Enclosure 4._BOQ_25R6506.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai, Thailand
Solicitation number
N6274225R6506
Issued by

About this file

The document is a Bill of Quantity (BOQ) cost estimate for a Design-Build construction project for an AT-6 Warehouse at Wing 41 in Chiang Mai, Thailand, under solicitation N6274225R6506 by the Department of the Navy Naval Facilities Engineering Command. The BOQ includes two Contract Line Item Numbers (CLINs): CLIN 0001 for the base bid to construct a single-story warehouse, and CLIN 0002 as an optional item to construct an enclosed wall for the warehouse.

The detailed cost estimate breaks down expenses across multiple categories including foundation, superstructure, roofing, interior finishes, plumbing, electrical, site preparation, and field requirements. Key project details include a pre-solicitation site visit scheduled for July 2, 2025, at a PTT Gas Station in Chiang Mai, and a proposal submission deadline of July 21, 2025, at 11:00 a.m. local time. The estimate covers various construction components such as excavation, concrete work, steel structures, electrical systems, lighting, drainage, and professional services, with line items for materials, labor, and engineering costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

COST ESTIMATEDATE PREPARED:
ACTIVITY AND LOCATION:CONTRACT NUMBER:
Wing 41, Chiang Mai, ThailandN6274225R6506
PROJECT TITLE:ESTIMATED BY:
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai,Thailand
DESCRIPTIONTOTAL

CLIN 0001 BASE BID ITEM: CONSTRUCT A SINGLE-STORY WAREHOUSE

CLIN 0002 OPTIONAL ITEM: CONSTRUCT ENCLOSED WALL FOR THE SINGLE-STORY WAREHOUSE

GRAND TOTAL

CLIN 0001

COST ESTIMATEDATE PREPARED:
ACTIVITY AND LOCATION:CONTRACT NUMBER:
Wing 41, Chiang Mai, ThailandN6274225R6506
PROJECT TITLE:ESTIMATED BY:
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai,Thailand
ITEM DESCRIPTIONQUANTITYMATERIAL COST (USD)LABOR COST (USD)ENGINEERING ESTIMATE (USD)
NUMBERUNITUNIT COSTTOTALUNIT COSTTOTALUNIT COSTTOTAL
CLIN 0001: BASE BID ITEM 0001 – CONSTRUCT AGE FACILITY
A10FOUNDATION
a. Excavation workcu.m
1. Compacted sandcu.m
2. Lean concretecu.m
3. Concretecu.m
4. Reinforcing steelkg
5. Binding wirekg
6. Side formsq.m
b. Backfill and compactioncu.m
c. Remove existing jet blast deflextorea
Other (if any)
Sub-Total A10
B10SUPERSTRUCTURE
B1010Floor Construction
a. First floor and column
1. Compacted sandcu.m
2. Damp proof membranesq.m
3. Concretecu.m
4. Reinforcing steelkg
5. Binding wirekg
6. Falsework and formworkL/S
7. Sructural steel columns and bearing plateskg
8. Mobile craneday
Other (if any)
Sub-Total B1010
B1020 Roof Construction
a. Roof structural frame
1. Steel trusses and purlinsSM
2. Mobile craneday
Other (if any)
Sub-Total B1020
B30 ROOFING
a. Roof covering with flashing and trim associated with the roofsq.m
b. Thermal insulationsq.m
c. Roof gutter and downspoutL/S
Other (if any)
Sub-Total B30
C30 INTERIOR FINISHES
C3020 Floor Finishes
a.Floor hardenersq.m
b. Entrance ramp
1. Compacted sandcu.m
2. Concretecu.m
3. Reinforcing steelkg
4. Binding wirekg
5. FormworkL/S
c. Entrance and exit ramps
1. Compacted sandcu.m
2. Concretecu.m
3. Reinforcing steelkg
4. Binding wirekg
5. FormworkL/S
d. Exterior roadea
Other (if any)
Sub-Total C3020
C3030 Ceiling Finishes
a. Bird protection netsq.m
Sub-Total C3030
D20PLUMBING
D2040 Rainwater Drainage
a. Storm sewer gutter with gratingea
b. Manholes for storm sewerea
Other (if any)
Sub-Total D2040
D50ELECTRICAL
D5010 Electrical Service and Distribution
a. MDBea.
b. Panel boardsL/S
Other (if any)
Sub-Total D5010
D5020 Lighting and Branch Wiring
a. Switches and receptaclesea.
b. Lighting equipment
1. High-bay LED lighting fixtureea.
2. Weatherproof LED lightea.
c. Wiring and conduitea.
Other (if any)
Sub-Total D5020
D5090 Other Electrical Services
a. Lightning protection system
L/S
b. Disconnecting switchesea.
Other (if any)
Sub-Total D5090
F10SPECIAL CONSTRUCTION
F1010 Special Structures
a. Carved project granite plaqueL/S
Sub-Total F1010
G10SITE PREPARATION
a. Topographic surveyL/S
b. Soil investigationL/S
Sub-Total G10
G20SITE IMPROVEMENTS
a. Building name signL/S
b. Dedication plaqueea.
c. Concrete pavementsq.m
Sub-Total G20
G40 ELECTRICAL UTILITIES
G4010Electrical Distribution
a. LV Underground conduits, pull string, and handholesL/S
b. Exterior lightingea.
c. Transformer on pole and overhead HV lineL/S
Other (if any)
Sub-Total G4010
X10 FIELD REQUIREMENTS
a. Obtain all appropriate permits and clearance (if any)L/S
b. Mobilization/Demobilization
1. Fencing and gateL/S
2. Project identification boardL/S
3. Temporary site officeL/S
4. Temporary storageL/S
5. Temporary toiletsL/S
6. Worker accommodationsmonth
c. Professional fees for key personnel
1. Superintendent & QCmonth
2. SSHOmonth
d. Temporary utilitiesmonth
1. Electrical supplymonth
2. Water supplymonth
e. Safety implementationL/S
f. Work platform and scaffoldingL/S
g. Tests and commissioningL/S
h. Transportationmonth
j. Technical trainingL/S
Other (if any)
Sub-Total X10
X20 OFFICE OVERHEAD
a. Design fees for DORea.
b. Home office operations
1. Administrative feesmonth
2. Telecommunicationsmonth
3. Documentation and drawingsL/S
c. Post-award A&E professional servicesmonth
d. Produce and send project rendering to the U.S.L/S
Other (if any)
Sub-Total X20

Sub-Total A10-X20

X30 PROFIT
a. Profit
Sub-Total X30
VATIncluded

TOTAL CLIN 0001

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

CLIN 0002

COST ESTIMATEDATE PREPARED:
ACTIVITY AND LOCATION:CONTRACT NUMBER:
Wing 41, Chiang Mai, ThailandN6274225R6506
PROJECT TITLE:ESTIMATED BY:
D/B Construct AT-6 Warehouse, Wing 41, Chiang Mai,Thailand
ITEM DESCRIPTIONQUANTITYMATERIAL COST (USD)LABOR COST (USD)ENGINEERING ESTIMATE (USD)
NUMBERUNITUNIT COSTTOTALUNIT COSTTOTALUNIT COSTTOTAL
CLIN 0002 OPTIONAL ITEM: CONSTRUCT ENCLOSED WALL FOR THE SINGLE-STORY WAREHOUSE
B20 EXTERIOR ENCLOSURE
B2010 Exterior Walls
a. Construct exterior walls
1.Plastered brick wallssq.m
b. Exterior wall paintingsq.m
c. Metal sheet ventilated louver wallsq.m
c. Bird protectionsq.m
Other (if any)
Sub-Total B2010
B2030 Exterior Doors
a. Electric operated overhead roller shutter doorset
b. Swinging half/narrow lite doorset
c. Exit doorset
Other (if any)
Sub-Total B2030
X10 FIELD REQUIREMENTS
c. Professional fees for key personnel
1. Superintendentmonth
2. QC Managermonth
3. SSHOmonth
d. Temporary utilitiesmonth
1. Electrical supplymonth
2. Water supplymonth
e. Safety implementationL/S
f. Work platform and scaffoldingL/S
g. Tests and commissioningL/S
h. Transportationmonth
l. Technical trainingL/S
Other (if any)
Sub-Total X10
X20 OFFICE OVERHEAD
a. Design fees for DORea.
b. Home office operations
1. Administrative feesmonth
2. Telecommunicationsmonth
3. Documentation and drawingsL/S
c. Post-award A&E professional servicesmonth
Other (if any)
Sub-Total X20

Sub-Total A10-X20

X30 PROFIT
a. Profit
Sub-Total X30
VATIncluded

TOTAL CLIN 0002

File details come from the government source that posted it. Updated .