IMG_4693.jpg

JPG image 74 KB Posted

Attached to
CES Expansion UPS Upgrade
Solicitation number
W91SMC26QA016
Issued by

About this file

This is an image of an electrical load monitoring display screen. The screen shows a status indicator at the top left and a green "LOAD ON IN" notification in the upper right. The main section displays a load analysis table with measurements across three phases (A, B, and C) plus a total column.

The table presents five key electrical metrics: Load Percentage (89.8%, 59.4%, 81.3%, 89.0% total), Active Power (2.9, 1.9, 2.4, 7.2 kW total), Apparent Power (2.9, 2.0, 2.7, 7.6 kVA total), Reactive Power (0.0, 0.8, 1.2, 1.8 kVAR total), and Voltage measurements for L-L (207.6, 208.8, 207.3 V). An additional voltage row appears partially visible at the bottom. A yellow "Close" button is visible in the lower right corner of the display. This appears to be a real-time electrical system monitoring interface, likely used for equipment diagnostics or facility power management.

View the file

Other files

File Type Posted
SBSA Pre-RFQ Slides - 183 WG .pptx PPTX presentation
Site Visit - Meeting minutes.pdf PDF
Site Visit - Sign-in sheet 8-11-2026.pdf PDF
SOW - CES Expasnsion Upgrade.pdf PDF
SF 1705 -Consent for Background Check.pdf PDF
IMG_8291.jpg JPG image
IMG_8292.jpg JPG image
IMG_8294.jpg JPG image
IMG_4545.jpg JPG image
IMG_1287.jpg JPG image
IMG_1295.jpg JPG image
IMG_4692.jpg JPG image
IMG_4541.jpg JPG image
IMG_1294.jpg JPG image
Solicitation - W91SMC26QA016.pdf PDF
Existing B8 - Electrical Drawings.pdf PDF
IMG_8290.jpg JPG image
IMG_4544.jpg JPG image
IMG_1288.jpg JPG image
IMG_1297.jpg JPG image
IMG_8293.jpg JPG image
IMG_4542.jpg JPG image
IMG_1290.jpg JPG image
IMG_1289.jpg JPG image
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .