToR) for the complete detail, including objectives, scopes, deliverables, and staffing.


5. Submission Instructions and Evaluation Procedures


5.a. Submission and Evaluation Overview


In accordance with FAR 36.6, the submission and evaluation procedures will be split into two phases: (1) the submission and evaluation of the bidders' qualifications and (2) the submission, evaluation, and negotiation of the highest qualified bidder's price proposal.


Phase 1: Synopsis: The submission and evaluation of the bidders' qualifications
Step 1: The bidders must submit completed SF-330 Part I and Part II to verify its qualifications.
Step 2: The MCC Evaluation Board will evaluate all responsive SF-330s and select, at a minimum, three most highly qualified A-E firms.
Step 3: MCC will invite those selected firms for an oral presentation / interview.
Step 4: The MCC Evaluation Board will rank the top three most qualified firms and make a recommendation to the designated selection authority.
Step 5: The selection authority will make the final determination on the ranking of the top three most qualified firms.


Phase 2: Solicitation: The submission, evaluation, and negotiation of cost/price proposal
Step 1: MCC will issue a solicitation in the form of Request for Proposal (RFP) to the top highest qualified A-E firm.
Step 2: The A-E firm will submit a complete cost/price proposal to MCC.
Step 3: MCC will evaluate the cost/price proposal and determine whether or not it is fair and reasonable.
Step 4: MCC may enter into a technical and/or cost/price negotiation with the firm.
Step 5: Once agreeable terms are reached, MCC will move forward with the award. If MCC and the firm cannot reach an agreement within a time specified by the contracting officer, MCC will terminate the negotiation and invite the second most qualified firm to submit a proposal. If MCC and the second qualified firm cannot reach an agreement, MCC will invite the third most qualified firm to submit a proposal. If an agreement is not reached with the third most qualified firm, the synopsis and solicitation will be cancelled and may be re-competed.


5.b. Submission Requirements and Instructions


The bidders must submit the following:
1. Cover Page, at a minimum including:
a. The solicitation number and title;
b. The bidding firm's official name;
c. The bidding firm's DUNS number;
d. Main point-of-contact who has signatory and negotiation authority with name, phone number, and email; and
e. Statement that the bid submission is valid for 1 year.
2. Completed SF-330 Part I Contract-Specific Qualifications (Section A through H); and
3. Completed SF-330 Part II General Qualifications.


The Cover Page is limited to 2 pages; the SF-330 Part I has no page limit, however the Section H Additional Information is limited to 30 pages; and the SF-330 Part II has no page limit. (SF-330 Part I Section E Resumes of Key Personnel Proposed for This Contract is not considered in the page limits provided.)


The Phase I Qualifications submission must not include any price/cost information as it will not be reviewed during our Phase I Qualifications evaluation.


The firms must provide all the necessary materials, equipment, personnel, etc. to satisfy the requirement. There is a possibility, however, that the MCA may offer an office space for limited number of contractor personnel. This will be separately negotiated before or after the award.


The submissions must clearly demonstrate in English the firm's qualifications and the understanding of the technical requirements for further consideration. Clarity and completeness are of the utmost importance. Therefore, the submissions, including all illustrative and graphical representations, must be presented in a practical, clear, and concise manner.


The narrative must provide the Government with a reasonable assurance that the firm has the necessary qualifications to fully satisfy the Government's requirements. A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating.


The Government recommends completing and signing the SF-330s electronically, rather than handwriting then scanning. If any part of the submission is not clearly readable, i.e. a document is not legible or comprehensible, the Government may either disregard the information in our evaluation or deem the submission unresponsive without an opportunity for re-submission.


The submissions must clearly demonstrate a thorough understanding of the Government's requirement, as well as convey the A-E firm's capability for transforming its understanding into successful performance.


5.c. Standard Form 330 (SF-330) and Required Submissions Documents


The SF-330 Parts I and II are standard documents used for the A-E firms to present their qualifications to the Government. Both parts and all its sections must be submitted electronically for award consideration. Only the SF-330 Part I Section D Organizational Chart of Proposed Team and Section H Additional Information may be submitted as Microsoft Word (.docx) and Microsoft Excel (.xlsx) documents (to allow graphical representations and to conveniently present additional information) as long as it does not exceed the page limits noted in 5.b. Submission Requirements and Instructions.


If a Word/Excel document is used, the font must be Calibri or Times New Roman size 11 or larger and page size must be 8.5x11" with 1" margin all around. The first page of Section H must be completed as the original SF-330 PDF document with the appropriate signature and the remaining pages may be presented in Word/Excel. All supplemental documents should clearly show sequential page numbers and the corresponding section title, e.g. "Section D Organizational Chart of Proposed Team" or "Section H Additional Information." All other sections must be completed within the SF-330 PDF. The firm may complete multiple copies of the PDFs for SF-330 Part I Sections A through H and Part II to ensure sufficient documentation of its qualifications.


In the synopsis phase, MCC will evaluate the following:


5.d. Submission Information


Firms are responsible for submitting electronic submissions, and any modifications or revisions, so as to reach the Government Official by the date and time specified below:
Date: Monday, 4 February 2019*
Time: 5:00 PM Eastern Time*
Location: Millennium Challenge Corporation
Attn: Andrew Lee, Contract Specialist
mailto:leeae@mcc.gov


* Or as amended depending on the US Federal Government furlough.


All questions regarding this synopsis must be emailed to Andrew Lee at leeae@mcc.gov by 1:00 PM Eastern Time on Friday, 4 January 2019. To assure timely and proper handling, the email question must state "95332419E0001 DCO TVS ATP A-E Service" in the subject line.


The Government will not answer any question or request received after the time specified above. Questions or requests for clarification that result in specific information necessary to respond to the synopsis will be provided to all firms. Therefore, questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to the firm's questions and requests, but will consider them and incorporate the responses and any changes to an amendment to the synopsis.


5.e. Blocked and Unacceptable Electronic File Types


Due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such firms must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their submission will be blocked, preventing receipt of the submission by MCC and potentially being precluded from award consideration.


The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:


.vbs (Microsoft Visual Basic script file)
.vbe (VBScript encoded script file)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (Word with macros)
.xlsm (Excel with macros)
.pptm (PowerPoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)


6. Qualification Factors


Qualification Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


Firms must submit resumes of its proposed team (both key and non-key personnel). Firms may choose to complete SF-330 Part I Section E. Resumes of Key Personnel Proposed for This Contract or submit Word documents as a part of SF-330 Part I Section H. Additional Information. The resumes must be chronological with the most recent information listed first. The resumes must contain, at a minimum, (1) name, (2) role in this contract, (3) years of experience, for both total years and the years at the submitting firm, (4) education, including the name of schools attended, the duration of enrollment, and the degree/certificate obtained, (5) current proposal registration, including title and location of registration, and (6) relevant employment experiences that are directly related to the requirement, including the name of company or agency, the period of employment, the title and job description of the individual, and the level of responsibility. The resumes may and should contain details of any design awards the proposed team members had won.


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


Firms must also submit at least three (3) references with full contact information for each of the proposed key personnel. The references shall all be directly relevant to the requirement and demonstrate individual past performance relative to the requirement:


1. Project Manager/Team Leader;
2. Traffic Demand Modeler;
3. Pavement Engineer(s);
4. Environmental Specialist;
5. Resettlement Specialist; and
6. Stakeholder Engagement Specialist.


The firm shall demonstrate how it proposes to organize, mobilize, and deploy its proposed project team to perform the tasks described under the requirement while maintaining appropriate stakeholder engagement to ensure that the objectives of the assignment are met, including keeping the major stakeholders involved on a routine basis;


The firm shall demonstrate how the Project Manager/Team Leader's experience demonstrates her/his ability to integrate and manage a large multi-disciplinary team, effectively communicate with project stakeholders and perform quality assurance/quality control (QA/QC) to satisfy the Government's requirements.


The firm shall demonstrate how the proposed team is adapted to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire and past experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials.


Firms must submit a signed commitment letter from each of its Key Personnel team member. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 2: Methodology and Workplan


In SF-330 Section H. Additional Information, firms must submit the following information to further demonstrate their qualifications:



1. Workplan, WBS and LOE


a. Provide summary workplan with critical path clearly identified including all milestones, proposed design reviews workshops and CTCTR Monthly Progress Meetings;


b. Provide summary of the WBS (one page);


c. Provide a proposed deliverables schedule (firms shall provide their optimal delivery schedule for the base period and for option period 1); and,


d. Provide summary Level of Effort (LoE) including all sub-contractors for each of the deliverables [to be completed in the Attachment Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)].


The firms must complete the Synopsis Attachment Levels-of-Effort (LoEs) by Deliverables. The firms shall enter a total estimated level of effort (LoE) percentage, including both key and non-key personnel and all administrative effort, for each deliverable. The attachment shall not be altered without a written approval by the MCC contracting officer and/or contract specialist.


This completed Excel attachment is counted as a part of the SF-330 Section H. Additional Information and it counts as one (1) page towards the page limit.


2. Methodology


The methodology section shall indicate the role of the relevant team members and demonstrate the firm's understanding of specific aspects of the requirement.


Note that cutting and pasting and/or repeating from the terms of reference may result in a less than satisfactory evaluation.


(1) Traffic Demand and Simulation Modelling:
a. Detail the traffic demand and simulation modelling aspect of the assignment including the team and its role, the selection of the proposed traffic modelling software, calibration and simulations, data collection, and major challenges foreseen by the firm.


(2) Geometric Reconfiguration and Structural Rehabilitation Design:
a. Detail the geometric redesign and configuration and structural rehabilitation design methodology of the project roads; and


b. Detail the approach for the use of recovered materials, pollution prevention, and waste reduction to the maximum extent practicable in developing the design, e.g. pavement recycling approach.


(3) Technical Training and Coursework:
a. Detail the technical training and coursework aspect of the requirement including the team and assignments, the proposed training curriculum development and delivery approach with major challenges foreseen by the firm.


b. Detail an approach for delivery of the technical assistance for the Abidjan Road and Safety Prioritization.


(4) Mitigating Port Congestion:
a. Provide a methodology detailing the firm's approach to study and provide recommendations to alleviate congestion in and around the port, as well as identifying opportunities for private investment.


(5) Integration of Environmental, Resettlement, and Social Tasks with the Engineering Process:
a. Provide a methodology detailing the firm's proposed team and how the firm proposes to integrate the environmental, social and resettlement tasks of the requirement into the engineering process.


(6) Maintaining and Integrating Community Welfare and Needs:
a. Provide a methodology detailing how the firm proposes to:


i. Maintain host community welfare and safety during construction, including construction site efficiencies, coordination and communication with drivers, pedestrians and local business owners;


ii. Work with the community to develop measures to reduce impacts to the local populations from congestion and inconvenience caused by construction; and,


iii. Develop an urban architecture plan and streetscape for the proposed road segments that reflects community needs. The firm shall provide at least two (2) architectural transport/streetscape renderings (before and after architectural presentations) from the proposed team and brief description of how the participatory process was used and how this will be adapted to the requirement.


3. Subcontracting Plan


The firms must submit its subcontracting plan to describe its relationship and the roles of any and all subcontractors.


The SF-330 Part II General Qualifications and a signed commitment letter must be completed for each subcontractor proposed. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


1. Firms relevant urban transport engineering experience including:


a. Firms role on the project and financial amount under direct management by the firm over the last ten (10) years including the total value of the resulting construction contract(s) over the last ten (10) years;


b. Indicate the average annual daily traffic and lane-kilometers on each project including city size for each over the last ten (10) years.


2. Firm's geometric reconfiguration and structural rehabilitation design experience, including pavement recycling and rolled compacted concrete (or similar), relevant to the project over the last ten (10) years;


3. Firm's urban traffic demand modelling and simulation experience and relevance to the project over the last ten (10) years;


4. Firms specialized experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials;


5. Firm's capability, including financial resources, to demonstrate the technical bench (i.e. backstopping, additional technical support if needed, replacement of personnel, etc.) and financial capability to satisfy the requirement. (Please do not detail any specific cost/price quote/proposal.)


6. Additional relevant supporting information.


Qualification Factor 4: Past performance on contracts with any government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The firms must submit at least three (3) and no more than ten (10) past performance references. At least 3 references must be for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


All past performance references must be in similar in size, scope, and complexity to this requirement which can speak to the following (the firm shall indicate each of the elements below in the past performance template provided):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or
d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


[Past performance reference format removed. Firms must submit past performance references as SF-330 Section F Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract. Firms must complete one copy of Section F for each reference they propose. This will not count towards the Section H page limit.]


The Government will consider the relevance of past performance references to the scope of this synopsis. Those past performance ratings that are not closely relevant to this requirement will receive a "Neutral" rating.


Firms shall ensure that all contact information is up to date and correct.


Note that Government evaluators may utilize various OCONUS, Federal, state, and local past performance databases including, but not limited to, Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS). Government evaluators reserve the right to contact any of the provided references to solicit additional information or clarification regarding the firm's past performance. The Contracting Officer and/or technical evaluators may research on any OCONUS, Federal, state, local, and commercial contract performance that is known to the Contracting Officer, but not included as a reference on the submitted qualifications package. Additionally, personal experience and evaluator knowledge may be utilized by the technical evaluation team members as long as there's sufficient supporting documentation.


Qualification Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


In SF-330 Section H. Additional Information, the firms must submit their understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire. The firms must detail the potential challenges and solutions to those challenges and shall propose other possible challenges they foresee by working on this project.


7. Evaluation Criteria


Award evaluations will be conducted in accordance with FAR 36.602 Selection of firms for architect-engineer contracts.


7.a. Basis for Qualification


The Government intends to award one hybrid firm-fixed price (FFP) and time-and-materials (T & M) contract with base period and two option periods to the firm that is determined to be a highly qualified and is fair and reasonable to the Government. For each evaluation factor, with an exception to the Evaluation Factor 5 Past Performance, the Government will perform a comparative analysis of the advantages and disadvantages, including their significance, and assign one of following adjectival ratings:


Technical Evaluation Ratings
Outstanding (O) The qualification exceeds the Government's expectations. The Government expects that the firm should result in outstanding effective, efficient, and economical performance under the contract. The submission contains several significant advantages and no more than a few minor disadvantages. The performance risk is deemed to be very low.
Satisfactory (S) The qualification meets the Government's expectations. The Government expects satisfactory performance under the contract. The submission contains many advantages and only a few minor disadvantages. The performance risk is deemed to be low.
Marginal (M) The qualification marginally satisfies the Government's expectations. The firm demonstrates a shallow understanding of the work to be accomplished. The submission contains several disadvantages and only a few advantages. The performance risk is deemed to be moderate to high.
Unsatisfactory (U) The qualification fails to meet the Government's expectations. The submission is incomplete, vague, incompatible, incomprehensible, and/or so incorrect as to be unsatisfactory. The submission contains significant disadvantages that are unacceptable. The performance risk is deemed to be very high.


MCC will use the following adjectival risk ratings to evaluate the firms' relevant Past Performance References:


Past Performance Evaluation Ratings
Low Risk The relevant Past Performance References have only positive reviews ("Satisfactory" or better using the CPARS standards) of the firm.
Moderate Risk The relevant Past Performance References have generally positive reviews ("Satisfactory" or better) with possibly some negative reviews ("Marginal" or worse) of the firm.
High Risk The relevant Past Performance References have mostly negative reviews ("Marginal" or worse) of the firm.
Neutral Offerors without relevant Past Performance References will be assigned "Neutral" rating, which is neither favorable nor unfavorable to the Offeror.


7.b. Evaluation Factors


All submissions will be evaluated based on the evaluation factors listed below in descending order starting with the most important factor:


Evaluation Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


The firm must demonstrate:


a. The comprehensiveness of the team structure (including key and non-key personnel proposed by the A & E) to complete the requirement;


b. The technical capability and qualifications of the proposed key personnel and non-key personnel to meet the requirement including references for key personnel; (additional non-key personnel proposed by the firm will not be evaluated individually but as a whole, however resumes shall be provided);


c. The proposed team (key and non-key personnel) mobilization, deployment, and approach to maintain satisfactory stakeholder engagement throughout the requirement including the role of the Project Manager/Team Leader;


d. The proposed teams approach to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire; and,


e. The proposed team member's relevant urban transport engineering experience with special consideration of energy conservation, pollution prevention, waste reduction, and the use of recovered materials.


Evaluation Factor 2: Methodology and Workplan


The Government will evaluate the rationale for the proposed workplan, WBS with LOEs, and methodology to meet the objectives outlined under the terms of reference.


1. Workplan, WBS and LOE


The Government will evaluate:


a. Comprehensiveness of the proposed workplan and WBS;


b. Integration of the environmental and social tasks into the engineering tasks throughout the requirement and understanding of the conditions and challenges of working in Abidjan, Côte d'Ivoire;


c. The firm's estimated level of effort for each deliverable to ensure the appropriate understanding of the Government's requirements and the realistic expectations by the firm; and,


d. The firms proposed deliverables schedule.


2. Methodology


The Government will evaluate the comprehensiveness of the proposed methodology, specifically:


a. Urban traffic demand and simulation modelling approach relevant to this assignment;


b. Geometric reconfiguration and structural rehabilitation design (road recycling and rolled compacted concrete) approach relevant to this assignment;


c. Technical training and coursework delivery relevant to this requirement;


d. Approach to mitigate port congestion relevant to this requirement;


e. Integration of environmental and social tasks into the engineering process throughout the requirement; and


f. Addressing community welfare and needs throughout the requirement.


3. Subcontractor Plan


The Government will evaluate the thoroughness of the firm's proposed plan to ensure that it has comprehensive and methodical plans on how the firm will work with and manage its subcontractors.


Evaluation Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


The firms must possess:


1. A minimum of ten (10) years of comparable related experience in direct management of urban transport engineering in highly congested, urban environments in cities over 1 million people on at least five (5) transport projects (about 100 lane kilometers per year) with at least 50,000 vehicles/day;


2. At least three (3) previous experiences in the reuse of recovered materials in transport projects (i.e. pavement recycling) and at least two (2) previous experiences in rolled compacted concrete (or similar);


3. A minimum of five (5) years demonstrated experience in urban traffic demand modeling and simulation relevant to the assignment;


4. An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation); and,


5. A sufficient technical resource bench to satisfy the requirement.


The Government will evaluate the firm's specialized experience and technical competence in the type of work required. The Government will evaluate the firm's availability of resources, ability to timely deploy resources, ensure appropriate level of quality assurance and control, and ability to successfully deliver the project as required.


Evaluation Factor 4: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The Government will evaluate the performance under existing and prior contracts, including references with full contact information for:


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


The Government will focus on information that demonstrates quality performance relative to the size and complexity of the requirement under consideration.


The Government reserves the right to consider information from any other sources when evaluating the firm's qualifications and past performance.


Evaluation Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


The firms must demonstrate a clear understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire, including unique challenges and solutions.


8. Synopsis Conference


MCC will hold a Synopsis Conference to detail the Government's requirement, what we expect in the submission, and to answer any preliminary questions from the interested firms. The conference details are as follows:


Location: MCC Headquarter
1099 14th Street, NW, Suite 700
Washington, DC 20005
Date: Wednesday, 28 November 2018
Time: 2:00 PM Eastern Time


MCC will also host a teleconference of the event for those wishing to join us remotely. Those interested in attending the conference in person or via teleconference must email Andrew Lee at leeae@mcc.gov by 12:00pm ET on Tuesday, 27 November 2018 to allow sufficient time for the invitation. The email should contain a list of names, titles, and email addresses of those that wish to attend.


The highlights of the conference will be issued via an amendment to the synopsis.


[This Conference was held and is addressed in Synopsis Amendment 2. MCC will not hold another Synopsis Conference.]


9. Administrative Information


MCC may host a pre-submission conference to discuss the Government's requirements. A separate notice will be posted on FBO.gov under this synopsis for additional information.


After the close of the synopsis, the Government will notify those nonresponsive firms of their exclusion from further consideration if any part of the submission is missing or incomplete.


Once the MCC Evaluation Board selects at least three highly qualified firms, MCC will invite those firms for an oral presentation in person or via teleconference. Oral presentations are a crucial part of the evaluation. Those firms that cannot accommodate an oral presentation will not be considered for award.


Once the selection authority makes the final determination, those unsuccessful firms will be notified of their exclusion from further consideration. The solicitation will be first issued only to the most qualified firm. The second and third most qualified firms will be notified as such.


The firm may be invited in person or via teleconference for a technical and/or cost/price negotiation to reach an agreement.


The Government is not liable for any cost incurred by the firms for the preparation of the submission documents or for the in-person or teleconference meetings.


After the contract has been awarded, the contract information will be posted on FBO.gov and the firms will not be separately notified.


The Government hopes to award this A-E contract around March of 2019.


10. Attachments


a. 1. Terms of Reference (ToR) 20180102 (Microsoft Word) [Official]
2. Terms of Reference in French 20181224 (Microsoft Word) [Unofficial; for reference only]
b. Provisions and Clauses 20181119 (Microsoft Word)
c. Revised Levels-of-Effort (LoEs) by Deliverables 20181224 (Microsoft Excel)
d. Commitment Letter Template 20181119 (Microsoft Word)
e. SF-330 Part I and Part II Templates 20181119 (Adobe PDF)
f. Synopsis Conference Presentation 20181224 (Microsoft PowerPoint) [Unofficial; for reference only]


[End of Document]

.

Update #3 ·

***Refer to the attachments for the complete detail***
95332419E0001 Amendment 2
DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d'Ivoire
Synopsis

Amendment 1


The purpose of Amendment 1 is to issue the updated ToR. All other terms and conditions remain unchanged.


[End of Amendment 1]


Amendment 2


The purpose of Amendment 2 is (1) to issue the details of the Synopsis Conference held on 27 November 2018, (2) to extend the Questions Due Date to 1:00pm ET on 4 January 2019 (Friday), and (3) to issue updated attachments. For the overview of the Conference, refer to the Synopsis Attachment f. Synopsis Conference Presentation. The highlights/questions from the synopsis are listed below in a form of questions and answers (Q & As).


This Amendment also includes the following attachments: Unofficial Terms of Reference in French 20181218, Updated LoEs by Deliverables, and Unofficial Synopsis Conference Presentation. The Unofficial Terms of Reference in French and the Unofficial Synopsis Conference Presentation are for reference purpose only. If there are any discrepancies among the documents, the information from the Official Terms of Reference and the Synopsis supplant the unofficial documents.


All other terms and conditions remain unchanged.


Firms must acknowledge Amendments 1 and 2 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1 and 2."


List of Synopsis Conference attendees:


a. Atkins Acuity
b. CP & Y
c. Egis Group
d. ERM Group
e. exp Global
f. IMC Worldwide
g. Ingérop
h. Jacobs Engineering Group
i. Louis Berger Group
j. Monkey Forest Consulting
k. Mott MacDonald
l. Rendel Limited
m. SETEC
n. Tetra Tech


Conference Questions and Answers (Q & As):


1. Would MCC consider extending the questions due date until the first week of January? Some of our international offices are closed until the first week.
A: Yes. The questions are now due by 1:00PM ET on 4 January 2019 (Friday).


2. Would MCC consider extending the SF-330 submission due date?
A: Yes. The submissions are now due by 5:00p ET on 4 February 2019 (Monday).


3. Would MCC consider cost plus incentive fee type contract?
A: No.


4. Will MCC provide a Microsoft Word version of the SF-330 template?
A: No. The SF-330 is managed and distributed by US GSA and they only have a PDF version available. After the Synopsis was posted, the CS realized that the Attachments E. SF-330 Part I and Part II Templates were corrupt. We will attempt to re-upload in this Amendment 2. However in case the upload fails again, MCC encourages the interested firms to download the templates directly from the GSA website:


https://www.gsa.gov/reference/forms?search_keyword=sf-330


5. How will MCC share any revised Synopsis Attachments?
A: MCC may update the Synopsis Attachments as needed and upload it as an Amendment on FBO.gov under this announcement 95332419E0001. Firms are required to reference and use the most up-to-date Attachments from the latest amendment for their submissions. Please periodically check the FBO announcement at the following link for any revised Attachments:


https://www.fbo.gov/spg/MCC/MCCMCC/MCCMCC01/95332419E0001/listing.html


6. How should firms confirm that the submission is valid for one year?
A: Firms may simply note "The submission is valid for one year" in the Cover Letter.


7. In the Synopsis Section 1. Background, what does it mean by "The estimated cost range for the construction project is to exceed $10,000,000"?
A: This is simply a prescribed set of ranges per FAR 36.204.


8. Is an SF-330 Part II required for each office where key personnel reside?
A: Yes. SF-330 Part II is required for each office that will be involved in this project.


(The complete SF-330 template has a set of instructions on how to complete the form. On page 4 of Instructions, it says to submit SF-330 Part II for the firm and each of its "branch office seeking work if the firm has branch offices.")


9. How soon does MCC expect to receive the top firm's cost proposal once the firms ranking is established?
A: Once the solicitation (RFP) is issued to the top firm, we will expect to receive the cost proposal in two weeks.


10. What is the expected award date?
A: MCC hopes to make the award in March of 2019.


11. Who does the MCC expect to be present at the presentation/interview?
A: The Team Lead must be present either in person or virtually (if virtually, she/he must have a reliable connection to communicate with MCC clearly). Ideally, MCC would like all the Key Personnel members to be present, but this is not required.


12. General Format. Please confirm that use of 11x17" paper for charts, graphics, and matrices is approved, and will only count as a single page within the allotted page count.
A: Yes. Up to five 11x17" with 1" margins pages will be permitted in Section H Additional Information for charts, graphics, matrices, or any other visual representations. These pages shall not include extensive written descriptions of your technical approach (as a general rule of thumb, if these pages reserved for visuals include paragraphs of information, we will disregard them during our evaluation). Each 11x17" page will count as one page towards the 30-page limit.


13. Are resumes only required for the six key personnel or do we need to include resumes for all personnel listed on the organizational chart?
A: The resumes must be submitted for both key and non-key personnel that are listed on the organizational chart.


14. Format of CV. In the RFP Public meeting, MCC specified offerors do not have to follow the Section E resume template; rather, should ensure that the required information is included in the CVs provided. Please confirm this to be correct. Also, please confirm there is no page limit, nor limit on number of CVs included in Section E.
A: That is correct. As long as the required information is included, Section E resume template is not required for submission. If Section E template is not used, the resumes shall be compiled and submitted as a separate electronic file, collective of all relevant resumes, on 8.5x11" paper with 1" margin. There is no page limit to resumes.


15. Where in the SF-330 should firms incorporate the Commitment Letters?
A: You may include all the Commitment Letters as a separate attachment to the SF-330 Section E. Resumes of Key Personnel Proposed for this Contract. As a reminder, there is no page limit for Commitment Letters.


16. Does MCC want a confirmation of the A-E firm's commitment to this project from an authorized officer of the firm?
A: Yes. The Cover Letter shall include a statement from an executive of the proposing firm confirming their commitment to actualizing the proposed and negotiated plans, including the team members. Firms may simply include a statement in the signed Cover Letter, "Firm ABC confirms the commitment of carrying out our proposed and any negotiated technical plans, including mobilizing and maintaining the proposed team members."


An attempt by the contractor to alter the technical plans after award may not be considered favorably by MCC and may result in a termination for default.


17. Would MCC consider limiting the number of projects under SF-330 Section F. Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract? How should firms reflect the multiple projects?
A: Yes. The total number of projects in Section F shall not exceed 10 projects. Firms must complete a copy of SF-330 Section F for each project proposed, i.e. if proposing 5 projects, the firm must complete the Section F five times, one for each project.


18. Can firms provide past performance references of the subcontractors?
A: Yes. MCC expects at least three (3) past performance references of the prime firm. The firm may choose to submit additional past performance references of its subcontractors if they have performed similar projects, in size and scope, in the past.


19. The Qualification Factor 4 asks for at least 3 past performance references in a format that differs from SF-330 Section F. Will MCC clarify this?
A: The Qualification Factor 4 has been revised to require at least 3 but no more than 10 past performance references to match the requires of SF-330 Section F (refer to Question no. 4 above). Firms must submit at least 3 references for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


The Qualification Factor 4 has been revised to reconcile SF-330 Section F.


20. Would MCC consider limiting the SF-330 Section G. Key Personnel Participation in Example Projects to the proposed Key Personnel only?
A: Yes. The Section G may comprise of example projects participated by the proposed Key Personnel only.


21. Section G. Section G states Key Personnel be included only in the matrix. Will MCC allow Key and other Core Technical Experts be included to illustrate experience level more appropriately?
A: The minimum requirement is to complete Section G of the proposed Key Personnel. However, firms are permitted to include other Core Technical Experts (no junior-level staff) in Section G to illustrate a more complete picture of its proposed team's professional qualifications. Doing so may result in a higher rating for the Evaluation Factor 1 Proposed team professional qualifications necessary for satisfactory performance of required services.


22. Can firms re-phrase the Team's roles as stated in the ToR?
A: No. As noted under 5.b. Submission Requirements and Instructions, "A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating."


23. How much of the contract would be performed before/after the Entry-into-Force (EIF)?
A: The EIF is the point in time when a Compact or Threshold Program Agreement comes into full legal force and effect and its term begins. MCC estimates the EIF may take place in middle of 2019, but there is no certainty as of now so we cannot estimated this performance split.


24. What is MCC's expectations on the team mobilization plan?
A: The team mobilization plan shall demonstrate the proposed teams mobilization and timing to complete the assignment per the proposed workplan and overall approach and methodology. Firms shall consider, among other items, how the proposed team will be initially mobilized to Abidjan to begin the assignment in earnest.


25. Subcontracting Plan. In an SF 330, a proper Subcontracting Plan is generally not included, due to the costing content required therein. Will MCC consider dropping this requirement for the SF 330 submission, until prior to negotiations at which time all costs, etc can be revealed?
A: MCC is not seeking a formal Subcontracting Plan with the cost information. MCC wishes to verify that the prime contract has a management plan on (1) how it will oversee the subcontractor's performance and (2) what its plans are in case of subpar performance.


26. Page 7 of ToR, asks for the LoEs less administrative effort. There may be uneven comparison by removing the administrative effort.
A: We have changed this requirement to propose the Total Estimated LoE Percentage per Deliverable. Refer to the Attachment c. LoEs by Deliverable. We are no longer seeking a total number of hours per deliverable. The sum of all the LoE percentages (including the Base Period and Option Period 1) must equal 100% and shall reflect the total hours, including both technical and administrative hours, in the calculation.


27. Is there a detailed contract deliverables review and approval process?
A: Yes, it can be found in the ToR Section 4. Deliverables and Documentation Requirements.


28. Are firms permitted to propose cost-cutting and/or value engineering methods?
A: Yes. Firms may propose innovative cost-cutting and/or value engineering methods that can improve the Government's requirement in Section H. Additional Information. However, this synopsis phase is strictly a technical evaluation phase and SF-330 does not allow any cost information. Therefore, firms must take care not to submit any specific cost detail. General explanations of the methods are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited. MCC will not advise the firms whether or not their language would be permissible before the submission due date. Firms should consult the permissible language with their legal counsel.


29. Would MCC consider giving a range for the expected number of team members? Firms could propose a very effective technical approach but it could be very expensive.
A: No. We want the interested firms to determine the most effective and efficient team structure.


30. Would MCC consider providing a range of the estimated contract value? Providing some parameter would assist firms to better prepare the submission.
A: Periodically, MCC updates our Business Forecast on our website. According to our Forecast, the estimated contract value for this A-E service is between $10,000,000 and $20,000,000 (https://www.mcc.gov/resources/doc/eport-business-forecast-fy-2018-mid-year).


This is a pure estimate and does not bound interested firms to prepare a technical approach within this range. This information is strictly for referential purpose and not a strict requirement. MCC expects the firms to submit the best, realistic, and fair and reasonable technical submissions based on their own assessment of MCC's requirement.


31. During the contract performance, it may be necessary for the contractor to access various areas of the project. What would happen if there are any accessibility issue?
A: If the said issue arises from the fault of the Government, we will absolutely consider modifying the contract for reasonable equitable adjustments. If the issue/delay could have been resolved or avoided by the contractor, any additional costs incurred would be assumed by the contractor.


32. Has there been any further determination on the site of the truck parking?
A: The World Bank is currently conducting a study. The site detail has not yet been established.


33. Regarding the Key personnel, the terms indicate the team leader should have led and manage two similar projects valued at 175 million USD each, which is fairly high threshold for projects dealing with urban networks requalification in developing countries; would any other relevant projects be considered in the evaluation of the team leaders if projects credentials are below that threshold, while still being significant for developing countries (for example: projects within the range of 75-80 million USD)?
A: No. But to clarify, the projects do not have to be from developing countries. The US$175 million is for any construction projects at such value. This is to ensure a team lead who have handled similar projects in size and scope as MCC's project.


34. Regarding the key-experts and their presence on site, should we consider a minimum share of their man-days to be spent in Ivory Coast?
A: The firm shall propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment.


35. Some project activities might imply generating and selecting some preferred options regarding these projects, and the consultant's level of effort might vary depending on the option(s) that will be selected (for example: Option period 1, activity 2 : "To prepare preliminary designs for the four road projects"); it is our understanding that these variance in the level of efforts would be discussed at a future stage of the selection process, once the preferred technical proposal has been selected; can you confirm this?
A: Yes. MCC is open to negotiating points such as this with the highest rated firm(s) during the solicitation phase.


36. In relation with Attachment c. Level of efforts by deliverables: it is our understanding that the total LOE estimation presented in that table will actually correspond to the total level of efforts of all activities specific to the deliverables; can you confirm our understanding? How would you recommend that LOE related to common tasks (such as project management, etc.) be considered?
A: LOE shall be presented for each deliverable as a percentage of the sum total of LOE for the Base and Option Period 1, including both direct and indirect (administrative) hours.


37. Levels of Effort (LOEs): we understand that the total man-hours of personnel should be provided by deliverable; do we also include support staff (administrative) and surveys team (traffic counts, technical and socio-environmental investigations...)?
A: Please note the required LoEs by Deliverables spreadsheet now requires the percentage of total LoEs, instead of number of hours. The percentages are to be the absolute total, including support staff.


38. The terms indicate the training sessions should be meant for groups of 30 to 50 attendees. Such a big group size may impact negatively the quality of the interaction and learning. Would it be possible to reconsider the size of the groups and to reduce them to 15 to 20 attendees or to expand the number of training sessions (i.e. more or less to double them) for that purpose?
A: MCC agrees the training would be more effective with smaller group size. MCC agrees that the class size shall not exceed 40 participants. MCC will evaluate the firms' approach on how they will implement the training sessions.


39. The proposal evaluation factors and criteria are very clear; in addition, how will the relative importance of each factor or criteria be assessed and evaluated, to produce the overall evaluation and ranking of the proposal?
A: MCC will use adjectival rating system per Synopsis Section 7. Evaluation Criteria. We will not use a numeric system to rank the important of the evaluation factors. Those firms that rate more highly on the more important factors, e.g. Professional Qualification, Methodology and Workplan, and Specialized Experience and Technical Competence, would be more favorable to MCC than those firms that rate more highly on the less important factors, e.g. Past Performance and Knowledge of the Locality.


40. Regarding the synopsis, English seems to be the working language. But based on ToR deliverables must be in French. Would you please confirm the submission could also be submitted in French?
A: The SF-330 submission must be in English.


41. Regarding the applicable standards for the conceptual and preliminary design, we understood from the terms of reference, that the A & E was expected to provide a list of relevant standards (for instance North American and European, cf page 16 and 30). However we found the sentence "Final Designs are per US Standards" confusing. Could you please clarify whether or not the A & E is expected to propose the most relevant standards, North American, European or local standards?
A: The final design standards are defined by level of completeness of the design per U.S. design standards.


42. The Evaluation Factor 3 requires the following, "An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation)." This restricts the competition to very large firms. Please confirm that the $500 million USD is the revenue of A-E/Construction services by the Prime Contractor only and whether or not MCC would consider easing this requirement.
A: This value is for the prime contractor only and MCC is not consider easing this requirement, which will help us ensure sufficient experience in similar size and scope as MCC's requirement.


[End of Amendment 2]


Amendment 3


The purpose of Amendment 3 is (1) to extend the Submission Due Date to 5:00pm ET on 4 February 2019 (Friday), (2) to answer several questions posed by interested bidders, and (3) to issue updated Attachment a.1 Terms of Reference (ToR) 20181227 (Microsoft Word) [Official]. This Amendment 3 revises the answers to Amendment 2 Questions 1 and 2. Please note the information in this Amendment 3, including the Attachments, supplants any conflicting information you may found in previous versions of this Synopsis. Any changes to the previous version of the synopsis are highlighted in the body in yellow. Any changes to revised version of the ToR are noted in the Track Changes.


We have made some changes to the ToR, including the removal of one task (formerly 3.1.4.2) and its associated deliverable (Deliverable 14). We also added language regarding the bachelor's degrees for engineering positions at the senior level, namely that the degrees shall come from accredited engineering institutions. We provided the names of the accreditation institutions with links for verification in the US, Canada, France and international agreements (Washington Accords and CTI).


Firms must acknowledge Amendments 1, 2, and 3 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1, 2, and 3."


Questions and Answers (Q & As):


1. Requirements for the Pavement Engineer (s) (P. 58 of the ToR): "S/he shall have a Masters' degree in Civil Engineering with specialty in concrete pavements and high modulus asphalts." To our knowledge, this specialty is acquired rather after years of practice. Would you consider lowering the education requirement?
A: Section 5 paragraph 7 allows for the substitution of years of experience for a Master's degree.


2. TOR 5.2.1 page 57: Can PM/TL's two projects over $175 million count toward the requirement that s/he must have led at least three projects over the past 10 years? In other words, is three total projects acceptable, or is MCC looking for five total projects for the PM/TL?
A: The two (2) urban infrastructure projects valued at over $175 million can be counted as part of the three (3) projects over the last ten (10) years.


3. Can MCC provide a copy of WSP's VGE integrated model?
A: MCC would require a legal approval to release this model, which may significantly delay this procurement. We also don't believe this is critical for bidders to prepare their submission. Therefore, this will not be shared with the interested bidders. However, it will be made available to the awardee after the award.


4. Does a cost loaded implementation plan with WBS need to be provided for the purposes of this qualifications-based submittal?
A: No. this will need to be provided with the financials as part of the second phase of the procurement.


5. Who will have primary responsibility for developing the Stakeholder Engagement Plan - the ESOC or the A & E? (There seems to be conflicting references to SEP preparation on pages 9 and 16 of the TOR.)
A: The A & E has total responsibility for planning and conducting all Stakeholder Engagement for all activities that are conducted under their contract scope. The ESOC has responsibility for the Project-wide Stakeholder Engagement Plan as required under the IFC PS and MCC, of which the Stakeholder Engagement program of the A & E is a part. The ESOC will need to capture and document what the A & E does in the larger Project-wide Stakeholder Engagement Plan and the A & E will need to share information and collaborate with the ESOC on its approach and results. Note on page 17 of the ToR, it states, "The A & E shall provide a preliminary stakeholder engagement plan including stakeholder mapping for completing the requirement." Therefore, this is consistent and correct.


6. Who will have primary responsibility for developing the Training course - the ESOC or the A & E? (There seems to be conflicting references on pages 9 and 13 of the TOR.)
A: The two training courses and objectives are different. Additional clarification is provided in revised ToR with this Amendment. Each consultant is responsible for their own course content development.


7. Who shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials?
A: The A & E shall bear the costs of stakeholder engagement expenses such as venues, media adverts and information materials for all Stakeholder Engagement activities that are conducted under their contract scope. Page 10 of the ToR has been modified to reflect this.


8. One of the requirements for the key personnel is to have a bachelor's degree in civil engineering and/or construction engineering. In some non-US countries, the degree is not called bachelor and not always civil, construction. Could the wording be modified to Bachelor's degree in Civil Engineering or similar?
A: Yes, this has been adjusted. Note that MCC reserves the exclusive right to evaluate what constitutes similar; as such the firm shall provide supporting evidence to help inform the MCC appropriately.


9. Can the A/E proposed different dates for the deliverables as long as the Base and Option Period do not go beyond the timeframe proposed by MCC? Also, can the A/E include additional deliverables not listed in the ToR?
A: Yes, the A & E is encouraged to propose different dates for deliverables. The A/E may propose additional deliverables, however the MCC reserves the right to accept or decline the proposal.


10. General Review and Approval Question. Please specify that the NTE Due dates provided in the schedules of the RFP are for DRAFT deliverables, which will begin the review "clock" ticking, and NOT for Final deliverables having undergone the 4-week pre-submission review process.
A: The dates provided are for approval of the deliverables. See Question No. 9 above. The A & E may modify the deliverables schedule as long as they fit in the period of performance provided.


11. It is stated that the A/E must possess an average of at least $100 million USD in total annual revenue over the last five years. Please clarify if the $100 million refers to revenue from design and/or from construction. Some design firms do not provide construction services.
A: This refers to annual revenue generated by the prime contractor's architecture and/or engineering design work.


12. TOR Page 44. 4.2 Deliverables. The RFP specifies that the official language of all deliverables is in French; however, also references translation requirements. Later, MCC requests that Monthly Reports be provided in both French & English. Please clarify language requirements for all primary deliverables as French only. (Only Deliverables 1 and 2 specifically note the French language requirement.)
A: Section 4.4.2.1 Base Period Deliverables notes that all deliverables are in French unless otherwise noted. This clarification has been extended to Section 4.4.2.2 Option Period 1 Deliverables.


13. TOR Page 44, 4.3 Review of Work. Please consider changing the deliverable review and time schedule to a set time frame, such as "Total deliverable review and finalization will be no more than 28 calendar days, which begins at the time the draft final is delivered to the MCC, MCA and appropriate organizations for review. Review organization have 14 calendar days to provide comments for inclusion or discussion, at which time the A & E has 14 days to include, discuss and revise the draft to Final. If reviewing organizations do not meet the 14-day deadline, the A & E is not obliged to include them. The A & E is responsible to keep record of and time stamp all received comments. This system does not preclude the A & E from eliciting informal feedback and comments during the drafting process."
A: This change has been provided in the ToR.


14. TOR Page 45. 4.3.1. and 4.3.2 CTCTR Monthly Progress & Design Review Meetings. MCC requires that the CTCTR meetings include videoconferencing. Please confirm that publicly available systems, such as Skype or Zoom can be used for this purpose.
A: Publicly available systems are permissible as long as they provide a high quality videoconferencing environment with proper audio and video quality for all participants.


15. TOR Page 46. Monthly reports. In this section of the RFP, MCC request that the monthly report must include a detailed time sheet for all personnel documenting in and out of country time. However, MCC has defined the contract terms as Firm Fixed Price, or FFP. Under FFP contracts, detailed time and costs are not required to be reviewed, presented or approved. Please clarify this requirement under the standard terms of a FFP contract structure.
A: This monthly report is to allow quality management by MCC. This is not to confirm the cost or invoice; this is to ensure that the contractor is providing a quality work as they proposed and negotiated.


16. TOR Page 44-47. Inception Report. The RFP states the draft Inception Report is due two weeks prior to the kick off meeting but the Abidjan Kick Off, and the final report is due within two weeks of the kick off meeting. Yet, the RFP states the Inception Report is Due at Week 10. The dates do not seem to coincide appropriately.
A: As noted in the Deliverables Timeline 4.4.2.1.10 Base Period Deliverable Timeline and 4.4.2.2.6 Option Period 1 Deliverable Timeline, the deliverable timelines are indicative and will be proposed and finalized by the A & E.


17. TOR Page 18. Task 3.1.2.1.1 Data Collection. Traffic counting data is not detailed in this task. Data is supposed to be collected for traffic counts, OD, safety assessment, injuries and fatalities, truck parking needs and land availability. Only OD survey is detailed. Other types of data seem to be rather requested in further tasks.
A: As noted in Section 3.1.2 Multimodal traffic demand and simulation model for the Project Zone of Influence, the objectives of the task are to perform data collection to develop a Traffic Demand and Simulation Model and develop a multimodal traffic demand and simulation model for trip generation, trip assignment, modal distribution and trip assignment. The A & E shall develop a methodology to accomplish this task accordingly.


18. TOR Page 27. 3.1.5.1 Conceptual Design. Traffic Assessment asks to perform a specific detailed traffic counts (during AM and PM peak periods, while it is not specified in Data Collection. Does this traffic count different from the one asked in Task 3.1.2.1.1 Data collection?
A: The A & E must propose, justify, and implement a data collection plan as part of the mandate. MCC believes traffic counts are necessary.


19. Data Collection. Can you confirm the Data collection for deliverable 4 includes only the road sections from figure 2 (excluding Boul de la Paix and Yopougon)?
A: The Project Zone of Influence is detailed under section 1.2.2 Project Zone of Influence. Figure 2 is provided as a partial reference material for the Project Zone of Influence.


20. Traffic Counting. Does the MCC expect the A/E to complete the traffic counting only with Deliverable 8-Conceptual Design at week 32?
A: Data collection results and simulations (to account for various network development scenarios or deviation plans) are required for the conceptual designs. The data collection may be performed earlier if needed.


21. Due Date. When is the Preliminary ESIA and Resettlement Report due and what is the required content?
A: The A & E shall include relevant ESIA and Resettlement information in the Preliminary Design Documents as outlined under Section 3.2.1.4. Deliverables found under section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included.


22. Deliverable. Can you clarify the requirements in terms of Preliminary ESIA and resettlement in Deliverable 8 and Deliverable 9? From the deliverable descriptions (section 3.1.5.7 and section 4.4.2.2.1.1), both deliverables 8 and 9 should include the preliminary ESIA and resettlement assessment. Please provide details of what is expected.
A: Section 3.1.5.7 Conceptual Design is modified to summary ESIA and resettlement assessments, while 3.2.1 Preliminary designs and its deliverables under Section 4.4.2.2.1 Deliverable 9 note preliminary ESIA and resettlement risks and results shall be included. The Conceptual Design ESIA elements are meant to highlight the major aspects that may influence the overall design selection; the preliminary design is a more completed version of the selected conceptual design with more refined resettlement, environmental and social risks and measures identified.


23. Preliminary Estimates and types of PAP. What was the methodology used to estimate the preliminary number and type of PAP? What were the criteria used to distinguish permanently and temporarily displaced PAP?
A: It should be emphasized that the estimates of the number of PAPS are indicative only and NOT definitive. The presence of PAPs and the estimate of number of PAPS was assessed through counts made using satellite imagery coupled with windshield survey and intermittent on the ground counts. The difference between permanently displaced and temporarily displaced PAPS is that permanently displaced PAPs will not be able to resume their activities in their original location post-project completion.


24. Overlap ESOC-A & E. Could you clarify the responsibility of the A & E vs the ESOC:


a) The ESOC should develop training courses for the MCA and CTCTR, 6 courses X 16 h, all of them have the same topic as the 36h-classes provided by the A & E. Can you clarify the differences between both training programs?
A: The ESOC courses are generalized courses meant to provide a general awareness and understanding of each of the selected topics in anticipation of the A & E modules, which are meant to be more specialized and focused on providing the CTCTR with sufficient understanding to participate in the engineering design phase and to deliver the road projects during the Compact period as noted in paragraph 1 of 3.1.4.1 Training for the CTCTR.


b) Who, between the A & E and ESOC, is responsible to coordinate the engagement and effort of INP-HB and ENSEA?
A: The ESOC is responsible for engaging with the INP-HB and ENSEA for their six (6) modules, while the A & E is responsible for coordination with INP-HB and ENSEA, with support from MCA-CI, for its ten (10) modules.


c) What is the effort expected from INP-HB and ENSEA for those training programs? Should the A & E plan a budget for local professors in addition to international trainers?
A: The INP-HB and ENSEA have separate budgets from the A & E. Note that the A & E is expected to provide the training itself and not through professors from either institution. Note that professors from both institutions may be present during the modules.


[End of Amendment 3]


1. Background


The Millennium Challenge Corporation (MCC) is a United States government-owned corporation created under Title VI of the Foreign Operations, Export Financing, and Related Programs Appropriations Act, 2004 and is responsible for the stewardship of the Millennium Challenge Account (MCA). MCC works with developing countries to promote sustainable economic growth to reduce poverty. Eligible countries develop specific investment programs in furtherance of the goal of economic development to be funded by MCC over a five-year period and implemented by the country partner.


The Compact with the Government of Côte d'Ivoire (GoCI), signed on 07 November 2017 will be implemented by the Millennium Challenge Account Cote d'Ivoire (MCA-CI). The Compact contains two projects:
• The Skills for Employability and Productivity Project, and
• The Abidjan Transport Project.


This requirement refers to the Abidjan Transport Project (ATP) only. The objective of the ATP is to reduce vehicle operating costs and travel times along targeted road segments, while improving overall pedestrian and vehicle mobility and safety.


The estimated cost range for the construction project is to exceed $10,000,000.


2. Purpose


The purpose of this synopsis 95332419E0001 is to select a highly qualified architecture-engineering firm (A-E firm) to provide architectural and engineering (A-E) service to MCC Transport and Vertical Structure (TVS) Abidjan Transport Project (ATP) in Abidjan, Côte d'Ivoire. The awardee shall develop and implement the ATP Compact Program in Côte d'Ivoire, which is to help improve the movement of goods and people in and around Abidjan.


This synopsis is procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.6 Architect-Engineer Contracting under the NAICS Code 541330 Engineering Services and PSC C1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways.


This requirement is full and open to all professional A-E firms (professionally licensed in the US or in their respective home country).


3. Contract Information


The Government anticipates awarding one firm-fixed price (FFP) and time-and-materials (T & M) hybrid contract.


This is a design-bid-build contract for the A-E service. The A-E firm selected for this service will not be eligible for the construction contract.


Anticipated Period of Performance:


The contract will include a Base Period of 8 months, an Option Period 1 of 10 months, and an Option Period 2 of 12 months. While the Contract will be awarded for the Base and Option Periods, the exercise of the option periods is at the sole discretion of MCC.


Base: 11 March 2019 - 10 November 2019
Option Period 1: 11 November 2019 - 10 September 2020
Option Period 2: 11 September 2020 - 10 October 2021


Anticipated Contract Line Item Number (CLIN) Information
ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Base: Deliverables 1 to 8 | 8 months (Award + 32 Weeks)
FFP
Contract Period: Base NTE Lot _______________ _______________
1001 OP 1: Deliverables 9 to 14 | Award + 10 months (Award + 72 Weeks)
FFP
Contract Period: Option 1 NTE Lot _______________ _______________
2001 OP 2: Technical Design Support | 12 months
T & M
Contract Period: Option 2 TBD Lot _______________ _______________
GRAND TOTAL NTE _______________


In accordance with clause MCC 52-232-72 Limitation of Funds-Incrementally Funded Contracts, funds in the amount of $X.XX have been allotted to this contract. MCC contemplates that the total available funds now obligated will cover the work to be performed through 10 October 2021. The contractor shall not perform work on the contract which exceeds the total amount actually allotted by the Government to the contract. The Government is not obligated to reimburse the contractor for costs incurred in excess of the total amount allotted by the Government to this contract. The contractor assumes the risk for any increased costs beyond what the Government obligates.


4. Scope of Project / Terms of Reference (ToR)


Refer to the Synopsis Attachment Terms of Reference (ToR) for the complete detail, including objectives, scopes, deliverables, and staffing.


5. Submission Instructions and Evaluation Procedures


5.a. Submission and Evaluation Overview


In accordance with FAR 36.6, the submission and evaluation procedures will be split into two phases: (1) the submission and evaluation of the bidders' qualifications and (2) the submission, evaluation, and negotiation of the highest qualified bidder's price proposal.


Phase 1: Synopsis: The submission and evaluation of the bidders' qualifications
Step 1: The bidders must submit completed SF-330 Part I and Part II to verify its qualifications.
Step 2: The MCC Evaluation Board will evaluate all responsive SF-330s and select, at a minimum, three most highly qualified A-E firms.
Step 3: MCC will invite those selected firms for an oral presentation / interview.
Step 4: The MCC Evaluation Board will rank the top three most qualified firms and make a recommendation to the designated selection authority.
Step 5: The selection authority will make the final determination on the ranking of the top three most qualified firms.


Phase 2: Solicitation: The submission, evaluation, and negotiation of cost/price proposal
Step 1: MCC will issue a solicitation in the form of Request for Proposal (RFP) to the top highest qualified A-E firm.
Step 2: The A-E firm will submit a complete cost/price proposal to MCC.
Step 3: MCC will evaluate the cost/price proposal and determine whether or not it is fair and reasonable.
Step 4: MCC may enter into a technical and/or cost/price negotiation with the firm.
Step 5: Once agreeable terms are reached, MCC will move forward with the award. If MCC and the firm cannot reach an agreement within a time specified by the contracting officer, MCC will terminate the negotiation and invite the second most qualified firm to submit a proposal. If MCC and the second qualified firm cannot reach an agreement, MCC will invite the third most qualified firm to submit a proposal. If an agreement is not reached with the third most qualified firm, the synopsis and solicitation will be cancelled and may be re-competed.


5.b. Submission Requirements and Instructions


The bidders must submit the following:
1. Cover Page, at a minimum including:
a. The solicitation number and title;
b. The bidding firm's official name;
c. The bidding firm's DUNS number;
d. Main point-of-contact who has signatory and negotiation authority with name, phone number, and email; and
e. Statement that the bid submission is valid for 1 year.
2. Completed SF-330 Part I Contract-Specific Qualifications (Section A through H); and
3. Completed SF-330 Part II General Qualifications.


The Cover Page is limited to 2 pages; the SF-330 Part I has no page limit, however the Section H Additional Information is limited to 30 pages; and the SF-330 Part II has no page limit. (SF-330 Part I Section E Resumes of Key Personnel Proposed for This Contract is not considered in the page limits provided.)


The Phase I Qualifications submission must not include any price/cost information as it will not be reviewed during our Phase I Qualifications evaluation.


The firms must provide all the necessary materials, equipment, personnel, etc. to satisfy the requirement. There is a possibility, however, that the MCA may offer an office space for limited number of contractor personnel. This will be separately negotiated before or after the award.


The submissions must clearly demonstrate in English the firm's qualifications and the understanding of the technical requirements for further consideration. Clarity and completeness are of the utmost importance. Therefore, the submissions, including all illustrative and graphical representations, must be presented in a practical, clear, and concise manner.


The narrative must provide the Government with a reasonable assurance that the firm has the necessary qualifications to fully satisfy the Government's requirements. A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating.


The Government recommends completing and signing the SF-330s electronically, rather than handwriting then scanning. If any part of the submission is not clearly readable, i.e. a document is not legible or comprehensible, the Government may either disregard the information in our evaluation or deem the submission unresponsive without an opportunity for re-submission.


The submissions must clearly demonstrate a thorough understanding of the Government's requirement, as well as convey the A-E firm's capability for transforming its understanding into successful performance.


5.c. Standard Form 330 (SF-330) and Required Submissions Documents


The SF-330 Parts I and II are standard documents used for the A-E firms to present their qualifications to the Government. Both parts and all its sections must be submitted electronically for award consideration. Only the SF-330 Part I Section D Organizational Chart of Proposed Team and Section H Additional Information may be submitted as Microsoft Word (.docx) and Microsoft Excel (.xlsx) documents (to allow graphical representations and to conveniently present additional information) as long as it does not exceed the page limits noted in 5.b. Submission Requirements and Instructions.


If a Word/Excel document is used, the font must be Calibri or Times New Roman size 11 or larger and page size must be 8.5x11" with 1" margin all around. The first page of Section H must be completed as the original SF-330 PDF document with the appropriate signature and the remaining pages may be presented in Word/Excel. All supplemental documents should clearly show sequential page numbers and the corresponding section title, e.g. "Section D Organizational Chart of Proposed Team" or "Section H Additional Information." All other sections must be completed within the SF-330 PDF. The firm may complete multiple copies of the PDFs for SF-330 Part I Sections A through H and Part II to ensure sufficient documentation of its qualifications.


In the synopsis phase, MCC will evaluate the following:


5.d. Submission Information


Firms are responsible for submitting electronic submissions, and any modifications or revisions, so as to reach the Government Official by the date and time specified below:
Date: Monday, 4 February 2019
Time: 5:00 PM Eastern Time
Location: Millennium Challenge Corporation
Attn: Andrew Lee, Contract Specialist
mailto:leeae@mcc.gov


All questions regarding this synopsis must be emailed to Andrew Lee at leeae@mcc.gov by 1:00 PM Eastern Time on Friday, 4 January 2019. To assure timely and proper handling, the email question must state "95332419E0001 DCO TVS ATP A-E Service" in the subject line.


The Government will not answer any question or request received after the time specified above. Questions or requests for clarification that result in specific information necessary to respond to the synopsis will be provided to all firms. Therefore, questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to the firm's questions and requests, but will consider them and incorporate the responses and any changes to an amendment to the synopsis.


5.e. Blocked and Unacceptable Electronic File Types


Due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such firms must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their submission will be blocked, preventing receipt of the submission by MCC and potentially being precluded from award consideration.


The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:


.vbs (Microsoft Visual Basic script file)
.vbe (VBScript encoded script file)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (Word with macros)
.xlsm (Excel with macros)
.pptm (PowerPoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)


6. Qualification Factors


Qualification Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


Firms must submit resumes of its proposed team (both key and non-key personnel). Firms may choose to complete SF-330 Part I Section E. Resumes of Key Personnel Proposed for This Contract or submit Word documents as a part of SF-330 Part I Section H. Additional Information. The resumes must be chronological with the most recent information listed first. The resumes must contain, at a minimum, (1) name, (2) role in this contract, (3) years of experience, for both total years and the years at the submitting firm, (4) education, including the name of schools attended, the duration of enrollment, and the degree/certificate obtained, (5) current proposal registration, including title and location of registration, and (6) relevant employment experiences that are directly related to the requirement, including the name of company or agency, the period of employment, the title and job description of the individual, and the level of responsibility. The resumes may and should contain details of any design awards the proposed team members had won.


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


Firms must also submit at least three (3) references with full contact information for each of the proposed key personnel. The references shall all be directly relevant to the requirement and demonstrate individual past performance relative to the requirement:


1. Project Manager/Team Leader;
2. Traffic Demand Modeler;
3. Pavement Engineer(s);
4. Environmental Specialist;
5. Resettlement Specialist; and
6. Stakeholder Engagement Specialist.


The firm shall demonstrate how it proposes to organize, mobilize, and deploy its proposed project team to perform the tasks described under the requirement while maintaining appropriate stakeholder engagement to ensure that the objectives of the assignment are met, including keeping the major stakeholders involved on a routine basis;


The firm shall demonstrate how the Project Manager/Team Leader's experience demonstrates her/his ability to integrate and manage a large multi-disciplinary team, effectively communicate with project stakeholders and perform quality assurance/quality control (QA/QC) to satisfy the Government's requirements.


The firm shall demonstrate how the proposed team is adapted to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire and past experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials.


Firms must submit a signed commitment letter from each of its Key Personnel team member. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 2: Methodology and Workplan


In SF-330 Section H. Additional Information, firms must submit the following information to further demonstrate their qualifications:



1. Workplan, WBS and LOE


a. Provide summary workplan with critical path clearly identified including all milestones, proposed design reviews workshops and CTCTR Monthly Progress Meetings;


b. Provide summary of the WBS (one page);


c. Provide a proposed deliverables schedule (firms shall provide their optimal delivery schedule for the base period and for option period 1); and,


d. Provide summary Level of Effort (LoE) including all sub-contractors for each of the deliverables [to be completed in the Attachment Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)].


The firms must complete the Synopsis Attachment Levels-of-Effort (LoEs) by Deliverables. The firms shall enter a total estimated level of effort (LoE) percentage, including both key and non-key personnel and all administrative effort, for each deliverable. The attachment shall not be altered without a written approval by the MCC contracting officer and/or contract specialist.


This completed Excel attachment is counted as a part of the SF-330 Section H. Additional Information and it counts as one (1) page towards the page limit.


2. Methodology


The methodology section shall indicate the role of the relevant team members and demonstrate the firm's understanding of specific aspects of the requirement.


Note that cutting and pasting and/or repeating from the terms of reference may result in a less than satisfactory evaluation.


(1) Traffic Demand and Simulation Modelling:
a. Detail the traffic demand and simulation modelling aspect of the assignment including the team and its role, the selection of the proposed traffic modelling software, calibration and simulations, data collection, and major challenges foreseen by the firm.


(2) Geometric Reconfiguration and Structural Rehabilitation Design:
a. Detail the geometric redesign and configuration and structural rehabilitation design methodology of the project roads; and


b. Detail the approach for the use of recovered materials, pollution prevention, and waste reduction to the maximum extent practicable in developing the design, e.g. pavement recycling approach.


(3) Technical Training and Coursework:
a. Detail the technical training and coursework aspect of the requirement including the team and assignments, the proposed training curriculum development and delivery approach with major challenges foreseen by the firm.


b. Detail an approach for delivery of the technical assistance for the Abidjan Road and Safety Prioritization.


(4) Mitigating Port Congestion:
a. Provide a methodology detailing the firm's approach to study and provide recommendations to alleviate congestion in and around the port, as well as identifying opportunities for private investment.


(5) Integration of Environmental, Resettlement, and Social Tasks with the Engineering Process:
a. Provide a methodology detailing the firm's proposed team and how the firm proposes to integrate the environmental, social and resettlement tasks of the requirement into the engineering process.


(6) Maintaining and Integrating Community Welfare and Needs:
a. Provide a methodology detailing how the firm proposes to:


i. Maintain host community welfare and safety during construction, including construction site efficiencies, coordination and communication with drivers, pedestrians and local business owners;


ii. Work with the community to develop measures to reduce impacts to the local populations from congestion and inconvenience caused by construction; and,


iii. Develop an urban architecture plan and streetscape for the proposed road segments that reflects community needs. The firm shall provide at least two (2) architectural transport/streetscape renderings (before and after architectural presentations) from the proposed team and brief description of how the participatory process was used and how this will be adapted to the requirement.


3. Subcontracting Plan


The firms must submit its subcontracting plan to describe its relationship and the roles of any and all subcontractors.


The SF-330 Part II General Qualifications and a signed commitment letter must be completed for each subcontractor proposed. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


1. Firms relevant urban transport engineering experience including:


a. Firms role on the project and financial amount under direct management by the firm over the last ten (10) years including the total value of the resulting construction contract(s) over the last ten (10) years;


b. Indicate the average annual daily traffic and lane-kilometers on each project including city size for each over the last ten (10) years.


2. Firm's geometric reconfiguration and structural rehabilitation design experience, including pavement recycling and rolled compacted concrete (or similar), relevant to the project over the last ten (10) years;


3. Firm's urban traffic demand modelling and simulation experience and relevance to the project over the last ten (10) years;


4. Firms specialized experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials;


5. Firm's capability, including financial resources, to demonstrate the technical bench (i.e. backstopping, additional technical support if needed, replacement of personnel, etc.) and financial capability to satisfy the requirement. (Please do not detail any specific cost/price quote/proposal.)


6. Additional relevant supporting information.


Qualification Factor 4: Past performance on contracts with any government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The firms must submit at least three (3) and no more than ten (10) past performance references. At least 3 references must be for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


All past performance references must be in similar in size, scope, and complexity to this requirement which can speak to the following (the firm shall indicate each of the elements below in the past performance template provided):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or
d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


[Past performance reference format removed. Firms must submit past performance references as SF-330 Section F Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract. Firms must complete one copy of Section F for each reference they propose. This will not count towards the Section H page limit.]


The Government will consider the relevance of past performance references to the scope of this synopsis. Those past performance ratings that are not closely relevant to this requirement will receive a "Neutral" rating.


Firms shall ensure that all contact information is up to date and correct.


Note that Government evaluators may utilize various OCONUS, Federal, state, and local past performance databases including, but not limited to, Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS). Government evaluators reserve the right to contact any of the provided references to solicit additional information or clarification regarding the firm's past performance. The Contracting Officer and/or technical evaluators may research on any OCONUS, Federal, state, local, and commercial contract performance that is known to the Contracting Officer, but not included as a reference on the submitted qualifications package. Additionally, personal experience and evaluator knowledge may be utilized by the technical evaluation team members as long as there's sufficient supporting documentation.


Qualification Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


In SF-330 Section H. Additional Information, the firms must submit their understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire. The firms must detail the potential challenges and solutions to those challenges and shall propose other possible challenges they foresee by working on this project.


7. Evaluation Criteria


Award evaluations will be conducted in accordance with FAR 36.602 Selection of firms for architect-engineer contracts.


7.a. Basis for Qualification


The Government intends to award one hybrid firm-fixed price (FFP) and time-and-materials (T & M) contract with base period and two option periods to the firm that is determined to be a highly qualified and is fair and reasonable to the Government. For each evaluation factor, with an exception to the Evaluation Factor 5 Past Performance, the Government will perform a comparative analysis of the advantages and disadvantages, including their significance, and assign one of following adjectival ratings:


Technical Evaluation Ratings
Outstanding (O) The qualification exceeds the Government's expectations. The Government expects that the firm should result in outstanding effective, efficient, and economical performance under the contract. The submission contains several significant advantages and no more than a few minor disadvantages. The performance risk is deemed to be very low.
Satisfactory (S) The qualification meets the Government's expectations. The Government expects satisfactory performance under the contract. The submission contains many advantages and only a few minor disadvantages. The performance risk is deemed to be low.
Marginal (M) The qualification marginally satisfies the Government's expectations. The firm demonstrates a shallow understanding of the work to be accomplished. The submission contains several disadvantages and only a few advantages. The performance risk is deemed to be moderate to high.
Unsatisfactory (U) The qualification fails to meet the Government's expectations. The submission is incomplete, vague, incompatible, incomprehensible, and/or so incorrect as to be unsatisfactory. The submission contains significant disadvantages that are unacceptable. The performance risk is deemed to be very high.


MCC will use the following adjectival risk ratings to evaluate the firms' relevant Past Performance References:


Past Performance Evaluation Ratings
Low Risk The relevant Past Performance References have only positive reviews ("Satisfactory" or better using the CPARS standards) of the firm.
Moderate Risk The relevant Past Performance References have generally positive reviews ("Satisfactory" or better) with possibly some negative reviews ("Marginal" or worse) of the firm.
High Risk The relevant Past Performance References have mostly negative reviews ("Marginal" or worse) of the firm.
Neutral Offerors without relevant Past Performance References will be assigned "Neutral" rating, which is neither favorable nor unfavorable to the Offeror.


7.b. Evaluation Factors


All submissions will be evaluated based on the evaluation factors listed below in descending order starting with the most important factor:


Evaluation Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


The firm must demonstrate:


a. The comprehensiveness of the team structure (including key and non-key personnel proposed by the A & E) to complete the requirement;


b. The technical capability and qualifications of the proposed key personnel and non-key personnel to meet the requirement including references for key personnel; (additional non-key personnel proposed by the firm will not be evaluated individually but as a whole, however resumes shall be provided);


c. The proposed team (key and non-key personnel) mobilization, deployment, and approach to maintain satisfactory stakeholder engagement throughout the requirement including the role of the Project Manager/Team Leader;


d. The proposed teams approach to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire; and,


e. The proposed team member's relevant urban transport engineering experience with special consideration of energy conservation, pollution prevention, waste reduction, and the use of recovered materials.


Evaluation Factor 2: Methodology and Workplan


The Government will evaluate the rationale for the proposed workplan, WBS with LOEs, and methodology to meet the objectives outlined under the terms of reference.


1. Workplan, WBS and LOE


The Government will evaluate:


a. Comprehensiveness of the proposed workplan and WBS;


b. Integration of the environmental and social tasks into the engineering tasks throughout the requirement and understanding of the conditions and challenges of working in Abidjan, Côte d'Ivoire;


c. The firm's estimated level of effort for each deliverable to ensure the appropriate understanding of the Government's requirements and the realistic expectations by the firm; and,


d. The firms proposed deliverables schedule.


2. Methodology


The Government will evaluate the comprehensiveness of the proposed methodology, specifically:


a. Urban traffic demand and simulation modelling approach relevant to this assignment;


b. Geometric reconfiguration and structural rehabilitation design (road recycling and rolled compacted concrete) approach relevant to this assignment;


c. Technical training and coursework delivery relevant to this requirement;


d. Approach to mitigate port congestion relevant to this requirement;


e. Integration of environmental and social tasks into the engineering process throughout the requirement; and


f. Addressing community welfare and needs throughout the requirement.


3. Subcontractor Plan


The Government will evaluate the thoroughness of the firm's proposed plan to ensure that it has comprehensive and methodical plans on how the firm will work with and manage its subcontractors.


Evaluation Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


The firms must possess:


1. A minimum of ten (10) years of comparable related experience in direct management of urban transport engineering in highly congested, urban environments in cities over 1 million people on at least five (5) transport projects (about 100 lane kilometers per year) with at least 50,000 vehicles/day;


2. At least three (3) previous experiences in the reuse of recovered materials in transport projects (i.e. pavement recycling) and at least two (2) previous experiences in rolled compacted concrete (or similar);


3. A minimum of five (5) years demonstrated experience in urban traffic demand modeling and simulation relevant to the assignment;


4. An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation); and,


5. A sufficient technical resource bench to satisfy the requirement.


The Government will evaluate the firm's specialized experience and technical competence in the type of work required. The Government will evaluate the firm's availability of resources, ability to timely deploy resources, ensure appropriate level of quality assurance and control, and ability to successfully deliver the project as required.


Evaluation Factor 4: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The Government will evaluate the performance under existing and prior contracts, including references with full contact information for:


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


The Government will focus on information that demonstrates quality performance relative to the size and complexity of the requirement under consideration.


The Government reserves the right to consider information from any other sources when evaluating the firm's qualifications and past performance.


Evaluation Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


The firms must demonstrate a clear understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire, including unique challenges and solutions.


8. Synopsis Conference


MCC will hold a Synopsis Conference to detail the Government's requirement, what we expect in the submission, and to answer any preliminary questions from the interested firms. The conference details are as follows:


Location: MCC Headquarter
1099 14th Street, NW, Suite 700
Washington, DC 20005
Date: Wednesday, 28 November 2018
Time: 2:00 PM Eastern Time


MCC will also host a teleconference of the event for those wishing to join us remotely. Those interested in attending the conference in person or via teleconference must email Andrew Lee at leeae@mcc.gov by 12:00pm ET on Tuesday, 27 November 2018 to allow sufficient time for the invitation. The email should contain a list of names, titles, and email addresses of those that wish to attend.


The highlights of the conference will be issued via an amendment to the synopsis.


[This Conference was held and is addressed in Synopsis Amendment 2. MCC will not hold another Synopsis Conference.]


9. Administrative Information


MCC may host a pre-submission conference to discuss the Government's requirements. A separate notice will be posted on FBO.gov under this synopsis for additional information.


After the close of the synopsis, the Government will notify those nonresponsive firms of their exclusion from further consideration if any part of the submission is missing or incomplete.


Once the MCC Evaluation Board selects at least three highly qualified firms, MCC will invite those firms for an oral presentation in person or via teleconference. Oral presentations are a crucial part of the evaluation. Those firms that cannot accommodate an oral presentation will not be considered for award.


Once the selection authority makes the final determination, those unsuccessful firms will be notified of their exclusion from further consideration. The solicitation will be first issued only to the most qualified firm. The second and third most qualified firms will be notified as such.


The firm may be invited in person or via teleconference for a technical and/or cost/price negotiation to reach an agreement.


The Government is not liable for any cost incurred by the firms for the preparation of the submission documents or for the in-person or teleconference meetings.


After the contract has been awarded, the contract information will be posted on FBO.gov and the firms will not be separately notified.


The Government hopes to award this A-E contract around March of 2019.


10. Attachments


a. 1. Terms of Reference (ToR) 20181227 (Microsoft Word) [Official]
2. Terms of Reference in French 20181224 (Microsoft Word) [Unofficial; for reference only]
b. Provisions and Clauses 20181119 (Microsoft Word)
c. Revised Levels-of-Effort (LoEs) by Deliverables 20181224 (Microsoft Excel)
d. Commitment Letter Template 20181119 (Microsoft Word)
e. SF-330 Part I and Part II Templates 20181119 (Adobe PDF)
f. Synopsis Conference Presentation 20181224 (Microsoft PowerPoint) [Unofficial; for reference only]


[End of Document]


.

Update #2 ·

***Refer to the attachments for the complete detail***
95332419E0001 Amendment 2
DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d'Ivoire
Synopsis

Amendment 1


The purpose of Amendment 1 is to issue the updated ToR. All other terms and conditions remain unchanged.


[End of Amendment 1]


Amendment 2


The purpose of Amendment 2 is (1) to issue the details of the Synopsis Conference held on 27 November 2018, (2) to extend the Questions Due Date to 1:00pm ET on 4 January 2019 (Friday), and (3) to issue updated attachments. For the overview of the Conference, refer to the Synopsis Attachment f. Synopsis Conference Presentation. The highlights/questions from the synopsis are listed below in a form of questions and answers (Q & As). Any changes to the original synopsis are highlighted in the body in yellow.


This Amendment also includes the following attachments: Unofficial Terms of Reference in French 20181218, Updated LoEs by Deliverables, and Unofficial Synopsis Conference Presentation. The Unofficial Terms of Reference in French and the Unofficial Synopsis Conference Presentation are for reference purpose only. If there are any discrepancies among the documents, the information from the Official Terms of Reference and the Synopsis supplant the unofficial documents.


All other terms and conditions remain unchanged.


Firms must acknowledge Amendments 1 and 2 in their Cover Letter. Firms may simply state, "Firm ABC acknowledges Amendments 1 and 2."


List of Synopsis Conference attendees:


a. Atkins Acuity
b. CP & Y
c. Egis Group
d. ERM Group
e. exp Global
f. IMC Worldwide
g. Ingérop
h. Jacobs Engineering Group
i. Louis Berger Group
j. Monkey Forest Consulting
k. Mott MacDonald
l. Rendel Limited
m. SETEC
n. Tetra Tech


Conference Questions and Answers (Q & As):


1. Would MCC consider extending the questions due date until the first week of January? Some of our international offices are closed until the first week.
A: Yes. The questions are now due by 2:00PM ET on 4 January 2019 (Friday).


2. Would MCC consider extending the SF-330 submission due date?
A: No. MCC believes we have provided sufficient amount of time to prepare the SF-330 for submission.


3. Would MCC consider cost plus incentive fee type contract?
A: No.


4. Will MCC provide a Microsoft Word version of the SF-330 template?
A: No. The SF-330 is managed and distributed by US GSA and they only have a PDF version available. After the Synopsis was posted, the CS realized that the Attachments E. SF-330 Part I and Part II Templates were corrupt. We will attempt to re-upload in this Amendment 2. However in case the upload fails again, MCC encourages the interested firms to download the templates directly from the GSA website:


https://www.gsa.gov/reference/forms?search_keyword=sf-330


5. How will MCC share any revised Synopsis Attachments?
A: MCC may update the Synopsis Attachments as needed and upload it as an Amendment on FBO.gov under this announcement 95332419E0001. Firms are required to reference and use the most up-to-date Attachments from the latest amendment for their submissions. Please periodically check the FBO announcement at the following link for any revised Attachments:


https://www.fbo.gov/spg/MCC/MCCMCC/MCCMCC01/95332419E0001/listing.html


6. How should firms confirm that the submission is valid for one year?
A: Firms may simply note "The submission is valid for one year" in the Cover Letter.


7. In the Synopsis Section 1. Background, what does it mean by "The estimated cost range for the construction project is to exceed $10,000,000"?
A: This is simply a prescribed set of ranges per FAR 36.204.


8. Is an SF-330 Part II required for each office where key personnel reside?
A: Yes. SF-330 Part II is required for each office that will be involved in this project.


(The complete SF-330 template has a set of instructions on how to complete the form. On page 4 of Instructions, it says to submit SF-330 Part II for the firm and each of its "branch office seeking work if the firm has branch offices.")


9. How soon does MCC expect to receive the top firm's cost proposal once the firms ranking is established?
A: Once the solicitation (RFP) is issued to the top firm, we will expect to receive the cost proposal in two weeks.


10. What is the expected award date?
A: MCC hopes to make the award in March of 2019.


11. Who does the MCC expect to be present at the presentation/interview?
A: The Team Lead must be present either in person or virtually (if virtually, she/he must have a reliable connection to communicate with MCC clearly). Ideally, MCC would like all the Key Personnel members to be present, but this is not required.


12. General Format. Please confirm that use of 11x17" paper for charts, graphics, and matrices is approved, and will only count as a single page within the allotted page count.
A: Yes. Up to five 11x17" with 1" margins pages will be permitted in Section H Additional Information for charts, graphics, matrices, or any other visual representations. These pages shall not include extensive written descriptions of your technical approach (as a general rule of thumb, if these pages reserved for visuals include paragraphs of information, we will disregard them during our evaluation). Each 11x17" page will count as one page towards the 30-page limit.


13. Are resumes only required for the six key personnel or do we need to include resumes for all personnel listed on the organizational chart?
A: The resumes must be submitted for both key and non-key personnel that are listed on the organizational chart.


14. Format of CV. In the RFP Public meeting, MCC specified offerors do not have to follow the Section E resume template; rather, should ensure that the required information is included in the CVs provided. Please confirm this to be correct. Also, please confirm there is no page limit, nor limit on number of CVs included in Section E.
A: That is correct. As long as the required information is included, Section E resume template is not required for submission. If Section E template is not used, the resumes shall be compiled and submitted as a separate electronic file, collective of all relevant resumes, on 8.5x11" paper with 1" margin. There is no page limit to resumes.


15. Where in the SF-330 should firms incorporate the Commitment Letters?
A: You may include all the Commitment Letters as a separate attachment to the SF-330 Section E. Resumes of Key Personnel Proposed for this Contract. As a reminder, there is no page limit for Commitment Letters.


16. Does MCC want a confirmation of the A-E firm's commitment to this project from an authorized officer of the firm?
A: Yes. The Cover Letter shall include a statement from an executive of the proposing firm confirming their commitment to actualizing the proposed and negotiated plans, including the team members. Firms may simply include a statement in the signed Cover Letter, "Firm ABC confirms the commitment of carrying out our proposed and any negotiated technical plans, including mobilizing and maintaining the proposed team members."


An attempt by the contractor to alter the technical plans after award may not be considered favorably by MCC and may result in a termination for default.


17. Would MCC consider limiting the number of projects under SF-330 Section F. Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract? How should firms reflect the multiple projects?
A: Yes. The total number of projects in Section F shall not exceed 10 projects. Firms must complete a copy of SF-330 Section F for each project proposed, i.e. if proposing 5 projects, the firm must complete the Section F five times, one for each project.


18. Can firms provide past performance references of the subcontractors?
A: Yes. MCC expects at least three (3) past performance references of the prime firm. The firm may choose to submit additional past performance references of its subcontractors if they have performed similar projects, in size and scope, in the past.


19. The Qualification Factor 4 asks for at least 3 past performance references in a format that differs from SF-330 Section F. Will MCC clarify this?
A: The Qualification Factor 4 has been revised to require at least 3 but no more than 10 past performance references to match the requires of SF-330 Section F (refer to Question no. 4 above). Firms must submit at least 3 references for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


The Qualification Factor 4 has been revised to reconcile SF-330 Section F.


20. Would MCC consider limiting the SF-330 Section G. Key Personnel Participation in Example Projects to the proposed Key Personnel only?
A: Yes. The Section G may comprise of example projects participated by the proposed Key Personnel only.


21. Section G. Section G states Key Personnel be included only in the matrix. Will MCC allow Key and other Core Technical Experts be included to illustrate experience level more appropriately?
A: The minimum requirement is to complete Section G of the proposed Key Personnel. However, firms are permitted to include other Core Technical Experts (no junior-level staff) in Section G to illustrate a more complete picture of its proposed team's professional qualifications. Doing so may result in a higher rating for the Evaluation Factor 1 Proposed team professional qualifications necessary for satisfactory performance of required services.


22. Can firms re-phrase the Team's roles as stated in the ToR?
A: No. As noted under 5.b. Submission Requirements and Instructions, "A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating."


23. How much of the contract would be performed before/after the Entry-into-Force (EIF)?
A: The EIF is the point in time when a Compact or Threshold Program Agreement comes into full legal force and effect and its term begins. MCC estimates the EIF may take place in middle of 2019, but there is no certainty as of now so we cannot estimated this performance split.


24. What is MCC's expectations on the team mobilization plan?
A: The team mobilization plan shall demonstrate the proposed teams mobilization and timing to complete the assignment per the proposed workplan and overall approach and methodology. Firms shall consider, among other items, how the proposed team will be initially mobilized to Abidjan to begin the assignment in earnest.


25. Subcontracting Plan. In an SF 330, a proper Subcontracting Plan is generally not included, due to the costing content required therein. Will MCC consider dropping this requirement for the SF 330 submission, until prior to negotiations at which time all costs, etc can be revealed?
A: MCC is not seeking a formal Subcontracting Plan with the cost information. MCC wishes to verify that the prime contract has a management plan on (1) how it will oversee the subcontractor's performance and (2) what its plans are in case of subpar performance.


26. Page 7 of ToR, asks for the LoEs less administrative effort. There may be uneven comparison by removing the administrative effort.
A: We have changed this requirement to propose the Total Estimated LoE Percentage per Deliverable. Refer to the Attachment c. LoEs by Deliverable. We are no longer seeking a total number of hours per deliverable. The sum of all the LoE percentages (including the Base Period and Option Period 1) must equal 100% and shall reflect the total hours, including both technical and administrative hours, in the calculation.


27. Is there a detailed contract deliverables review and approval process?
A: Yes, it can be found in the ToR Section 4. Deliverables and Documentation Requirements.


28. Are firms permitted to propose cost-cutting and/or value engineering methods?
A: Yes. Firms may propose innovative cost-cutting and/or value engineering methods that can improve the Government's requirement in Section H. Additional Information. However, this synopsis phase is strictly a technical evaluation phase and SF-330 does not allow any cost information. Therefore, firms must take care not to submit any specific cost detail. General explanations of the methods are permitted but any numbers associated to cost or even inferences that can be made to any specific cost numbers are prohibited. MCC will not advise the firms whether or not their language would be permissible before the submission due date. Firms should consult the permissible language with their legal counsel.


29. Would MCC consider giving a range for the expected number of team members? Firms could propose a very effective technical approach but it could be very expensive.
A: No. We want the interested firms to determine the most effective and efficient team structure.


30. Would MCC consider providing a range of the estimated contract value? Providing some parameter would assist firms to better prepare the submission.
A: Periodically, MCC updates our Business Forecast on our website. According to our Forecast, the estimated contract value for this A-E service is between $10,000,000 and $20,000,000 (https://www.mcc.gov/resources/doc/eport-business-forecast-fy-2018-mid-year).


This is a pure estimate and does not bound interested firms to prepare a technical approach within this range. This information is strictly for referential purpose and not a strict requirement. MCC expects the firms to submit the best, realistic, and fair and reasonable technical submissions based on their own assessment of MCC's requirement.


31. During the contract performance, it may be necessary for the contractor to access various areas of the project. What would happen if there are any accessibility issue?
A: If the said issue arises from the fault of the Government, we will absolutely consider modifying the contract for reasonable equitable adjustments. If the issue/delay could have been resolved or avoided by the contractor, any additional costs incurred would be assumed by the contractor.


32. Has there been any further determination on the site of the truck parking?
A: The World Bank is currently conducting a study. The site detail has not yet been established.


33. Regarding the Key personnel, the terms indicate the team leader should have led and manage two similar projects valued at 175 million USD each, which is fairly high threshold for projects dealing with urban networks requalification in developing countries; would any other relevant projects be considered in the evaluation of the team leaders if projects credentials are below that threshold, while still being significant for developing countries (for example: projects within the range of 75-80 million USD)?
A: No. But to clarify, the projects do not have to be from developing countries. The US$175 million is for any construction projects at such value. This is to ensure a team lead who have handled similar projects in size and scope as MCC's project.


34. Regarding the key-experts and their presence on site, should we consider a minimum share of their man-days to be spent in Ivory Coast?
A: The firm shall propose how they anticipate staffing and maintaining the appropriate level of in country presence to complete the assignment.


35. Some project activities might imply generating and selecting some preferred options regarding these projects, and the consultant's level of effort might vary depending on the option(s) that will be selected (for example: Option period 1, activity 2 : "To prepare preliminary designs for the four road projects"); it is our understanding that these variance in the level of efforts would be discussed at a future stage of the selection process, once the preferred technical proposal has been selected; can you confirm this?
A: Yes. MCC is open to negotiating points such as this with the highest rated firm(s) during the solicitation phase.


36. In relation with Attachment c. Level of efforts by deliverables: it is our understanding that the total LOE estimation presented in that table will actually correspond to the total level of efforts of all activities specific to the deliverables; can you confirm our understanding? How would you recommend that LOE related to common tasks (such as project management, etc.) be considered?
A: LOE shall be presented for each deliverable as a percentage of the sum total of LOE for the Base and Option Period 1, including both direct and indirect (administrative) hours.


37. Levels of Effort (LOEs): we understand that the total man-hours of personnel should be provided by deliverable; do we also include support staff (administrative) and surveys team (traffic counts, technical and socio-environmental investigations...)?
A: Please note the required LoEs by Deliverables spreadsheet now requires the percentage of total LoEs, instead of number of hours. The percentages are to be the absolute total, including support staff.


38. The terms indicate the training sessions should be meant for groups of 30 to 50 attendees. Such a big group size may impact negatively the quality of the interaction and learning. Would it be possible to reconsider the size of the groups and to reduce them to 15 to 20 attendees or to expand the number of training sessions (i.e. more or less to double them) for that purpose?
A: MCC agrees the training would be more effective with smaller group size. MCC agrees that the class size shall not exceed 40 participants. MCC will evaluate the firms' approach on how they will implement the training sessions.


39. The proposal evaluation factors and criteria are very clear; in addition, how will the relative importance of each factor or criteria be assessed and evaluated, to produce the overall evaluation and ranking of the proposal?
A: MCC will use adjectival rating system per Synopsis Section 7. Evaluation Criteria. We will not use a numeric system to rank the important of the evaluation factors. Those firms that rate more highly on the more important factors, e.g. Professional Qualification, Methodology and Workplan, and Specialized Experience and Technical Competence, would be more favorable to MCC than those firms that rate more highly on the less important factors, e.g. Past Performance and Knowledge of the Locality.


40. Regarding the synopsis, English seems to be the working language. But based on ToR deliverables must be in French. Would you please confirm the submission could also be submitted in French?
A: The SF-330 submission must be in English.


41. Regarding the applicable standards for the conceptual and preliminary design, we understood from the terms of reference, that the A & E was expected to provide a list of relevant standards (for instance North American and European, cf page 16 and 30). However we found the sentence "Final Designs are per US Standards" confusing. Could you please clarify whether or not the A & E is expected to propose the most relevant standards, North American, European or local standards?
A: The final design standards are defined by level of completeness of the design per U.S. design standards.


42. The Evaluation Factor 3 requires the following, "An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation)." This restricts the competition to very large firms. Please confirm that the $500 million USD is the revenue of A-E/Construction services by the Prime Contractor only and whether or not MCC would consider easing this requirement.
A: This value is for the prime contractor only and MCC is not consider easing this requirement, which will help us ensure sufficient experience in similar size and scope as MCC's requirement.


[End of Amendment 2]


1. Background


The Millennium Challenge Corporation (MCC) is a United States government-owned corporation created under Title VI of the Foreign Operations, Export Financing, and Related Programs Appropriations Act, 2004 and is responsible for the stewardship of the Millennium Challenge Account (MCA). MCC works with developing countries to promote sustainable economic growth to reduce poverty. Eligible countries develop specific investment programs in furtherance of the goal of economic development to be funded by MCC over a five-year period and implemented by the country partner.


The Compact with the Government of Côte d'Ivoire (GoCI), signed on 07 November 2017 will be implemented by the Millennium Challenge Account Cote d'Ivoire (MCA-CI). The Compact contains two projects:
• The Skills for Employability and Productivity Project, and
• The Abidjan Transport Project.


This requirement refers to the Abidjan Transport Project (ATP) only. The objective of the ATP is to reduce vehicle operating costs and travel times along targeted road segments, while improving overall pedestrian and vehicle mobility and safety.


The estimated cost range for the construction project is to exceed $10,000,000.


2. Purpose


The purpose of this synopsis 95332419E0001 is to select a highly qualified architecture-engineering firm (A-E firm) to provide architectural and engineering (A-E) service to MCC Transport and Vertical Structure (TVS) Abidjan Transport Project (ATP) in Abidjan, Côte d'Ivoire. The awardee shall develop and implement the ATP Compact Program in Côte d'Ivoire, which is to help improve the movement of goods and people in and around Abidjan.


This synopsis is procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.6 Architect-Engineer Contracting under the NAICS Code 541330 Engineering Services and PSC C1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways.


This requirement is full and open to all professional A-E firms (professionally licensed in the US or in their respective home country).


3. Contract Information


The Government anticipates awarding one firm-fixed price (FFP) and time-and-materials (T & M) hybrid contract.


This is a design-bid-build contract for the A-E service. The A-E firm selected for this service will not be eligible for the construction contract.


Anticipated Period of Performance:


The contract will include a Base Period of 8 months, an Option Period 1 of 10 months, and an Option Period 2 of 12 months. While the Contract will be awarded for the Base and Option Periods, the exercise of the option periods is at the sole discretion of MCC.


Base: 11 March 2019 - 10 November 2019
Option Period 1: 11 November 2019 - 10 September 2020
Option Period 2: 11 September 2020 - 10 October 2021


Anticipated Contract Line Item Number (CLIN) Information
ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Base: Deliverables 1 to 8 | 8 months (Award + 32 Weeks)
FFP
Contract Period: Base NTE Lot _______________ _______________
1001 OP 1: Deliverables 9 to 14 | Award + 10 months (Award + 72 Weeks)
FFP
Contract Period: Option 1 NTE Lot _______________ _______________
2001 OP 2: Technical Design Support | 12 months
T & M
Contract Period: Option 2 TBD Lot _______________ _______________
GRAND TOTAL NTE _______________


In accordance with clause MCC 52-232-72 Limitation of Funds-Incrementally Funded Contracts, funds in the amount of $X.XX have been allotted to this contract. MCC contemplates that the total available funds now obligated will cover the work to be performed through 10 October 2021. The contractor shall not perform work on the contract which exceeds the total amount actually allotted by the Government to the contract. The Government is not obligated to reimburse the contractor for costs incurred in excess of the total amount allotted by the Government to this contract. The contractor assumes the risk for any increased costs beyond what the Government obligates.


4. Scope of Project / Terms of Reference (ToR)


Refer to the Synopsis Attachment Terms of Reference (ToR) for the complete detail, including objectives, scopes, deliverables, and staffing.


5. Submission Instructions and Evaluation Procedures


5.a. Submission and Evaluation Overview


In accordance with FAR 36.6, the submission and evaluation procedures will be split into two phases: (1) the submission and evaluation of the bidders' qualifications and (2) the submission, evaluation, and negotiation of the highest qualified bidder's price proposal.


Phase 1: Synopsis: The submission and evaluation of the bidders' qualifications
Step 1: The bidders must submit completed SF-330 Part I and Part II to verify its qualifications.
Step 2: The MCC Evaluation Board will evaluate all responsive SF-330s and select, at a minimum, three most highly qualified A-E firms.
Step 3: MCC will invite those selected firms for an oral presentation / interview.
Step 4: The MCC Evaluation Board will rank the top three most qualified firms and make a recommendation to the designated selection authority.
Step 5: The selection authority will make the final determination on the ranking of the top three most qualified firms.


Phase 2: Solicitation: The submission, evaluation, and negotiation of cost/price proposal
Step 1: MCC will issue a solicitation in the form of Request for Proposal (RFP) to the top highest qualified A-E firm.
Step 2: The A-E firm will submit a complete cost/price proposal to MCC.
Step 3: MCC will evaluate the cost/price proposal and determine whether or not it is fair and reasonable.
Step 4: MCC may enter into a technical and/or cost/price negotiation with the firm.
Step 5: Once agreeable terms are reached, MCC will move forward with the award. If MCC and the firm cannot reach an agreement within a time specified by the contracting officer, MCC will terminate the negotiation and invite the second most qualified firm to submit a proposal. If MCC and the second qualified firm cannot reach an agreement, MCC will invite the third most qualified firm to submit a proposal. If an agreement is not reached with the third most qualified firm, the synopsis and solicitation will be cancelled and may be re-competed.


5.b. Submission Requirements and Instructions


The bidders must submit the following:
1. Cover Page, at a minimum including:
a. The solicitation number and title;
b. The bidding firm's official name;
c. The bidding firm's DUNS number;
d. Main point-of-contact who has signatory and negotiation authority with name, phone number, and email; and
e. Statement that the bid submission is valid for 1 year.
2. Completed SF-330 Part I Contract-Specific Qualifications (Section A through H); and
3. Completed SF-330 Part II General Qualifications.


The Cover Page is limited to 2 pages; the SF-330 Part I has no page limit, however the Section H Additional Information is limited to 30 pages; and the SF-330 Part II has no page limit. (SF-330 Part I Section E Resumes of Key Personnel Proposed for This Contract is not considered in the page limits provided.)


The Phase I Qualifications submission must not include any price/cost information as it will not be reviewed during our Phase I Qualifications evaluation.


The firms must provide all the necessary materials, equipment, personnel, etc. to satisfy the requirement. There is a possibility, however, that the MCA may offer an office space for limited number of contractor personnel. This will be separately negotiated before or after the award.


The submissions must clearly demonstrate in English the firm's qualifications and the understanding of the technical requirements for further consideration. Clarity and completeness are of the utmost importance. Therefore, the submissions, including all illustrative and graphical representations, must be presented in a practical, clear, and concise manner.


The narrative must provide the Government with a reasonable assurance that the firm has the necessary qualifications to fully satisfy the Government's requirements. A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating.


The Government recommends completing and signing the SF-330s electronically, rather than handwriting then scanning. If any part of the submission is not clearly readable, i.e. a document is not legible or comprehensible, the Government may either disregard the information in our evaluation or deem the submission unresponsive without an opportunity for re-submission.


The submissions must clearly demonstrate a thorough understanding of the Government's requirement, as well as convey the A-E firm's capability for transforming its understanding into successful performance.


5.c. Standard Form 330 (SF-330) and Required Submissions Documents


The SF-330 Parts I and II are standard documents used for the A-E firms to present their qualifications to the Government. Both parts and all its sections must be submitted electronically for award consideration. Only the SF-330 Part I Section D Organizational Chart of Proposed Team and Section H Additional Information may be submitted as Microsoft Word (.docx) and Microsoft Excel (.xlsx) documents (to allow graphical representations and to conveniently present additional information) as long as it does not exceed the page limits noted in 5.b. Submission Requirements and Instructions.


If a Word/Excel document is used, the font must be Calibri or Times New Roman size 11 or larger and page size must be 8.5x11" with 1" margin all around. The first page of Section H must be completed as the original SF-330 PDF document with the appropriate signature and the remaining pages may be presented in Word/Excel. All supplemental documents should clearly show sequential page numbers and the corresponding section title, e.g. "Section D Organizational Chart of Proposed Team" or "Section H Additional Information." All other sections must be completed within the SF-330 PDF. The firm may complete multiple copies of the PDFs for SF-330 Part I Sections A through H and Part II to ensure sufficient documentation of its qualifications.


In the synopsis phase, MCC will evaluate the following:


5.d. Submission Information


Firms are responsible for submitting electronic submissions, and any modifications or revisions, so as to reach the Government Official by the date and time specified below:
Date: Monday, 28 January 2019
Time: 5:00 PM Eastern Time
Location: Millennium Challenge Corporation
Attn: Andrew Lee, Contract Specialist
mailto:leeae@mcc.gov


All questions regarding this synopsis must be emailed to Andrew Lee at leeae@mcc.gov by 1:00 PM Eastern Time on Friday, 4 January 2019. To assure timely and proper handling, the email question must state "95332419E0001 DCO TVS ATP A-E Service" in the subject line.


The Government will not answer any question or request received after the time specified above. Questions or requests for clarification that result in specific information necessary to respond to the synopsis will be provided to all firms. Therefore, questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to the firm's questions and requests, but will consider them and incorporate the responses and any changes to an amendment to the synopsis.


5.e. Blocked and Unacceptable Electronic File Types


Due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such firms must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their submission will be blocked, preventing receipt of the submission by MCC and potentially being precluded from award consideration.


The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:


.vbs (Microsoft Visual Basic script file)
.vbe (VBScript encoded script file)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (Word with macros)
.xlsm (Excel with macros)
.pptm (PowerPoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)


6. Qualification Factors


Qualification Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


Firms must submit resumes of its proposed team (both key and non-key personnel). Firms may choose to complete SF-330 Part I Section E. Resumes of Key Personnel Proposed for This Contract or submit Word documents as a part of SF-330 Part I Section H. Additional Information. The resumes must be chronological with the most recent information listed first. The resumes must contain, at a minimum, (1) name, (2) role in this contract, (3) years of experience, for both total years and the years at the submitting firm, (4) education, including the name of schools attended, the duration of enrollment, and the degree/certificate obtained, (5) current proposal registration, including title and location of registration, and (6) relevant employment experiences that are directly related to the requirement, including the name of company or agency, the period of employment, the title and job description of the individual, and the level of responsibility. The resumes may and should contain details of any design awards the proposed team members had won.


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


Firms must also submit at least three (3) references with full contact information for each of the proposed key personnel. The references shall all be directly relevant to the requirement and demonstrate individual past performance relative to the requirement:


1. Project Manager/Team Leader;
2. Traffic Demand Modeler;
3. Pavement Engineer(s);
4. Environmental Specialist;
5. Resettlement Specialist; and
6. Stakeholder Engagement Specialist.


The firm shall demonstrate how it proposes to organize, mobilize, and deploy its proposed project team to perform the tasks described under the requirement while maintaining appropriate stakeholder engagement to ensure that the objectives of the assignment are met, including keeping the major stakeholders involved on a routine basis;


The firm shall demonstrate how the Project Manager/Team Leader's experience demonstrates her/his ability to integrate and manage a large multi-disciplinary team, effectively communicate with project stakeholders and perform quality assurance/quality control (QA/QC) to satisfy the Government's requirements.


The firm shall demonstrate how the proposed team is adapted to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire and past experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials.


Firms must submit a signed commitment letter from each of its Key Personnel team member. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 2: Methodology and Workplan


In SF-330 Section H. Additional Information, firms must submit the following information to further demonstrate their qualifications:



1. Workplan, WBS and LOE


a. Provide summary workplan with critical path clearly identified including all milestones, proposed design reviews workshops and CTCTR Monthly Progress Meetings;


b. Provide summary of the WBS (one page);


c. Provide a proposed deliverables schedule (firms shall provide their optimal delivery schedule for the base period and for option period 1); and,


d. Provide summary Level of Effort (LoE) including all sub-contractors for each of the deliverables [to be completed in the Attachment Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)].


The firms must complete the Synopsis Attachment Levels-of-Effort (LoEs) by Deliverables. The firms shall enter a total estimated level of effort (LoE) percentage, including both key and non-key personnel and all administrative effort, for each deliverable. The attachment shall not be altered without a written approval by the MCC contracting officer and/or contract specialist.


This completed Excel attachment is counted as a part of the SF-330 Section H. Additional Information and it counts as one (1) page towards the page limit.


2. Methodology


The methodology section shall indicate the role of the relevant team members and demonstrate the firm's understanding of specific aspects of the requirement.


Note that cutting and pasting and/or repeating from the terms of reference may result in a less than satisfactory evaluation.


(1) Traffic Demand and Simulation Modelling:
a. Detail the traffic demand and simulation modelling aspect of the assignment including the team and its role, the selection of the proposed traffic modelling software, calibration and simulations, data collection, and major challenges foreseen by the firm.


(2) Geometric Reconfiguration and Structural Rehabilitation Design:
a. Detail the geometric redesign and configuration and structural rehabilitation design methodology of the project roads; and


b. Detail the approach for the use of recovered materials, pollution prevention, and waste reduction to the maximum extent practicable in developing the design, e.g. pavement recycling approach.


(3) Technical Training and Coursework:
a. Detail the technical training and coursework aspect of the requirement including the team and assignments, the proposed training curriculum development and delivery approach with major challenges foreseen by the firm.


b. Detail an approach for delivery of the technical assistance for the Abidjan Road and Safety Prioritization.


(4) Mitigating Port Congestion:
a. Provide a methodology detailing the firm's approach to study and provide recommendations to alleviate congestion in and around the port, as well as identifying opportunities for private investment.


(5) Integration of Environmental, Resettlement, and Social Tasks with the Engineering Process:
a. Provide a methodology detailing the firm's proposed team and how the firm proposes to integrate the environmental, social and resettlement tasks of the requirement into the engineering process.


(6) Maintaining and Integrating Community Welfare and Needs:
a. Provide a methodology detailing how the firm proposes to:


i. Maintain host community welfare and safety during construction, including construction site efficiencies, coordination and communication with drivers, pedestrians and local business owners;


ii. Work with the community to develop measures to reduce impacts to the local populations from congestion and inconvenience caused by construction; and,


iii. Develop an urban architecture plan and streetscape for the proposed road segments that reflects community needs. The firm shall provide at least two (2) architectural transport/streetscape renderings (before and after architectural presentations) from the proposed team and brief description of how the participatory process was used and how this will be adapted to the requirement.


3. Subcontracting Plan


The firms must submit its subcontracting plan to describe its relationship and the roles of any and all subcontractors.


The SF-330 Part II General Qualifications and a signed commitment letter must be completed for each subcontractor proposed. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


1. Firms relevant urban transport engineering experience including:


a. Firms role on the project and financial amount under direct management by the firm over the last ten (10) years including the total value of the resulting construction contract(s) over the last ten (10) years;


b. Indicate the average annual daily traffic and lane-kilometers on each project including city size for each over the last ten (10) years.


2. Firm's geometric reconfiguration and structural rehabilitation design experience, including pavement recycling and rolled compacted concrete (or similar), relevant to the project over the last ten (10) years;


3. Firm's urban traffic demand modelling and simulation experience and relevance to the project over the last ten (10) years;


4. Firms specialized experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials;


5. Firm's capability, including financial resources, to demonstrate the technical bench (i.e. backstopping, additional technical support if needed, replacement of personnel, etc.) and financial capability to satisfy the requirement. (Please do not detail any specific cost/price quote/proposal.)


6. Additional relevant supporting information.


Qualification Factor 4: Past performance on contracts with any government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The firms must submit at least three (3) and no more than ten (10) past performance references. At least 3 references must be for the prime contractor. Firms may submit 1 or 2 references for each of its subcontractors and the total number of subcontractor references may not exceed 7 references.


All past performance references must be in similar in size, scope, and complexity to this requirement which can speak to the following (the firm shall indicate each of the elements below in the past performance template provided):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or
d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


[Past performance reference format removed. Firms must submit past performance references as SF-330 Section F Example Projects which Best Illustrate Proposed Team's Qualifications for This Contract. Firms must complete one copy of Section F for each reference they propose. This will not count towards the Section H page limit.]


The Government will consider the relevance of past performance references to the scope of this synopsis. Those past performance ratings that are not closely relevant to this requirement will receive a "Neutral" rating.


Firms shall ensure that all contact information is up to date and correct.


Note that Government evaluators may utilize various OCONUS, Federal, state, and local past performance databases including, but not limited to, Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS). Government evaluators reserve the right to contact any of the provided references to solicit additional information or clarification regarding the firm's past performance. The Contracting Officer and/or technical evaluators may research on any OCONUS, Federal, state, local, and commercial contract performance that is known to the Contracting Officer, but not included as a reference on the submitted qualifications package. Additionally, personal experience and evaluator knowledge may be utilized by the technical evaluation team members as long as there's sufficient supporting documentation.


Qualification Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


In SF-330 Section H. Additional Information, the firms must submit their understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire. The firms must detail the potential challenges and solutions to those challenges and shall propose other possible challenges they foresee by working on this project.


7. Evaluation Criteria


Award evaluations will be conducted in accordance with FAR 36.602 Selection of firms for architect-engineer contracts.


7.a. Basis for Qualification


The Government intends to award one hybrid firm-fixed price (FFP) and time-and-materials (T & M) contract with base period and two option periods to the firm that is determined to be a highly qualified and is fair and reasonable to the Government. For each evaluation factor, with an exception to the Evaluation Factor 5 Past Performance, the Government will perform a comparative analysis of the advantages and disadvantages, including their significance, and assign one of following adjectival ratings:


Technical Evaluation Ratings
Outstanding (O) The qualification exceeds the Government's expectations. The Government expects that the firm should result in outstanding effective, efficient, and economical performance under the contract. The submission contains several significant advantages and no more than a few minor disadvantages. The performance risk is deemed to be very low.
Satisfactory (S) The qualification meets the Government's expectations. The Government expects satisfactory performance under the contract. The submission contains many advantages and only a few minor disadvantages. The performance risk is deemed to be low.
Marginal (M) The qualification marginally satisfies the Government's expectations. The firm demonstrates a shallow understanding of the work to be accomplished. The submission contains several disadvantages and only a few advantages. The performance risk is deemed to be moderate to high.
Unsatisfactory (U) The qualification fails to meet the Government's expectations. The submission is incomplete, vague, incompatible, incomprehensible, and/or so incorrect as to be unsatisfactory. The submission contains significant disadvantages that are unacceptable. The performance risk is deemed to be very high.


MCC will use the following adjectival risk ratings to evaluate the firms' relevant Past Performance References:


Past Performance Evaluation Ratings
Low Risk The relevant Past Performance References have only positive reviews ("Satisfactory" or better using the CPARS standards) of the firm.
Moderate Risk The relevant Past Performance References have generally positive reviews ("Satisfactory" or better) with possibly some negative reviews ("Marginal" or worse) of the firm.
High Risk The relevant Past Performance References have mostly negative reviews ("Marginal" or worse) of the firm.
Neutral Offerors without relevant Past Performance References will be assigned "Neutral" rating, which is neither favorable nor unfavorable to the Offeror.


7.b. Evaluation Factors


All submissions will be evaluated based on the evaluation factors listed below in descending order starting with the most important factor:


Evaluation Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


The firm must demonstrate:


a. The comprehensiveness of the team structure (including key and non-key personnel proposed by the A & E) to complete the requirement;


b. The technical capability and qualifications of the proposed key personnel and non-key personnel to meet the requirement including references for key personnel; (additional non-key personnel proposed by the firm will not be evaluated individually but as a whole, however resumes shall be provided);


c. The proposed team (key and non-key personnel) mobilization, deployment, and approach to maintain satisfactory stakeholder engagement throughout the requirement including the role of the Project Manager/Team Leader;


d. The proposed teams approach to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire; and,


e. The proposed team member's relevant urban transport engineering experience with special consideration of energy conservation, pollution prevention, waste reduction, and the use of recovered materials.


Evaluation Factor 2: Methodology and Workplan


The Government will evaluate the rationale for the proposed workplan, WBS with LOEs, and methodology to meet the objectives outlined under the terms of reference.


1. Workplan, WBS and LOE


The Government will evaluate:


a. Comprehensiveness of the proposed workplan and WBS;


b. Integration of the environmental and social tasks into the engineering tasks throughout the requirement and understanding of the conditions and challenges of working in Abidjan, Côte d'Ivoire;


c. The firm's estimated level of effort for each deliverable to ensure the appropriate understanding of the Government's requirements and the realistic expectations by the firm; and,


d. The firms proposed deliverables schedule.


2. Methodology


The Government will evaluate the comprehensiveness of the proposed methodology, specifically:


a. Urban traffic demand and simulation modelling approach relevant to this assignment;


b. Geometric reconfiguration and structural rehabilitation design (road recycling and rolled compacted concrete) approach relevant to this assignment;


c. Technical training and coursework delivery relevant to this requirement;


d. Approach to mitigate port congestion relevant to this requirement;


e. Integration of environmental and social tasks into the engineering process throughout the requirement; and


f. Addressing community welfare and needs throughout the requirement.


3. Subcontractor Plan


The Government will evaluate the thoroughness of the firm's proposed plan to ensure that it has comprehensive and methodical plans on how the firm will work with and manage its subcontractors.


Evaluation Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


The firms must possess:


1. A minimum of ten (10) years of comparable related experience in direct management of urban transport engineering in highly congested, urban environments in cities over 1 million people on at least five (5) transport projects (about 100 lane kilometers per year) with at least 50,000 vehicles/day;


2. At least three (3) previous experiences in the reuse of recovered materials in transport projects (i.e. pavement recycling) and at least two (2) previous experiences in rolled compacted concrete (or similar);


3. A minimum of five (5) years demonstrated experience in urban traffic demand modeling and simulation relevant to the assignment;


4. An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation); and,


5. A sufficient technical resource bench to satisfy the requirement.


The Government will evaluate the firm's specialized experience and technical competence in the type of work required. The Government will evaluate the firm's availability of resources, ability to timely deploy resources, ensure appropriate level of quality assurance and control, and ability to successfully deliver the project as required.


Evaluation Factor 4: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The Government will evaluate the performance under existing and prior contracts, including references with full contact information for:


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


The Government will focus on information that demonstrates quality performance relative to the size and complexity of the requirement under consideration.


The Government reserves the right to consider information from any other sources when evaluating the firm's qualifications and past performance.


Evaluation Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


The firms must demonstrate a clear understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire, including unique challenges and solutions.


8. Synopsis Conference


MCC will hold a Synopsis Conference to detail the Government's requirement, what we expect in the submission, and to answer any preliminary questions from the interested firms. The conference details are as follows:


Location: MCC Headquarter
1099 14th Street, NW, Suite 700
Washington, DC 20005
Date: Wednesday, 28 November 2018
Time: 2:00 PM Eastern Time


MCC will also host a teleconference of the event for those wishing to join us remotely. Those interested in attending the conference in person or via teleconference must email Andrew Lee at leeae@mcc.gov by 12:00pm ET on Tuesday, 27 November 2018 to allow sufficient time for the invitation. The email should contain a list of names, titles, and email addresses of those that wish to attend.


The highlights of the conference will be issued via an amendment to the synopsis.


[This Conference was held and is addressed in Synopsis Amendment 2. MCC will not hold another Synopsis Conference.]


9. Administrative Information


MCC may host a pre-submission conference to discuss the Government's requirements. A separate notice will be posted on FBO.gov under this synopsis for additional information.


After the close of the synopsis, the Government will notify those nonresponsive firms of their exclusion from further consideration if any part of the submission is missing or incomplete.


Once the MCC Evaluation Board selects at least three highly qualified firms, MCC will invite those firms for an oral presentation in person or via teleconference. Oral presentations are a crucial part of the evaluation. Those firms that cannot accommodate an oral presentation will not be considered for award.


Once the selection authority makes the final determination, those unsuccessful firms will be notified of their exclusion from further consideration. The solicitation will be first issued only to the most qualified firm. The second and third most qualified firms will be notified as such.


The firm may be invited in person or via teleconference for a technical and/or cost/price negotiation to reach an agreement.


The Government is not liable for any cost incurred by the firms for the preparation of the submission documents or for the in-person or teleconference meetings.


After the contract has been awarded, the contract information will be posted on FBO.gov and the firms will not be separately notified.


The Government hopes to award this A-E contract around March of 2019.


10. Attachments


a. 1. Terms of Reference (ToR) (Microsoft Word) [Official]
2. Terms of Reference in French 20181218 (Microsoft Word) [Unofficial; for reference only]
b. Provisions and Clauses (Microsoft Word)
c. Revised Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)
d. Commitment Letter Template (Microsoft Word)
e. SF-330 Part I and Part II Templates (Adobe PDF)
f. Synopsis Conference Presentation (Microsoft PowerPoint) [Unofficial; for reference only]


[End of Document]

.

Update #1 ·

***Refer to the attachments for the complete detail***
95332419E0001
DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d'Ivoire
Synopsis

1. Background


The Millennium Challenge Corporation (MCC) is a United States government-owned corporation created under Title VI of the Foreign Operations, Export Financing, and Related Programs Appropriations Act, 2004 and is responsible for the stewardship of the Millennium Challenge Account (MCA). MCC works with developing countries to promote sustainable economic growth to reduce poverty. Eligible countries develop specific investment programs in furtherance of the goal of economic development to be funded by MCC over a five-year period and implemented by the country partner.


The Compact with the Government of Côte d'Ivoire (GoCI), signed on 07 November 2017 will be implemented by the Millennium Challenge Account Cote d'Ivoire (MCA-CI). The Compact contains two projects:
• The Skills for Employability and Productivity Project, and
• The Abidjan Transport Project.


This requirement refers to the Abidjan Transport Project (ATP) only. The objective of the ATP is to reduce vehicle operating costs and travel times along targeted road segments, while improving overall pedestrian and vehicle mobility and safety.


The estimated cost range for the construction project is to exceed $10,000,000.


2. Purpose


The purpose of this synopsis 95332419E0001 is to select a highly qualified architecture-engineering firm (A-E firm) to provide architectural and engineering (A-E) service to MCC Transport and Vertical Structure (TVS) Abidjan Transport Project (ATP) in Abidjan, Côte d'Ivoire. The awardee shall develop and implement the ATP Compact Program in Côte d'Ivoire, which is to help improve the movement of goods and people in and around Abidjan.


This synopsis is procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.6 Architect-Engineer Contracting under the NAICS Code 541330 Engineering Services and PSC C1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways.


This requirement is full and open to all professional A-E firms (professionally licensed in the US or in their respective home country).


3. Contract Information


The Government anticipates awarding one firm-fixed price (FFP) and time-and-materials (T & M) hybrid contract.


This is a design-bid-build contract for the A-E service. The A-E firm selected for this service will not be eligible for the construction contract.


Anticipated Period of Performance:


The contract will include a Base Period of 8 months, an Option Period 1 of 10 months, and an Option Period 2 of 12 months. While the Contract will be awarded for the Base and Option Periods, the exercise of the option periods is at the sole discretion of MCC.


Base: 11 March 2019 - 10 November 2019
Option Period 1: 11 November 2019 - 10 September 2020
Option Period 2: 11 September 2020 - 10 October 2021


Anticipated Contract Line Item Number (CLIN) Information
ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Base: Deliverables 1 to 8 | 8 months (Award + 32 Weeks)
FFP
Contract Period: Base NTE Lot _______________ _______________
1001 OP 1: Deliverables 9 to 14 | Award + 10 months (Award + 72 Weeks)
FFP
Contract Period: Option 1 NTE Lot _______________ _______________
2001 OP 2: Technical Design Support | 12 months
T & M
Contract Period: Option 2 TBD Lot _______________ _______________
GRAND TOTAL NTE _______________


In accordance with clause MCC 52-232-72 Limitation of Funds-Incrementally Funded Contracts, funds in the amount of $X.XX have been allotted to this contract. MCC contemplates that the total available funds now obligated will cover the work to be performed through 10 October 2021. The contractor shall not perform work on the contract which exceeds the total amount actually allotted by the Government to the contract. The Government is not obligated to reimburse the contractor for costs incurred in excess of the total amount allotted by the Government to this contract. The contractor assumes the risk for any increased costs beyond what the Government obligates.


4. Scope of Project / Terms of Reference (ToR)


Refer to the Synopsis Attachment Terms of Reference (ToR) for the complete detail, including objectives, scopes, deliverables, and staffing.


5. Submission Instructions and Evaluation Procedures


5.a. Submission and Evaluation Overview


In accordance with FAR 36.6, the submission and evaluation procedures will be split into two phases: (1) the submission and evaluation of the bidders' qualifications and (2) the submission, evaluation, and negotiation of the highest qualified bidder's price proposal.


Phase 1: Synopsis: The submission and evaluation of the bidders' qualifications
Step 1: The bidders must submit completed SF-330 Part I and Part II to verify its qualifications.
Step 2: The MCC Evaluation Board will evaluate all responsive SF-330s and select, at a minimum, three most highly qualified A-E firms.
Step 3: MCC will invite those selected firms for an oral presentation / interview.
Step 4: The MCC Evaluation Board will rank the top three most qualified firms and make a recommendation to the designated selection authority.
Step 5: The selection authority will make the final determination on the ranking of the top three most qualified firms.


Phase 2: Solicitation: The submission, evaluation, and negotiation of cost/price proposal
Step 1: MCC will issue a solicitation in the form of Request for Proposal (RFP) to the top highest qualified A-E firm.
Step 2: The A-E firm will submit a complete cost/price proposal to MCC.
Step 3: MCC will evaluate the cost/price proposal and determine whether or not it is fair and reasonable.
Step 4: MCC may enter into a technical and/or cost/price negotiation with the firm.
Step 5: Once agreeable terms are reached, MCC will move forward with the award. If MCC and the firm cannot reach an agreement within a time specified by the contracting officer, MCC will terminate the negotiation and invite the second most qualified firm to submit a proposal. If MCC and the second qualified firm cannot reach an agreement, MCC will invite the third most qualified firm to submit a proposal. If an agreement is not reached with the third most qualified firm, the synopsis and solicitation will be cancelled and may be re-competed.


5.b. Submission Requirements and Instructions


The bidders must submit the following:
1. Cover Page, at a minimum including:
a. The solicitation number and title;
b. The bidding firm's official name;
c. The bidding firm's DUNS number;
d. Main point-of-contact who has signatory and negotiation authority with name, phone number, and email; and
e. Statement that the bid submission is valid for 1 year.
2. Completed SF-330 Part I Contract-Specific Qualifications (Section A through H); and
3. Completed SF-330 Part II General Qualifications.


The Cover Page is limited to 2 pages; the SF-330 Part I has no page limit, however the Section H Additional Information is limited to 30 pages; and the SF-330 Part II has no page limit. (SF-330 Part I Section E Resumes of Key Personnel Proposed for This Contract is not considered in the page limits provided.)


The Phase I Qualifications submission must not include any price/cost information as it will not be reviewed during our Phase I Qualifications evaluation.


The firms must provide all the necessary materials, equipment, personnel, etc. to satisfy the requirement. There is a possibility, however, that the MCA may offer an office space for limited number of contractor personnel. This will be separately negotiated before or after the award.


The submissions must clearly demonstrate in English the firm's qualifications and the understanding of the technical requirements for further consideration. Clarity and completeness are of the utmost importance. Therefore, the submissions, including all illustrative and graphical representations, must be presented in a practical, clear, and concise manner.


The narrative must provide the Government with a reasonable assurance that the firm has the necessary qualifications to fully satisfy the Government's requirements. A restatement of the ToR will be deemed unacceptable and may result in a low evaluation rating.


The Government recommends completing and signing the SF-330s electronically, rather than handwriting then scanning. If any part of the submission is not clearly readable, i.e. a document is not legible or comprehensible, the Government may either disregard the information in our evaluation or deem the submission unresponsive without an opportunity for re-submission.


The submissions must clearly demonstrate a thorough understanding of the Government's requirement, as well as convey the A-E firm's capability for transforming its understanding into successful performance.


5.c. Standard Form 330 (SF-330) and Required Submissions Documents


The SF-330 Parts I and II are standard documents used for the A-E firms to present their qualifications to the Government. Both parts and all its sections must be submitted electronically for award consideration. Only the SF-330 Part I Section D Organizational Chart of Proposed Team and Section H Additional Information may be submitted as Microsoft Word (.docx) and Microsoft Excel (.xlsx) documents (to allow graphical representations and to conveniently present additional information) as long as it does not exceed the page limits noted in 5.b. Submission Requirements and Instructions.


If a Word/Excel document is used, the font must be Calibri or Times New Roman size 11 or larger and page size must be 8.5x11" with 1" margin all around. The first page of Section H must be completed as the original SF-330 PDF document with the appropriate signature and the remaining pages may be presented in Word/Excel. All supplemental documents should clearly show sequential page numbers and the corresponding section title, e.g. "Section D Organizational Chart of Proposed Team" or "Section H Additional Information." All other sections must be completed within the SF-330 PDF. The firm may complete multiple copies of the PDFs for SF-330 Part I Sections A through H and Part II to ensure sufficient documentation of its qualifications.


In the synopsis phase, MCC will evaluate the following:


5.d. Submission Information


Firms are responsible for submitting electronic submissions, and any modifications or revisions, so as to reach the Government Official by the date and time specified below:
Date: Monday, 28 January 2019
Time: 5:00 PM Eastern Time
Location: Millennium Challenge Corporation
Attn: Andrew Lee, Contract Specialist
mailto:leeae@mcc.gov


All questions regarding this synopsis must be emailed to Andrew Lee at leeae@mcc.gov by 2:00 PM Eastern Time on Thursday, 20 December 2018. To assure timely and proper handling, the email question must state "95332419E0001 DCO TVS ATP A-E Service" in the subject line.


The Government will not answer any question or request received after the time specified above. Questions or requests for clarification that result in specific information necessary to respond to the synopsis will be provided to all firms. Therefore, questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to the firm's questions and requests, but will consider them and incorporate the responses and any changes to an amendment to the synopsis.


5.e. Blocked and Unacceptable Electronic File Types


Due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such firms must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their submission will be blocked, preventing receipt of the submission by MCC and potentially being precluded from award consideration.


The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:


.vbs (Microsoft Visual Basic script file)
.vbe (VBScript encoded script file)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (Word with macros)
.xlsm (Excel with macros)
.pptm (PowerPoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)


6. Qualification Factors


Qualification Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


Firms must submit resumes of its proposed team (both key and non-key personnel). Firms may choose to complete SF-330 Part I Section E. Resumes of Key Personnel Proposed for This Contract or submit Word documents as a part of SF-330 Part I Section H. Additional Information. The resumes must be chronological with the most recent information listed first. The resumes must contain, at a minimum, (1) name, (2) role in this contract, (3) years of experience, for both total years and the years at the submitting firm, (4) education, including the name of schools attended, the duration of enrollment, and the degree/certificate obtained, (5) current proposal registration, including title and location of registration, and (6) relevant employment experiences that are directly related to the requirement, including the name of company or agency, the period of employment, the title and job description of the individual, and the level of responsibility. The resumes may and should contain details of any design awards the proposed team members had won.


