CA FTBR Senator Wash (1) Ferguson Road to Imperial Dam
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF20B000042
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Winterhaven Ca Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks bids for a road repaving project along approximately 2.5 miles of Ferguson Road to Imperial Dam in Imperial County, California. The Federal Highway Administration within the Department of Transportation is procuring these construction services, which include pulverizing the existing pavement for reuse as base material and paving the roadway. Contractors must complete performance between December 2020 and April 2021 while minimizing disruptions to recreation area visitors through proper construction phasing and traffic control. The lowest priced technically acceptable bid will be awarded. The deadline for questions is November 10, 2020 and bids are due by the same date.
This is a total small business set-aside designated under NAICS codes 237310 and PSC code D304. The engineer's estimate is $1,748,000. Five potential bidders are identified. Work will be performed in Winterhaven, California. Bids ranged from $1,619,259.96 to $3,703,085.00, with the lowest from Pyramid Construction & Aggregates, Inc. Construction must be conducted between December 2020 and April 2021 along 2.5 miles of roadway in Imperial County, California to qualify for award.
Notice text
THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE.
PROJECT NUMBER: CA FTBR Senator Wash (1)
PROJECT NAME: Ferguson Road to Imperial Dam
PROJECT DESCRIPTION: This project consists of repaving approximately 2.5 miles of roadway in Imperial County, California. The existing pavement will be pulverized and reused as base material prior to paving. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to recreation area visitors throughout construction and achieve customer satisfaction.
CONSTRUCTION DURATION: December, 2020 to April, 2021
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA FTBR Senator Wash (1) Ferguson Road to Imperial Dam | Award Notice | |
| This notice | Solicitation | |
| CA FTBR Senator Wash (1) Ferguson Road to Imperial Dam | Pre-Solicitation | |
| CA FTBR Senator Wash (1) Ferguson Road to Imperial Dam | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ND OMAD 2025(1) Minuteman Missile Access Road | Federal Highway Administration | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business | |
| OK FW TSM 10(1) NFH Entrance Road and Parking Improvements | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity