06.3.2Amendment3Div1(Draft)(PeaceArch).doc
DOC document 914 KB Posted
- Solicitation number
- GS-10-P-06-LT-C-3022
About this file
Division 1 (Draft)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Pack 13 - Addeundum 1.pdf | ||
| Final Clean Bid Scope.doc | DOC document | |
| JED BidPack 11.pdf | ||
| JED Bid Pack 10.pdf | ||
| 06.3Amendment3-Phase2Pricing.doc | DOC document | |
| 06.3.1Amendment3SF30.pdf | ||
| 06.3.3Amendment3SampleGMPProposaltemplate.xls | XLS spreadsheet | |
| 06.2.1RFP(PeaceArch).doc | DOC document | |
| 00.2EarlyExchanges(PeaceArch).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PEACE ARCH U.S. PORT OF ENTRY REDEVELOPMENT
BLAINE, WA
SECTION 01110
SUMMARY OF WORK
PART 1 ‑ GENERALPRIVATE
FOR DIVISION 1: PENDING ITEMS HAVE BEEN BOLDFACED. SEARCH FOR <BOLD> AND RESOLVE PRIOR TO FINAL ISSUE. 12 APR 00 1.1
RELATED DOCUMENTS
A.
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.
Document RESERVED
2.
Document RESERVED
3.
Section 01110, Summary of Work
4.
Section 01119, Cladding Design Criteria
5.
Section 01210, Allowances
6.
Section 01220, Unit Prices
7.
Section 01230, Options
8.
Section 01250, Contract Modification Procedures
9.
Section 01290, Payment Procedures
10.
Section 01310, Project Coordination
11.
Section 01312, Project Meetings
12.
Section 01314, Communications
13.
Section 01326, Construction Schedule (CPM)
14.
Section 01330, Submittal Procedures
15.
Section 01335, Submittal Checklist
16.
Section 01380, Construction Photographs SUGGEST SECTION BE DELETED. IF IT IS DELETE REFERENCE IN 1210 AND 1330.
17.
Section 01421, Definitions and Standards
18.
Section 01430, Mockups
19.
Section 01450, Quality Control Services
20.
Section 01500, Temporary Facilities
21.
Section 01546, Safety and Health
22.
Section 01570, Temporary Environmental Controls
23.
Section 01630, Products Requirements
24.
Section 01631, Product Substitution
25.
Section 01632, Substitution Request Form
26.
Section 01722, Field Engineering
27.
Section 01733, Cutting and Patching
28.
Section 01738, Job Site Recycling
29.
Section 01739, Solid Waste Disposal Summary
30.
Section 01770, Closeout Procedures
31.
Section 01784, Operation and Maintenance Data
32.
Section 01784, Product Warranties
33.
Section 01789, Project Record Documents
34.
Section 01810, Commissioning
1.2 seq level2 \h \r0 seq level3 \h \r0
PROJECT/WORK IDENTIFICATION
Project Name and Location: Nakamura Courthouse Renovation, Seattle, Washington.
B.
Architect: The term "Architect" refers to the professional services contractor listed below. The Architect's status relative to this construction will be fully delineated in writing by the Contracting Officer prior to the pre‑construction conference.
This project was designed by Weistein A/U, Seattle, WA for the General Services Administration.
C.seq level3 \h \r0 Contract documents indicate the work of contract, and related requirements and conditions that have an impact on the project. Related requirements and conditions that are indicated on the contract documents include, but are not necessarily limited to, the following:
Existing site conditions and restrictions.
Other work prior to work of contract.
Alterations and coordination with existing work.
Work by other contractors occurring concurrently with work of Contract.
Other work subsequent to work of Contract.
Options, whether accepted or not.
Elevator maintenance option, whether accepted or not.
D.seq level3 \h \r0 Summary by References: Work of Contract can be summarized by reference to the conditions of the contract, specification sections as listed in the "Index of Specification Sections" bound herewith, drawings as listed in "Schedule of Drawings" bound herewith, and modifications to the contract documents, including but not necessarily limited to printed matter referenced by any of these.
E.
Abbreviated Written Summary: Briefly, and without force and effect upon contract documents, work of contract can be summarized as follows:
The work includes, but is not limited to, excavation, demolition, hazardous material abatement, seismic structural upgrade, roof replacement, electrical and HVAC system upgrades, window replacement, exterior façade repair and interior finishes.
Site Development: The Nakamura United States Federal Courthouse – Seattle Washington site is located is downtown Seattle at 1010 5th Avenue. Sitework will include protection of exiting vegetation, historical markers, and construction of a new underground parking structure.
Mechanical: Exiting mechanical systems will be demolished and replaced with modern energy efficient system.
Electrical: Exiting electrical systems will be demolished and replaced.
Telecommunication: Telecommuniction closets and wiring chases will be built.
1.3 seq level2 \h \r0
PARTNERING
The Government anticipates formation of a cohesive partnership with the General Contractor and its subcontractors, the architect and engineering firms, client agencies, building management, and maintenance personnel. The partnership will draw on the strengths of each member to develop a quality product, on schedule, in an efficient and safe manner.
1.4 seq level2 \h \r0
CONTRACTOR USE OF PREMISES
General: In addition to site utilization limitations and requirements shown on drawings, and indicated by other contract documents, administer allocation of available space equitably among entities needing access and space, so as to produce best overall efficiency in performance of total work of project. Schedule deliveries so as to minimize space and time requirements for storage of materials and equipment on site.
Ceremonies: Subject to mutually satisfactory arrangements between the parties of the contract, the Government may enter the premises during the term of the contract to conduct ceremonies, and to occupy temporarily such portions of the premises as may be necessary.
C.
Parking Facilities: The Contractor and its subcontractors shall make their own arrangements for their employee’s vehicle parking.
1.5
COORDINATION WITH OTHER CONTRACTORS
General: Other contractors will be in the building during construction, such as system furniture installers, telephone/computer contractors to install riser/distribution cabling and equipment, electronics and security contractors, and other utility contractors. Contractor will have full use of the site, however coordination of the work and schedules of operation with other contractors on site will be required. All parties shall conform to site rules and regulations affecting the work while engaged in project construction.
Designate exclusive use of one or more elevators to service all floors for other contractors use during the last 8 months of the contract.
Loading dock areas are to be shared by all contractors.
Storing materials/equipment in the loading dock areas is strictly prohibited by all contractors, unless approved by GSA and agreed by all contractors in the building at the time.
Other contractors shall be required to schedule use of the loading dock areas at least 24 hour in advance with the Contractor.
The Contractor shall not be reimbursed for building utility costs that may occur due to other contractors using the building utilities.
1.6 seq level2 \h \r0
PROTECTION
Personnel: The Contractor shall protect personnel, whether passers‑by, occupants of existing building or adjacent buildings, or visitors to the site from harm and injury.
Construction: The Contractor shall protect existing and adjoining structures, sidewalks, curbs, streets, utilities, and work of any kind which is to remain from damage, defacement, or interruption of service, except as may be specially directed or authorized. All paving for sidewalks, streets, alleys, and other traffic ways shall be repaired, if damaged, and left in a condition approximating the original condition.
Existing Utilities: The Contractor shall protect existing utilities from any damage or interruption of service. If necessary obtain permission of utility Owners and relocate as required for completion of the Work.
D.
Adjacent Buildings & Property:
Prior to commencement of any work, the contractor shall inspect adjacent buildings and property for existing cracks or signs of damage and structural strain.
Record defects observed and photograph for future determination of damage caused by the work of this Contract.
a.
Narrated videotape may be used in lieu of photographs.
3.seq level4 \h \r0 During period when excavation is open, and while streets and adjacent property are being supported by temporary bracing or shoring, make periodic readings and inspections to ascertain signs of stress or strain being caused by the work.
Should signs of strain be observed, notify Architect immediately and proceed with corrective measures as directed.
1.7 seq level2 \h \r0
INSPECTION BY REGULATORY AUTHORITIES
This project is subject to inspection by GSA and regulatory authorities designated by GSA.
The Contractor shall notify the Contracting Officer when inspections take place.
1.8
MISCELLANEOUS AND GENERAL PROVISIONS
Existing Water Service: The contractor is responsible for protecting and maintaining the exiting water service.
Other Existing Utility Services: Other existing utilities include, city steam and electrical service from Seattle City Light.
New Work: Unless otherwise noted on drawings or specified, new work in connection of all utilities shall correspond in all respects with that to which it connects, or to similar existing conditions, in materials, workmanship, finish, and in compliance with the requirements of utility governing authority. Underground utility services shall be provided complete to all points of connection to utility as shown on Drawings and specified under other sections of these specifications. Any "Limit of Contract" lines or similar general limits that may appear on site or other drawings shall not be deemed to apply to the foregoing utility work. Coordination for connection to exiting city utilities is the responsibility of the Contractor.
D.
Alterations to New Work: Refer to Section 01733 - Cutting and Patching for requirements.
PART 2 ‑ PRODUCTS (Not Applicable)
PART 3 ‑ EXECUTION (Not Applicable)
END OF SECTION
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
SUMMARY
This section does not specify products. It is a reference section containing design requirements common to several sections which specify exterior building elements. These related sections include:
03450 - Architectural Precast Concrete
04851 Dimension Stone Cladding
05410 - Load-bearing Metal Stud System
07610 - Sheet Metal Roofing
07613 - Sheet Metal Wall Cladding
07710 - Manufactured Roof Specialties
08330 - Coiling Doors
08450 - All-Glass Entrance Doors
08632 - Custom Metal-Framed Skylights
08800 - Glass and Glazing
08910 - Glazed Aluminum Systems
10210 - Metal Wall Louvers
10214 - Metal Screen Wall System
B.seq level3 \h \r0 Section Includes:
Design criteria for exterior wall and roof systems.
1.3 seq level2 \h \r0
DEFINITIONS
Design Levels - Non-structural Component Damage Limits:
Life Safety Design Level: Component remains in place, component damage permitted, connection damage permitted. Non-tempered glass breakage permitted only if light remains in opening. Tempered glass breakage permitted.
Immediate Occupancy Design Level: Substantial weather protection maintained, minor cracking permitted, no connection damage, no glass breakage.
Substantial weather protection: External sealant damage permitted. Displacement of glazing gaskets permitted, but gaskets must remain attached to window (i.e. not fall out). Damage which would require disassembly or removal of component to accomplish repair not permitted.
1.4
SYSTEM DESCRIPTION
Exterior cladding systems shall be…… 1.5 seq level2 \h \r0
SUBMITTALS
Shop Drawings: Include for each section referencing this section.
Show all connections to primary structure with loads imposed by each connection.
Imposed loads: Include seismic, wind, gravity, and (as applicable) blast.
1.6 seq level2 \h \r0 seq level3 \h \r0 seq level4 \h \r0
LOADING / DESIGN CRITERIA
Gravity Loads ‑ Design and detail all members and connections to meet the requirements of the 2000 IBC based on the actual dead weight of the cladding materials as a minimum including the weight of all connection materials.
Wind ‑ Design and detail all members and connections to meet the requirements of the 2000 IBC based on 150 km/hour basic wind speed and Exposure B.
Damage limits: Immediate occupancy design level.
Building Cladding: Minimum 1.2 kPa inward / outward pressures.
Seismic ‑ Design and detail all members and connections to meet the requirements of the 2000 IBC (International Building Code) based on Seismic Zone 3 criteria. Allowable connector loads / connection stresses shall not include a 4/3 load / stress increase for seismic loads.
1.7
CLIMATIC DESIGN CONDITIONS
Ambient Temperature Range: Minus 15 to plus 35 degrees C.
Maximum Solar Radiation: 10.3 Watts per square meter for 100 percent absorptive (blackbody) surface normal to solar angle.
Anticipated dark metal surface temperature 155 degrees C.
1.8 seq level2 \h \r0
PRIMARY STRUCTURE CRITERIA
Beams have been designed to resist loads as shown in the structural plans. Beams shall not support lateral loads at the bottom flange of the beam unless specifically detailed. Contractor shall coordinate design of connections for cladding systems to primary structure with lateral support shown on structural drawings. Columns shall not resist torsional loads applied by the cladding system through their connections to the columns.
Where additional lateral loads from cladding are resisted by the bottom flange of a beam, the contractor shall design, supply, and install additional bottom flange bracing as required to laterally support the bottom flange of the beam.
The contractor shall design all cladding systems to transfer torsional loads to floor diaphragms.
Beam Deflections: Beams which support cladding have been designed to limit live load deflections to the lesser of L/360 or 13 mm maximum up or down.
Column Shortening: Concrete and steel columns have been designed to limit total load shortening of the column to 2.5 mm per floor down.
Lateral Horizontal Story Drift:
Life Safety Design Level: 0.015 x H (where H equals height above ground level. (90 mm in 6 m).
Immediate Occupancy Design Level: 0.002 x H.
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
This Section includes administrative and procedural requirements governing allowances.
Selected services, materials and equipment are specified in the Contract Documents by allowances. In some cases, these allowances include installation. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation.
Types of allowances include the following:
Inspection and testing allowances.
2. Dewatering allowance.
Related Sections:
Construction Contract Clauses specify procedures for submitting and handling Change Orders.
Section 01450 "Quality Control Services" specifies procedures governing the use of allowances for inspection and testing.
1.3 seq level2 \h \r0
SELECTION AND PURCHASE
Advise the Contracting Officer of the date when the final selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work. Ensure this notification activity is included in the project schedule and occurs 60 days prior.
At the Contracting Officer's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.
Purchase products and systems selected by the Contracting Officer from the designated supplier.
1.4
Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders.
Submit invoices or delivery slips to show the actual quantities of materials delivered to the site for use in fulfillment of each allowance.
1.5
INSPECTION AND TESTING ALLOWANCES
Inspection and testing allowances include the cost of engaging the inspection or testing agencies, the actual inspections and tests, and reporting the results.
The allowance does not include incidental labor required to assist the testing agency or costs for retesting upon failure of previous tests and inspections.
Costs of services not required by the Contract Documents are not included in the allowance.
At Project closeout unused amounts remaining in the inspection and testing allowance are returned to the Government. Deobligation of excess funding will be evidenced by contract modification.
1.6
DEWATERING ALLOWANCE
The Dewatering system will be designed by the dewatering contractor based on the test wells installed by the dewatering contractor, and not any information provided by GSA. The system should be designed to achieve and maintain water levels needed to perform the construction activity as sequenced and within the durations identified on the approved CMP schedule.
1.7 seq level2 \h \r0
UNUSED MATERIALS
Return unused materials to the manufacturer or supplier for credit to the Government, after installation has been completed and accepted.
When requested by the Contracting Officer, prepare unused material for storage by Government where it is not economically practical to return the material for credit. When directed by the Contracting Officer, deliver unused material to the Government's storage space. Otherwise, disposal of unused material is the Contractor's responsibility.
PART 2
seq level1 \h \r0 seq level2 \h \r0 seq level3 \h \r0 ‑ PRODUCTS (Not Applicable)
PART 3 ‑ EXECUTION
3.1
EXAMINATION
Examine products covered by an allowance promptly upon delivery for damage or defects.
3.2
PREPARATION
Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 seq level2 \h \r0
SCHEDULE OF ALLOWANCES
FINAL LIST AND AMOUNT OF ALLOWANCES TO BE DETERMINED
Allowance No. 1: Include the sum of $__________ for inspection and testing.
B. Allowance No. 2: Include the sum of $__________ for Dewatering costs.
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
This Section includes administrative and procedural requirements for unit prices.
Related Sections: The following Sections contain requirements that relate to this Section:
Section 01250 - "Modification Procedures" for procedures for submitting and handling Change Orders.
Section 01450 - "Quality Control Services" for general inspection requirements.
Section 02300 - "Earthwork" for procedures for measurement and payment for rock excavation.
Section 02450 - Drilled Concrete Shaft for procedures for measurement for payment for drilled piles.
1.3 seq level2 \h \r0
Unit price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum through an allowance, if the estimated quantities of Work required by the Contract Documents are increased or decreased.
1.4
PROCEDURES
Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, profit, and applicable taxes.
Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
The Contracting Officer reserves the right to reject the Contractor's measurement of work‑in‑place that involves use of established unit prices, and to have this work measured, at the Government's expense, by an independent surveyor acceptable to the Contractor.
Schedule: A "Unit Price Schedule" is included at the end of this Section. Specification Sections referenced in the Schedule contain requirements for materials described under each unit price.
PART 2
seq level1 \h \r0 seq level2 \h \r0 ‑ PRODUCTS (Not Applicable)
PART 3 ‑ EXECUTION
3.1
UNIT PRICE SCHEDULE
FINAL LIST PENDING - include "base bid quantity" for each
END OF SECTION
PART 1 ‑ GENERALPRIVATE
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
Intent: It is the intent of the Government to award a contract for the construction of the project, complete, as shown on the drawings and specified; however, the necessity of obtaining bids that will allow the maximum amount of construction within a fixed budget requires the following option proposals.
Right to Reject: The Government reserves the right to accept, or to reject, any or all of the bids.
Coordination: The Contractor shall coordinate related work and modify or adjust adjacent work as required to ensure that work affected by each accepted option is complete and fully integrated into the project.
For purposes of identification of options, reference may be made to Drawing numbers containing essential information about scope of specific options. Complete information is not limited to referenced Drawings. Contractor shall be responsible for investigating all related Drawings and Specifications in order to determine full extent of options described.
Include as part of each option, miscellaneous devices, appurtenances and similar items incidental to or required for a complete installation whether or not mentioned as part of the option.
1.3 seq level2 \h \r0
DESCRIPTION OF BASIC BID
Basic Bid: Includes all labor, materials, services and incidentals necessary for the completion of General Construction Work, including Mechanical and Electrical Work, for the project as indicated and specified.
1.4 seq level2 \h \r0
DESCRIPTION OF OPTION BIDS
LIST OF OPTIONS PENDING
A.
Option Bids: Offerors shall include, in the spaces provided on the "Evaluated Total Bid Form", a net amount for adding or deducting construction of the work indicated by each option item, to the Basic Bid. Each option bid shall include costs of all adjustments in the Work of all trades made necessary by the option construction.
DESCRIBE ALTERNATES BASED ON A WRITTEN DESCRIPTION FROM THE PROJECT MANAGER.
Option No. 1 Identify from Alternate Priority List
Option No. 2 Identify from Alternate Priority List
OPTIONAL FORM - INCLUDES "BASE BID" DESCRIPTION
PART 2
seq level1 \h \r0 seq level2 \h \r0 seq level3 \h \r0 ‑ PRODUCTS ‑ NOT APPLICABLE
PART 3 ‑ EXECUTION ‑ NOT APPLICABLE
END OF SECTION
NOTE TO SPECIFIER: IF ANY PARAGRAPHS ARE DELETED FROM THIS SECTION BE SURE TO CHECK THE REFERENCES IN THIS SECTION TO OTHER PARAGRAPHS THAT PROBABLY CHANGED
PART 1 ‑ GENERALPRIVATE
Contract GS-10P-XX-LTC-XXXX, specifically clauses entitled
CHANGES(52.243-4) and EQUITABLE ADJUSTMENTS (552.232-71).
SUMMARY:
Contract changes shall be processed according to the clauses cited above. Constructware (software application) module titled “Cost
Event” shall be used to process all equitable adjustment requests.
1.2 seq level2 \h \r0
Submit name of the individual authorized to accept changes, and to be responsible for informing others in Contractor's employ of changes in the Work.
PART 2
seq level1 \h \r0 seq level2 \h \r0 ‑ PRODUCTS 2.1
NOT APPLICABLE
PART 3
seq level1 \h \r0 ‑ EXECUTION 3.1seq level2 \h \r0
DETERMINATION OF COST
Cost Documentation: Where changes in the Work or modifications to the Contract Documents involve adjustments to the Contract Sum, Contractor shall prepare, in such form as the Contracting Officer may prescribe, an itemized accounting together with appropriate supporting data in accordance with the following:
Allowable Costs: Unless otherwise provided in the Contract Documents, costs to be included are limited to the following:
Actual costs of labor, including social security, old age, and unemployment insurance, fringe benefits required by agreement or custom, and workers' or workmen's compensation insurance;
b.
Actual costs of materials, supplies, and equipment, including cost of transportation, whether incorporated or consumed. Provide invoice slips as documentation;
c.
Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others with hourly rates as follows:
(1) Equipment rented by Contractor or subcontractor from an unrelated third party: Actual cost.
(2) Equipment owned by Contractor or subcontractor: One half (1/2) or the current Blue Book hourly rental rate plus full value Blue Book estimated operating costs per hour.
(3) Equipment not listed in Blue Book: Rental rate established by mutual agreement.
d.seq level5 \h \r0 Small tools and consumables for which initial cost is $500 or less per tool or consumable.
e.
Engineering services, including layout, line and grade and/or coordination;
f.
Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the work; and g.
Additional costs of supervision and field office personnel directly attributable to the change.
h.
Additional costs, when authorized by the Contracting Officer, for flag persons, watch persons and security personnel
2.seq level4 \h \r0 Disallowed Costs: The following items, elements or components for changes in the Work or proposed changes, are to be covered by the allowance for overhead and profit stated and are excluded:
All classifications of administrative, supervisory, and clerical personnel not engaged manually in the performance of the Work, including timekeepers, clerks or other personnel located at the Contractor's project field office.
Miscellaneous expenses, job burden, and/or other generalized categories of cost or expense; and, Use of small tool and/or miscellaneous consumables;
d.
Insurance other than insurance coverage required herein.
Loss of efficiency or productivity.
Capital expenses, including interest on capital employed in connection with Extra Work.
Legal costs.
Federal, state, or local taxes such as business, income, and franchise taxes.
i.
Cost of any item not specifically and expressly included in the items described as "Allowable Costs", above.
In order to facilitate checking of quotations for extras or credits, all proposals, except those so minor that their propriety can be seen by inspection, shall be accompanied by a complete itemization of costs including labor, materials and Subcontractors.
Labor and materials shall be itemized in the manner prescribed above.
Where major cost items (exceeding $1000.00) are Subcontracts, they shall be itemized also.
In no case will a change involving over $500.00 be approved without such itemization.
C. During the design phase of this procurement, the Contractor, and selected first tier subcontractors were primarily responsible for ensuring the constructability of the design. During construction, constructability problems are primarily the responsibility of the construction contractor and the cost of the resulting changes shall only include direct costs.
3.2seq level2 \h \r0
CONTRACTOR'S COST SAVINGS PROPOSALS
The Contractor is permitted to propose changes in the Drawings, design, Specifications, or other contract requirements in the event that such changes would result in a savings to the Government, as described herein. Such proposals shall be submitted to the Contracting Officer under a (CCR) (Refer to Article "CONTRACTOR CHANGE REQUEST (CCR)", above). Acceptance of the Contractor's proposal shall be indicated by the execution of a Change Order.
The Contractor shall submit the following minimum information with each Cost Savings Proposal for review:
Description of difference between existing contract requirements and the proposed changed work recommended by Contractor, stating the comparative advantages and disadvantages of each change, including such intangible items as life expectancy, comparative operation, and maintenance costs, etc.
The date of conception of the changed work and an itemization of tangible cost savings which would be immediately realized, excluding intangible items such as lower maintenance costs, longer life expectancy, etc.
A statement of the time by which the Cost Savings Proposal must be acted upon to achieve the maximum cost savings, and other limitations or conditions, if any.
A statement noting effects the Cost Savings Proposal will have on completion of the work or the work of others.
The Contracting Officer may accept or reject, in whole or in part, at his sole discretion, any Cost Savings Proposal submitted by the Contractor. Contracting Officer shall communicate his decision to the Contractor in writing within a reasonable period of time after receipt of Contractor's Cost Savings Proposal. If the Government wishes to accept part or all of Contractor's Cost Savings Proposal, the Contracting Officer will draft, execute, and send to Contractor a Change Order covering the changed work. Until the Contractor is notified in writing of acceptance of part of or all of Contractor's Cost Savings Proposal, the Contractor shall be obligated to perform the work in accordance with unmodified terms of the Contract.
3.3seq level2 \h \r0
OVERTIME WORK
The Contract Sum will be adjusted to include premium‑time wages for Contracting Officer‑requested and authorized overtime Work performed after regular working hours, or on Saturday, Sunday, and regular holidays.
All other costs of overtime Work required by the nature of this Contract, except as provided in this Article, shall be at the expense of the Contractor.
3.4seq level2 \h \r0
CORRELATION OF CONTRACTOR SUBMITTALS.
Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum as shown on Change Order.
Promptly revise Progress Schedules to reflect any change in Contract Time, revise subschedules to adjust times for other items of work affected by the change, and resubmit.
PART 1 - GENERALPRIVATE
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
This Section specifies administrative and procedural requirements governing the Contractor's Applications for Payment.
Coordinate the Schedule of Values and Applications for Payment with the Contractor's Construction Schedule, Submittal Schedule, and List of Subcontracts.
01312 - Project Meetings; "pencil" payment request review at monthly progress meeting.
01314 - Communications; Non-conformance notice.
01326 - Construction Schedule (CPM).
01330 - Submittal Procedures.
1.3 seq level2 \h \r0
SCHEDULE OF VALUES
General: Submit a cost breakdown of the Contract Sum in accordance with FAR 52.232-5 entitled PAYMENTS UNDER FIXED-PRICE
CONSTRUCTION CONTRACT. Submit in format and content as described below, listing each subdivision of the work separately with its respective portion of the Contract Sum on the Schedule. List administrative and general conditions items separately. Upon request of the Contracting Officer, furnish support data substantiating the correctness of any designated amounts. The total of values listed shall equal the contract Sum.
Coordination: Coordinate preparation of the Schedule of Values with preparation of the Contractor's Construction Schedule.
Correlate line items in the Schedule of Values with other required administrative schedules and forms, including:
Contractor's Construction Schedule.
Application for Payment forms, including Continuation Sheets.
List of subcontractors.
Schedule of allowances.
Schedule of options.
List of products.
List of principal suppliers and fabricators.
Schedule of submittals.
Subschedules: Where Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment.
Format and Content: Use the Project Manual table of contents as a guide to establish the format for the Schedule of Values. Provide at least one line item for each Specification Section.
Identification: Include the following Project identification on the Schedule of Values:
Project name and location.
Project number.
Contractor's name and address.
Date of submittal.
Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:
Related Specification Section or Division.
Description of Work.
Name of subcontractor.
Name of manufacturer or fabricator.
Name of supplier.
Dollar value.
Percentage of Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.
seq level5 \h \r0 Provide a breakdown of the Contract Sum in sufficient detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Break principal subcontract amounts down into several line items.
Round amounts to nearest whole dollar; the total shall equal the Contract Sum.
Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment, purchased or fabricated and stored, but not yet installed.
Differentiate between items stored on-site and items stored off-site. Payment for items stored off-site will not be authorized unless the material is stored in an insured bonded warehouse or the risk of loss is addressed in some other fashion approved by the Contracting Officer as required by FAR 52.232-5 entitled PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACT.
6.seq level4 \h \r0 Provide separate line items on the Schedule of Values for initial cost of the materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
Each item in the Schedule of Values and Applications for Payment shall be complete. Include the total cost and proportionate share of general overhead and profit margin for each item.
Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at the Contractor's option.
8.seq level4 \h \r0 Schedule Updating: Update and resubmit the Schedule of Values prior to the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.
1.4 seq level2 \h \r0
APPLICATIONS FOR PAYMENT
Each Application for Payment shall be consistent with previous applications and payments as certified by the Contracting Officer and paid for by the Government.
The initial Application for Payment, the Application for Payment at time of Substantial Completion, and the final Application for Payment involve additional requirements.
Payment-Application Times: Each progress-payment date is indicated in the Agreement. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement.
Payment applications must be submitted by the 25th day of each month (for work projecting through the end of that month) for review by the Contracting Officer on an original standard AIA Application for Payment form, modified to include additional information required by GSAM clause 552.232-70 entitled INVOICE REQUIREMENTS. All payments will be subject to the approval of the Contracting Officer. Payments will be made consistent with FAR clause 52.232-37 entitled PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS.
C.seq level3 \h \r0 Payment-Application Forms: Use AIA Document G702 and Continuation Sheets G703 or similar computer-generated form. The contractor may use GSA Form 2419, Certification of Progress Payments Under Fixed-Price Construction Contracts, for the certification required by FAR 52.232–5.
Application Preparation: Complete every entry on the form. The Contracting Officer may return incomplete applications without action.
Entries shall match data on the Schedule of Values and the Contractor's Construction Schedule. Use updated schedules if revisions were made.
Include amounts of Change Orders and Construction Change Directives issued prior to the last day of the construction period covered by the application.
E.seq level3 \h \r0 Transmittal: Submit signed original with required certification to the Contracting Officer by a method ensuring receipt within 24 hours.
F.
Initial Application for Payment: Administrative actions and submittals, that must precede or coincide with submittal of the first Application for Payment, include the following:
Schedule of Values (preliminary).
List of Contractor's staff assignments.
List of Contractor's principal consultants.
Initial progress report.
Report of preconstruction meeting.
Initial settlement survey and damage report, if required.
G.seq level3 \h \r0 Second Application for Payment: Administrative actions and submittals, that must precede or coincide with submittal of the first Application for Payment, include the following:
List of subcontractors.
List of principal suppliers and fabricators.
Schedule of Values.
Contractor's CPM Construction Schedule.
Schedule of principal products.
Schedule of unit prices.
Submittal Schedule.
Copies of authorizations and licenses from governing authorities for performance of the Work.
Progress report.
H.seq level3 \h \r0 Application for Payment at Substantial Completion: Following issuance of the Certificate of Substantial Completion, submit an Application for Payment.
This application shall reflect Certificates of Partial Substantial Completion issued previously for Government occupancy of designated portions of the Work.
Administrative actions and submittals that shall precede or coincide with this application include:
Warranties (guarantees) and maintenance agreements.
Test/adjust/balance records.
Maintenance instructions.
Meter readings.
Startup performance reports.
Changeover information related to Government's occupancy, use, operation, and maintenance.
Final cleaning.
Application for reduction of retainage and consent of surety.
Final progress photographs.
j.
List of incomplete Work, recognized as exceptions to Certificate of Substantial Completion.
I.seq level3 \h \r0
Final Payment Application: Administrative actions and submittals that must precede or coincide with submittal of the final Application for Payment include the following:
Completion of Project closeout requirements.
Completion of items specified for completion after Substantial Completion.
Ensure that unsettled claims will be settled.
Ensure that incomplete Work is not accepted and will be completed without undue delay.
Transmittal of required Project construction records to the Government.
Certified property survey.
Removal of temporary facilities and services.
Removal of surplus materials, rubbish, and similar elements.
Change of door locks to Government's access.
PART 2
seq level1 \h \r0 seq level2 \h \r0 seq level3 \h \r0 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable)
END OF SECTION
PART 1 - GENERALPRIVATE
Drawings and general provisions of GSA Contract GS-10P-XX-LTC-XXXX and Division‑1 Specifications Sections apply to this Section.
1.2
This Section includes administrative and supervisory procedures and performance required for coordinating construction operations including, but not necessarily limited to, the following:
General project coordination procedures to include use of a web-based management tool (WBMT)(to be determined/negotiated during design phase services)
Conservation.
Coordination Drawings.
Administrative and supervisory personnel.
Cleaning and protection.
Related Sections: The following Sections contain requirements that relate to this Section:
Division 1 Section "Field Engineering" specifies procedures for field engineering services, including establishment of benchmarks and control points.
Division 1 Section "Project Meetings" for progress meetings, coordination meetings, and preinstallation conferences.
Division 1 Section "Submittals" for preparing and submitting the Contractor's Construction Schedule.
Division 1 Section "Materials and Equipment" for coordinating general installation.
Division 1 Section "Contract Closeout" for coordinating contract closeout.
1.3 seq level2 \h \r0
Coordination Drawings: Form and content specified below. Submit for information only. Contracting Officer's review will be for purposes of understanding potential conflicts.
Comply with requirements contained in Section "Submittals."
Coordination Conflict Resolution Plan: Submit for information only. Documented processes and/or procedures to be employed to resolve coordination problems identified in coordination drawings and those surfaced during construction.
C.
Trade Interface Agreement: Completed document using approved template which was negotiated and approved by the Contracting Officer during the design phase.
Project Directory: Prior to commencement of construction operations ensure the WBMT information for the Contractor's principal staff, including the superintendent and other personnel in attendance at the Project Site, is completed. Utilize the NOTES section (of data input form) to describe the individual’s duties and responsibilities.
Post copies of the project directory in the Project meeting room.
2. Ensure WBMT contact information is kept current.
1.4 seq level2 \h \r0
ADMINISTRATIVE/SUPERVISORY PERSONNEL
General: In addition to a General Superintendent and other administrative and supervisory personnel required for performance of the work, provide specific coordinating personnel who are experienced in administration and supervision of all phases of building construction including mechanical and electrical work, and who are hereby authorized to act as general coordinator of interfaces between units of work.
Contractor shall have a full-time on-site person with a delegation of authority for a minimum of $25,000 to permit preparation, negotiation, and adjudication of contract modifications.
For purpose of this provision, "interface" is defined to include the scheduling and sequencing of work, sharing of access to work spaces, installations, protection of each other's work, cutting and patching, tolerances, cleaning, selections for compatibility, preparation of coordination drawings, inspections, tests, and temporary facilities and services.
Safety Engineer (or Equivalent):
The Contractor shall designate a "Safety Engineer" whose duties shall include responsibility for enforcing:
Environmental protection provisions of these specifications including safety and health;
Requirements of the Occupational Safety and Health Act; and other applicable Federal, state and local standards.
As outlined in the applicable sections of this specification, submit for approval by the Contracting Officer the proposed traffic flow plan, security plan, program for temporary structures, housecleaning plan, erosion control plan, and safety and health plan.
After approval by the Contracting Officer, the implementation and enforcement of these programs shall become the responsibility of the Safety Engineer.
Any changes in the programs must be approved by the Contracting Officer.
Energy Conservation Officer: RESERVED
Mechanical/Electrical/Plumbing Coordinator: Provide a full-time mechanical/ electrical/plumbing (MEP) coordinator, with minimum 10 years experience in administrative and supervisory coordination of mechanical and electrical work, both within the various types of MEP work required for project and with relation to other types of work.
For the purposes of these provisions, "interface" is defined to include scheduling and sequencing of MEP work, sharing of access to work spaces, integration of work placed into limited spaces available for MEP installations, each trade's protection of work by other trades, cutting and patching, tolerances, preparation of MEP coordination drawings, inspections, tests, and utilization of MEP temporary facilities.
Mechanical/Electrical/Electronic/Communication Coordinator and Commissioner (MEECCC): Provide a full-time (MEECCC) with the following qualifications:
The MEECCC shall have extensive experience, totaling at least 15 years, in startup and troubleshooting HVAC, automatic control systems, plumbing, electrical, emergency power, fire alarm, life safety, and security. Qualifications shall also include the following.
Current and demonstrated working knowledge of complex computer operated HVAC, lighting, security, fire alarm, communication, and security systems, Competent in system design and intent.
Knowledgeable in test and balance of both air and hydronic systems.
Excellent communication and writing skills, be highly organized, and be able to work with both management and trade contractors.
Capable of using AutoCad and be able to review and approve Record Drawings submitted as AutoCad files.
A bachelor’s degree in Mechanical and/or Electrical Engineering and registration as a Professional Engineer, with extensive practical field experience, is preferred; however, other technical training and experience with extensive practical field experience will be considered.
Coordinator responsibilities include administrative and supervisory coordination of Mechanical/Electrical/Electronic/ Communication (MEEC) work, both within the various types of MEEC work required for project and with relation to other types of work. For the purposes of these provisions, "interface" is defined to include scheduling and sequencing of MEEC work, sharing of access to work spaces, integration of work placed into limited spaces available for MEEC installations, each trade's protection or work by other trades, cutting and patching, tolerances, preparation of MEEC coordination drawings, inspections, and utilization of MEEC temporary facilities.
Commissioning, as used in these Specifications, means the process to assure the Contracting Officer that elevator (Division 14), mechanical (Division 15), electrical (Division 16), and electronic security/communication (Division 17) equipment, controls, and systems have been completed in a satisfactory and fully operational manner and function together properly to meet performance requirements and design intent as shown in a composite manner in the Contract Documents. The commissioner responsibilities include the following:
Review and approve all functional performance tests, results, and documentation required by the contract documents; for all equipment and systems; as performed by subcontractors, suppliers, etc.
Develop schedules for all testing; integrate testing into the master construction activity schedule; and coordinate all subcontractor testing as required.
Develop test procedures and forms for documentation of all equipment tests, system functional tests, and cross system functional tests. test procedures shall be in accordance with equipment manufacturer's recommendations, where applicable. Test procedures shall fully describe system configuration and steps required for each test; appropriately documented so that another party can repeat the tests with virtually identical results.
Submit test procedure schedule, procedures, forms, and other documentation to the Contracting Officer for review six months prior to starting any testing required under Division 14, 15, 16, and 17.
Coordinate directly with each subcontractor on their specific responsibilities and contractual obligations.
Provide qualified personnel for participation in commissioning tests, including seasonal testing required after the initial commissioning.
Provide engineering and technical expertise to oversee and direct the correction of deficiencies found during the commissioning process.
Observe the start-up and initial testing of equipment by the Contractor and subcontractors; and then all final tests of equipment and systems.
Manage all integrated system testing such as HVAC, building automation, fire alarm, emergency power, life safety, lighting controls, elevators, etc.
Document inconsistencies or deficiencies in system operations and enforce system compliance or recommend to the Contracting Officer modifications to system design which will enhance system performance.
k.
Coordinate the personnel required in testing participation and approval procedures, after verifying that pretests have been satisfactorily conducted and final tests are ready to be performed.
l.
In the event that a functional test fails, the cause of the failure shall be determined and rectified as soon as possible, and then retested. If more than one functional performance test of the same system(s) is required, the Contractor shall reimburse all associated costs for the extraordinary participation to the Contracting Officer, as required by the particular test being performed.
m.
Review Operating and Maintenance Data, and Record Drawings provided by the various subcontractors and suppliers for verification, organization, distribution, and conformance to requirements of Contract Documents.
n.
Obtain all documentation from tests and assemble a final test report to be submitted to the Contracting Officer for approval.
o.
Oversee or provide training, or both, for the systems specified Divisions 14, 15, 16, and 17.
PART 2
seq level1 \h \r0 seq level2 \h \r0 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1
COORDINATION
Coordinate construction operations included in various Sections of these Specifications to assure efficient and orderly installation of each part of the Work. Coordinate construction operations included under different Sections that depend on each other for proper installation, connection, and operation.
Schedule construction operations in the sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
Coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair.
Make provisions to accommodate items scheduled for later installation.
Inspection of Conditions: Require the Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.
Coordinate temporary enclosures with required inspections and tests to minimize the necessity of uncovering completed construction for that purpose.
Where necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.
Prepare similar memoranda for the Government and separate contractors where coordination of their work is required.
Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid…