D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N6274225R6506
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Chiang Mai Thailand

Notice details come from SAM.gov. Updated .

About this opportunity

The Naval Facilities Engineering Command is soliciting proposals for a design-build construction project to construct a single-story AT-6 Warehouse at Wing 41, Royal Thai Air Force base in Chiang Mai, Thailand. The project includes a base bid for constructing an approximately 972 square meter (54m x 18m) column-free warehouse facility and an optional contract line item for adding enclosed walls with a roller shutter door. Contractors must demonstrate relevant design-build experience, provide past performance information, and comply with technical, safety, and quality control requirements including host nation compliance and registration in the System for Award Management (SAM). The procurement uses a Lowest Price Technically Acceptable (LPTA) evaluation method, requiring separate technical and price proposals. A mandatory pre-proposal site visit was scheduled for July 2, 2025, at 9:30 AM local time, with the proposal submission deadline extended via Amendment 0001 to July 30, 2025, at 11:00 AM Thailand time.

This solicitation does not include any set-aside designations and is open to all qualified contractors meeting the small business size standard of $45 million in annual revenue. The estimated contract value ranges between $250,000 and $500,000, with the small business size standard indicating this is not restricted to small businesses. The contract includes a 600-calendar day performance period for completion of each contract line item, with work hours specified as 0800-1600 daily. The project will be performed at Wing 41, Royal Thai Air Force base in Chiang Mai, Thailand, requiring the contractor to handle complete design and construction services including site investigations, permit acquisition, and coordination with local authorities. Key project specifications include tree removal, electrical work, drainage connections, equipment relocation, and installation of a portable manual crane with 2,000 lbs load capacity.

Notice text

2 versions

Update #2 · Latest ·

Attached amendment 0001 to incorporate PPIs and Answers and to change the proposal due date to 30 July 2025 at no later than 11:00 am. Thailand time.

*******************************************************************

Completed RFP is attached.

******************************************************************

Solicitation N6274225R6506 D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand is hereby posted, in related to Sources Sought N6274225R6506.

Enclosure 1. Proposal Inquiry form and Enclosure 4. Blank Bill of Quantity (BOQ) are provided in both pdf. and excel. formats, for your use. 

Pre-Solicitation Site Visit (PPSV) is scheduled on:

  • 2 July 2025, at 09:30 a.m. local time, meeting at PTT GAS STATION 10 3 Tambon Su Thep, Mueang Chiang Mai District, Chiang Mai 50200 (18.7720020, 98.9722054).

Contractors did not submitted the base access request, in reference to Sources Sought N6274225R6503, will not be allowed to attend the site visit.

The date for submission of proposal is July 21, 2025, no later than 11:00 a.m. Thailand time.

Update #1 ·

Solicitation N6274225R6506 D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand is hereby posted, in related to Sources Sought N6274225R6506.

Enclosure 1. Proposal Inquiry form and Enclosure 4. Blank Bill of Quantity (BOQ) are provided in both pdf. and excel. formats, for your use. 

Pre-Solicitation Site Visit (PPSV) is scheduled on:

  • 2 July 2025, at 09:30 a.m. local time, meeting at PTT GAS STATION 10 3 Tambon Su Thep, Mueang Chiang Mai District, Chiang Mai 50200 (18.7720020, 98.9722054).

Contractors did not submitted the base access request, in reference to Sources Sought N6274225R6503, will not be allowed to attend the site visit.

The date for submission of proposal is July 21, 2025, no later than 11:00 a.m. Thailand time.

Files

Notice history

Notice Type Posted
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand Award Award Notice
This notice Latest solicitation Solicitation
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand Original Pre-Solicitation