06.3.3Amendment3SampleGMPProposaltemplate.xls
XLS spreadsheet 20 KB Posted
- Solicitation number
- GS-10-P-06-LT-C-3022
About this file
Sample GMP proposal template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Pack 13 - Addeundum 1.pdf | ||
| Final Clean Bid Scope.doc | DOC document | |
| JED BidPack 11.pdf | ||
| JED Bid Pack 10.pdf | ||
| 06.3Amendment3-Phase2Pricing.doc | DOC document | |
| 06.3.1Amendment3SF30.pdf | ||
| 06.3.2Amendment3Div1(Draft)(PeaceArch).doc | DOC document | |
| 06.2.1RFP(PeaceArch).doc | DOC document | |
| 00.2EarlyExchanges(PeaceArch).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PHASE 2 - GMP PRICING PROPOSAL BREAKDOWN | ||||||||||||
| SECTION | DESCRIPTION | COST | DESIGN | |||||||||
| CONTINGENCY | NORMAL | |||||||||||
| ESCALATION | EXTRAORDINARY | |||||||||||
| ESCALATION | SUBTOTAL | CONSTRUCTION | ||||||||||
| CONTINGENCY ALLOCATION (%) | TOTAL | COMMENTS/NOTES | ||||||||||
| % | $ | % | $ | % | $ | |||||||
| Division 1 | GENERAL REQUIRMENTS | $14,185,434.49 | ||||||||||
| Staffing | $2,000,000 | 0.00% | $0 | 3.00% | $60,000 | 0.50% | $60,000 | $2,120,000 | 0.00% | $2,120,000.00 | ||
| Facilities | $234,000 | 0.00% | $0 | 1.00% | $2,340 | 0.00% | $2,340 | $238,680 | 0.00% | $238,680.00 | ||
| Utilities | $55,500 | 0.00% | $0 | 2.00% | $1,110 | 1.00% | $1,110 | $57,720 | 0.00% | $57,720.00 | ||
| Testing | $126,000 | 0.00% | $0 | 2.00% | $2,520 | 1.00% | $2,520 | $131,040 | 0.50% | $131,695.20 | ||
| ITEM | ||||||||||||
| ITEM | ||||||||||||
| Division 2 | SITE CONSTRUCTION | $11,637,339.29 | ||||||||||
| 2100 | Underground Utilities | $128,500 | 0.30% | $386 | 1.00% | $1,285 | 0.50% | $1,285 | $131,456 | 0.25% | $131,784.14 | |
| 2200 | Dewatering | $470,000 | 0.00% | $0 | 1.00% | $4,700 | 0.00% | $4,700 | $479,400 | 0.50% | $481,797.00 | |
| 2300 | Earthwork | $3,800,000 | 2.50% | $95,000 | 2.00% | $76,000 | 2.00% | $76,000 | $4,047,000 | 1.00% | $4,087,470.00 | |
| 2400 | Hotmix Asphalt Paving | $3,600,000 | 1.25% | $45,000 | 2.00% | $72,000 | 1.50% | $72,000 | $3,789,000 | 1.00% | $3,826,890.00 | |
| 2500 | PCC & Concrete Paving | $2,200,000 | 1.25% | $27,500 | 2.00% | $44,000 | 2.50% | $44,000 | $2,315,500 | 1.00% | $2,338,655.00 | |
| 2600 | Landcape/Irrigation | $565,000 | 3.60% | $20,340 | 2.00% | $11,300 | 1.75% | $11,300 | $607,940 | 1.50% | $617,059.10 | |
| 2700 | Fences & Gates | $145,000 | 1.20% | $1,740 | 2.00% | $2,900 | 1.50% | $2,900 | $152,540 | 0.75% | $153,684.05 | |
| Division 3 | CONCRETE | |||||||||||
| 3100 | ITEM | |||||||||||
| 3200 | ITEM | |||||||||||
| 3300 | ITEM | |||||||||||
| 3400 | ITEM | |||||||||||
| 3500 | ITEM | |||||||||||
| 3600 | ITEM | |||||||||||
| Division 4 | MASONRY | |||||||||||
| 4100 | Masonry | |||||||||||
| Division 5 | METALS | |||||||||||
| 5100 | Steel |