About this file

Synopsis Attachment b. Provisions and Clauses

View the file

Other files for this federal contract opportunity

Other files attached to DCO TVS Abidjan Transport Project (ATP) A-E Service, newest first.
File Type Posted
19E0001_Synopsis_Amendment_5_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20190131).docx DOCX document
19E0001_Synopsis_Amend_5.pdf PDF
19E0001_Synopsis_Amendment_5_Attachment_a.1._Official_Terms_of_Reference_20190131.docx DOCX document
19E0001_Synopsis_Amendment_4_Attachment_a.1._Official_Terms_of_Reference_20190102.docx DOCX document
19E0001_Synopsis_Amendment_4.pdf PDF
19E0001_Synopsis_Amendment_3_20181227.pdf PDF
19E0001_Synopsis_Amendment_3_Attachment_a.1._Official_Terms_of_Reference_(ToR)_20181227.docx DOCX document
19E0001_Synopsis_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20181224_.docx DOCX document
19E0001_Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.5._SF330_Section_H_2018119.pdf PDF
19E0001_Synopsis_Amendment_2_20181224.pdf PDF
19E0001_Synopsis_Attachment_e.1.4._SF330_Section_G_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.3._SF330_Section_F_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.2._SF330_Part_II_2018119.pdf PDF
19E0001_Synopsis_Attachment_c._Revised_LoEs_by_Deliverable_20181224.xlsx XLSX spreadsheet
19E0001_Synopsis_Conference_Presentation_20181224.pptx PPTX presentation
19E0001_Synopsis_Attachment_e.1._SF330_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.2._SF330_Section_E_2018119.pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.2._SF330_Section_E).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_d._Commitment_Letter_Template).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1._SF330_Part_I).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.5._SF330_Section_H).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.4._SF330_Section_G).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.2._SF330_Part_II).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.3._SF330_Section_F).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_c._LoEs_by_Deliverable).xlsx XLSX spreadsheet
DCO_TVS_CIV_Engineering_Services_(Synopsis).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

95332419E0001 DCO TVS Abidjan Transport Project (ATP) A-E Service in Côte d’Ivoire Provisions and Clauses

Provisions

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

(End of provision)

52.252-3 Alterations in Solicitation (Apr 1984)

ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

N/A

(End of clause) 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (May 2007) 52.204-7 System for Award Management (Oct 2018) 52.204-8 Annual Representations and Certifications (Jan 2018) 52.204-16 Commercial and Government Entity Code Reporting (July 2016) 52.204-17 Ownership or Control of Offeror (July 2016) 52.204-20 Predecessor of Offeror (July 2016) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-Representation (Nov 2015) 52.209-5 Certification Regarding Responsibility Matters (Oct 2015) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2018) 52.215-1 Instructions to Offerors-Competitive Acquisition (Jan 2018) 52.215-20 Alternate I Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010) 52.216-30 Time-and-Materials/Labor-Hour Proposal Requirements-Non-Commercial Item Acquisition without Adequate Price Competition (Feb 2007) 52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation (Apr 1999) 52.222-25 Affirmative Action Compliance (Apr 1984) 52.222-38 Compliance with Veterans’ Employment Reporting Requirements (Feb 2016) 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Mar 2015) 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation (Dec 2016) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan-Certification (Aug 2009) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications (Aug 2018) 52.230-1 Cost Accounting Standards Notices and Certification (Oct 2015) 52.230-7 Proposal Disclosure-Cost Accounting Practice Changes (Apr 2005) 52.233-2 Service of Protest (Sept 2006)

Clauses

52.252-2 Clauses Incorporated by Reference (Feb 1998)

CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

(End of clause)

52.217-8 Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 1 days.

(End of clause)

52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 1 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 0 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 2 years and 6 months.

(End of clause)

52.236-22 Design within Funding Limitations (Apr 1984)

DESIGN WITHIN FUNDING LIMITATIONS (APR 1984)

(a) The Contractor shall accomplish the design services required under this contract so as to permit the award of a contract, using standard Federal Acquisition Regulation procedures for the construction of the facilities designed at a price that does not exceed the estimated construction contract price as set forth in paragraph(c) of this clause. When bids or proposals for the construction contract are received that exceed the estimated price, the contractor shall perform such redesign and other services as are necessary to permit contract award within the funding limitation. These additional services shall be performed at no increase in the price of this contract. However, the Contractor shall not be required to perform such additional services at no cost to the Government if the unfavorable bids or proposals are the result of conditions beyond its reasonable control.

(b) The Contractor will promptly advise the Contracting Officer if it finds that the project being designed will exceed or is likely to exceed the funding limitations and it is unable to design a usable facility within these limitations. Upon receipt of such information, the Contracting Officer will review the Contractor’s revised estimate of construction cost. The Government may, if it determines that the estimated construction contract price set forth in this contract is so low that award of a construction contract not in excess of such estimate is improbable, authorize a change in scope or materials as required to reduce the estimated construction cost to an amount within the estimated construction contract price set forth in paragraph(c) of this clause, or the Government may adjust such estimated construction contract price. When bids or proposals are not solicited or are unreasonably delayed, the Government shall prepare an estimate of constructing the design submitted and such estimate shall be used in lieu of bids or proposals to determine compliance with the funding limitation.

(c) The estimated construction contract price for the project described in this contract is $TBD.

(End of clause)

52.252-4 Alterations in Contract (Apr 1984)

ALTERATIONS IN CONTRACT (APR 1984)

Portions of this contract are altered as follows:

N/A

(End of clause)

52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Sep 2016) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010) 52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (July 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (July 2016) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2014) 52.210-1 Market Research (Apr 2011) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (Aug 2011) 52.215-12 Subcontractor Certified Cost or Pricing Data (Oct 2010) 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications (Oct 2010) 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pension (July 2005) 52.215-19 Notification of Ownership Changes (Oct 1997) 52.215-21 Alternate I Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Oct 2010) 52.215-23 Limitations on Pass-Through Charges (Oct 2009) 52.216-1 Type of Contract (Apr 1984) 52.216-7 Allowable Cost and Payment (Aug 2018) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2015) 52.222-29 Notification of Visa Denial (Apr 2015) 52.222-50 Combating Trafficking in Persons (May 2015) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.225-14 Inconsistency between English Version and Translation of Contract (Feb 2000) 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (Mar 2008) 52.228-2 Additional Bond Security (Oct 1997) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-16 Performance and Payment Bonds-Other Than Construction (Nov 2006) 52.229-6 Taxes-Foreign Fixed-Price Contracts (Feb 2013) 52.230-2 Cost Accounting Standards (Oct 2015) 52.230-3 Disclosure and Consistency of Cost Accounting Practices (Oct 2015) 52.230-4 Disclosure and Consistency of Cost Accounting Practices-Foreign Concerns (Oct 2015) 52.230-6 Administration of Cost Accounting Standards (June 2010) 52.232-7 Payments under Time-and-Materials and Labor-Hour Contracts (Aug 2012) 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts (Apr 2010) 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (June 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-23 Responsibility of the Architect-Engineer Contractor (Apr 1984) 52.236-24 Work Oversight in Architect-Engineer Contracts (Apr 1984) 52.236-25 Requirements for Registration of Designers (June 2003) 52.242-4 Certification of Final Indirect Costs (Jan 1997) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension of Work (Apr 1984) 52.242-15 Stop-Work Order (Aug 1984) 52.242-17 Government Delay of Work (Aug 1984) 52.243-1 Changes-Fixed-Price (Aug 1987) 52.243-3 Changes-Time-and-Materials or Labor-Hours (Sept 2000) 52.244-2 Subcontracts (Oct 2010) 52.244-4 Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (Aug 1998) 52.244-6 Subcontracts for Commercial Items (Oct 2018) 52.246-6 Inspection-Time-and-Material and Labor-Hour (May 2001) 52.248-2 Value Engineering-Architect-Engineer (Mar 1990) 52.249-7 Termination (Fixed-Price Architect-Engineer) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)

MCC 52.201-70 Contracting Officer’s Representative (COR) and/or Project Monitor (PM) (July 2012)

(a) The Contracting Officer may designate a Government representative to act as the Contracting Officer's Representative (COR) or Project Monitor (PM) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the COR and/or PM and the Contractor. The designation letters will set forth the authorities and limitations of the COR and/or PM under the contract.

(b) Modifications to this contract are effective only if reduced to writing and executed by the Contracting Officer. The Contractor is specifically prohibited from performing any work that is outside the scope of this contract without the approval of the Contracting Officer. The Contracting Officer cannot authorize the COR or any other representative to sign documents (e.g. contracts, contract modifications, etc.) that require the signature of the Contracting Officer.

(End of clause)

MCC 52.203-70 Contractor Non-Disclosure Agreement (July 2012)

All contractor employees or independent contractors engaged in this contract shall provide a non-disclosure agreement as follows signed by the individual contractor/consultant and, if a contractor employee, by the contractor’s contract administrator:

NON-DISCLOSURE AGREEMENT

I, _[contractor employee’s name]_, do solemnly swear (or affirm) that I will not divulge any information, whether obtained orally or in writing from, or data maintained by the Millennium Challenge Corporation (MCC) to any unauthorized person for any purpose. I will not directly or indirectly use, or allow the use of Confidential Information for any other purpose other than that directly associated with my officially assigned duties for MCC.

Further, I will not directly or indirectly reveal or cause to be revealed the nature or content of any [Confidential Information], except to authorized personnel.

I am aware that the unauthorized use of information may be a violation of law and this Agreement.

Company or Subcontractor

Understand that authorized persons refer only to persons assigned to a project requiring access to Confidential Information or directly in the line of management over the project requiring access to the data.

Signatory

_____________________________________________
Contract AdministratorDate

(End of clause)

MCC 52.209-70 Organizational Conflicts of Interest: Preclusion from Implementation Contract (July 2012)

Work under this contract may call for the Contractor to furnish important services in support of the design or feasibility of specific activities that may become part of a Millennium Challenge Corporation (MCC) Compact. In accordance with the principles of FAR subpart 9.5, THE CONTRACTOR MAY BE INELIGIBLE TO FURNISH, AS A PRIME OR SUBCONTRACTOR OR OTHERWISE; THE IMPLEMENTATION SERVICES FOR ANY ACTIVITIES FOR WHICH IT PROVIDES SUBSTANTIAL DESIGN SERVICES EXCEPT FOR SUCH SERVICES THAT MAY BE FURNISHED UNDER THIS CONTRACT. If a determination is made that the contractor is ineligible for implementation services, the MCC Managing Director of Contracts and Grants Management may authorize a waiver (in accordance with FAR 9.503) if the Director determines that preclusion of the Contractor from the implementation contract would not be in the Government’s best interest.

(End of clause)

MCC 52.232-70 Invoice Instructions (May 2017)

Invoices shall be paid in accordance with the Prompt Payment Act, thirty days (30) following receipt of a proper invoice. The Contractor shall submit each invoice electronically via email or fax to the following:

Fax: 303.969.5151/7281 ATTN: MCC Payments, Email: MCC_Accounting_IBCDenver@ibc.doi.gov, or

As an alternative to electronic submission of invoices, one copy of each invoice may be submitted to the following address:

Interior Business Center M/S D-2773 7301 West Mansfield Avenue Lakewood, CO 80235-2230

If it is determined that the amount billed is incorrect, the invoice may be revised by the Government, or the contractor may be required to submit a revised invoice.

To constitute a proper invoice, each invoice must include the following information and/or attached documentation:

1. Name, address, and telephone of the Contractor,

2. Date of invoice and invoice number,

3. Contract number (including task order or call number and contract line item(s)) also modification number, if applicable,

4. Description (quantity, unit of measure, unit price, and extended price) of the supplies/services rendered (including hours incurred and billing rate, as applicable to the contract),

5. A schedule depicting the following information:

Amount Invoiced This Period

Cumulative Amount Invoiced
Authorized Value of Contract
Balance Remaining on Contract

If the contractor is billing for costs incurred over more than a single month, the costs for each month in which the costs were incurred and shall be segregated into the month they were actually incurred.

6. Name of Contracting Officer’s Representative (COR), and

7. Signature of authorized representative of the firm with the following invoice certification:

“The undersigned hereby certifies to the best of my knowledge and belief that: the sum claimed under this contract is proper and due, and all the costs of contract performance have been paid, or to the extent allowed under the applicable payment clause, will be paid by the Contractor when due in the ordinary course of business; the work reflected by these costs has been performed, and amounts involved are consistent with the requirements of this Contract.

BY: _____________________________________________
TITLE: ___________________________________________
DATE: ___________________________________________

Inquiries regarding the status of invoices may be directed to NBC Accounting. The email address is: MCC_Accounting_IBCDenver@ibc.doi.gov.

(End of clause) MCC 52.232-72 Limitation of Funds—Incrementally Funded Contracts (Nov 2006)

a. Of the total price in Section B (or the “Prices” section), only the amount stated on the contract award document or subsequent modifications is now available for payment and obligated under this contract. It is anticipated that from time to time, additional funds will be obligated under the contract until the total price of the contract is obligated.

b. The Government is not obligated to pay or reimburse the contractor more than the amount obligated pursuant to this clause. The contractor agrees to perform the contract up to the point at which the total amount paid and payable by the Government (including amounts payable for subcontracts and settlement costs if this contract is terminated for convenience) approximates but does not exceed the total amount obligated.

c. (1) If the contractor considers the funds obligated under this contract to be insufficient to cover the work to be performed until the date specified in Section B, or another date agreed to by the parties, the contractor shall notify the contracting officer in writing and indicate the date on which it expects expended funds to approximate 75 percent of the total amount obligated. The notice shall state the estimated amount of additional funds required to continue performance through the date for which incremental funds is provided.

(2) If, after notification is provided pursuant to paragraph (c)(1) of this clause, additional funds are not obligated, or an earlier date than the date in Section B of this clause is not agreed to, the contractor shall not be obligated to continue performance under this contract (including actions under the termination clause of this contract) beyond the funds obligated for contract performance.

d. When additional funds are obligated from time to time for continued performance of this contract, the contract shall be modified to increase the funds obligated and to indicate the period of performance for which funds are applicable. The contractor may notify the contracting officer as provided in paragraph (c)(1) of this clause regarding any additional funds obligated.

e. This clause shall become inoperative upon obligation of funds sufficient to cover the full price stated in the contract, except for rights and obligations then existing under this clause.

f. Nothing in this clause shall affect the Government’s right to terminate the contract for convenience or default.

(End of clause)

MCC 52.232-73 Travel Reimbursement (May 2017)

Policy. When authorized as part of the Scope of Work on this contract/order and within the contract/order ceiling and as approved by the Contracting Officer’s Representative (COR) and/or other MCC officials as described below, travel expenses incurred in performance of technical directives issued under this contractor/order may be reimbursed as allowed by the Federal Travel Regulations (FTR) in effect at the time of travel. MCC’s supplemental policy interpretations are derived from the FTR and cannot grant additional benefits or adjust processes defined in the FTR. Supplemental policies of MCC set forth below:

a. Traveler Responsibilities. All contractor travelers must:

1. Exercise the same care in incurring expenses that a prudent person would exercise if traveling on personal business;

2. Travel in accordance with the FTR and the MCC policies included in this document; and

3. Pay any charges or fees associated with non-compliance of FTR or any MCC policies included in this document, and any expenses incurred for personal convenience. For example, the traveler may become personally responsible for travel costs associated with unauthorized use of other than coach class accommodations, failing to follow the Fly American Act requirements, exceeding per diem rates, changing departure or return flights, purchasing unapproved items, etc. regardless of the fact that travel arrangements may have been booked by others (e.g., Travel Agency).

b. Cabin Class Standards

1. The standard cabin class for contractor air-travel is coach class, regardless of destination or travel time.

2. Coach “premium” class may be authorized for destinations which have a travel time of more than 14 hours, consistent with the Federal Travel Regulations and the approval standards outlined in paragraph (f) of this document.

3. Business class travel accommodations will NOT be authorized except as determined through the approval process outlined in paragraph (f) of this document. This approval process is considered to be exceptional, to be part of a trip by trip analysis, and at the discretion of the government regardless of the destination or travel time.

c. Airlines and Flights. In accordance with the Fly America Act, contractors must use a U.S. flag air carrier service for all travel funded by the government beginning or ending in the U.S. unless a specific exemption to the “Fly America” rule applies. Flights on U.S. air carrier pairings with foreign carriers (i.e., code share flights) are regarded as meeting Fly America requirements if the ticket is issued on the American carrier and there is an American carrier flight number.

d. Limitations. Travel reimbursement, which is part of ODC, shall not exceed the authorized ODC amount on the contract. To be reimbursable, the travel expenses must be:

1. Allowable under the FTR and the provisions of this contract/order and associated technical directives;

2. Approved prior to travel expenditure by the COR; and

3. Allocable and necessary for performance of this contract/order and associated technical directives.

e. Reimbursement Requests. Travel reimbursement requests must be submitted in sufficient time for the COR to give prior approval, and must identify:

1. The name of the traveler,

2. Destination (s) including itinerary,

3. Purpose of the travel, and

4. Cost breakdown.

To be reimbursed, invoices including travel expenses must provide a detailed breakdown of the actual expenditures invoiced. Contractor shall maintain the original or legible copy of receipts for all travel expenses invoiced when the expenditure is $75.00 or more. MCC reserves the right to request evidence of any travel expense paid.

f. Approvals. All travel expenses, including rental cars, must be approved by the MCC COR in writing in advance of booking any travel and incurring travel expenses. The following expense types require additional MCC pre-approvals beyond that of the COR. These additional approvals and associated justifications will be documented in writing:

1. Business class Business class travel is considered to be exceptional, to be determined as part of a trip by trip analysis, and at the discretion of the government regardless of the destination or travel time. To reflect the exceptional nature of this approval, the justification for use of business class must be prepared by the COR and approved in writing by the relevant Managing Director or Deputy Vice President of the organization requesting the contractor to travel. The single exception to requiring this justification and approval for every trip in question is when a State Department approved medical accommodation has been granted. In this case, the approval of the COR and the Contracting Officer only is required after verifying that the medical accommodation is effective for the trip in question and that sufficient funds are available. All justifications must verify that the contractor is required to report for duty the following day or sooner, that the travel time for the trip is at least 14 hours, and that a rest stop will not be taken en route. For audit purposes, all justifications and approvals to this effect must be retained by the COR and the contractor until contract closeout at which point all documentation must be provided to the Contracting Officer for incorporation in the contract file. Below are possible justifications supporting these exceptional requests:

A. Medical accommodation. MCC has engaged the services of the U.S. Department of Health & Human Services (HHS), Federal Occupational Health Service (FOH), and Medical Employability Program (MEP) for medical accommodations due to disability adjudication. Requests for, and HHS determinations on, medical accommodations for business class travel will be confidential, with only MCC’s Travel Office receiving copies of the request and the MED/DP determination. Contractor travelers requesting medical accommodations based upon disability must complete the steps below. Forms are available from the MCC COR and/or PM.

a. Contractor traveler completes the Medical Employability Case Transmittal Form, A127523-S192701-W190333. Form can be faxed to (301) 492-4783 or e-mailed to medical.employability@foh.hhs.gov with a copy to the MCC Travel Office at mccmedical@mcc.gov.

b. Contractor traveler forwards Physician a copy of the Medical Accommodation Physician’s form, which the physician completes, dates, and signs. Once signed, the traveler OR their physician e–mails a scanned .pdf attachment to HHS at medical.employability@foh.hhs.gov. Alternatively, it can be faxed Attn: Medical Employability Program (301) 492-4783.

c. Once both forms have been completed and sent, HHS makes a medical determination based on the information provided by the traveler and the traveler’s physician on the HHS/FOH/EMP forms. FOH will send a letter to the POC listed on the transmittal form with recommendations. MCC will not approve any business class accommodations beyond normal MCC guidelines unless the traveler has completed the medical accommodation paperwork and received a positive response from FOH/MEP.

d. Contractor must note that the process can take several weeks and will depend on how quickly HHS/FOH/MED receives the information (including communication with treating physicians).

B. Sanitation/Health. Coach accommodations on an authorized/approved foreign air carrier do not provide adequate sanitation or health standards.

C. Savings. Flying in non-coach status would involve significant cost savings to MCC when compared to the lowest price non-refundable or restricted coach class fare.

D. Availability. No space is available in coach-class accommodations in time to accomplish the mission, which is urgent and cannot be postponed. (Note: This justification should not be used based on the lack of advanced planning by the contractor or the COR).

E. Security. Exceptional security circumstances require other than coach-class airline accommodations.

F. Mission critical agency requirement. Circumstances in which a critical agency priority or project will incur delay or degradation without the intervention of a contractor and that intervention urgently requires other than coach class ticketing.

2. Coach “premium” class must be approved by the COR, subject to the availability of funds on the contract/order, and:

A. The origin and/or destination are OCONUS;

B. The scheduled flight time including non-overnight stopovers and change of planes, is in excess of 14 hours. Scheduled flight time is the flight time between the originating departure point and the ultimate arrival point including scheduled non-overnight time spent at airports during plane changes. Scheduled non-overnight time does not include time spent at the originating or ultimate arrival airports;

C. The contractor is required to report to duty the following day or sooner; and D. The contractor does not take a rest stop en route or a rest period upon arrival at the duty site.

3. Rest stops must be approved by the COR and cannot exceed 24 hours.

Note: Travelers may upgrade flight accommodations at their own expense or through the use of frequent flyer miles if the coach airfare is upgradeable at no extra cost to MCC.

(End of clause)

MCC 52.232-74 ODC Reimbursement (Jan 2007)

Other Direct Charges (ODCs) will be reimbursed for direct costs as provided in the contract and/or task order. To be reimbursed, invoices including ODCs, must provide a detailed breakdown of the actual expenditures invoiced. The contractor shall maintain the original or legible copy of receipts for all ODCs invoiced. MCC reserves the right to request evidence of any ODC reimbursed. To assure timely reimbursement of ODC’s, the contractor is strongly encouraged to submit charges within 45 days of the expense.

(End of clause)

MCC 52.242-70 Contractor Performance Assessment Rating System (CPARS) Registration (Aug 2011)

The Millennium Challenge Corporation (MCC) utilizes the Contractor Performance Assessment Rating System (CPARS) to evaluate contractor performance (see FAR, Subparts 42.1502 and 42.1503). Contractors doing business with MCC are required to register in CPARS accessible via the Internet at: http://www.cpars.csd.disa.mil/cparsmain.htm. An evaluation of contractor performance using the CPARS is mandatory for all contract actions exceeding $150,000, but may be conducted for contract actions lower than that amount should significant events occur such as a contract termination or extraordinary contract performance by the contractor. Inquiries regarding the registration process should be addressed to the CPARS help desk. The email address is WEBPTSMH@NAVY.MIL and the telephone number is (207) 438-1690.

(End of clause)

MCC 52.243-70 Increase in Services (Oct 2006)

The services described in Sections B and C (statement of work) represent the Government’s best estimate for known requirements at this time. However, due to the uncertainty of the work, the Government reserves the right to add or delete services if the need arises.

(End of clause)

MCC 52.245-70 Contractor Acquired MCC Government Property Overseas (July 2012)

Property and equipment (hereafter stated “property”) that MCC Contractors (other than Personnel Service Contractors) acquire and for which they receive MCC reimbursement through the invoice process is Government (MCC) owned property. Government property is to be used, monitored, and inventoried in accordance with FAR Part 45, Subpart 45.5 Management of Government Property in the Possession of Contractors, as well as MCC Policy 350, “Policies and procedures on Property, Plant, and Equipment.” The contractor should start a running property inventory as soon as it begins to procure property and equipment the cost of which is charged back to the Government. The Contractor shall furnish a copy of such inventory to the COR semi-annually or at least as the contract is in its final stages of completion if its duration does not exceed six months. Mandatory fields on the inventory include: The Contractor’s Name; the Contractor Number; the Country Location and address location; a description of the item with model number serial number, and manufacturer; the acquisition date and cost; the Quantity; the expected life; and its condition at the time of the report. The contractor is responsible for removing US Government identification from property that is to be abandoned.

(End of clause)

[End of document]