DB for Major Maintenance & Repair of Building #3 at USCG Base Elizabeth City Elizabeth City, NC (NMACC III Pool 1)
Closed Solicitation Posted
- Solicitation number
- 70Z05024R43000004
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Elizabeth City, North Carolina, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The U.S. Coast Guard is seeking Design-Build services to perform major renovations on Building #3, the Rescue Swimmer Training Facility (RSTF), at the USCG Base in Elizabeth City, North Carolina. The project involves demolishing and removing the existing rescue swimmer pool and pool room, protecting certain walls, constructing a new corridor and exterior walls, reconstituting the building envelope, and restoring all remaining facility functions and systems. The contractor must obtain the services of an Architecture/Engineering firm licensed in North Carolina to provide the design, which must conform to applicable regulations, codes, and requirements. The Coast Guard will accept the 65% design before the contractor proceeds with construction. The proposal is due by July 23, 2024.
Paragraph 2:
This contract opportunity is only available to the successful offerors under the NMACC III Pool 1 contract vehicle. There is no set-aside designation. The anticipated contract value is approximately $13,000,000, and the period of performance is 530 calendar days. The place of performance is the U.S. Coast Guard Base in Elizabeth City, North Carolina.
Notice text
************THIS OPPORTUNITY IS AVAILABLE TO THE SUCCESSFUL NMACC III POOL 1 OFFERORS ONLY.************
Design-Build services to perform major renovations of Building #3, the Rescue Swimmer Training Facility (RSTF), at CG Base Elizabeth City in Elizabeth City, NC. The Contractor shall obtain the services of an Architecture/Engineering firm licensed in the State of North Carolina to provide design services for the project. The design shall be in conformance with applicable regulations, codes, and regulatory requirements. Upon Coast Guard acceptance of the Contractor’s 65% design, the Contractor shall construct the accepted design solution. The intent of the project is to demolish and remove the Rescue Swimmer Pool and Pool Room, protect the West, North and East pre-cast walls, and features to remain, construct a new corridor and exterior walls along the perimeter of the former pool area, fully reconstitute the building envelope, and restore all remaining facility functions and systems.
************THIS OPPORTUNITY IS AVAILABLE TO THE SUCCESSFUL NMACC III POOL 1 OFFERORS ONLY.************
Files
Show all 35
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Major maintenance and repair UPH building 127 U.S. Coast guard base SAN juan, PR | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity