This is a Bid Form for FY25 Audit Repairs at Portsmouth Naval Shipyard in Kittery, Maine. The document outlines multiple Contract Line Item Numbers (CLINs) for various repair and maintenance tasks, including wall, deck, balcony, concrete, and drainage repairs across different sections (DD1, DD2, DD3). The bid form is structured with base bid (CLIN 0001) and four additional option quantities (CLIN 0002 through CLIN 0005), each covering specific repair work such as pumpwell wall repairs, tunnel spall repairs, floor delamination repairs, and drainage installation. Each CLIN includes spaces for material, labor, and equipment costs, with provisions for sub-contractor performance value, project management costs, overhead, profit, and bonding percentages. The document is a template for contractors to complete their pricing details for the proposed repair work at the naval shipyard.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
FY25 Audit Repairs
PROJECT LOCATION
Portsmouth Naval Shipyard Kittery, Maine
CONTRACTOR:
DATE:
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
0001AA DD2 West Wall Spall Repair 1 LS
0001AB DD2 East Side Deck Drainage Repairs 1 LS
0001AC DD2 Head End Capstan Repairs 1 LS
0001AD DD2 West Balcony Repairs 1 LS
0001AE DD3 Pumpwell Beam Repairs 1 LS
0001AF DD3 Pumpwell Concrete Repairs 1 LS
0001AG DD3 Pressure Plate repairs 1 LS
0001AH DD2 East Column Base Repairs 1 LS
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
NOTE:
Refer to Contract Docs and Repair Bid Schedule
CLIN 0001 - BASE BID
QUANTITY
PROJECT LOCATION
Portsmouth Naval Shipyard Kittery, Maine
CONTRACTOR:
DATE:
NOTE:
Refer to Contract Docs and Repair Bid Schedule
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
0002AA DD2 Pumpwell Wall Repairs 1 LS
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
0003AA DD1 Tunnel Spall Repairs 1 LS
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0003 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
CLIN 0003 - OPTION 02
QUANTITY
CLIN 0002 - OPTION 01
PROJECT LOCATION
Portsmouth Naval Shipyard Kittery, Maine
CONTRACTOR:
DATE:
NOTE:
Refer to Contract Docs and Repair Bid Schedule
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
0004AA DD3 Floor Delam repairs 1 LS
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0004 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
0005AA DD3 N Drainage install 1 LS
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0005 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
CLIN 0004 - OPTION 03
QUANTITY
CLIN 0005 - OPTION 04