Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912EP22R0005
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
- Place of performance
- Palm Beach, Florida, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Jacksonville District is soliciting proposals for the Central Everglades Planning Project Contract 11A, Everglades Agricultural Area A-2 Reservoir Foundation & Cutoff Wall Project located in Palm Beach County, Florida. The scope of work includes clearing, grubbing, de-mucking, blasting, foundation preparation, installation of a seepage cutoff wall, canal backfilling, and related work to prepare approximately 15.3 miles of foundation for a 17.3 mile embankment dam. Proposals will be evaluated based on technical merit, past performance, small business participation, and price using best value procedures. The pre-proposal conference was held on June 22, 2022 and proposals are due by July 28, 2022.
There is no set-aside designation for this solicitation. The NAICS code is 237990 and the size standard is $39.5 million. The estimated value of construction is between $250-500 million and the period of performance is 2,044 calendar days. Over 90 attendees representing 34 companies participated in the pre-proposal conference. Award will be a fixed price contract for work to be performed in Palm Beach County, Florida.
Notice text
2 versions
Update #2 · Latest ·
The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project, Palm Beach County, Florida.
Preproposal Conference
A Pre-Proposal Conference will be held on Wednesday, 22 June 2022 from 10:00am - 11:00am, EST via teleconference.
The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 199 227 9920##
https://usace1.webex.com/meet/james.t.tracy
* It is requested that an email be sent to martha.g.sequeira@usace.army.mil to confirm attendance by your organization.
Scope of Work
The Scope of Work for this project includes the following features:
Clearing, grubbing, de-mucking, blasting, foundation preparation, installation of a seepage cutoff wall, canal backfilling, and all incidental related work to prepare approximately 15.3 miles of foundation for a 17.3 miles-long embankment dam, to be constructed under separate contract within the Everglades Agricultural Area (EAA). The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Dewatering will be required to control the groundwater and conduct work in the dry in accordance with contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features.
ESTIMATED MAGNITUDE OF CONSTRUCTION: $250,000,000 and $500,000,000
ESTIMATED PERIOD OF PERFORMANCE: 2,044 calendar days
NAICS: 237990
SIZESTANDARD: $39,500,000
PROPOSAL REQUIREMENTS:
Award will be made to the offeror whose proposal represents the best value to the government utilizing best value source selection procedures. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price.
ATTACHMENTS: VOL1, VOL2, PLANS
Update #1 ·
The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project, Palm Beach County, Florida.
Preproposal Conference
A Pre-Proposal Conference will be held on Wednesday, 22 June 2022 from 10:00am - 11:00am, EST via teleconference.
The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 199 227 9920##
* It is requested that an email be sent to martha.g.sequeira@usace.army.mil to confirm attendance by your organization.
Scope of Work
The Scope of Work for this project includes the following features:
Clearing, grubbing, de-mucking, blasting, foundation preparation, installation of a seepage cutoff wall, canal backfilling, and all incidental related work to prepare approximately 15.3 miles of foundation for a 17.3 miles-long embankment dam, to be constructed under separate contract within the Everglades Agricultural Area (EAA). The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Dewatering will be required to control the groundwater and conduct work in the dry in accordance with contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features.
ESTIMATED MAGNITUDE OF CONSTRUCTION: $250,000,000 and $500,000,000
ESTIMATED PERIOD OF PERFORMANCE: 2,044 calendar days
NAICS: 237990
SIZESTANDARD: $39,500,000
PROPOSAL REQUIREMENTS:
Award will be made to the offeror whose proposal represents the best value to the government utilizing best value source selection procedures. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price.
ATTACHMENTS: VOL1, VOL2, PLANS
Files
Show all 12
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Kissimmee River Restoration (KRR) Project, S-69 Weir Repair | ENDIST Jacksonville | No set-aside | |
| Timucuan Ecological and Historic Preserve TIMU-335 | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity