PRICING MATRIX T-6 COMBS IV - Protected (V10) - 18 Sep 23.xlsx
XLSX spreadsheet 139 KB Posted
- Attached to
- CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS) SERVICES FOR THE T-6A/B/D TEXAN II AIRCRAFT
- Solicitation number
- FA810623R1000
About this file
This document provides pricing instructions and templates for a competitive solicitation seeking Contractor Operated and Maintained Base Supply (COMBS) services for the T-6A/B/D Texan II aircraft. Offerors are to input proposed unit prices or rates into the pricing matrix template for various contract line items including program management, detachment support, weekend support, price per flying hour, overhauls, repairs, depot maintenance material support, data, transition services, and over and above rates. Pricing is to be proposed for a five year basic period, four year option period, and six month optional extension period. The total evaluated price will be automatically calculated from entries in the pricing matrix templates.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Source Selection Information - See FAR 2.101 and 3.104 |
| T-6 COMBS IV Source Selection |
| Attachment 4 |
| Instructions to complete this Pricing Matrix: |
| 1 | Offerors are to input the proposed unit prices or rates into the "PRICING MATRIX" worksheet in ALL yellow highlighted cells (Offeror Name in Cell B1 and dollar amounts/percentages in Columns G, J, M, P, S, V, AA, AD, AG, and AJ) |
| 2 | Rounding: All dollar amounts and labor rates shall be rounded to two decimal places. All rates in percentages shall be rounded to four decimal places (ex. .0755 = 7.55%). Enter burden percentages as 100% plus the percentage amount. For example 7.55% burden shall be entered as 107.55% |
| 3 | The extended price will be automatically calculated by multiplying the proposed unit price/rate by the best estimated evaluation quantity |
| 4 | A subtotal price will be automatically calculated at the bottom of each contract period/year |
| 5 | The Total Evaluated Price (TEP) will automatically calculate on the "Total Evaluated Price" worksheet |
Calculation Methodology
| T-6 COMBS IV PRICING MATRIX - CALCULATION METHODOLOGY | ||
| CLIN | DESCRIPTION | CALCULATION METHODOLOGY |
| 1X00 - 1X06 | Program Management - United States Air Force (USAF) (Multiple Locations) | Proposed monthly unit price (fully burdened) multiplied by quantity of months |
| 1X20 - 1X25 | Detachment Support - USAF (Multiple Locations) | Proposed weekly unit price (fully burdened) multiplied by estimated quantity of weeks |
| 1X30 - 1X36 | Weekend Support - USAF (Multiple Locations) | Proposed hourly unit price (fully burdened) multiplied by estimated quantity of hours |
| 1X50 - 1X54 | Program Management - United States Navy (USN) (Multiple Locations) | Proposed monthly unit price (fully burdened) multiplied by quantity of months |
| 1X70 - 1X72 | Detachment Support - USN (Multiple Locations) | Proposed weekly unit price (fully burdened) multiplied by estimated quantity of weeks |
| 1X80 - 1X83 | Weekend Support - USN (Multiple Locations) | Proposed hourly unit price (fully burdened) multiplied by estimated quantity of hours |
| 1X90 | Program Management - United States Army (USA) | Proposed monthly unit price (fully burdened) multiplied by quantity of months |
| 2X00 - 2X06 | Support Equipment - USAF (Multiple Locations) | Proposed monthly unit price (fully burdened) multiplied by quantity of months |
| 2X54 | Support Equipment - USN | Proposed monthly unit price (fully burdened) multiplied by quantity of months |
| 3X00 - 3X54 | Price Per Flying Hour - USAF | Proposed hourly unit price (fully burdened) multiplied by estimated quantity of hours |
| 3X10 - 3X15 | Incentive - Price Per Flying Hour - USAF (Multiple Locations) | No Input - To Be Determined (TBD) (Not Evaluated) |
| 3X50 - 3X54 | Price Per Flying Hour - USN | Proposed hourly unit price (fully burdened) multiplied by estimated quantity of hours |
| 3X60 - 3X64 | Incentive - Price Per Flying Hour - USN (Multiple Locations) | No Input - TBD (Not Evaluated) |
| 3X90 | Price Per Flying Hour - USA | Proposed hourly unit price (fully burdened) multiplied by estimated quantity of hours |
| 4X00 | Overhaul - Major Time Change Item (TCI) - USAF - 1st Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X01 | Overhaul - Major TCI - USAF - 2nd Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X02 | Overhaul - Major TCI - USAF - 3rd Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X03 | Overhaul - Major TCI - USAF - Propeller | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X04 | Overhaul - Major TCI - USAF - Left Main Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X05 | Overhaul - Major TCI - USAF - Right Main Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X06 | Overhaul - Major TCI - USAF - Nose Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X10 | Over and Above (O&A) Engine Repair - Major TCI - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 4X11 | O&A Propeller Repair - Major TCI - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 4X12 | O&A Left Landing Gear Repair - Major TCI - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 4X13 | O&A Right Landing Gear Repair - Major TCI - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 4X14 | O&A Nose Landing Gear Repair - Major TCI - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 4X50 | Overhaul - Major TCI - USN - 1st Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X51 | Overhaul - Major TCI - USN - 2nd Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X52 | Overhaul - Major TCI - USN - 3rd Engine Run | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X53 | Overhaul - Major TCI - USN - Propeller | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X54 | Overhaul - Major TCI - USN - Left Main Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X55 | Overhaul - Major TCI - USN - Right Main Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X56 | Overhaul - Major TCI - USN - Nose Landing Gear | Proposed unit price per overhaul (fully burdened) multiplied by best estimated quantity of overhauls |
| 4X60 | O&A Engine Repair - Major TCI - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 4X61 | O&A Propeller Repair - Major TCI - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 4X62 | O&A Left Landing Gear Repair - Major TCI - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 4X63 | O&A Right Landing Gear Repair - Major TCI - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 4X64 | O&A Nose Landing Gear Repair - Major TCI - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 5X00 | O&A Depot Maintenance Material Support (DMMS) - Analytical Condition Inspection (ACI) Consumables - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 5X01 | O&A DMMS - ACI Repairables - USAF | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X00 inputs |
| 5X50 | O&A DMMS - Aircraft Conditional Inspection (ACI) Consumables - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 5X51 | O&A DMMS - ACI Repairables - USN | No input - proposed O&A Material (Subcontractor) Burden rate and O&A Program Management hourly labor rate will automatically populate based on CLIN 8X50 inputs |
| 6X00 | Data - USAF | No Input - TBD (Not Separately Priced) |
| 6X50 | Data - USN | No Input - TBD (Not Separately Priced) |
| 6X90 | Data - USAF | No Input - TBD (Not Separately Priced) |
| 7X00 - 7X06 | Transition In - USAF (Multiple Locations) | Proposed weekly unit price (fully burdened) multiplied by transition period (26 weeks) |
| 7X50 - 7X54 | Transition In - USN - Multiple Locations) | Proposed weekly unit price (fully burdened) multiplied by transition period (26 weeks) |
| 7X90 | Transition In - USA - Redstone | Proposed weekly unit price (fully burdened) multiplied by transition period (26 weeks) |
| 8X00 | O&A Program Management - USAF | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours |
| O&A Supply Technician - USAF | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours | |
| O&A Material/Subcontractor Burden - USAF | Proposed material/subcontractor burden rate (fully burdened) multiplied by the best estimated O&A material dollars | |
| 8X01 | O&A Travel - USAF | Proposed Travel Burden rate (fully burdened) multiplied by the best estimated O&A travel dollars |
| 8X02 | O&A Time Change Technical Order/Technical Directive (TCTO/TD) - USAF | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A TCTO/TD material dollars |
| 8X03 | O&A Beyond Fair Wear and Tear (BFWT) - USAF | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A BFWT material dollars |
| 8X04 | O&A Fleet Readiness Center South East (FRCSE) -Pre-Expended Bin - USAF | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A FRCSE Pre-Expended Bin material dollars |
| 8X50 | O&A Program Management - USN | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours |
| O&A Supply Technician - USN | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours | |
| O&A Material/Subcontractor Burden - USN | Proposed Material/Subcontractor Burden rate (fully burdened) multiplied by the best estimated O&A material dollars | |
| 8X51 | O&A Travel - USN | Proposed Travel Burden rate (fully burdened) multiplied by the best estimated O&A travel dollars |
| 8X52 | O&A TCTO/TD - USN | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A TCTO/TD material dollars |
| 8X53 | O&A BFWT - USN | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A BFWT material dollars |
| 8X54 | O&A FRCSE - In Service Repair/Aircraft Delivery Deficiency Report (ISR/ADDR) - USN | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A FRCSE ISR/ADDR material dollars |
| 8X55 | O&A FRCSE - Defective Work Order (DWO) - USN | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A FRCSE DWO material dollars |
| 8X90 | O&A Program Management - USA | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours |
| O&A Supply Technician - USA | Proposed hourly labor rate (fully burdened) multiplied by best estimated quantity of labor hours | |
| O&A Material Burden - USA | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A material dollars | |
| 8X91 | O&A Travel - USA | Proposed Travel Burden rate (fully burdened) multiplied by the best estimated O&A travel dollars |
| 8X92 | O&A TCTO/TD - USA | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A TCTO/TD material dollars |
| 8X93 | O&A BFWT - USA | Proposed Material Burden rate (fully burdened) multiplied by the best estimated O&A BFWT material dollars |
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104
PRICING MATRIX
Offeror: Input Offeror Name Here
T-6 COMBS IV Competitive Pricing Matrix BASIC PERIOD (5 YEARS) OPTION PERIOD (4 YEARS) OPTIONAL EXTENSION PERIOD
(6 MONTHS)
| Basic Period - Year 1 Transition In | |||
| (6 months) | Basic Period - Year 1 Performance | ||
| (6 months) | Basic Period - Year 2 | ||
| (12 months) | Basic Period - Year 3 | ||
| (12 months) | Basic Period - Year 4 | ||
| (12 months) | Basic Period - Year 5 | ||
| (12 months) | Option Period - Year 1 | ||
| (12 months) | Option Period - Year 2 | ||
| (12 months) | Option Period - Year 3 | ||
| (12 months) | Option Period - Year 4 | ||
| (12 months) | Optional Extension Period |
(6 months)
| Item Information | ||||
| Service | CLIN Description | Location | Unit of Issue | Basic Period CLIN |
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price Option Period I CLIN
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price
BEQ
Unit Price Extended Price Optional Extension Period CLIN
BEQ
Unit Price Extended
| Price | TOTAL EVALUATED PRICE | |||||||||||||||||||||||||||||||||||||||||
| USAF | Program Management | Columbus | Month | 1000 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1100 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1200 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | Laughlin | Month | 1001 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1101 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1201 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | Randolph | Month | 1002 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1102 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1202 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | Sheppard | Month | 1003 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1103 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1203 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | Vance | Month | 1004 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1104 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1204 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | Pensacola CSO | Month | 1005 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1105 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1205 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Program Management | FRCSE USAF | Month | 1006 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1106 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1206 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Columbus | Week | 1020 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1120 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1220 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Laughlin | Week | 1021 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1121 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1221 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Randolph | Week | 1022 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1122 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1222 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Sheppard | Week | 1023 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1123 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1223 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Vance | Week | 1024 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1124 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1224 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Detachment Support | Pensacola CSO | Week | 1025 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1125 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1225 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Columbus | Hour | 1030 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1130 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1230 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Laughlin | Hour | 1031 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1131 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1231 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Randolph | Hour | 1032 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1132 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1232 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Sheppard | Hour | 1033 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1133 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1233 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Vance | Hour | 1034 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1134 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1234 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | Pensacola CSO | Hour | 1035 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1135 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1235 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Weekend Support | FRCSE USAF | Hour | 1036 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1136 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1236 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Program Management | Whiting Field | Month | 1050 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1150 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1250 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Program Management | Corpus Christi | Month | 1051 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1151 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1251 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Program Management | Pensacola NFO | Month | 1052 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1152 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1252 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Program Management | FRCSE USN | Month | 1053 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1153 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1253 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Program Management | Patuxent River (TPS) | Month | 1054 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1154 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1254 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Detachment Support | Whiting Field | Week | 1070 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1170 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1270 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Detachment Support | Corpus Christi | Week | 1071 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1171 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1271 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Detachment Support | Pensacola NFO | Week | 1072 | 1 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1172 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1272 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Weekend Support | Whiting Field | Hour | 1080 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1180 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1280 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Weekend Support | Corpus Christi | Hour | 1081 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1181 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1281 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Weekend Support | Pensacola NFO | Hour | 1082 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1182 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1282 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Weekend Support | FRCSE USN | Hour | 1083 | 96 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1183 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 192 | $ - 0 | $ - 0 | 1283 | 96 | $ - 0 | $ - 0 | $ - 0 | |||||
| USA | Program Management | Redstone | Month | 1090 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1190 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 1290 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Columbus | Month | 2000 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2100 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2200 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Laughlin | Month | 2001 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2101 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2201 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Randolph | Month | 2002 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2102 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2202 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Sheppard | Month | 2003 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2103 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2203 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Vance | Month | 2004 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2104 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2204 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | Pensacola CSO | Month | 2005 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2105 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2205 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Support Equipment | FRCSE - USAF | Month | 2006 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2106 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2206 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Support Equipment | Patuxent River (TPS) | Month | 2054 | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2154 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 2254 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Columbus | Hour | 3000 | 23,733 | $ - 0 | $ - 0 | 47,466 | $ - 0 | $ - 0 | 47,466 | $ - 0 | $ - 0 | 47,466 | $ - 0 | $ - 0 | 46,800 | $ - 0 | $ - 0 | 3100 | 46,800 | $ - 0 | $ - 0 | 46,800 | $ - 0 | $ - 0 | 46,800 | $ - 0 | $ - 0 | 46,800 | $ - 0 | $ - 0 | 3200 | 23,400 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Laughlin | Hour | 3001 | 24,390 | $ - 0 | $ - 0 | 48,780 | $ - 0 | $ - 0 | 48,780 | $ - 0 | $ - 0 | 48,780 | $ - 0 | $ - 0 | 48,207 | $ - 0 | $ - 0 | 3101 | 48,207 | $ - 0 | $ - 0 | 48,207 | $ - 0 | $ - 0 | 48,207 | $ - 0 | $ - 0 | 48,207 | $ - 0 | $ - 0 | 3201 | 24,104 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Randolph | Hour | 3002 | 9,148 | $ - 0 | $ - 0 | 18,296 | $ - 0 | $ - 0 | 18,296 | $ - 0 | $ - 0 | 18,296 | $ - 0 | $ - 0 | 17,855 | $ - 0 | $ - 0 | 3102 | 17,855 | $ - 0 | $ - 0 | 17,855 | $ - 0 | $ - 0 | 17,855 | $ - 0 | $ - 0 | 17,855 | $ - 0 | $ - 0 | 3202 | 8,928 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Sheppard | Hour | 3003 | 16,701 | $ - 0 | $ - 0 | 33,055 | $ - 0 | $ - 0 | 33,066 | $ - 0 | $ - 0 | 33,187 | $ - 0 | $ - 0 | 33,257 | $ - 0 | $ - 0 | 3103 | 33,257 | $ - 0 | $ - 0 | 33,257 | $ - 0 | $ - 0 | 33,257 | $ - 0 | $ - 0 | 33,257 | $ - 0 | $ - 0 | 3203 | 16,629 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Vance | Hour | 3004 | 23,292 | $ - 0 | $ - 0 | 46,583 | $ - 0 | $ - 0 | 46,583 | $ - 0 | $ - 0 | 46,583 | $ - 0 | $ - 0 | 46,961 | $ - 0 | $ - 0 | 3104 | 46,961 | $ - 0 | $ - 0 | 46,961 | $ - 0 | $ - 0 | 46,961 | $ - 0 | $ - 0 | 46,961 | $ - 0 | $ - 0 | 3204 | 23,481 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Price Per Flying Hour | Pensacola CSO | Hour | 3005 | 4,968 | $ - 0 | $ - 0 | 9,936 | $ - 0 | $ - 0 | 9,936 | $ - 0 | $ - 0 | 9,936 | $ - 0 | $ - 0 | 9,772 | $ - 0 | $ - 0 | 3105 | 9,772 | $ - 0 | $ - 0 | 9,772 | $ - 0 | $ - 0 | 9,772 | $ - 0 | $ - 0 | 9,772 | $ - 0 | $ - 0 | 3205 | 4,886 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Incentive - PPFH | Columbus | N/A | 3010 | 3110 | 3210 | ||||||||||||||||||||||||||||||||||||
| USAF | Incentive - PPFH | Laughlin | N/A | 3011 | 3111 | 3211 | ||||||||||||||||||||||||||||||||||||
| USAF | Incentive - PPFH | Randolph | N/A | 3012 | 3112 | 3212 | ||||||||||||||||||||||||||||||||||||
| USAF | Incentive - PPFH | Sheppard | N/A | 3013 | 3113 | 3213 | ||||||||||||||||||||||||||||||||||||
| USAF | Incentive - PPFH | Vance | N/A | 3014 | 3114 | 3214 | ||||||||||||||||||||||||||||||||||||
| USAF | Incentive - PPFH | Pensacola CSO | N/A | 3015 | 3115 | 3215 | ||||||||||||||||||||||||||||||||||||
| USN | Price Per Flying Hour | Whiting Field | Hour | 3050 | 31,128 | $ - 0 | $ - 0 | 61,589 | $ - 0 | $ - 0 | 61,538 | $ - 0 | $ - 0 | 61,532 | $ - 0 | $ - 0 | 60,603 | $ - 0 | $ - 0 | 3150 | 60,603 | $ - 0 | $ - 0 | 60,603 | $ - 0 | $ - 0 | 60,603 | $ - 0 | $ - 0 | 60,603 | $ - 0 | $ - 0 | 3250 | 30,302 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Price Per Flying Hour | Corpus Christi | Hour | 3051 | 20,837 | $ - 0 | $ - 0 | 41,003 | $ - 0 | $ - 0 | 41,096 | $ - 0 | $ - 0 | 40,981 | $ - 0 | $ - 0 | 40,270 | $ - 0 | $ - 0 | 3151 | 40,270 | $ - 0 | $ - 0 | 40,270 | $ - 0 | $ - 0 | 40,270 | $ - 0 | $ - 0 | 40,270 | $ - 0 | $ - 0 | 3251 | 20,135 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Price Per Flying Hour | NFO Pensacola | Hour | 3052 | 6,121 | $ - 0 | $ - 0 | 11,978 | $ - 0 | $ - 0 | 11,887 | $ - 0 | $ - 0 | 11,868 | $ - 0 | $ - 0 | 11,603 | $ - 0 | $ - 0 | 3152 | 11,603 | $ - 0 | $ - 0 | 11,603 | $ - 0 | $ - 0 | 11,603 | $ - 0 | $ - 0 | 11,603 | $ - 0 | $ - 0 | 3252 | 5,802 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Price Per Flying Hour | Patuxent River (TPS) | Hour | 3054 | 414 | $ - 0 | $ - 0 | 827 | $ - 0 | $ - 0 | 827 | $ - 0 | $ - 0 | 827 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 3154 | 808 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 3254 | 404 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Incentive - PPFH | Whiting Field | N/A | 3060 | 3160 | 3260 | ||||||||||||||||||||||||||||||||||||
| USN | Incentive - PPFH | Corpus Christi | N/A | 3061 | 3161 | 3261 | ||||||||||||||||||||||||||||||||||||
| USN | Incentive - PPFH | NFO Pensacola | N/A | 3062 | 3162 | 3262 | ||||||||||||||||||||||||||||||||||||
| USN | Incentive - PPFH | Patuxent River (TPS) | N/A | 3064 | 3164 | $ - 0 | 3264 | |||||||||||||||||||||||||||||||||||
| USA | Price Per Flying Hour | Redstone | Hour | 3090 | 300 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 3190 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 600 | $ - 0 | $ - 0 | 3290 | 300 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | 1st Run Engine | Each | 4000 | 2 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4100 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4200 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | 2nd Run Engine | Each | 4001 | 18 | $ - 0 | $ - 0 | 72 | $ - 0 | $ - 0 | 75 | $ - 0 | $ - 0 | 46 | $ - 0 | $ - 0 | 55 | $ - 0 | $ - 0 | 4101 | 52 | $ - 0 | $ - 0 | 47 | $ - 0 | $ - 0 | 15 | $ - 0 | $ - 0 | 49 | $ - 0 | $ - 0 | 4201 | 25 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | 3rd Run Engine | Each | 4002 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4102 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4202 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | Propeller | Each | 4003 | 48 | $ - 0 | $ - 0 | 49 | $ - 0 | $ - 0 | 86 | $ - 0 | $ - 0 | 80 | $ - 0 | $ - 0 | 80 | $ - 0 | $ - 0 | 4103 | 80 | $ - 0 | $ - 0 | 80 | $ - 0 | $ - 0 | 80 | $ - 0 | $ - 0 | 80 | $ - 0 | $ - 0 | 4203 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | Left Main Landing Gear | Each | 4004 | 6 | $ - 0 | $ - 0 | 7 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | 29 | $ - 0 | $ - 0 | 34 | $ - 0 | $ - 0 | 4104 | 47 | $ - 0 | $ - 0 | 67 | $ - 0 | $ - 0 | 27 | $ - 0 | $ - 0 | 33 | $ - 0 | $ - 0 | 4204 | 17 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | Right Main Landing Gear | Each | 4005 | 8 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 16 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 27 | $ - 0 | $ - 0 | 4105 | 54 | $ - 0 | $ - 0 | 72 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 35 | $ - 0 | $ - 0 | 4205 | 18 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Overhaul - Major TCI | Nose Landing Gear | Each | 4006 | 6 | $ - 0 | $ - 0 | 14 | $ - 0 | $ - 0 | 11 | $ - 0 | $ - 0 | 29 | $ - 0 | $ - 0 | 19 | $ - 0 | $ - 0 | 4106 | 59 | $ - 0 | $ - 0 | 66 | $ - 0 | $ - 0 | 38 | $ - 0 | $ - 0 | 48 | $ - 0 | $ - 0 | 4206 | 24 | $ - 0 | $ - 0 | $ - 0 | |||||
| USAF | Over & Above Repair - Major TCI | Over & Above Engine Repair - USAF | 4010 | 4110 | 4210 | |||||||||||||||||||||||||||||||||||||
| Engine Repair - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 2,240,939 | 0.00% | $ - 0 | $ 4,592,726 | 0.00% | $ - 0 | $ 4,706,315 | 0.00% | $ - 0 | $ 4,822,713 | 0.00% | $ - 0 | $ 4,941,990 | 0.00% | $ - 0 | $ 5,064,218 | 0.00% | $ - 0 | $ 5,189,468 | 0.00% | $ - 0 | $ 5,317,815 | 0.00% | $ - 0 | $ 5,449,338 | 0.00% | $ - 0 | $ 2,724,669 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Engine Repair - Program Management Labor (RSS Prep) | Hour | 16 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 16 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above Repair - Major TCI | Over & Above Propeller Repair - USAF | 4011 | 4111 | 4211 | |||||||||||||||||||||||||||||||||||||
| Propeller Repair - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 387,253 | 0.00% | $ - 0 | $ 793,661 | 0.00% | $ - 0 | $ 813,290 | 0.00% | $ - 0 | $ 833,405 | 0.00% | $ - 0 | $ 854,017 | 0.00% | $ - 0 | $ 875,139 | 0.00% | $ - 0 | $ 896,783 | 0.00% | $ - 0 | $ 918,963 | 0.00% | $ - 0 | $ 941,691 | 0.00% | $ - 0 | $ 470,845 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Propeller Repair - Program Management Labor (RSS Prep) | Hour | 44 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 88 | $ - 0 | $ - 0 | 44 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above Repair - Major TCI | Over & Above Left Main Landing Gear Repair - USAF | 4012 | 4112 | 4212 | |||||||||||||||||||||||||||||||||||||
| Left Main Landing Gear Repair - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 52,910 | 0.00% | $ - 0 | $ 108,437 | 0.00% | $ - 0 | $ 111,119 | 0.00% | $ - 0 | $ 113,867 | 0.00% | $ - 0 | $ 116,683 | 0.00% | $ - 0 | $ 119,569 | 0.00% | $ - 0 | $ 122,526 | 0.00% | $ - 0 | $ 125,556 | 0.00% | $ - 0 | $ 128,662 | 0.00% | $ - 0 | $ 64,331 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Left Main Landing Gear Repair - Program Management Labor (RSS Prep) | Hour | 4 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above Repair - Major TCI | Over & Above Right Main Landing Gear Repair - USAF | 4013 | 4113 | 4213 | |||||||||||||||||||||||||||||||||||||
| Right Main Landing Gear - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 67,799 | 0.00% | $ - 0 | $ 138,951 | 0.00% | $ - 0 | $ 142,388 | 0.00% | $ - 0 | $ 145,910 | 0.00% | $ - 0 | $ 149,518 | 0.00% | $ - 0 | $ 153,216 | 0.00% | $ - 0 | $ 157,006 | 0.00% | $ - 0 | $ 160,889 | 0.00% | $ - 0 | $ 164,868 | 0.00% | $ - 0 | $ 82,434 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Right Main Landing Gear - Program Management Labor (RSS Prep) | Hour | 4 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 8 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above Repair - Major TCI | Over & Above Nose Landing Gear Repair - USAF | 4014 | 4114 | 4214 | |||||||||||||||||||||||||||||||||||||
| Nose Landing Gear - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 196,605 | 0.00% | $ - 0 | $ 402,935 | 0.00% | $ - 0 | $ 412,900 | 0.00% | $ - 0 | $ 423,112 | 0.00% | $ - 0 | $ 433,577 | 0.00% | $ - 0 | $ 444,300 | 0.00% | $ - 0 | $ 455,289 | 0.00% | $ - 0 | $ 466,549 | 0.00% | $ - 0 | $ 478,088 | 0.00% | $ - 0 | $ 239,044 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Nose Landing Gear - Program Management Labor (RSS Prep) | Hour | 12 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Overhaul - Major TCI | 1st Run Engine | Each | 4050 | 12 | $ - 0 | $ - 0 | 13 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4150 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4250 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | 2nd Run Engine | Each | 4051 | 5 | $ - 0 | $ - 0 | 9 | $ - 0 | $ - 0 | 7 | $ - 0 | $ - 0 | 11 | $ - 0 | $ - 0 | 11 | $ - 0 | $ - 0 | 4151 | 20 | $ - 0 | $ - 0 | 35 | $ - 0 | $ - 0 | 24 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4251 | 2 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | 3rd Run Engine | Each | 4052 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4152 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 4252 | 1 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | Propeller | Each | 4053 | 24 | $ - 0 | $ - 0 | 49 | $ - 0 | $ - 0 | 54 | $ - 0 | $ - 0 | 57 | $ - 0 | $ - 0 | 58 | $ - 0 | $ - 0 | 4153 | 58 | $ - 0 | $ - 0 | 60 | $ - 0 | $ - 0 | 62 | $ - 0 | $ - 0 | 62 | $ - 0 | $ - 0 | 4253 | 31 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | Left Main Landing Gear | Each | 4054 | 38 | $ - 0 | $ - 0 | 49 | $ - 0 | $ - 0 | 30 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 4154 | 7 | $ - 0 | $ - 0 | 11 | $ - 0 | $ - 0 | 22 | $ - 0 | $ - 0 | 13 | $ - 0 | $ - 0 | 4254 | 7 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | Right Main Landing Gear | Each | 4055 | 38 | $ - 0 | $ - 0 | 48 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 4155 | 7 | $ - 0 | $ - 0 | 19 | $ - 0 | $ - 0 | 17 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 4255 | 6 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Overhaul - Major TCI | Nose Landing Gear | Each | 4056 | 33 | $ - 0 | $ - 0 | 49 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 9 | $ - 0 | $ - 0 | 7 | $ - 0 | $ - 0 | 4156 | 9 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 13 | $ - 0 | $ - 0 | 13 | $ - 0 | $ - 0 | 4256 | 7 | $ - 0 | $ - 0 | $ - 0 | |||||
| USN | Over & Above Repair - Major TCI | Over & Above Engine Repair - USN | 4060 | 4160 | 4260 | |||||||||||||||||||||||||||||||||||||
| Engine Repair - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 1,884,369 | 0.00% | $ - 0 | $ 3,861,949 | 0.00% | $ - 0 | $ 3,957,464 | 0.00% | $ - 0 | $ 4,055,341 | 0.00% | $ - 0 | $ 4,155,639 | 0.00% | $ - 0 | $ 4,258,418 | 0.00% | $ - 0 | $ 4,363,739 | 0.00% | $ - 0 | $ 4,471,665 | 0.00% | $ - 0 | $ 4,582,260 | 0.00% | $ - 0 | $ 2,291,130 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Engine Repair - Program Management Labor (RSS Prep) | Hour | 14 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 28 | $ - 0 | $ - 0 | 14 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above Repair - Major TCI | Over & Above Propeller Repair - USN | 4061 | 4161 | 4261 | |||||||||||||||||||||||||||||||||||||
| Propeller Repair - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 681,146 | 0.00% | $ - 0 | $ 1,395,984 | 0.00% | $ - 0 | $ 1,430,510 | 0.00% | $ - 0 | $ 1,465,890 | 0.00% | $ - 0 | $ 1,502,145 | 0.00% | $ - 0 | $ 1,539,297 | 0.00% | $ - 0 | $ 1,577,367 | 0.00% | $ - 0 | $ 1,616,379 | 0.00% | $ - 0 | $ 1,656,356 | 0.00% | $ - 0 | $ 828,178 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Propeller Repair - Program Management Labor (RSS Prep) | Hour | 52 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 108 | $ - 0 | $ - 0 | 54 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above Repair - Major TCI | Over & Above Left Main Landing Gear Repair - USN | 4062 | 4162 | 4262 | |||||||||||||||||||||||||||||||||||||
| Left Main Landing Gear - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 86,270 | 0.00% | $ - 0 | $ 196,454 | 0.00% | $ - 0 | $ 201,312 | 0.00% | $ - 0 | $ 206,291 | 0.00% | $ - 0 | $ 211,393 | 0.00% | $ - 0 | $ 216,622 | 0.00% | $ - 0 | $ 221,979 | 0.00% | $ - 0 | $ 227,469 | 0.00% | $ - 0 | $ 233,095 | 0.00% | $ - 0 | $ 116,548 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Left Main Landing Gear - Program Management Labor (RSS Prep) | Hour | 6 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above Repair - Major TCI | Over & Above Right Main Landing Gear Repair - USN | 4063 | 4163 | 4263 | |||||||||||||||||||||||||||||||||||||
| Right Main Landing Gear - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 111,960 | 0.00% | $ - 0 | $ 229,458 | 0.00% | $ - 0 | $ 235,133 | 0.00% | $ - 0 | $ 240,949 | 0.00% | $ - 0 | $ 246,908 | 0.00% | $ - 0 | $ 253,015 | 0.00% | $ - 0 | $ 259,272 | 0.00% | $ - 0 | $ 265,685 | 0.00% | $ - 0 | $ 272,256 | 0.00% | $ - 0 | $ 136,128 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Right Main Landing Gear - Program Management Labor (RSS Prep) | Hour | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above Repair - Major TCI | Over & Above Nose Landing Gear Repair - USN | 4064 | 4164 | 4264 | |||||||||||||||||||||||||||||||||||||
| Nose Landing Gear - Material (Subcontractor) Burden | Material (Subcontractor) Dollars | $ 109,855 | 0.00% | $ - 0 | $ 225,143 | 0.00% | $ - 0 | $ 230,711 | 0.00% | $ - 0 | $ 236,417 | 0.00% | $ - 0 | $ 242,265 | 0.00% | $ - 0 | $ 248,256 | 0.00% | $ - 0 | $ 254,396 | 0.00% | $ - 0 | $ 260,688 | 0.00% | $ - 0 | $ 267,136 | 0.00% | $ - 0 | $ 133,568 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| Nose Landing Gear - Program Management Labor (RSS Prep) | Hour | 6 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above DMMS - ACI Consumables | FRCSE ACI Consumables - USAF | 5000 | 5100 | 5200 | |||||||||||||||||||||||||||||||||||||
| FRCSE - USAF - Material Burden | Material Dollars | $ 111,709 | 0.00% | $ - 0 | $ 228,943 | 0.00% | $ - 0 | $ 234,606 | 0.00% | $ - 0 | $ 240,408 | 0.00% | $ - 0 | $ 246,354 | 0.00% | $ - 0 | $ 252,447 | 0.00% | $ - 0 | $ 258,690 | 0.00% | $ - 0 | $ 265,089 | 0.00% | $ - 0 | $ 271,645 | 0.00% | $ - 0 | $ 135,822 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| FRCSE - USAF - Program Management Labor (RSS Prep) | Hour | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above DMMS - ACI Repairables | FRCSE ACI Repairables - USAF | 5001 | 5001 | 5201 | |||||||||||||||||||||||||||||||||||||
| FRCSE - USAF - Material Burden | Material Dollars | $ 217,121 | 0.00% | $ - 0 | $ 444,983 | 0.00% | $ - 0 | $ 455,988 | 0.00% | $ - 0 | $ 467,266 | 0.00% | $ - 0 | $ 478,822 | 0.00% | $ - 0 | $ 490,665 | 0.00% | $ - 0 | $ 502,800 | 0.00% | $ - 0 | $ 515,235 | 0.00% | $ - 0 | $ 527,978 | 0.00% | $ - 0 | $ 263,989 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| FRCSE - USAF - Program Management Labor (RSS Prep) | Hour | 6 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above DMMS - ACI Consumables | FRCSE - ACI Consumables - USN | 5050 | 5150 | 5250 | |||||||||||||||||||||||||||||||||||||
| FRCSE - USN - Material Burden | Material Dollars | $ 1,203,551 | 0.00% | $ - 0 | $ 2,466,635 | 0.00% | $ - 0 | $ 2,527,641 | 0.00% | $ - 0 | $ 2,590,155 | 0.00% | $ - 0 | $ 2,654,216 | 0.00% | $ - 0 | $ 2,719,861 | 0.00% | $ - 0 | $ 2,787,130 | 0.00% | $ - 0 | $ 2,856,062 | 0.00% | $ - 0 | $ 2,926,699 | 0.00% | $ - 0 | $ 1,463,350 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| FRCSE - USN - Program Management Labor (RSS Prep) | Hour | 42 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 42 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above DMMS - ACI Repairables | FRCSE - ACI Repairables - USN | 5051 | 5151 | 5251 | |||||||||||||||||||||||||||||||||||||
| FRCSE - USN - Material Burden | Material Dollars | $ 1,752,465 | 0.00% | $ - 0 | $ 3,591,616 | 0.00% | $ - 0 | $ 3,680,445 | 0.00% | $ - 0 | $ 3,771,471 | 0.00% | $ - 0 | $ 3,864,749 | 0.00% | $ - 0 | $ 3,960,333 | 0.00% | $ - 0 | $ 4,058,281 | 0.00% | $ - 0 | $ 4,158,652 | 0.00% | $ - 0 | $ 4,261,506 | 0.00% | $ - 0 | $ 2,130,753 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| FRCSE - USN - Program Management Labor (RSS Prep) | Hour | 42 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 84 | $ - 0 | $ - 0 | 42 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| USAF | Data | NSP | N/A | 6000 | 0 | . | 6100 | 6200 | ||||||||||||||||||||||||||||||||||
| USN | Data | NSP | N/A | 6050 | 0 | 6150 | 6250 | |||||||||||||||||||||||||||||||||||
| USA | Data | NSP | N/A | 6090 | 0 | 6190 | 6290 | |||||||||||||||||||||||||||||||||||
| USAF | Transition In | Columbus | Week | 7000 | 26 | $ - 0 | $ - 0 | 26 | 7100 | 7200 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | Laughlin | Week | 7001 | 26 | $ - 0 | $ - 0 | 26 | 7101 | 7201 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | Randolph | Week | 7002 | 26 | $ - 0 | $ - 0 | 26 | 7102 | 7202 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | Sheppard | Week | 7003 | 26 | $ - 0 | $ - 0 | 26 | 7103 | 7203 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | Vance | Week | 7004 | 26 | $ - 0 | $ - 0 | 26 | 7104 | 7204 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | Pensacola CSO | Week | 7005 | 26 | $ - 0 | $ - 0 | 26 | 7105 | 7205 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Transition In | FRCSE USAF | Week | 7006 | 26 | $ - 0 | $ - 0 | 26 | 7106 | 7206 | $ - 0 | |||||||||||||||||||||||||||||||
| USN | Transition In | Whiting Field | Week | 7050 | 26 | $ - 0 | $ - 0 | 26 | 7150 | 7250 | $ - 0 | |||||||||||||||||||||||||||||||
| USN | Transition In | Corpus Christi | Week | 7051 | 26 | $ - 0 | $ - 0 | 26 | 7151 | 7251 | $ - 0 | |||||||||||||||||||||||||||||||
| USN | Transition In | Pensacola NFO | Week | 7052 | 26 | $ - 0 | $ - 0 | 26 | 7152 | 7252 | $ - 0 | |||||||||||||||||||||||||||||||
| USN | Transition In | FRCSE USN | Week | 7053 | 26 | $ - 0 | $ - 0 | 26 | 7153 | 7253 | $ - 0 | |||||||||||||||||||||||||||||||
| USN | Transition In | Patuxent River (TPS) | Week | 7054 | 26 | $ - 0 | $ - 0 | 26 | 7154 | 7254 | $ - 0 | |||||||||||||||||||||||||||||||
| USA | Transition In | Redstone | Week | 7090 | 26 | $ - 0 | $ - 0 | 26 | 7190 | 7290 | $ - 0 | |||||||||||||||||||||||||||||||
| USAF | Over & Above | General Over & Above Rates - USAF | 8000 | |||||||||||||||||||||||||||||||||||||||
| Program Management | Hour | 20 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 8100 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 8200 | 20 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician | Hour | 20 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Material/Subcontractor Burden | Material/Subcontractor Dollars | $ 2,909,500 | 0.00% | $ - 0 | $ 5,963,000 | 0.00% | $ - 0 | $6,110,000 | 0.00% | $ - 0 | $ 6,262,000 | 0.00% | $ - 0 | $ 6,416,000 | 0.00% | $ - 0 | $ 6,575,000 | 0.00% | $ - 0 | $ 6,738,000 | 0.00% | $ - 0 | $ 6,904,000 | 0.00% | $ - 0 | $ 7,075,000 | 0.00% | $ - 0 | $ 3,537,500 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| USAF | Over & Above | Travel Burden | Lot | 8001 | $ 6,220 | 0.00% | $ - 0 | $ 12,748 | 0.00% | $ - 0 | $ 13,063 | 0.00% | $ - 0 | $ 13,386 | 0.00% | $ - 0 | $ 13,717 | 0.00% | $ - 0 | 8101 | $ 14,056 | 0.00% | $ - 0 | $ 14,404 | 0.00% | $ - 0 | $ 14,760 | 0.00% | $ - 0 | $ 15,126 | 0.00% | $ - 0 | 8201 | $ 7,563 | 0.00% | $ - 0 | $ - 0 | |||||
| USAF | Over & Above | TCTO/TD - Material Burden | Material/Subcontractor Dollars | 8002 | $ 1,768,000 | 0.00% | $ - 0 | $ 3,624,000 | 0.00% | $ - 0 | $ 3,713,000 | 0.00% | $ - 0 | $ 3,805,000 | 0.00% | $ - 0 | $ 3,899,000 | 0.00% | $ - 0 | 8102 | $ 3,996,000 | 0.00% | $ - 0 | $ 4,094,000 | 0.00% | $ - 0 | $ 4,196,000 | 0.00% | $ - 0 | $ 4,299,000 | 0.00% | $ - 0 | 8202 | $ 2,149,500 | 0.00% | $ - 0 | $ - 0 | |||||
| USAF | Over & Above | BFWT - Material Burden | Material/Subcontractor Dollars | 8003 | $ 1,622,500 | 0.00% | $ - 0 | $ 3,326,000 | 0.00% | $ - 0 | $ 3,408,000 | 0.00% | $ - 0 | $ 3,492,000 | 0.00% | $ - 0 | $ 3,579,000 | 0.00% | $ - 0 | 8103 | $ 3,667,000 | 0.00% | $ - 0 | $ 3,758,000 | 0.00% | $ - 0 | $ 3,851,000 | 0.00% | $ - 0 | $ 3,946,000 | 0.00% | $ - 0 | 8203 | $ 1,973,000 | 0.00% | $ - 0 | $ - 0 | |||||
| USAF | Over & Above | FRCSE - Bench Stock - Material Burden | Material/Subcontractor Dollars | 8004 | $ 64,500 | 0.00% | $ - 0 | $ 132,000 | 0.00% | $ - 0 | $ 135,000 | 0.00% | $ - 0 | $ 139,000 | 0.00% | $ - 0 | $ 142,000 | 0.00% | $ - 0 | 8104 | $ 146,000 | 0.00% | $ - 0 | $ 149,000 | 0.00% | $ - 0 | $ 153,000 | 0.00% | $ - 0 | $ 157,000 | 0.00% | $ - 0 | 8204 | $ 78,500 | 0.00% | $ - 0 | $ - 0 | |||||
| USN | General Over & Above Rates - USN | 8050 | ||||||||||||||||||||||||||||||||||||||||
| Over & Above | Program Management | Hour | 20 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 8150 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 8250 | 20 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Supply Technician | Hour | 20 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 40 | $ - 0 | $ - 0 | 20 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Material Burden/Subcontractor Burden | Material/Subcontractor Dollars | $ 3,073,000 | 0.00% | $ - 0 | $ 6,298,000 | 0.00% | $ - 0 | $ 6,454,000 | 0.00% | $ - 0 | $ 6,613,000 | 0.00% | $ - 0 | $ 6,777,000 | 0.00% | $ - 0 | $ 6,944,000 | 0.00% | $ - 0 | $ 7,116,000 | 0.00% | $ - 0 | $ 7,292,000 | 0.00% | $ - 0 | $ 7,472,000 | 0.00% | $ - 0 | $ 3,736,000 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| USN | Over & Above | Travel Burden | Lot | 8051 | $ 6,227 | 0.00% | $ - 0 | $ 12,761 | 0.00% | $ - 0 | $ 13,077 | 0.00% | $ - 0 | $ 13,400 | 0.00% | $ - 0 | $ 13,732 | 0.00% | $ - 0 | 8151 | $ 14,071 | 0.00% | $ - 0 | $ 14,420 | 0.00% | $ - 0 | $ 14,776 | 0.00% | $ - 0 | $ 15,142 | 0.00% | $ - 0 | 8251 | $ 7,571 | 0.00% | $ - 0 | $ - 0 | |||||
| USN | Over & Above | TCTO/TD - Material Burden | Material/Subcontractor Dollars | 8052 | $ 856,500 | 0.00% | $ - 0 | $ 1,755,000 | 0.00% | $ - 0 | $ 1,799,000 | 0.00% | $ - 0 | $ 1,843,000 | 0.00% | $ - 0 | $ 1,889,000 | 0.00% | $ - 0 | 8152 | $ 1,935,000 | 0.00% | $ - 0 | $ 1,983,000 | 0.00% | $ - 0 | $ 2,032,000 | 0.00% | $ - 0 | $ 2,083,000 | 0.00% | $ - 0 | 8252 | $ 1,041,500 | 0.00% | $ - 0 | $ - 0 | |||||
| USN | Over & Above | BFWT - Material Burden | Material/Subcontractor Dollars | 8053 | $ 2,146,500 | 0.00% | $ - 0 | $ 4,399,000 | 0.00% | $ - 0 | $ 4,508,000 | 0.00% | $ - 0 | $ 4,619,000 | 0.00% | $ - 0 | $ 4,733,000 | 0.00% | $ - 0 | 8153 | $ 4,850,000 | 0.00% | $ - 0 | $ 4,970,000 | 0.00% | $ - 0 | $ 5,093,000 | 0.00% | $ - 0 | $ 5,219,000 | 0.00% | $ - 0 | 8253 | $ 2,609,500 | 0.00% | $ - 0 | $ - 0 | |||||
| USN | Over & Above | FRCSE - ISR/ADDR - Material Burden | Material/Subcontractor Dollars | 8054 | $ 168,500 | 0.00% | $ - 0 | $ 346,000 | 0.00% | $ - 0 | $ 354,000 | 0.00% | $ - 0 | $ 363,000 | 0.00% | $ - 0 | $ 372,000 | 0.00% | $ - 0 | 8154 | $ 381,000 | 0.00% | $ - 0 | $ 390,000 | 0.00% | $ - 0 | $ 400,000 | 0.00% | $ - 0 | $ 410,000 | 0.00% | $ - 0 | 8254 | $ 205,000 | 0.00% | $ - 0 | $ - 0 | |||||
| USN | Over & Above | FRCSE - DWO - Material Burden | Material/Subcontractor Dollars | 8055 | $ 221,000 | 0.00% | $ - 0 | $ 452,000 | 0.00% | $ - 0 | $ 464,000 | 0.00% | $ - 0 | $ 475,000 | 0.00% | $ - 0 | $ 487,000 | 0.00% | $ - 0 | 8155 | $ 499,000 | 0.00% | $ - 0 | $ 511,000 | 0.00% | $ - 0 | $ 524,000 | 0.00% | $ - 0 | $ 537,000 | 0.00% | $ - 0 | 8255 | $ 268,500 | 0.00% | $ - 0 | $ - 0 | |||||
| USA | Over & Above | General Over & Above Rates - USA | 8090 | |||||||||||||||||||||||||||||||||||||||
| Program Management | Hour | 5 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 8190 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 8290 | 5 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician | Hour | 5 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 10 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Material/Subcontractor Burden | Material/Subcontractor Dollars | $ 24,000 | 0.00% | $ - 0 | $ 49,000 | 0.00% | $ - 0 | $ 50,000 | 0.00% | $ - 0 | $ 52,000 | 0.00% | $ - 0 | $ 53,000 | 0.00% | $ - 0 | $ 54,000 | 0.00% | $ - 0 | $ 55,000 | 0.00% | $ - 0 | $ 57,000 | 0.00% | $ - 0 | $ 58,000 | 0.00% | $ - 0 | $ 29,000 | 0.00% | $ - 0 | $ - 0 | ||||||||||
| USA | Over & Above | Travel Burden | Lot | 8091 | $ 871 | 0.00% | $ - 0 | $ 1,786 | 0.00% | $ - 0 | $ 1,830 | 0.00% | $ - 0 | $ 1,875 | 0.00% | $ - 0 | $ 1,922 | 0.00% | $ - 0 | 8191 | $ 1,969 | 0.00% | $ - 0 | $ 2,018 | 0.00% | $ - 0 | $ 2,068 | 0.00% | $ - 0 | $ 2,118 | 0.00% | $ - 0 | 8291 | $ 1,059 | 0.00% | $ - 0 | $ - 0 | |||||
| USA | Over & Above | TCTO/TD - Material Burden | Material/Subcontractor Dollars | 8092 | $ 5,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | 8192 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | 8292 | $ 5,000 | 0.00% | $ - 0 | $ - 0 | |||||
| USA | Over & Above | BFWT - Material Burden | Material/Subcontractor Dollars | 8093 | $ 5,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | 8193 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | $ 10,000 | 0.00% | $ - 0 | 8293 | $ 5,000 | 0.00% | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | TOTAL | $ - 0 | $ - 0 | TOTAL EVALUATED PRICE | |||||||||||||||||||
| *See "Calculation Methodology" worksheet for acronyms | ||||||||||||||||||||||||||||||||||||||||||
| $ - 0 | Double Check | |||||||||||||||||||||||||||||||||||||||||
| Note 1: | Enter O&A burden percentages as 100% plus the percentage amount. For example 7.55% burden percentage should be entered as 107.55% | $ - 0 | Difference should be $0 | |||||||||||||||||||||||||||||||||||||||
| Note 2: | All prices/rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all subcontractor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year. | |||||||||||||||||||||||||||||||||||||||||
| Note 3: | The proposed prices for the 6 month extension period shall equal the proposed prices for Option I Year 4. No input is required. |
Total Evaluated Price
| PERIOD OF PERFORMANCE | PRICE |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD (TRANSITION) - YEAR 1 (6 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD (PERFORMANCE) - YEAR 1 (6 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD - YEAR 2 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD - YEAR 3 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD - YEAR 4 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR BASIC PERIOD - YEAR 5 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION PERIOD I - YEAR 1 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION PERIOD I - YEAR 2 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION PERIOD I - YEAR 3 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION PERIOD I - YEAR 4 (12 MONTHS) | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTIONAL EXTENSIONAL PERIOD (6 MONTHS) | $0.00 |
| TOTAL EVALUATED PRICE (TEP) = (5 YEAR BASIC PERIOD + 4 YEAR OPTION PERIOD + 6 MONTH OPTIONAL ORDERING PERIOD | $0.00 |
File details come from the government source that posted it. Updated .