Climate Control Unit (CCU) Replacement

Closed Solicitation Posted

Solicitation number
FA466124Q0138
Agency
Global Strike Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
Place of performance
Dyess AFB, Texas 79607, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Global Strike Command is seeking a contractor to replace the Climate Control Unit (CCU) Air Handler at Building 4315 on Dyess Air Force Base. The requirement includes the removal and disposal of the existing equipment, procurement and installation of a new equivalent unit, and verification and testing of the east side CCU system. Contractors must comply with the Statement of Objectives and reference the current CCU system as-built drawings. An optional site visit is scheduled for July 15, 2024, and quotes are due by July 23, 2024 at 12:00pm Central Time. The evaluation will be based solely on the lowest price of technically acceptable items.

This procurement is set aside for Small Businesses under NAICS code 238220 with a $19M size standard. The government intends to award a Firm-Fixed Price contract and reserves the right to cancel the solicitation. The period of performance should be minimized, and the work must be scheduled during normal business hours to avoid disruption. The contractor is responsible for disposal of all waste and debris and restoration of the work area.

Notice text

3 versions

Update #3 · Latest ·

This requirement is for the replacement of the Climate Control Unit (CCU) Air Handler. This includes removal/disposal of existing equipment, the procurement of the new unit and install, connection and integration of the new unit. Must also verify and test the east side CCU system to ensure it is working correctly after installation.

Please refer to RFQ document for optional site visit information on July 15, 2024 at 10:00am Central Time. The site visit is recommended and will allow plenty of time for contractors to gather information needed to provide the Government an accurate quote.

Please also refer to the Statement of Objectives and Current CCU System As-Builts(attached) for the specifications. 

***Amendment 1: Site visit has been RESCHEDULED to Thursday, July 18, 2024 at 10:00am Central Time.***

***Amendment 2: Questions deadline has been extended to 19 July, 2024 at 3:00pm Central Time. Please email all questions directly to taylor.norris@us.af.mil***

***Amendment 3: Added PDF file of information/photos from the site visit.***

Update #2 ·

This requirement is for the replacement of the Climate Control Unit (CCU) Air Handler. This includes removal/disposal of existing equipment, the procurement of the new unit and install, connection and integration of the new unit. Must also verify and test the east side CCU system to ensure it is working correctly after installation.

Please refer to RFQ document for optional site visit information on July 15, 2024 at 10:00am Central Time. The site visit is recommended and will allow plenty of time for contractors to gather information needed to provide the Government an accurate quote.

Please also refer to the Statement of Objectives and Current CCU System As-Builts(attached) for the specifications. 

***Amendment 1: Site visit has been RESCHEDULED to Thursday, July 18, 2024 at 10:00am Central Time.***

Update #1 ·

This requirement is for the replacement of the Climate Control Unit (CCU) Air Handler. This includes removal/disposal of existing equipment, the procurement of the new unit and install, connection and integration of the new unit. Must also verify and test the east side CCU system to ensure it is working correctly after installation.

Please refer to RFQ document for optional site visit information on July 15, 2024 at 10:00am Central Time. The site visit is recommended and will allow plenty of time for contractors to gather information needed to provide the Government an accurate quote.

Please also refer to the Statement of Objectives and Current CCU System As-Builts(attached) for the specifications. 

Attachments

Files attached to this notice, newest first
File Type Posted
AMENDED 2 FA466124Q0138 RFQ COMBO.docx DOCX document
AMENDED FA466124Q0138 RFQ COMBO.docx DOCX document
Site Visit Minutes - Photos.pdf PDF
FA466124Q0138 RFQ COMBO.rtf RTF text file
FAR 52.212-5 Clause.pdf PDF
CSAA - AHU 1 - As Built Drawings.pdf PDF
SOO - Bldg 4315 CCU Air Handler Replacement.pdf PDF
Attachment 1 Provisions and Clauses.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity