This document is an amendment to a federal solicitation. The amendment provides responses to pre-proposal inquiries related to the demolition and renovation of Building #3, the Rescue Swimmer Training Facility, at the U.S. Coast Guard Base in Elizabeth City, North Carolina. Key details include:
The amendment confirms that contractors should include precautions for de-tensioning existing tie-back anchors prior to demolition. It also provides guidance on the treatment of under-slab dewatering piping, stating that piping below the main pool slab may be abandoned in place, while piping around the perimeter must be removed unless infeasible. The Coast Guard does not have information on the original support of excavation system used during construction. The proposal due date is not extended. Offerors are required to acknowledge receipt of this amendment.
The related federal contract opportunity is a solicitation for design-build services to perform major renovations on Building #3 at the U.S. Coast Guard Base in Elizabeth City, North Carolina. This opportunity is available only to the successful offerors under the NMACC III Pool 1 contract.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
70Z05024R43000004; DB FOR MAJOR M&R OF BLDG #3 AT USCG BASE ELIZABETH CITY, NC
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries.
USCG FDCC SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
70Z05024R43000004
1 2
07/19/2024
06/06/2024
70Z05024R43000004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Enclosed Document(s): N/A
SUMMARY OF CHANGES
A. ANSWERS TO OFFEROR QUESTIONS:
PPI 139
Amendment 0004 Remediation drawings indicate installed location of tie-back anchors along with tensile capacities. Please confirm tie-back anchors are pre-tensioned and that Contractor should include precautions for de-tensioning tie-back anchors prior to demolition.
Answer: USCG cannot physically confirm what is shown on the Remediation drawings. The Contractor shall include precautions for de-tensioning existing anchors prior to demolition.
PPI 140
Amendment 0004 Remediation drawings indicate under-slab dewatering piping is present below the existing pool slab. Please confirm if the existing under-slab piping must be removed during demolition or abandoned in place.
Answer: Piping located below the main pool slab (at elevation -5.00 and below) may be abandoned in place. Piping around the perimeter of the pool, at higher elevation shall be removed unless found to be unfeasible.
PPI 141
Please provide information on the Support of Excavation system used in the original construction so that Contractor may understand the system used and approximate location of components in place to allow for planning demolition and new construction.
Answer: The USCG does not have this information.
All other terms and conditions remain unchanged. The Proposal due date IS NOT EXTENDED.
Offerors are reminded to acknowledge receipt of this amendment in response to the subject TOA.