Camp Buckner Revitalization Phase 4

Closed Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
W912DS25RA020
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
West Point, New York, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District New York is seeking design-build construction services for the Camp Buckner Revitalization Phase 4 project, which involves selective improvements to four existing buildings at West Point, New York. The scope includes modernizing fire suppression, fire alarm, and mass notification systems, installing HVAC and broadband internet infrastructure, repairing plumbing systems, abating hazardous materials, improving interior and exterior lighting, and upgrading utility infrastructure. This two-phase procurement follows FAR 36.3 requirements, where Phase One evaluates firms based on Relevant Specialized Experience and Past Performance (equally weighted), and Phase Two uses a Best Value Trade-Off approach with Past Performance as the most important non-price factor. The original proposal submission deadline of September 8, 2025 has been extended twice through amendments, with the current due date of September 17, 2025 at 2:00 PM local time. Proposals must be submitted electronically with a 25MB file size limit per email to designated Corps of Engineers personnel.

This opportunity is designated as a 100% Total Small Business set-aside under NAICS code 236220 (Commercial and Institutional Building Construction) with a size standard of $45,000,000. The Construction Cost Limit is established at $7,400,000 for design and construction, with the overall project magnitude ranging from $5,000,000 to $10,000,000. The contract requires a firm fixed price structure with performance and payment bonds, plus a 20% bid guarantee, and mandates that contractors perform at least 20% of the work with their own organization. The performance period is 365 calendar days with a 5-calendar day lead time following contract award. All work will be performed at West Point, New York, with up to five firms being short-listed from Phase One to compete in the final Phase Two selection process.

Notice text

3 versions

Update #3 · Latest ·

As of 05 September 2025: Amendment 0002 has been posted. 

As of 19 August 2025: Amendment 0001 has been posted. 

CAMP BUCKNER SOLICITATION

Update #2 ·

As of 19 August 2025: Amendment 0001 has been posted. 

CAMP BUCKNER SOLICITATION

Update #1 ·

CAMP BUCKNER SOLICITATION

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX Bldg. 56767 Equipment Concentration Site (ECS) #6428th St. and Park Ave.North Fort Hood, TX Gatesville, Texas 76528, United States · NAICS 236220 ENDIST Louisville Total Small Business
Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJ Joint Base MDL, New Jersey, United States · NAICS 236220 ENDIST Louisville Total Small Business
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Fort Bragg, NC · NAICS 236220 ENDIST Savannah No set-aside
SOLICITATION NOTICE DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona Yuma Proving Ground (YPG) in Yuma, Arizona · NAICS 236220 ENDIST Los Angeles Total Small Business
FY23-28 General Construction Services BPA - W911S223S8000 Fort Drum, New York 13602, United States · NAICS 236220 MICC Fort Drum HUBZone

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity