19E0001 Synopsis Attachment c. Revised LoEs by Deliverable 20181224
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Est. LoEs
| Millennium Challenge Corporation |
| 95332419E0001 |
| Transportation and Vertical Structure (TVS) Abidjan Transport Project (ATP) A-E Service in Côte d’Ivoire |
| Levels-of-Effort (LoEs) by Deliverables |
Instructions:
Fill only the Total Estimated LoE Percentage for each deliverable below (cells highlighted in green). The Total Estimated LoE Percentage shall include both direct (technical) and indirect (administrative) LoEs. The sum of all percentages (cell B28) must equal 100%. MCC will not penalize reasonable rounding errors.
MCC will use this document to evaluate the firm's appropriate understanding of the Government's requirements and and the realistic expectations by the firm.
| Base Period: Estimated Total Level of Effort (LoE) for Each Deliverable | |
| Deliverable | Total Estimated Percentage |
| 1: Pre-Kickoff Meeting Summary Report | |
| 2: Inception Report | |
| 3: Training Course Outline and Training Report | |
| 4: Data Collection and Modelling Tool Justification Report | |
| 5: Traffic Demand and Simulation Model | |
| 6: Technical Training Curriculum Report | |
| 7: Port Congestion Study | |
| 8. Conceptual Designs |
| Option Period 1: Estimated Total Level of Effort (LoE) for Each Deliverable | |
| Deliverable | Total Estimated Percentage |
| 9. Preliminary Design Report | |
| 10: Final Designs and Tender Documents | |
| 11. Final RAP / RLP and Final ESIA | |
| 12. Final Course Training Report | |
| 13. Final Traffic Management Model | |
| 14. Abidjan Road and Safety Prioritization Design |
| Total (Must add to 100%) | 0% |
| There is no estimated LoE for Option Period 2. |