19E0001_Synopsis_Attachment_c._Revised_LoEs_by_Deliverable_20181224.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
DCO TVS Abidjan Transport Project (ATP) A-E Service Federal contract opportunity
Solicitation number
95332419E0001
Issued by
Millennium Challenge Corporation

About this file

19E0001 Synopsis Attachment c. Revised LoEs by Deliverable 20181224

View the file

Other files for this federal contract opportunity

Other files attached to DCO TVS Abidjan Transport Project (ATP) A-E Service, newest first.
File Type Posted
19E0001_Synopsis_Amendment_5_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20190131).docx DOCX document
19E0001_Synopsis_Amend_5.pdf PDF
19E0001_Synopsis_Amendment_5_Attachment_a.1._Official_Terms_of_Reference_20190131.docx DOCX document
19E0001_Synopsis_Amendment_4_Attachment_a.1._Official_Terms_of_Reference_20190102.docx DOCX document
19E0001_Synopsis_Amendment_4.pdf PDF
19E0001_Synopsis_Amendment_3_20181227.pdf PDF
19E0001_Synopsis_Amendment_3_Attachment_a.1._Official_Terms_of_Reference_(ToR)_20181227.docx DOCX document
19E0001_Synopsis_Attachment_e.1.4._SF330_Section_G_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.3._SF330_Section_F_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.2._SF330_Part_II_2018119.pdf PDF
19E0001_Synopsis_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20181224_.docx DOCX document
19E0001_Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.5._SF330_Section_H_2018119.pdf PDF
19E0001_Synopsis_Amendment_2_20181224.pdf PDF
19E0001_Synopsis_Conference_Presentation_20181224.pptx PPTX presentation
19E0001_Synopsis_Attachment_e.1._SF330_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.2._SF330_Section_E_2018119.pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1._SF330_Part_I).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.5._SF330_Section_H).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.4._SF330_Section_G).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.2._SF330_Section_E).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_d._Commitment_Letter_Template).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_b._Provisions_and_Clauses).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.2._SF330_Part_II).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.3._SF330_Section_F).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_c._LoEs_by_Deliverable).xlsx XLSX spreadsheet
DCO_TVS_CIV_Engineering_Services_(Synopsis).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Est. LoEs

Millennium Challenge Corporation
95332419E0001
Transportation and Vertical Structure (TVS) Abidjan Transport Project (ATP) A-E Service in Côte d’Ivoire
Levels-of-Effort (LoEs) by Deliverables

Instructions:

Fill only the Total Estimated LoE Percentage for each deliverable below (cells highlighted in green). The Total Estimated LoE Percentage shall include both direct (technical) and indirect (administrative) LoEs. The sum of all percentages (cell B28) must equal 100%. MCC will not penalize reasonable rounding errors.

MCC will use this document to evaluate the firm's appropriate understanding of the Government's requirements and and the realistic expectations by the firm.

Base Period: Estimated Total Level of Effort (LoE) for Each Deliverable
DeliverableTotal Estimated Percentage
1: Pre-Kickoff Meeting Summary Report
2: Inception Report
3: Training Course Outline and Training Report
4: Data Collection and Modelling Tool Justification Report
5: Traffic Demand and Simulation Model
6: Technical Training Curriculum Report
7: Port Congestion Study
8. Conceptual Designs
Option Period 1: Estimated Total Level of Effort (LoE) for Each Deliverable
DeliverableTotal Estimated Percentage
9. Preliminary Design Report
10: Final Designs and Tender Documents
11. Final RAP / RLP and Final ESIA
12. Final Course Training Report
13. Final Traffic Management Model
14. Abidjan Road and Safety Prioritization Design
Total (Must add to 100%)0%
There is no estimated LoE for Option Period 2.

File details come from the government source that posted it.