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


Firms must also submit at least three (3) references with full contact information for each of the proposed key personnel. The references shall all be directly relevant to the requirement and demonstrate individual past performance relative to the requirement:


1. Project Manager/Team Leader;
2. Traffic Demand Modeler;
3. Pavement Engineer(s);
4. Environmental Specialist;
5. Resettlement Specialist; and
6. Stakeholder Engagement Specialist.


The firm shall demonstrate how it proposes to organize, mobilize, and deploy its proposed project team to perform the tasks described under the requirement while maintaining appropriate stakeholder engagement to ensure that the objectives of the assignment are met, including keeping the major stakeholders involved on a routine basis;


The firm shall demonstrate how the Project Manager/Team Leader's experience demonstrates her/his ability to integrate and manage a large multi-disciplinary team, effectively communicate with project stakeholders and perform quality assurance/quality control (QA/QC) to satisfy the Government's requirements.


The firm shall demonstrate how the proposed team is adapted to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire and past experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials.


Firms must submit a signed commitment letter from each of its Key Personnel team member. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 2: Methodology and Workplan


In SF-330 Section H. Additional Information, firms must submit the following information to further demonstrate their qualifications:



1. Workplan, WBS and LOE


a. Provide summary workplan with critical path clearly identified including all milestones, proposed design reviews workshops and CTCTR Monthly Progress Meetings;


b. Provide summary of the WBS (one page);


c. Provide a proposed deliverables schedule (firms shall provide their optimal delivery schedule for the base period and for option period 1); and,


d. Provide summary Level of Effort (LoE) including all sub-contractors for each of the deliverables [to be completed in the Attachment Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)].


The firms must complete the Synopsis Attachment Levels of Effort (LoEs) by Deliverables. The firms shall enter a total estimated level of effort (LoE) in hours, including both key and non-key personnel less any administrative effort, for each deliverable. The attachment shall not be altered without a written approval by the MCC contracting officer and/or contract specialist.


This completed Excel attachment is counted as a part of the SF-330 Section H. Additional Information and it counts as one (1) page towards the page limit.


2. Methodology


The methodology section shall indicate the role of the relevant team members and demonstrate the firm's understanding of specific aspects of the requirement.


Note that cutting and pasting and/or repeating from the terms of reference may result in a less than satisfactory evaluation.


(1) Traffic Demand and Simulation Modelling:
a. Detail the traffic demand and simulation modelling aspect of the assignment including the team and its role, the selection of the proposed traffic modelling software, calibration and simulations, data collection, and major challenges foreseen by the firm.


(2) Geometric Reconfiguration and Structural Rehabilitation Design:
a. Detail the geometric redesign and configuration and structural rehabilitation design methodology of the project roads; and


b. Detail the approach for the use of recovered materials, pollution prevention, and waste reduction to the maximum extent practicable in developing the design, e.g. pavement recycling approach.


(3) Technical Training and Coursework:
a. Detail the technical training and coursework aspect of the requirement including the team and assignments, the proposed training curriculum development and delivery approach with major challenges foreseen by the firm.


b. Detail an approach for delivery of the technical assistance for the Abidjan Road and Safety Prioritization.


(4) Mitigating Port Congestion:
a. Provide a methodology detailing the firm's approach to study and provide recommendations to alleviate congestion in and around the port, as well as identifying opportunities for private investment.


(5) Integration of Environmental, Resettlement, and Social Tasks with the Engineering Process:
a. Provide a methodology detailing the firm's proposed team and how the firm proposes to integrate the environmental, social and resettlement tasks of the requirement into the engineering process.


(6) Maintaining and Integrating Community Welfare and Needs:
a. Provide a methodology detailing how the firm proposes to:


i. Maintain host community welfare and safety during construction, including construction site efficiencies, coordination and communication with drivers, pedestrians and local business owners;


ii. Work with the community to develop measures to reduce impacts to the local populations from congestion and inconvenience caused by construction; and,


iii. Develop an urban architecture plan and streetscape for the proposed road segments that reflects community needs. The firm shall provide at least two (2) architectural transport/streetscape renderings (before and after architectural presentations) from the proposed team and brief description of how the participatory process was used and how this will be adapted to the requirement.


3. Subcontracting Plan


The firms must submit its subcontracting plan to describe its relationship and the roles of any and all subcontractors.


The SF-330 Part II General Qualifications and a signed commitment letter must be completed for each subcontractor proposed. A template of the commitment letter is separately attached to this synopsis. The commitment letters are submitted separately to the SF-330 and there is no page limit to the commitment letters.


Qualification Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


In SF-330 Section H. Additional Information, the firms must submit a summary of the following:


1. Firms relevant urban transport engineering experience including:


a. Firms role on the project and financial amount under direct management by the firm over the last ten (10) years including the total value of the resulting construction contract(s) over the last ten (10) years;


b. Indicate the average annual daily traffic and lane-kilometers on each project including city size for each over the last ten (10) years.


2. Firm's geometric reconfiguration and structural rehabilitation design experience, including pavement recycling and rolled compacted concrete (or similar), relevant to the project over the last ten (10) years;


3. Firm's urban traffic demand modelling and simulation experience and relevance to the project over the last ten (10) years;


4. Firms specialized experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials;


5. Firm's capability, including financial resources, to demonstrate the technical bench (i.e. backstopping, additional technical support if needed, replacement of personnel, etc.) and financial capability to satisfy the requirement. (Please do not detail any specific cost/price quote/proposal.)


6. Additional relevant supporting information.


Qualification Factor 4: Past performance on contracts with any government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The firms must submit at least three (3) past performance references with full contact information that are similar in size, scope, and complexity to this requirement which can speak to the following (the firm shall indicate each of the elements below in the past performance template provided):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or
d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


All references must be for work performed as a prime contract or subcontractor within the past ten (10) years (no references for work performed prior to 2008).


The firms should include the following matrix for each past performance reference:
Contract/Task/Call Order Number: Period of Performance (Base and Options):



Total Contract/Task/Call Order Value:


Percentage of Total under firm's direct management:
Brief Project Description (Major Bullet Points):



Relevance to 95332419E0001 (Provide relevance for all that apply with supporting details):


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment;


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


Role of the Firm:
Technical PoC Name:
Email:
Telephone:


Contract PoC Name:
Email:
Telephone:



The Government will consider the relevance of past performance references to the scope of this synopsis. Those past performance ratings that are not closely relevant to this requirement will receive a "Neutral" rating.


Firms shall ensure that all contact information is up to date and correct.


Note that Government evaluators may utilize various OCONUS, Federal, state, and local past performance databases including, but not limited to, Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS). Government evaluators reserve the right to contact any of the provided references to solicit additional information or clarification regarding the firm's past performance. The Contracting Officer and/or technical evaluators may research on any OCONUS, Federal, state, local, and commercial contract performance that is known to the Contracting Officer, but not included as a reference on the submitted qualifications package. Additionally, personal experience and evaluator knowledge may be utilized by the technical evaluation team members as long as there's sufficient supporting documentation.


Qualification Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


In SF-330 Section H. Additional Information, the firms must submit their understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire. The firms must detail the potential challenges and solutions to those challenges and shall propose other possible challenges they foresee by working on this project.


7. Evaluation Criteria


Award evaluations will be conducted in accordance with FAR 36.602 Selection of firms for architect-engineer contracts.


7.a. Basis for Qualification


The Government intends to award one hybrid firm-fixed price (FFP) and time-and-materials (T & M) contract with base period and two option periods to the firm that is determined to be a highly qualified and is fair and reasonable to the Government. For each evaluation factor, with an exception to the Evaluation Factor 5 Past Performance, the Government will perform a comparative analysis of the advantages and disadvantages, including their significance, and assign one of following adjectival ratings:


Technical Evaluation Ratings
Outstanding (O) The qualification exceeds the Government's expectations. The Government expects that the firm should result in outstanding effective, efficient, and economical performance under the contract. The submission contains several significant advantages and no more than a few minor disadvantages. The performance risk is deemed to be very low.
Satisfactory (S) The qualification meets the Government's expectations. The Government expects satisfactory performance under the contract. The submission contains many advantages and only a few minor disadvantages. The performance risk is deemed to be low.
Marginal (M) The qualification marginally satisfies the Government's expectations. The firm demonstrates a shallow understanding of the work to be accomplished. The submission contains several disadvantages and only a few advantages. The performance risk is deemed to be moderate to high.
Unsatisfactory (U) The qualification fails to meet the Government's expectations. The submission is incomplete, vague, incompatible, incomprehensible, and/or so incorrect as to be unsatisfactory. The submission contains significant disadvantages that are unacceptable. The performance risk is deemed to be very high.


MCC will use the following adjectival risk ratings to evaluate the firms' relevant Past Performance References:


Past Performance Evaluation Ratings
Low Risk The relevant Past Performance References have only positive reviews ("Satisfactory" or better using the CPARS standards) of the firm.
Moderate Risk The relevant Past Performance References have generally positive reviews ("Satisfactory" or better) with possibly some negative reviews ("Marginal" or worse) of the firm.
High Risk The relevant Past Performance References have mostly negative reviews ("Marginal" or worse) of the firm.
Neutral Offerors without relevant Past Performance References will be assigned "Neutral" rating, which is neither favorable nor unfavorable to the Offeror.


7.b. Evaluation Factors


All submissions will be evaluated based on the evaluation factors listed below in descending order starting with the most important factor:


Evaluation Factor 1: Proposed team professional qualifications necessary for satisfactory performance of required services.


The firm must demonstrate:


a. The comprehensiveness of the team structure (including key and non-key personnel proposed by the A & E) to complete the requirement;


b. The technical capability and qualifications of the proposed key personnel and non-key personnel to meet the requirement including references for key personnel; (additional non-key personnel proposed by the firm will not be evaluated individually but as a whole, however resumes shall be provided);


c. The proposed team (key and non-key personnel) mobilization, deployment, and approach to maintain satisfactory stakeholder engagement throughout the requirement including the role of the Project Manager/Team Leader;


d. The proposed teams approach to meet the conditions and challenges of working in Abidjan, Cote d'Ivoire; and,


e. The proposed team member's relevant urban transport engineering experience with special consideration of energy conservation, pollution prevention, waste reduction, and the use of recovered materials.


Evaluation Factor 2: Methodology and Workplan


The Government will evaluate the rationale for the proposed workplan, WBS with LOEs, and methodology to meet the objectives outlined under the terms of reference.


1. Workplan, WBS and LOE


The Government will evaluate:


a. Comprehensiveness of the proposed workplan and WBS;


b. Integration of the environmental and social tasks into the engineering tasks throughout the requirement and understanding of the conditions and challenges of working in Abidjan, Côte d'Ivoire;


c. The firm's proposed level of effort for each deliverable to ensure the appropriate understanding of the Government's requirements and the realistic expectations by the firm; and,


d. The firms proposed deliverables schedule.



2. Methodology


The Government will evaluate the comprehensiveness of the proposed methodology, specifically:


a. Urban traffic demand and simulation modelling approach relevant to this assignment;


b. Geometric reconfiguration and structural rehabilitation design (road recycling and rolled compacted concrete) approach relevant to this assignment;


c. Technical training and coursework delivery relevant to this requirement;


d. Approach to mitigate port congestion relevant to this requirement;


e. Integration of environmental and social tasks into the engineering process throughout the requirement; and


f. Addressing community welfare and needs throughout the requirement.


3. Subcontractor Plan


The Government will evaluate the thoroughness of the firm's proposed plan to ensure that it has comprehensive and methodical plans on how the firm will work with and manage its subcontractors.


Evaluation Factor 3: Firms specialized experience and technical competence in the type of work required including capacity to accomplish the work


The firms must possess:


1. A minimum of ten (10) years of comparable related experience in direct management of urban transport engineering in highly congested, urban environments in cities over 1 million people on at least five (5) transport projects (about 100 lane kilometers per year) with at least 50,000 vehicles/day;


2. At least three (3) previous experiences in the reuse of recovered materials in transport projects (i.e. pavement recycling) and at least two (2) previous experiences in rolled compacted concrete (or similar);


3. A minimum of five (5) years demonstrated experience in urban traffic demand modeling and simulation relevant to the assignment;


4. An average of at least $100 million USD in total annual revenue over the last five (5) years, totaling at least $500 million USD over the five (5) year period (reference date of issue of the solicitation); and,


5. A sufficient technical resource bench to satisfy the requirement.



The Government will evaluate the firm's specialized experience and technical competence in the type of work required. The Government will evaluate the firm's availability of resources, ability to timely deploy resources, ensure appropriate level of quality assurance and control, and ability to successfully deliver the project as required.


Evaluation Factor 4: Firm's past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.


The Government will evaluate the performance under existing and prior contracts, including references with full contact information for:


a. Transport engineering experiences in highly congested urban environments;


b. Geometric reconfiguration and structural design of roads (pavement recycling and concrete) in a comparable urban environment


c. Projects for urban traffic demand and simulation modelling in similar complexity as the requirement; and/or


d. The use of IFC Performance Standards or equivalent, in urban transport environments in similar size and complexity.


The Government will focus on information that demonstrates quality performance relative to the size and complexity of the requirement under consideration.


The Government reserves the right to consider information from any other sources when evaluating the firm's qualifications and past performance.


Evaluation Factor 5: Location in the general geographical area of the project and knowledge of the locality of the project.


The firms must demonstrate a clear understanding of the socio-politico-economic landscape in and around Abidjan, Côte d'Ivoire, including unique challenges and solutions.


8. Synopsis Conference


MCC will hold a Synopsis Conference to detail the Government's requirement, what we expect in the submission, and to answer any preliminary questions from the interested firms. The conference details are as follows:


Location: MCC Headquarter
1099 14th Street, NW, Suite 700
Washington, DC 20005
Date: Wednesday, 28 November 2018
Time: 2:00 PM Eastern Time


MCC will also host a teleconference of the event for those wishing to join us remotely. Those interested in attending the conference in person or via teleconference must email Andrew Lee at leeae@mcc.gov by 12:00pm ET on Tuesday, 27 November 2018 to allow sufficient time for the invitation. The email should contain a list of names, titles, and email addresses of those that wish to attend.


The highlights of the conference will be issued via an amendment to the synopsis.


9. Administrative Information


MCC may host a pre-submission conference to discuss the Government's requirements. A separate notice will be posted on FBO.gov under this synopsis for additional information.


After the close of the synopsis, the Government will notify those nonresponsive firms of their exclusion from further consideration if any part of the submission is missing or incomplete.


Once the MCC Evaluation Board selects at least three highly qualified firms, MCC will invite those firms for an oral presentation in person or via teleconference. Oral presentations are a crucial part of the evaluation. Those firms that cannot accommodate an oral presentation will not be considered for award.


Once the selection authority makes the final determination, those unsuccessful firms will be notified of their exclusion from further consideration. The solicitation will be first issued only to the most qualified firm. The second and third most qualified firms will be notified as such.


The firm may be invited in person or via teleconference for a technical and/or cost/price negotiation to reach an agreement.


The Government is not liable for any cost incurred by the firms for the preparation of the submission documents or for the in-person or teleconference meetings.


After the contract has been awarded, the contract information will be posted on FBO.gov and the firms will not be separately notified.


The Government hopes to award this A-E contract around March of 2019.


10. Attachments


a. Terms of Reference (ToR) (Microsoft Word)
b. Provisions and Clauses (Microsoft Word)
c. Levels-of-Effort (LoEs) by Deliverables (Microsoft Excel)
d. Commitment Letter Template (Microsoft Word)
e. SF-330 Part I and Part II Templates (Adobe PDF)


[End of Document]

.

Attachments

Files attached to this notice, newest first
File Type Posted
19E0001_Synopsis_Amendment_5_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20190131).docx DOCX document
19E0001_Synopsis_Amend_5.pdf PDF
19E0001_Synopsis_Amendment_5_Attachment_a.1._Official_Terms_of_Reference_20190131.docx DOCX document
19E0001_Synopsis_Amendment_4_Attachment_a.1._Official_Terms_of_Reference_20190102.docx DOCX document
19E0001_Synopsis_Amendment_4.pdf PDF
19E0001_Synopsis_Amendment_3_Attachment_a.1._Official_Terms_of_Reference_(ToR)_20181227.docx DOCX document
19E0001_Synopsis_Amendment_3_20181227.pdf PDF
19E0001_Synopsis_Attachment_e.2._SF330_Part_II_2018119.pdf PDF
19E0001_Synopsis_Attachment_c._Revised_LoEs_by_Deliverable_20181224.xlsx XLSX spreadsheet
19E0001_Synopsis_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20181224_.docx DOCX document
19E0001_Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.5._SF330_Section_H_2018119.pdf PDF
19E0001_Synopsis_Amendment_2_20181224.pdf PDF
19E0001_Synopsis_Attachment_e.1.4._SF330_Section_G_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.3._SF330_Section_F_2018119.pdf PDF
19E0001_Synopsis_Conference_Presentation_20181224.pptx PPTX presentation
19E0001_Synopsis_Attachment_e.1._SF330_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.2._SF330_Section_E_2018119.pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.5._SF330_Section_H).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.4._SF330_Section_G).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.2._SF330_Section_E).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_d._Commitment_Letter_Template).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1._SF330_Part_I).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_b._Provisions_and_Clauses).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.2._SF330_Part_II).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.3._SF330_Section_F).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_c._LoEs_by_Deliverable).xlsx XLSX spreadsheet
DCO_TVS_CIV_Engineering_Services_(Synopsis).pdf PDF
Show all 31

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity