CMc Services for Peace Arch U. S. Port of Entry Redevelopment, Blaine, WA
Award Notice Posted
- Solicitation number
- GS-10-P-06-LT-C-3022
- Agency
-
Region 10
Public Buildings Service, General Services Administration
- Awarded
- to J.e. Dunn Construction Company
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- GS-10P-06-LTC-3022 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Blaine, WA
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Summary of Award: This is a Construction Management as Constructor (CMc) contract for Redevelopment of the Peace Arch U.S. Port of Entry, Blaine, WA was AWARDED March 14, 2007 and announced on FedBizOps. As stated in that announcement, the contract consisted of 2 phases. The first phase was pre-construction activity, primarily verification of all design documents for constructability and cost realism, as well as partnering activity, verification of site conditions, value engineering, schedule development, subcontract plan development, and estimating. The duration of the first phase, which was extended, was approximately 14 months. The second phase is the actual replacement /construction of the facility. The estimated value announced was %59,977,247. Since the original award announcement, the construction phase option price ended up exceeding GSA's funding. Additional funding was requested. While waiting for the additional funding construction effort was moved into the design phase. When the highway elements were bid, the project again was over-budget and additional funding was requested. Before funding was provide the schedule for constructing all highway elements had to be approved. That approval was received 9/10/2008 and allowed the construction phase to begin. The additional funding was provided under ARRA and was obligated by modification PS15, May 7, 2009. The total contract price, including design phase, was $91,806,815. By the time the additional funding requested was provided the contractor had "bought-out" the job. There are currently no open subcontract opportunities. Subcontract opportunities for this project have been posted to FedBizOpps since contract start.
Update #2 ·
REQUEST FOR PROPOSALS GS-10P-06-LT-C-3022
PROJECT DESCRIPTION: Replacement/Expansion of U.S. Port of Entry, Blaine Washington. POE requires significant expansion and total replacement of the existing facility. The site size will expand to 12 acres with construction of a new facility measuring 93,404 gross square feet including vehicular inspection. The number of inbound lanes will increase and space will be provided to meet outbound inspection requirements. Parking will accommodate 154 spaces.
PROJECT MAGNITUDE: The Estimated Cost of Construction is between $40,000,000.00 and $45,000,000.00.
PROJECT DURATION: 24 30 months
EARLY EXCHANGES: Conducted with interested parties that responded to previously posted Sources Sought Notice. Summary of Early Exchanges have been posted with data current as of 6/23/2006.
COMPETITION: Unrestricted.
CONTRACTING METHOD: Best Value Source Selection, Guaranteed Maximum Price (GMP) Contract Type with Construction Manager as Constructor (CMc) Delivery Method and Award Fee Potential. The scope of CMc services is to include Design Phase Services (i.e., constructability reviews, value engineering, project schedule and construction cost development, etc) and Construction Phase Services (i.e., construction contract and subcontract administration, CPM scheduling, monitoring of construction costs, etc.). For this contract, technical factors will be given significantly greater weight than the GMP Proposal in the selection of a successful offeror.
PROPOSAL SUBMISSION REQUIREMENTS: Proposals will be evaluated in two Phases. In Phase 1, offerors will be evaluated on technical factors including qualifications, past performance, and key personnel. Phase 2 offerors will be evaluated on submission of their GMP Proposal consisting of a conceptual estimate and pricing for Design Phase Services, and any other requirements stated in detail in the RFP.
CONTRACT AWARD: A guaranteed maximum price (GMP) contract will be awarded to the selected firm to provide Design Phase services. The price for Construction Phase services will be negotiated at a later date, resulting in a fixed price award fee contract.
SOLICITATION ISSUE DATE: June 23, 2006
PRE-PROPOSAL CONFERENCE: A pre-proposal conference is expected to occur around or about July 12, 2006, but will be confirmed via posting in FedBizOpps at a later date. At that time, please notify the POC via e-mail of the name and contact information of each person planning to attend.
CLOSING DATE: Stage I submittals are to be received no later than 2:00 PM PST on July 25, 2006. Only technical submittals should be submitted. GMP proposals will not be considered until the second stage of the source selection process.
SOLICITATION DISTRIBUTION METHOD: Exclusively via FedBizOpps electronic postings. No paper documents will be issued.
Update #1 ·
The GSA is seeking a contractor to perform as the CMc (Construction Manager as Constructor) for the redevelopment of the existing U.S. Port of Entry (POE) located in Blaine, WA. Currently, the POE does not meet the operational needs of the Department of Homeland Security (DHS)/Customs and Border Protection, and requires total replacement of the existing POE with a significantly expanded facility. The POE is to remain operational throughout construction. The new facility shall include approximately 102,400 gross square feet of building area and 148 parking spaces. Expansion may affect the functionality of the Interstate 5 exit to the City of Blaine. The City of Blaine, in partnership with Washington Department of Transportation, Federal Highways Administration, Whatcom County Council of Governments and General Services Administration, is studying access to and from Interstate 5 in Blaine. The number of inbound traffic lanes will increase and space will be provided to meet outbound inspection requirements. Bolin Cywinski Jackson (BCJ) is the design Architect. Preliminary design began November 20, 2003. Construction funding is estimated between $40 - 45 million. GSA presently assumes a construction start of February 2007 and a project duration of 24 - 30 months. GSA intends to award a Guaranteed Maximum Price (GMP) contract for construction services consisting of Design Phase Services and an Option for the actual construction. GSA intends to issue a Best Value Request For Proposals (RFP). Evaluation factors and sub-factors being considered are Past Performance, Key Personnel, Staffing Plan, Oral Presentation and Price. BY THIS POSTING, GSA WOULD LIKE TO BEGIN EARLY EXHANGES WITH INDUSTRY. Parties interested in meeting with the Contracting Officer (Patrick Brunner) and Project Manager (Mike Nuernberger) should request a meeting by EMAIL. Please send the EMAIL to maria.williams@gsa.gov.
Files
| File | Type | Posted |
|---|---|---|
| Bid Pack 13 - Addeundum 1.pdf | ||
| Final Clean Bid Scope.doc | DOC document | |
| JED BidPack 11.pdf | ||
| JED Bid Pack 10.pdf | ||
| 06.3Amendment3-Phase2Pricing.doc | DOC document | |
| 06.3.1Amendment3SF30.pdf | ||
| 06.3.3Amendment3SampleGMPProposaltemplate.xls | XLS spreadsheet | |
| 06.3.2Amendment3Div1(Draft)(PeaceArch).doc | DOC document | |
| 06.2.1RFP(PeaceArch).doc | DOC document | |
| 00.2EarlyExchanges(PeaceArch).doc | DOC document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity