About this opportunity

NIST, within the Department of Commerce, seeks firm-fixed-price quotations to transport spent fuel cells from its Center for Neutron Research in Gaithersburg, Maryland, to the Department of Energy Savannah River Site near Aiken, South Carolina, with responses due November 23, 2026 under Amendment 01. The acquisition is unrestricted (No Set-Aside Used) and proceeds under FAR Part 12 simplified acquisition procedures.

The base shipment (CLIN 0001) must be completed no later than December 31, 2028, and an optional second shipment (CLIN 0002) no later than December 31, 2030. The reactor produces approximately 28 spent fuel elements per year, and Q&A summaries cite up to 84 fuel sections under CLIN 0001. Place of performance is Gaithersburg, MD 20899, with acceptance at NIST's Gaithersburg facility.

The contractor must comply with NRC requirements and furnish transportation casks and loading equipment. Per Q&A summaries, a logistics company may serve as prime with subcontracted nuclear carriers, subcontractor certifications and past performance may establish capability, and NIST serves as shipper of record with the contractor as registered package user. A current NRC Certificate of Compliance with authorization documentation satisfies deliverable requirements. Amendment 03, posted November 10, 2026, answers all remaining solicitation questions and addresses bounding fuel characteristics (maximum decay heat of approximately 7 W per section, minimum cooling time exceeding 700 days) and site infrastructure, including a 52,000-pound outdoor staging capacity for the NAC-LWT container. Quoters must maintain active SAM.gov registration at submission and through final payment.

Quotations go by email to Nina.Lin@nist.gov and Donald.Collie@nist.gov in two volumes: Volume I (technical, with citations demonstrating compliance with each SOW requirement) and Volume II (price). Quotes remain valid 90 days from the due date. Award goes to the lowest-priced, technically acceptable quoter whose proposal demonstrates compliance with all SOW requirements. Non-small businesses must submit a small business subcontracting plan. Per Q&A summaries, NIST declined to share an IGCE range, historical pricing, or incumbent identity.

The NAICS code is 484230 (Specialized Freight Trucking, Long-Distance) with a small business size standard of $34 million, and the PSC is V112.

Notice text

4 versions

Update #4 · Latest ·

Amendment 03: See atttached Amendment 03 Q&A for responses to all remaining solicitation questions.

Amendment 02: See atttached Amendment 02 Q&A for responses to intial solicitation questions received. An additional  amendment Q&A will follow with responses to additional questions that are still pending responses.

Amendment 01: The response due date has been extended from November 5, 2026 to November 23, 2026. 

The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR) located in Gaithersburg, Maryland. The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, the NBSR produces approximately 28 spent fuel elements. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST is required to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina.

This requirement is for one base shipment to be completed no later than December 31, 2028, with an option for a second shipment to be completed no later than December 31, 2030. See attached solicitation# 1333ND27QNB610AMD and related attachments for full details.

Update #3 ·

Amendment 02: See atttached Amendment 02 Q&A for responses to intial solicitation questions received. An additional  amendment Q&A will follow with responses to additional questions that are still pending responses.

Amendment 01: The response due date has been extended from November 5, 2026 to November 23, 2026. 

The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR) located in Gaithersburg, Maryland. The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, the NBSR produces approximately 28 spent fuel elements. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST is required to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina.

This requirement is for one base shipment to be completed no later than December 31, 2028, with an option for a second shipment to be completed no later than December 31, 2030. See attached solicitation# 1333ND27QNB610AMD and related attachments for full details.

Update #2 ·

Amendment 01: The response due date has been extended from November 5, 2026 to November 23, 2026. 

The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR) located in Gaithersburg, Maryland. The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, the NBSR produces approximately 28 spent fuel elements. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST is required to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina.

This requirement is for one base shipment to be completed no later than December 31, 2028, with an option for a second shipment to be completed no later than December 31, 2030. See attached solicitation# 1333ND27QNB610AMD and related attachments for full details.

Update #1 ·

The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR) located in Gaithersburg, Maryland. The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, the NBSR produces approximately 28 spent fuel elements. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST is required to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina.

This requirement is for one base shipment to be completed no later than December 31, 2028, with an option for a second shipment to be completed no later than December 31, 2030. See attached solicitation# 1333ND27QNB610AMD and related attachments for full details.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Transportation of radiographic device (Yokosuka Naval Base) Yokosuka Kanagawa Japan · NAICS 481112 Naval Supply Systems Command No set-aside
Stoneville Hazardous Chemical Waste Packaging, Transportation, and Disposal Stoneville, Mississippi 38776, United States · NAICS 562211 Forest Service Total Small Business
F108--Radioactive Waste Disposal Services RFQ Amendment Ann Arbor VA Medical Center 2215 Fuller Road Contacting Facility In Regard To This Rfq., United States · NAICS 562211 Veterans Integrated Service Network 10 No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors