CES Expansion UPS Upgrade

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
038315
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Springfield, Illinois, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Army National Guard 183d Wing at Abraham Lincoln Capital Airport, Springfield, Illinois, intends to solicit a firm-fixed-price construction contract for UPS system upgrade with estimated solicitation posting in the last week of July 2026 and an anticipated industry site visit in the first week of August. The acquisition carries a total small business set-aside. Estimated contract magnitude falls between $25,000 and $250,000 and will be conducted under FAR Part 13 Simplified Acquisition Procedures.

The contractor shall remove an existing 10 kW Liebert EXM UPS system from Building 8 and install a new scalable 20 kW UPS system configured for 20 kVA/kW with scalability up to 30 kVA/kW for future expansion. The system must be three-phase 208V compatible with existing electrical infrastructure and include redundant N+1 power modules, hot-swappable VRLA battery modules with Building Management Systems integration, SNMP/Modbus/BACnet monitoring interfaces, and cabinet-integrated bypass module with four breaker configurations. All work must meet Unified Facilities Criteria and DoD Technical Publication TP-19 Static Uninterruptible Power Supply standards.

Performance period is 120 days or less following Notice to Proceed. Scope includes demolition, site and electrical preparation, full system installation and testing by factory-trained personnel, sealing of all wall/floor/ceiling penetrations to maintain fire and assembly ratings, and one-year manufacturer and workmanship warranties. Work is performed during standard hours (7:00 AM–4:30 PM Monday–Friday, alternating Fridays off) at the Springfield, Illinois facility.

The requirement will be solicited as "Brand Name or Equal" for systems equivalent to the Vertiv Liebert Model APM2. A draft SOW is attached for market research only; formal quotes should not be submitted at this time.

Notice text

Estimated Solicitation posting - Last week of July

Estimated Site Visit - First week of August (usually a Tuesday or Thursday, 1pm). 

A Draft Statement of Work (SOW) is attached to this notice for planning and market research purposes only. Do not submit formal quotes at this time.

1. PROJECT DESCRIPTION

The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.

The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.

Key scope items include:

  • Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
  • Site and electrical preparation for the new system.
  • Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
  • Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
  • Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.

Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).

2. BRAND NAME OR EQUAL

This requirement will be solicited as "Brand Name or Equal" for a system similar to the Vertiv Liebert Model APM2 with modular and scalable architecture. The forthcoming solicitation will explicitly list the salient characteristics that any proposed "equal" equipment must meet to be considered acceptable.

3. MAGNITUDE OF CONSTRUCTION

In accordance with FAR 36.204, the estimated magnitude of this construction project is between $25,000 and $250,000. This acquisition will be conducted using Simplified Acquisition Procedures under FAR Part 13.

4. SITE VISIT / PRE-PROPOSAL CONFERENCE

A formal site visit will be held. The exact date, time, and registration instructions for the site visit will be provided in the official solicitation when it is posted. Contractors are highly encouraged to attend to observe site conditions, conduit routing paths, and space constraints.

5. DISCLAIMER

THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No solicitation document is currently available. All interested parties should monitor SAM.gov for the official solicitation, which will contain the full Statement of Work, applicable FAR/DFARS clauses, Davis-Bacon Wage Determinations, and instructions for quote submission. Do not submit quotes or proposals in response to this notice.

Files

File Type Posted
SOW - CES Expasnsion Upgrade - DRAFT.pdf PDF

Notice history

Notice Type Posted
CES Expansion UPS Upgrade Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
6135--Uninterrupted Power Supply (UPS) Batteries Department of Veterans Affairs Lebanon VA Medical Center Lebanon PA 17042, United States · NAICS 335910 Veterans Integrated Service Network 4 Woman-Owned Small Business
Sources Sought – FY27 Temporary Backup Generator and Transformer Lease and Sustainment – Winn Army Community Hospital, Fort Stewart, Georgia Fort Stewart, Georgia 31314, United States · NAICS 532490 Mission and Installation Contracting Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors