Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project
Closed Pre-Solicitation Posted
Not the latest version. See the latest pre-solicitation from .
- Solicitation number
- W912DS26S0001
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Gilgo Beach, New York, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New York District is seeking contractors to perform maintenance dredging services at Fire Island Inlet and associated beach nourishment operations along the New York coast. The project involves removing approximately 3,000,000 cubic yards of sand from the Federal Navigation Channel and deposition basin at Fire Island Inlet, dredging to a depth of 14 feet below mean lower low water plus 2 feet allowable over depth. The dredged material will be beneficially used for beach erosion control and hurricane protection along the feeder beach at Gilgo, serving both navigation and coastal protection objectives. The work is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Y1KF (Construction of Dredging Facilities), with pipeline dredge (cutterhead) methods anticipated as the primary execution approach. The pre-solicitation notice was posted on January 29, 2026, with a deadline for submitting questions or comments by February 13, 2026.
This procurement carries no set-aside designation and remains open to all qualified contractors. The maintenance dredging operation is planned for the fall/winter dredging season, subject to funding availability, and is intended to alleviate shoaling effects while maintaining authorized project dimensions for safe and economical use of Fire Island Inlet by commercial and recreational boating interests. The project represents a continuation of previous maintenance work, with the channel last dredged in 2024 when approximately 1,510,000 cubic yards were removed and used for beach nourishment. The placement of physically bypassed sand at the feeder beach will be carried by littoral drift to naturally replenish downdrift beaches, thereby restoring navigation safety while protecting Ocean Parkway and supporting the region's coastal resilience. While specific contract award values are not disclosed in this pre-solicitation notice, the substantial volume and scope of work indicate a significant federal contract opportunity.
Notice text
Background Information:
The U.S. Army Corps of Engineers, New York District (the Corps) proposes to perform maintenance dredging of the Federal Navigation Channel and deposition basin in Fire Island Inlet with placement of the dredged material as beach nourishment along the feeder beach (Gilgo) west of the Fire Island Inlet. The channel was last dredged in 2024, with the removal of approximately 1,510,000 cubic yards (CY) of sand, which was used in a beneficial manner as beach erosion control and hurricane protection placed along Gilgo Beach, Overlook Beach, and Tobay Beach. The proposed maintenance dredging and beach nourishment would involve the removal of approximately 3,000,000 CY of sand, which would be used in a beneficial manner as beach erosion control and hurricane protection placed along the feeder beach (Gilgo).
The channel and deposition basins will be dredged to a depth of 14 feet below mean lower low water (MLLW) plus 2 feet allowable over depth (see Figure 1). The proposed dredging for this cycle is anticipated to occur in the fall/winter of the dredging year, subject to the availability of funds.
The purpose of the proposed work is to alleviate the efects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of the Fire Island Inlet by commercial and recreational boating interests while providing beneficial use of the dredged material. Between maintenance operations, the physically bypassed sand placed at the feeder beach would be carried by littoral drift to feed down drift beaches. This maintenance operation would thus serve to place sand trapped in the channel back into the normal littoral movement that naturally replenishes the western beaches and protect Ocean Parkway, while also restoring a safe channel for navigation.
Maintenance dredging of the channel and deposition basin at Fire Island Inlet is usually accomplished by pipeline dredge (cutterhead). The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging.
Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the notice to proceed and maintain an integrated production rate of at least 13,500 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact ship trafic, and it is necessary to maintain this production rate while minimizing the duration of this impact.
The proposed work is anticipated to take place in the fall/winter of 2026/2027. The work is estimated to cost between $25,000,000.00 and $100,000,000.00.
SURVEY OF THE DREDGING INDUSTRY
The following confidential survey questionnaire is designed to apprise the Corps of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Maintenance Dredging of Fire Island Inlet And Shores Westerly To Jones Inlet, New York Beach Erosion Control And Navigation Project.
General
- Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.
- What percentage of work (volume of material dredged and placed) can you perform with your own equipment or equipment owned by another dredging contractor?
- Have you performed dredging along the Fire Island Beaches or adjacent Long Island shoreline?
- Would you be willing to bid on the project described? If the answer is No, please explain why not?
- Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?
- Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?
- What is the largest dredging contract, in dollars, on which you were the prime contractor?
- What is your bonding capacity per contract? What is your total bonding capacity?
- On previous projects, do you have experience in completing environmental monitoring of endangered species? If so, was such work contracted to a company that specializes in such environmental work?
- Are you familiar with the USACE EM 385-1-1 (15 March 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes.
- Use of USACE Resident Management System (RMS 3.0) will be required for this dredging contract. Do you have experience using the USACE Resident Management System (RMS 3.0) for delivering Submittals, Daily Dredging reports and Pay Estimates?
Equipment
- Do you have experience with beach placement and grading of dredged material?
- What type of dredge equipment do you own and / or operate that is suitable for the work described? Do you own a hydraulic dredge? Please list each piece of equipment capable of performing dredging and pumping sand with beach placement and grading, i.e., dredges, discharge pipeline (specify quantity in linear feet), dozers, front end loaders, forklifts, and/or other equipment needed for beach placement and / or grading the beach as necessary. For each dredge that you list, please specify its size, horsepower, and any other salient characteristics.
- What length and size of discharge pipeline do you have available for use? Do you own the discharge pipeline?
- Do you plan to use booster pumps? Will they be placed in-water or on-land?
- If required, will you be able to meet a minimum production rate of 13,500 cubic yards per calendar day and complete all work?
Notice history
| Notice | Type | Posted |
|---|---|---|
| Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project | Pre-Solicitation | |
| This notice | Pre-Solicitation | |
| Sources Sought for, Brand Name, Market Research for Best Locks | Special Notice | |
| Sources Sought for Brand Name, Market Research for Monaco Fire Alarm system | Special Notice | |
| Camp Buckner Revitalization Phase 4 | Solicitation | |
| Advanced Notice- Camp Buckner Revitalization Phase 4 | Pre-Solicitation | |
| Market Research Camp Buckner Revitalization Phase 4 | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity