Amendment 03 QandA Spent Fuel.docx
DOCX document 35 KB Posted
- Solicitation number
- 1333ND27QNB610AMD
About this file
This file is an Amendment 03 Questions and Answers document providing clarifications to solicitation 1333ND27QNB610AMD regarding the shipment of spent fuel cells from the National Institute of Standards and Technology (NIST) Center for Neutron Research to the Department of Energy Savannah River Site. The Q&A addresses four key inquiries: (1) fuel characterization bounding values, with maximum decay heat of approximately 7 W per section, maximum activity of ~2030 Ci per section, and minimum cooling time exceeding 700 days; (2) site infrastructure specifications including crane capacities (20-ton and 15-ton hooks at C-200 and C-100 facilities respectively), pool bridge rating of 124,000 pounds, floor load limits of 1000 psf at the truck door meeting H20 standards, and outdoor staging area consisting of steel plate on concrete with 52,000-pound capacity for the NAC-LWT container; (3) confirmation that NIST will perform fuel element cutting and cropping; and (4) clarification that normal business hours are 7:00 am to 5:00 pm Monday through Friday.
This Q&A amendment provides essential technical and operational details necessary for contractors to develop compliant proposals for the base shipment deadline of December 31, 2028, and the optional second shipment by December 31, 2030. The responses establish critical parameters for transportation packaging design, lifting plan development, facility interface planning, and project scheduling that quoters must incorporate into their proposals and cost estimates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 02 QandA Spent Fuel.docx | DOCX document | |
| Attachment 1 Statement of Work.docx | DOCX document | |
| Attachment 2 Deliverables from Manufacturer for Standard Lifts - Custom Built.docx | DOCX document | |
| 1333ND27QNB610AMD Spent Fuel Cell Shipment 10-22-26.docx | DOCX document | |
| Attachment 3 Applicable Provisions and Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 03 to Solicitation 1333ND27QNB610AMD Questions and Answers November 10, 2026
1) Fuel characterization data: SOW Section 4, Government Access and Responsibilities, states the Government will provide residual uranium content, residual heat production, and radioactivity for individual fuel sections. Can bounding values (maximum decay heat per section and per shipment, maximum radioactivity, and minimum cooling time) be provided before the quotation due date, so quoters can confirm the proposed package's authorized contents bound the payload?
RESPONSE:
· Max decay heat per section: ~7 W
· Max activity per section: ~2030 Ci
· Min. Cooling time per section: >700 days
2) Site and lifting interface: To support the Lift Plan and Attachment 2, please provide, or confirm availability before the due date of: the rated capacity and hook height of the NCNR indoor crane over the pool area; the rated capacity of the bridge over the pool; the dimensions and floor load limits of the designated indoor entry point; and the location, surface type, and bearing capacity of the outdoor staging area.
RESPONSE:
· Rated capacity and hook height of crane
· C-200 crane
· 20T hook
· Hook height: 21.9 ft to C-200 floor, 43.3 ft to C-100 floor, 71 ft to B3(pool) floor
· C-100 crane
· 15T hook
· 15 ft to C-100 floor
· Rated capacity of bridge over pool
· Bridge rated for 124,000 lbs
· The floor in the basement is satisfactory to support the transfer cask for the NAC-LWT container on the fuel cask bridge.
· Dimensions and floor load limit at truck door
· C-100 general limit 1000psf and rated to meet H20 such that the trailer with transfer cask maybe backed into the space for unloading
· Location, surface type, bearing capacity of outdoor staging area
· Steel plate on concrete plinth near building access door
· Designed and rated to support the NAC-LWT container that we use to ship our fuel. Maximum weight of the package is 52,000 pounds.
3) Can you please confirm that NIST will cut/crop the fuel elements?
RESPONSE: Yes, NIST will cut the elements.
4) The scope of work lists normal business hours as both 7:00am – 5:00pm and 8:00am -5:00pm, can you please clarify?
RESPONSE: Normal Business Hours are 7:00am-5:00pm Monday – Friday.