SOO - Bldg 4315 CCU Air Handler Replacement.pdf

PDF 498 KB Posted

Attached to
Climate Control Unit (CCU) Replacement Federal contract opportunity
Solicitation number
FA466124Q0138
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a Statement of Objectives (SOO) for the removal, replacement, and installation of a Climate Control Unit (CCU) Air Handler at Building 4315 on Dyess Air Force Base.

The key objectives are for the contractor to remove and dispose of the existing CCU Air Handler, procure and install a new equivalent unit, connect and integrate the controls, and verify and test the system to ensure proper operation. The contractor must comply with all relevant codes, standards, and safety requirements. A pre-proposal site visit is mandatory to gather information needed for an accurate quote. The period of performance should be minimized, and the work must be scheduled during normal business hours to minimize disruption. The contractor is responsible for disposal of all waste and debris and restoration of the work area. Government-furnished property and services are limited to utilities, workspace, and limited security/fire protection. The contract has specific security requirements for accessing the installation and sponsoring personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Climate Control Unit (CCU) Replacement, newest first.
File Type Posted
Site Visit Minutes - Photos.pdf PDF
AMENDED FA466124Q0138 RFQ COMBO.docx DOCX document
AMENDED 2 FA466124Q0138 RFQ COMBO.docx DOCX document
FA466124Q0138 RFQ COMBO.rtf RTF text file
FAR 52.212-5 Clause.pdf PDF
CSAA - AHU 1 - As Built Drawings.pdf PDF
Attachment 1 Provisions and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

FOR

REMOVAL, REPLACEMENT, AND INSTALL OF CCU AIR HANDLER

1. DESCRIPTION OF SERVICES: The Contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and dispose the old CCU Air Handler, and to procure and install a new CCU Air Handler.

1.1. A pre-proposal site visit, with the presence of a Fuel Flight representative, will be conducted for all

Contractors submitting proposals to identify all material, dimensions, specifications, and work requirements.

1.1.1. The Contractor shall be prepared, at the pre-proposal site visit, to gather all information needed to provide the Government an accurate quote.

1.1.2. A second pre-proposal site visit shall not be permitted if the Contracting Officer determines that adequate information was gathered at the first pre-proposal site visit.

1.1.3. The Contractor shall contact the Contracting Officer if any discrepancies are found.

1.1.4. The Contractor shall include detailed line items in their quote provided to the Government.

1.2. Period of Performance: The period of performance shall be minimized to the maximum extent possible. Based off the Statement of Objectives and materials needed for the proposed task will determine the estimated time of completion and is negotiable.

1.3. The Contractor shall comply with all current NSPC (National Standard Plumbing Code), NEC

(National Electrical Code), American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRE), Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA) standards.

1.4. The Contractor shall be responsible for coordinating with building 4315’s occupants through the facility manager Point of Contact (POC) to ensure there will be minimum interruptions to their daily mission. The Contractor shall ensure the facility manager is notified of shut down seven (7) days in advance. The facility POC is the 7 CMS Fuel Section Chief or NCOIC. The phone number for the office is (325) 696-3217.

1.5. The Contractor shall notify the Contracting Officer no later than 7 days prior to the completion of all work. A CE representative shall be present for a Final Inspection once all work is completed.

The CE representative shall determine whether the completed work is acceptable.

1.6. Work Task: Removal, procurement, and installation of Building 4315 East Side CCU Air Handler

1.6.1. Removal and Disposal:

1.6.1.1. The Contractor shall remove the currently installed Air Handler at Building 4315 - East

Side.

1.6.1.2. The Contractor shall dispose of all equipment and parts in accordance with all environmental and disposal standards.

1.6.2. Procurement of New Air Handler

1.6.2.1. The Contractor shall procure a new CCU Air Handler that is equivalent to the currently installed unit.

1.6.3. Installation and Additive Services:

1.6.3.1. The Contractor shall install new CCU Air Handler at building 4315 - east side.

1.6.3.2. The Contractor shall connect and integrate any controls into the existing system.

1.6.3.3. The Contractor shall verify and test that the CCU system works properly after installation.

1.7. Work shall be scheduled during normal business hours 0700-1600.

1.8. The Contractor shall conduct the work in a manner to keep to a minimum disruption of normal operations.

1.9. The work may be in an operational or controlled area. In the event of an "actual" or "exercise" scenario, it may be required that the Contractor stop work until the event is complete. This delay will not be an additional expense to the Government. Lost construction time due to stop work will be added to performance time.

1.10. It is the responsibility of the Contractor to restore any areas/facility components, disturbed by their work, to their original state.

1.11. The work area must be kept free and clear of all debris. Access to the facility or driving rights-of-way in the surrounding area will not be closed off or substantially obstructed for long periods of time.

1.12. The Contractor shall dispose of all construction debris off the installation and in accordance with all local, state, and federal requirements as required by Section 6 of this document. The Contractor shall leave work site clean and clear of any work debris, materials, supplies, tools, or equipment associated with this project.

1.13. The Contractor shall be responsible for all damage to Government property or personal property resulting from actions by Contractor employees or equipment during the performance of this contract or while Contractor employees are on Dyess AFB.

2. HAZARDOUS CONDITIONS. During the performance of work under this contract, should the

Contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified. A confined-space permit must be obtained through the proper authorities before entering any confined spaces.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and workspace for the Contractor to perform the requested duties. There are no covered or secure storage areas available. The Contractor will provide all equipment and storage media necessary to perform tasks.

3.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted.

Contractor personnel will ensure that facility cleanliness is maintained at all times.

3.2. Security Police and Fire Protection. The Government will provide general on-base security police and fire protection service. Security police phone extension is 911 for emergencies, and 696- 2131 for routine calls. Fire protection emergency phone is 117 (from on-base phone only), or 696- 2486 from a cell phone.

3.3. Telephone. The Government shall not provide telephone services. If available, Contractor may use Government phones in a case of emergencies or during field and site work. No long-distance telephone calls will be authorized.

4. HOURS OF OPERATION. Working hours for the Contractor will normally be between the hours of 0700 and 1600 excluding Saturdays, Sundays, and Federal holidays.

4.1. RECOGNIZED U.S. FEDERAL HOLIDAYS

New Year’s Day January 1 Martin Luther King’s Birthday 3rd Monday in January Washington’s Birthday 3rd Monday in February Memorial Day Last Monday in May Juneteenth National Independence June 19 Independence Day July 4 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25

*U.S. Federal holidays that fall on a Saturday will be observed on the preceding Friday, and U.S. Federal holidays that fall on a Sunday will be observed on the following Monday.

5. HEALTH AND SAFETY. All holes/pits/trenches/manway openings, etc., that are to be left open shall be surrounded with a 48-inch-high mesh fence with highly visible orange plastic coating. The fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening to prevent an individual, should they fall across the fencing, from falling into the opening. Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent small children from entering the hole.

5.1. OSHA Requirements. All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks, and with the Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.

5.2. State Requirements. All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation Commission (TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph SUBMITTAL REQUIREMENTS. In addition to meeting the TWCC requirements, the plan must also include the requirements of COE Safety Manual 385-1-1.

5.3. Welding, Cutting, and Brazing: Contractor shall obtain required advance approval for any process that includes welding, soldering, brazing, cutting with or use of a torch, or any other operation that involves a flame or equipment that produces a high degree of heat. Approval must be requested 24 hours in advance via an AF Form 592. Assigned Representative will assist in filling out and processing the AF Form 592 when/if required. Operations shall not commence until the Dyess Fire Department approves the AF Form 592 and assigns a control number. Contractor shall put a fire watch in place and shall have appropriate fire extinguishers on-site at the location of the work. Contractor shall coordinate work start to allow an on-site inspection by Dyess Fire Prevention personnel prior to any portion of the work that requires the AF Form 592.

5.4. Work Clearance: An AF Form 103, Base Civil Engineer Work Clearance Request, shall be completed by the Contractor and approved by 7 CES prior to start of work; furthermore, the document must be renewed every 30 days until the completion of the contract. Preparation and approval of the AF Form 103 can be worked through the assigned 7 CE representative.

5.5. Confined Space: Contractors shall obtain all necessary approvals and permits for entry into confined space prior to work start.

6. Disposition of Waste, Excess, Scrap, and Salvage Materials. The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor - unless specifically excepted below. Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations.

Following is a list of materials (Exceptions) that will be generated because of this contract and shall be turned-into the Government at a location at Dyess AFB designated by the Contracting Officer.

Exceptions: None.

7. Radiation Permits and Authorizations. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Dyess AFB Radiation Safety Officer (RSO), 7 OMRS/SGXB. To obtain the required authorization permit, an application to bring a radioactive device on Dyess AFB must be emailed to the Dyess AFB RSO or forwarded to 7 OMRS/SGXB, 697 Louisiana, Dyess AFB, TX 79607-1367 (this is mailing address, physical address is 880 Third St.) or (325)696-2325, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide Bioenvironmental Engineering (7 OMRS/SGXB) a copy of Contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Dyess AFB.

8. Security Requirements.

8.1. Levels of Security. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.

8.1.1. The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all Dyess AFB outside of the "USAF Controlled" and "USAF Restricted" areas.

8.1.2. “USAF Controlled” access areas are the mid-level security areas. Presence within the CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.

8.1.3. The highest level of security on Dyess AFB is that within the “USAF RESTRICTED AREAS”. These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS.

Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of Dyess AFB Security Forces.

8.2. Closed Base. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. The Contracting Officer will provide information necessary to obtain identification badges. Upon completion of the work or termination of an employee, the Contractor shall be responsible for the turn in of identification badges to the Contracting Officer or to the Pass and Registration Office of the Security Forces.

NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the Contractor.

8.2.1. The Process to get Day Labors/Job Site Personnel Sub-Contracted onto the Installation:

8.2.1.1. The Contractor individuals identified in the Trusted Agent Letter will provide a typed or hand-written form (form will be provided by the 7 SFS) with all individuals they will sponsor onto the installation to the VCC. The VCC will verify the identity of all individuals on the form by checking the information against a valid State/Federal Identification card. The VCC will randomly check a percentage of the individuals via the TLETS. Should any individual not possess a valid identification card, they will be turned away at the VCC and entry to the installation denied. Pen and ink changes can be made to the form, but all information must be validated by the VCC before the Contractor will be allowed to proceed onto the installation with the sponsored individuals. No AF Form 75/Visitor Pass will be issued to any individual who is sponsored by the Trusted Agent Contractor unless the sponsored individual will be driving a vehicle onto the installation. Trusted Agent Contractors are encouraged to consolidate all sponsored individuals into the smallest number of vehicles as possible to avoid the issuance of multiple AF Forms 75. Should an AF Form 75 be issued, the driver will be required to produce a valid driver’s license, current insurance card, and current registration for the vehicle being operated. Once on the installation, the Trusted Agent Contractor will be responsible for the actions of the sponsored individuals.

Should an incident occur with a sponsored guest, and negligence be proven on the part of the Trusted Agent Contractor, their vouching/sponsoring authority will be revoked.

The Trusted Agent Letter can be adjusted to add and delete names of Trusted Agent Contractors as needed, if the provisions of this paragraph are followed. Although the 7 SFS form is used in lieu of the AF Form 75, it carries the same authority and responsibilities. Additionally, the 7 SFS Form will expire at 0001 daily or at the end of the Contractor duty day, whichever occurs first. At no time will the Trusted Agent Contractor depart the installation and leave any of his/her sponsored individuals with another Contractor that does not have the same vouching/sponsoring privileges.

8.2.1.2. All Contractors must attend a contractor briefing given by Pass and Registration who will provide a more detailed explanation regarding Contractor badges and their uses.

Pass and Registration reserves the right to not issue a contractor badge due to erroneous information or failure to disclose information on the Dyess Form 173. Any derogatory information received from the background check will result in the non-issuance of the Contractor badge.

9. EAL Submission Process. In the event the Contractor requires an Entry Authorization Letter, the contractor shall request the appropriate form from the Contracting Office and return the form no later than seven (7) business days prior to the start of work.

10. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.

11. Other Vehicle and Licensing Requirements:

11.1. All Contractor employees who will be driving a vehicle on Dyess AFB shall have a current driver’s license with them at all times while on Dyess AFB.

11.2. All Contractor vehicles to be operated on Dyess AFB will have a valid state registration, vehicle inspection, and insurance. Proof of registration and vehicle insurance must be physically available at all times while the vehicle is on Dyess AFB.

11.3. Any Contractor employee who will be operating heavy equipment or specialized equipment that requires a license or certification shall be so licensed and/or certified with proof presented to the contracting officer prior to work start.

File details come from the government source that posted it. Updated .