CES Expansion UPS Upgrade
Closed Solicitation Posted
- Solicitation number
- W91SMC26QA016
- Agency
-
Army National Guard
Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Springfield, Illinois, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The 183d Wing, Army National Guard, at Abraham Lincoln Capital Airport in Springfield, Illinois, seeks a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply system in Building 8, with proposals due August 25, 2026, and a mandatory site visit on August 11, 2026. This is a 100% small business set-aside under NAICS 236220, Commercial and Institutional Building Construction, with a small business size standard of $45 million.
Place of performance is Springfield, Illinois. The contractor shall remove the existing 10 kilowatt Liebert EXM UPS system from Switch Room 118 and install a new scalable 20 kilowatt UPS system configured for 20 kVA/kW and scalable up to 30 kVA/kW for future expansion. Scope includes demolition and removal of the existing unit and associated equipment, site and electrical preparation, installation of the new system with factory-trained field service personnel conducting full system adjustments, load balancing, and operational testing, and sealing of all wall, floor, and ceiling penetrations to meet existing fire and assembly ratings. The contractor must provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services.
Period of performance is 120 calendar days or less following issuance of Notice to Proceed. The estimated magnitude is between $25,000 and $100,000. Award will be made to the responsible offeror with the lowest conforming price. Performance and payment bonds are not required. Questions are due no later than the fifth working day prior to closing, submitted via email to Lawrence.J.Romang.civ@army.mil and Donald.G.Piper6.mil@army.mil. The acquisition is conducted under the Revolutionary FAR Overhaul utilizing RFO FAR Part 12 in conjunction with RFO FAR Part 36. Construction Wage Rate Requirements apply under General Decision Number WD# IL20260004. Pre-quote conference materials and site visit sign-in sheets and meeting minutes were posted August 12, 2026.
Notice text
2 versions
Update #2 · Latest ·
*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.*
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.
SITE VISIT - 11 AUG 2026 @ 1300.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.
Key scope items include:
- Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
- Site and electrical preparation for the new system.
- Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
- Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
- Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.
Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).
See Solicitation for additional information.
Update #1 ·
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.
SITE VISIT - 11 AUG 2026 @ 1300.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.
Key scope items include:
- Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
- Site and electrical preparation for the new system.
- Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
- Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
- Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.
Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).
See Solicitation for additional information.
Files
| File | Type | Posted |
|---|---|---|
| SBSA Pre-RFQ Slides - 183 WG .pptx | PPTX presentation | |
| Site Visit - Sign-in sheet 8-11-2026.pdf | ||
| Site Visit - Meeting minutes.pdf | ||
| Solicitation - W91SMC26QA016.pdf | ||
| Existing B8 - Electrical Drawings.pdf | ||
| IMG_8290.jpg | JPG image | |
| IMG_4544.jpg | JPG image | |
| IMG_4693.jpg | JPG image | |
| IMG_1288.jpg | JPG image | |
| IMG_1297.jpg | JPG image | |
| SOW - CES Expasnsion Upgrade.pdf | ||
| SF 1705 -Consent for Background Check.pdf | ||
| IMG_8291.jpg | JPG image | |
| IMG_8292.jpg | JPG image | |
| IMG_8294.jpg | JPG image | |
| IMG_4545.jpg | JPG image | |
| IMG_1287.jpg | JPG image | |
| IMG_8293.jpg | JPG image | |
| IMG_4542.jpg | JPG image | |
| IMG_1290.jpg | JPG image | |
| IMG_1289.jpg | JPG image | |
| IMG_1295.jpg | JPG image | |
| IMG_4692.jpg | JPG image | |
| IMG_4541.jpg | JPG image | |
| IMG_1294.jpg | JPG image |
Show all 25
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| CES Expansion UPS Upgrade | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business | |
| J061--Uninterruptible Power Supply St. Louis VA Medical Center | Veterans Integrated Service Network 15 | No set-aside | |
| J030--Generator-ATS Maintenance (VA-27-00002745) | National Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--537-24-106 Create Contractor Lie-Down Zone | Veterans Integrated Service Network 12 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity