QnA 10.21.2020.pdf

PDF 103 KB Posted

Attached to
CA FTBR Senator Wash (1) Ferguson Road to Imperial Dam
Solicitation number
6982AF20B000042
Issued by

About this file

This document contains questions and answers from an advertisement for a federal highway construction project in California. The project consists of repaving approximately 2.5 miles of roadway between Ferguson Road and Imperial Dam, and involves pulverizing the existing pavement for reuse as base material prior to new paving. Temporary traffic control will be necessary throughout construction to minimize disruptions. The contractor must provide a field office and obtain water from the Colorado River or Senator Wash Reservoir by coordinating with the Bureau of Reclamation. Licensed surveyors are required for certain tasks. A control strip will not be needed for asphalt paving startup. The gradation requirements for full depth reclamation conform to the specified section of the state specifications manual. Traffic can use the road during construction if maintained according to the manual's requirements.

View the file

Other files

File Type Posted
Bid Tabulation CA FTBR Senator Wash(1).pdf PDF
REVISED Bid Opening Summary CA FTBR SENATOR WASH(1).pdf PDF
Bid Opening Summary.pdf PDF
QnA 11.5.2020.pdf PDF
A003.pdf PDF
QnA 10.28.2020.pdf PDF
A002.pdf PDF
Interested Vendors - revised 10.23.20.pdf PDF
Interested Vendors.pdf PDF
A001.pdf PDF
FP-14.pdf PDF
6982AF20B000042.pdf PDF
CA_FTBR_Senator Wash(1) Plans.pdf PDF
06_CA FTBR Senator Wash(1)_Pavement_Design_Sealed.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CA FTBR Senator Wash(1) Ferguson Road to Imperial Dam

October 21, 2020

Questions Answers 1 Please provide locations for the field office.

Contractor to provide a field office, or field office space in accordance with SCR Section 637. No site has been pre-determined.

2 Will contractor have access to field office, or is it for FHWA use only?

As stated in FP-14 637.02, “Facilities and services are for the exclusive use of Government personnel…”

3 Do pre-construction cross-slopes/road profiling need to be done by a licensed surveyor?

Provide personnel with qualifications as stated in FP-14 Section 152.02

4 Are post construction cross-sloping/road profiling by licensed surveyor required?

Provide personnel with qualifications as stated in FP-14 Section 152.02

5 Will any unsuitable or excess material be paid as waste? There is no line item in the bid schedule for disposal of these materials and it appears that there will be a large quantity of waste/export material

There is no pay item for waste. Any waste generated would be associated with subexcavation and is considered subsidiary to the subexcavation pay item. Note that if subexcavation is necessary, it will be determined by the CO in the field, as noted on Note 1, Detail 204-A. It is not required throughout, and may not be required. The Summary Of Quantities has an estimated, provisional value of subexcavation.

6 Please provide locations available for construction water access.

Imperial Irrigation District was unable provide this information

Imperial Irrigation District will no longer be providing water. Water can be obtained from the Colorado River or Senator Wash Reservoir at no charge.

Coordination and an agreement with the Bureau of Reclamation will be required. Contact Carrie Scott at USBOR to coordinate. cmscott@usbr.gov , 928-343-8317

7 What is the thickness of the existing asphalt? See Appendix A of the Pavement Report 8 Please confirm if a control strip will be required for asphalt paving start-up A control strip will not be required for asphalt paving start-up, per FP-14 and SCR section 403.

9 Please confirm the gradation requirements for full depth reclamation

Conform to FP-14 703.06 for crushed aggregate for full depth reclamation (per FP-14 Section 304.02).

10 Please confirm if traffic will be allowed to drive on road once pulverized and compacted, or if traffic is only allowed on finished AC surface

Traffic can drive on the pulverized/compacted materials, as long as traffic is maintained in accordance with FP-14 Section 156.