Amendment 2: Concrete repairs to dry dock 2 and dry dock 3

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N4008525B0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Portsmouth Naval ShipyardKittery, Maine 03904 Kittery, Maine 03904, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Facilities Engineering Command is soliciting concrete repairs to Dry Dock 2 and Dry Dock 3 at Portsmouth Naval Shipyard in Kittery, Maine. This comprehensive project involves specialized marine concrete repair work designed for a 50-year service life, including concrete spall repairs, floor delamination repairs, tunnel repairs, and drainage installation across multiple dry dock structures. The solicitation requires strict compliance with detailed specifications for marine-grade concrete with compressive strength between 4,500-6,500 psi, extensive quality control measures, AISC certified structural steel fabrication, and comprehensive documentation including mix designs, material certifications, and trial batch test results. Contractors must provide performance and payment bonds, maintain specific insurance requirements including $500,000 comprehensive general liability coverage, and comply with Davis-Bacon wage requirements. The proposal submission deadline is August 22, 2025 at 11:00 AM EST, with bid opening at 1:00 PM via conference call, and a mandatory site visit was scheduled for August 8, 2025 at Dry Dock #2.

This procurement is designated as a Total Small Business Set Aside under NAICS Code 237990 with a $45 million size standard, indicating the total project value exceeds $10 million based on submitted bids ranging from approximately $8.9 million to $15.1 million from six bidding companies including Engineered Construction Services, Swan Contracting, Lucianos Excavation, P&S Construction, and CCB, Inc. The contract structure includes a base contract (CLIN 0001) and four optional line items (CLIN 0002-0005) covering DD2 Pumpwell Wall Repairs, DD1 Tunnel Spall Repairs, DD3 Floor Delamination Repairs, and DD3 Drainage Installation. The base contract period is 375 calendar days from award date, with potential extensions up to 90 additional days, and requires a bid guarantee of 20% of the bid price or $3,000,000, whichever is less. All work will be performed at Portsmouth Naval Shipyard in Kittery, Maine, with the contract administered by NAVFACSYSCOM Mid-Atlantic located in Norfolk, Virginia.

Notice text

3 versions

Update #3 · Latest ·

Amendment 2: Concrete repairs to dry dock 2 and dry dock 3 at Portsmouth Naval Shipyard, Kittery, ME.

Update #2 ·

Concrete repairs to dry dock 2 and dry dock 3 at Portsmouth Naval Shipyard, Kittery, ME.

Update #1 ·

Concrete repairs to dry dock 2 and dry dock 3 at Portsmouth Naval Shipyard, Kittery, ME.

Files

Show all 17

Notice history

Notice Type Posted
Concrete repairs to dry dock 2 and dry dock 3 Award Award Notice
This notice Latest solicitation Solicitation
Concrete repairs to dry dock 2 and dry dock 3 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD NAICS 336611 — Total Small Business
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business
Drydock repairs for the CGC anvil NAICS 336611 — Total Small Business
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Bremerton, Washington 98314 · NAICS 237990 Naval Facilities Engineering Command No set-aside
Drydock Repairs USCGC HATCHET (WLIC-75309) NAICS 33661 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors