DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_c._LoEs_by_Deliverable).xlsx

XLSX spreadsheet 13 KB Posted

Attached to
DCO TVS Abidjan Transport Project (ATP) A-E Service Federal contract opportunity
Solicitation number
95332419E0001
Issued by
Millennium Challenge Corporation

About this file

Synopsis Attachment c. Levels-of-Effort by Deliverable (Required)

View the file

Other files for this federal contract opportunity

Other files attached to DCO TVS Abidjan Transport Project (ATP) A-E Service, newest first.
File Type Posted
19E0001_Synopsis_Amendment_5_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20190131).docx DOCX document
19E0001_Synopsis_Amend_5.pdf PDF
19E0001_Synopsis_Amendment_5_Attachment_a.1._Official_Terms_of_Reference_20190131.docx DOCX document
19E0001_Synopsis_Amendment_4_Attachment_a.1._Official_Terms_of_Reference_20190102.docx DOCX document
19E0001_Synopsis_Amendment_4.pdf PDF
19E0001_Synopsis_Amendment_3_Attachment_a.1._Official_Terms_of_Reference_(ToR)_20181227.docx DOCX document
19E0001_Synopsis_Amendment_3_20181227.pdf PDF
19E0001_Synopsis_Attachment_a.2._Unofficial_Terms_of_Reference_in_French_20181224_.docx DOCX document
19E0001_Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.5._SF330_Section_H_2018119.pdf PDF
19E0001_Synopsis_Amendment_2_20181224.pdf PDF
19E0001_Synopsis_Attachment_e.2._SF330_Part_II_2018119.pdf PDF
19E0001_Synopsis_Attachment_c._Revised_LoEs_by_Deliverable_20181224.xlsx XLSX spreadsheet
19E0001_Synopsis_Attachment_e.1.4._SF330_Section_G_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.3._SF330_Section_F_2018119.pdf PDF
19E0001_Synopsis_Conference_Presentation_20181224.pptx PPTX presentation
19E0001_Synopsis_Attachment_e.1._SF330_2018119.pdf PDF
19E0001_Synopsis_Attachment_e.1.2._SF330_Section_E_2018119.pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.2._SF330_Section_E).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.1._SF330_Sections_A_B_C_and_D).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_a._Terms_of_Reference).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_d._Commitment_Letter_Template).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.5._SF330_Section_H).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.4._SF330_Section_G).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1._SF330_Part_I).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_b._Provisions_and_Clauses).docx DOCX document
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.2._SF330_Part_II).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis_Attachment_e.1.3._SF330_Section_F).pdf PDF
DCO_TVS_CIV_Engineering_Services_(Synopsis).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Est. LoEs

Millennium Challenge Corporation
95332419E0001
Transportation and Vertical Structure (TVS) Abidjan Transport Project (ATP) A-E Service in Côte d’Ivoire
Levels-of-Effort (LoEs) by Deliverables

Instructions:

Fill the Total Number of Hours estimated for each deliverable below. Add any notes as desired.

MCC will use this document to evaluate the firm's appropriate understanding of the Government's requirements and and the realistic expectations by the firm.

Base Period: Estimated Total Level of Effort (LoE) for Each Deliverable
DeliverableTotal Number of HoursNotes
1: Pre-Kickoff Meeting Summary Report
2: Inception Report
3: Training Course Outline and Training Report
4: Data Collection and Modelling Tool Justification Report
5: Traffic Demand and Simulation Model
6: Technical Training Curriculum Report
7: Port Congestion Study
8. Conceptual Designs

Total LoE for Base Period 0

Option Period 1: Estimated Total Level of Effort (LoE) for Each Deliverable
DeliverableTotal Number of HoursNotes
9. Preliminary Design Report
10: Final Designs and Tender Documents
11. Final RAP / RLP and Final ESIA
12. Final Course Training Report
13. Final Traffic Management Model
14. Abidjan Road and Safety Prioritization Design
Total LoE for Option Period 10
There is no estimated LoE for Option Period 2.

File details come from the government source that posted it.