Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA810623R1000
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The contractor is required to provide a full spectrum of Supply Chain Management (SCM) services for the T-6A/B/D Texan II Aircraft program for the United States Air Force, Navy, and Army. These services include managing supply and demand, sourcing parts, assembly, disposal, warehousing and inventory tracking, order entry and order management, distribution across all channels, and delivery to the customer. The contractor will also be responsible for hiring and maintaining properly trained personnel, providing on-site services during normal flying and maintenance operations, complying with Occupational Safety and Health Administration (OSHA) standards, and complying with environmental, Hazardous Material (HAZMAT) and pollution prevention programs.

List of services to be provided by the contractor:

  1. Supply Chain Management (SCM) services
  2. Sourcing parts
  3. Assembly
  4. Disposal
  5. Warehousing and inventory tracking
  6. Order entry and order management
  7. Distribution across all channels
  8. Delivery to the customer
  9. Hiring and maintaining properly trained personnel
  10. Providing on-site services during normal flying and maintenance operations
  11. Compliance with Occupational Safety and Health Administration (OSHA) standards
  12. Compliance with environmental, Hazardous Material (HAZMAT) and pollution prevention programs.

Notice text

9 versions

Update #9 · Latest ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.
  • 9-21-2023: It is the Government's preference that the most up-to-date version of the PPQ, as documented in Amendment 0002, be used and sent to customers.  However, Offerors are not required to resubmit the PPQs to the customers that have already been provided a previous version of the PPQ. The Government will accept either version of the PPQ.
  • 9-28-2023 The USAF is currently processing RFP Amendment 0003, along with USAF responses to the remaining vendor questions. The USAF does plan to extend the proposal due date; however, a firm date has not been solidified. The USAF releases this update to eliminate any confusion and/or worry that may result from a potential Government shutdown.
  • 10-06-2023: RFP Amendment 0003 posted; Proposal due date extended through 10-20-2023; USG responses to Vendor questions posted (Post-RFP through 9-25-2023); Questions submitted after 9-25-2023 will be released in a subsequent post;  
  • 10-13-2023 USG responses to Vendor questions posted (Post-RFP Amendment 0003 through 10-12-23)
  • 10-17-2023 USG response to Vendor question (Post-RFP Amendment 0003 through 10-12-23)

See attachments. 

Update #8 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.
  • 9-21-2023: It is the Government's preference that the most up-to-date version of the PPQ, as documented in Amendment 0002, be used and sent to customers.  However, Offerors are not required to resubmit the PPQs to the customers that have already been provided a previous version of the PPQ. The Government will accept either version of the PPQ.
  • 9-28-2023 The USAF is currently processing RFP Amendment 0003, along with USAF responses to the remaining vendor questions. The USAF does plan to extend the proposal due date; however, a firm date has not been solidified. The USAF releases this update to eliminate any confusion and/or worry that may result from a potential Government shutdown.
  • 10-06-2023: RFP Amendment 0003 posted; Proposal due date extended through 10-20-2023; USG responses to Vendor questions posted (Post-RFP through 9-25-2023); Questions submitted after 9-25-2023 will be released in a subsequent post;  
  • 10-13-2023 USG responses to Vendor questions posted (Post-RFP Amendment 0003 through 10-12-23)

See attachments. 

Update #7 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.
  • 9-21-2023: It is the Government's preference that the most up-to-date version of the PPQ, as documented in Amendment 0002, be used and sent to customers.  However, Offerors are not required to resubmit the PPQs to the customers that have already been provided a previous version of the PPQ. The Government will accept either version of the PPQ.
  • 9-28-2023 The USAF is currently processing RFP Amendment 0003, along with USAF responses to the remaining vendor questions. The USAF does plan to extend the proposal due date; however, a firm date has not been solidified. The USAF releases this update to eliminate any confusion and/or worry that may result from a potential Government shutdown.
  • 10-06-2023: RFP Amendment 0003 posted; Proposal due date extended through 10-20-2023; USG responses to Vendor questions posted (Post-RFP through 9-25-2023); Questions submitted after 9-25-2023 will be released in a subsequent post;  

See attachments. 

Update #6 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.
  • 9-21-2023: It is the Government's preference that the most up-to-date version of the PPQ, as documented in Amendment 0002, be used and sent to customers.  However, Offerors are not required to resubmit the PPQs to the customers that have already been provided a previous version of the PPQ. The Government will accept either version of the PPQ.
  • 9-28-2023 The USAF is currently processing RFP Amendment 0003, along with USAF responses to the remaining vendor questions. The USAF does plan to extend the proposal due date; however, a firm date has not been solidified. The USAF releases this update to eliminate any confusion and/or worry that may result from a potential Government shutdown.

See attachments. 

Update #5 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.
  • 9-21-2023: It is the Government's preference that the most up-to-date version of the PPQ, as documented in Amendment 0002, be used and sent to customers.  However, Offerors are not required to resubmit the PPQs to the customers that have already been provided a previous version of the PPQ. The Government will accept either version of the PPQ.

See attachments. 

Update #4 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.
  • 9-12-2023: RFP Amendment 0002 posted; Proposal due date extended through 10-13-2023; USG responses to Vendor questions posted (Post-RFP through 8-23-2023); Questions submitted after 8-23-2023 will be released in a subsequent post; An Amendment 0003 is expected--release date to be determined.

See attachments. 

Update #3 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.
  • 8-28-2023: In preparation for RFP amendment release, a final question cut-off date of 1 Sepetember 2023 is estabished for the T-6 COMBS IV RFP. Clarification questions will still be permitted.

See attachments. 

Update #2 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023
  • Final RFP Amendment, FA8106-23-R-0001-0001, posted 7 August 2023; Proposal due date is NOT extended.

See attachments. 

Update #1 ·

The purpose of this acquisition is to procure Contractor Operated and Maintained Base Supply (COMBS) services for the T6A/B/D Texan II Aircraft fleet of seven hundred and thirty-nine (739) aircraft that are currently assigned to eleven (11) Operating Locations: Columbus AFB MS, Laughlin AFB TX, Randolph AFB TX, Sheppard AFB TX, Vance AFB OK, USAF Combat Systems Officer (CSO) at Naval Air Station (NAS) Pensacola FL, NAS Whiting Field TX, NAS Corpus Christi TX, USN Naval Flight Officer (NFO) at Pensacola FL, NAS Patuxent River MD, U.S. Army Aviation Flight Test Directorate (AFTD) Redstone Arsenal AL, as well as one (1) Depot Location: Fleet Readiness Center South East (FRCSE) NAS Jacksonville FL. In addition, the Government reserves the right to add/decrease aircraft over the life of the contract.

Previously listed as FA8106-22-R-0001

Summary of Effort Postings

  • Sources Sought Synopsis (SSS) posted 3 March 2022. Responses Due 4 April 2022. 
  • Schedule Delay MFR posted 1 June 2022. No response date. 
  • Request for Information (RFI) posted 24 August 2022. Responses Due 23 September 2022. 
  • RFI Questions & Responses posted 21 September 2022. No response date. 
  • Industry Day registration form posted 27 September 2022. Responses Due 4 October 2022. 
  • Industry Day activities held at NAS Pensacola 18 October 2022 and 20 October 2022. USG briefing posted 4 November 2022. No response date. 
  • Industry Day Questions and Responses posted 8 December 2022. No response required. 
  • RFI II posted 6 February 2023. Responses due 10 February 2023
  • Draft RFP posted 22 February 2023 with a closing date of 24 March 2023. 
  • Reformatted/uncorrupted DRFP attachments uploaded 15 March 2023. Closing date/question submittal due date remains 24 March 2023. 
  • DRFP Question Responses uploaded 20 April 2023. No response date. 
  • Updated attachments (1, 2, 3, 5, 6, 7, 8 & 9) uploaded 21 April 2023. No response date. 
  • RFI III posted 21 April 2023. Responses due 28 April 2023.  
  • MFR RFI III Questions and Responses posted 11 May 2023. No response date. 
  • Updated Draft RFP and Select Attachments posted on 12 June 2023. No response date. THIS IS A DRAFT RFP; THIS IS NOT THE FINAL RFP--NO REAPONSE REQUESTED.
  • Final RFP posted 27 July 2023; proposals due 22 September 2023

See attachments. 

Files

File Type Posted
COMBS IV Team Updates to Vendor Question 10-16-23.pdf PDF
COMBS IV Team Updates to Vendor Questions 10-5-23 - 10-12-23.pdf PDF
FA8106-23-R-1000-Amendment 0003.pdf PDF
PWS_COMBS IV_26 SEPTEMBER 2023 (1).pdf PDF
Final COMBS IV Section L 20 September 2023.pdf PDF
PRICING MATRIX T-6 COMBS IV - Protected (V10) - 18 Sep 23.xlsx XLSX spreadsheet
FA8106-23-R-1000-0003.pdf PDF
COMBS IV Team Updates 11 Sept. to Vendor Questions 8-25-2023 through 9-25-2023 -RT.pdf PDF
COMBS CDRL Mod Package_COMPLETE_05Sep2023_Signed.pdf PDF
T-6 COMB IV Vendor Questions No 1.pdf PDF
CBA Pensacola-Whiting Field.pdf PDF
Revised COMBS IV Section L 17 August 2023.pdf PDF
FA8106-23-R-1000 Amend 0002.pdf PDF
CBA Laughlin.pdf PDF
PRICING MATRIX T-6 COMBS IV - Protected (V9) - 28 Aug 23.xlsx XLSX spreadsheet
CBA Corpus Christi.pdf PDF
CBA Sheppard.pdf PDF
Revised COMBS IV Section M 17 August 2023.pdf PDF
CBA Columbus.pdf PDF
CBA Patuxent.pdf PDF
FA8106-23-R-1000-0001 dated 7 August 2023.pdf PDF
Wage Determinations T-6 COMBS IV.pdf PDF
PWS_COMBS IV_27 July 2023 (FINAL).pdf PDF
Final COMBS IV Section L 27 July 2023.pdf PDF
Final COMBS IV Section M 27 July 2023.pdf PDF
PPI_Tool_Download_Instruction.docx DOCX document
COMBS IV CDRL Package - 27 July 2023.pdf PDF
GFP Inventory 27 July 2023.xlsx XLSX spreadsheet
PRICING MATRIX T-6 COMBS IV - Protected (V8) - Updated CLIN Structure - 27 July 2023.xlsx XLSX spreadsheet
FA8106-23-R-1000 27 July 2023.pdf PDF
Show all 30

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors