06.3Amendment3-Phase2Pricing.doc
DOC document 42 KB Posted
- Solicitation number
- GS-10-P-06-LT-C-3022
About this file
Amendment 3 - Pricing Pages 2 -4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Pack 13 - Addeundum 1.pdf | ||
| Final Clean Bid Scope.doc | DOC document | |
| JED BidPack 11.pdf | ||
| JED Bid Pack 10.pdf | ||
| 06.3.1Amendment3SF30.pdf | ||
| 06.3.2Amendment3Div1(Draft)(PeaceArch).doc | DOC document | |
| 06.3.3Amendment3SampleGMPProposaltemplate.xls | XLS spreadsheet | |
| 06.2.1RFP(PeaceArch).doc | DOC document | |
| 00.2EarlyExchanges(PeaceArch).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 3 to Solicitation GS-10P-06-LT-C-3022 Peace Arch U.S. Point of Entry Redevelopment, CMc Services, Blaine, WA.
SUMMARY
A. The purpose of this amendment is to provide supplemental instructions for the Phase 2 GMP/Pricing proposal; update the solicitation milestones; and, incorporate a new Exhibit.
B. Section 3 of the RFP, entitled “Acquisition Milestones/Schedule (Estimated),” is replaced with a revised Section 3, attached. The revision includes:
1. A date for issuance of 50% Design Documents.
2. A date to meet with GSA and their design team to discuss assumptions or seek any needed clarifications.
3. An assumed construction start/end.
C. Section 7 of the RFP, entitled “Phase 2 GMP Proposal Requirements,” is replaced with a revised Section 7, attached. The revision includes:
1. A requirement to submit a scope, schedule and cost for Design Phase Services.
2. A requirement to identify design contingency, escalation (normal and extraordinary), and contingency allocation assumptions in the GMP.
3. A requirement to submit a list of VE or cost avoidance ideas.
D. The following documents are being provided with or incorporated by this amendment.
1. Exhibit 7, Division 1 Requirements (DRAFT)
2. A sample GMP template identifying required contingency and escalation rates identified in Section 7.
3. 50% DDs (Please contact CO for instructions on how to obtain copies.)
4. AE 50% DD estimate (take-off quantities only) (Please contact CO for copies.)
3.0 ACQUISITION MILESTONES/SCHEDULE (Estimated)
06/23/06
RFP Issued.
07/14/06
Pre-Proposal Meeting
08/04/06
Phase 1 - Offerors Submit Technical Proposals.
08/14 - 08/18 Offeror oral presentations/interviews (tentative)
08/29/06 GSA notifies firms of competitive status.
09/01/06 Voluntary Short List established.
09/11/06 GSA issues supplemental instructions for pricing proposal 09/13/06 GSA issues 50% Design Documents for pricing proposal
09/25 - 09/27 Offerors meet with GSA and Design Team to coordinate assumptions and achieve additional clarification for preparation of GMP proposal.
10/03/06
Phase 2 - Offerors submit GMP Proposals.
10/18 – 10/20 Meeting with Offerors to present GMP Proposals (tentative) 10/23/06 GSA establishes the competitive range. GSA may limit the number of proposals for purposes of efficiency as authorized by FAR 52.215-1(f)(4).
10/25/06 GSA begins negotiations. Note, contract award may be made without discussion as authorized by FAR 15.306(a)(2) and requests Final Proposal Revision (FPR)
11/07/06 GSA receives Final Proposal Revisions.
11/09/06 GSA selects Contractor.
11/17/06
GSA Awards contract; unsuccessful offerors notified.
11/22/06
Debriefings (if requested) scheduled.
12/01/06
GSA issues Notice to Proceed for Design Phase Services.
03/01/06
Assumed Construction Start (Selective demolition and site work) 10/31/2009 Assumed Construction Completion Peace Arch U.S. POE Redevelopment *PAGE 3 OF 69*
SOLICITATION NO. GS-1OP-06-LT-C-3022
AMENDMENT NO. 3; 09/12/2006 (page 3/4)
7.0 PHASE 2 GMP PROPOSAL REQUIREMENTS
7.1 Phase 2 GMP Proposals should be submitted to the GSA Contracting Officer, Patrick Brunner, no later than 2:00 PM, October 3, 2006, at the GSA Regional Office, 2nd Floor, 400-15th Street SW, Auburn, WA 98001-6599.
7.2 The Offeror shall submit four (4) copies of their GMP proposal consisting of:
· A signed SF 1442 (exhibit 6), with firm, fixed price for Design Phase Services (insert in block 17).
· Completed Representations & Certifications (Section 0600 of the solicitation).
· A work plan detailing the Design Phase services to be provided. At a minimum, the plan should identify tasks/services to be performed, staff to be assigned, and resources to be employed. The work plan should communicate the offeror’s commercial “solution” for the Design Phase service needed.
· A detailed GMP proposal that serves to demonstrates the offeror’s understanding of the work based on the project/design documentation being provided. The GMP constitutes the offeror’s independent assessment of the maximum allowable construction cost and needed contingency amount.
· The GMP proposal shall include the following:
a. Design Contingency/Estimating Allowance, defined as the expected cost risk associated with an incomplete design package, and expressed as a percentage;
b. Normal Escalation, defined as the anticipated inflation increase to the midpoint of construction, and expressed as a percentage;
c. Extraordinary Escalation, defined as potential cost increases attributable to unusual market conditions (material shortages, labor non-availability or other risks the offerors may perceive that are beyond normal inflation); and
d. Construction Contingency, defined in the GMP clause of this solicitation as, the anticipated change order rate, and expressed as a percentage.
· A list of potential “VE” ideas or suggestions that would shorten the construction duration, reduce potential escalation costs, and cost associated with Division 1 requirements. VE ideas or suggestions should be detailed and include an estimate of the cost impact.
7.3 A two-hour meeting will be held at GSA’s Auburn location with each offeror to jointly review the GMP proposals submitted.
Peace Arch U.S. POE Redevelopment *PAGE 3 OF 69*
SOLICITATION NO. GS-1OP-06-LT-C-3022
AMENDMENT NO. 3; 09/12/2006 (page 4/4)
File details come from the government source that posted it. Updated .