This bid tabulation report details 21 bids received in response to Solicitation Number 6982AF20B000042 issued by the Department of Transportation Federal Highway Administration. The solicitation sought bids to repave approximately 2.5 miles of roadway in Imperial County, California, with work to be conducted from December 2020 to April 2021. Pyramid Construction and Aggregates, Inc. provided the lowest bid at $1,619,259.96. The other bids ranged from $1,826,851.86 by ARROW INDIAN CONTRACTORS, INC. to $3,703,085.00 by LB Civil Construction, Inc. with an engineer's estimate of $1,748,000. The report provides unit pricing for over 190 line items associated with tasks such as mobilization, surveying, quality control testing, roadway reconditioning, asphalt paving, signage, guardrails, and temporary traffic control equipment and personnel.

View the file

Other files

File Type Posted
REVISED Bid Opening Summary CA FTBR SENATOR WASH(1).pdf PDF
Bid Opening Summary.pdf PDF
QnA 11.5.2020.pdf PDF
A003.pdf PDF
QnA 10.28.2020.pdf PDF
A002.pdf PDF
Interested Vendors - revised 10.23.20.pdf PDF
Interested Vendors.pdf PDF
QnA 10.21.2020.pdf PDF
A001.pdf PDF
FP-14.pdf PDF
6982AF20B000042.pdf PDF
CA_FTBR_Senator Wash(1) Plans.pdf PDF
06_CA FTBR Senator Wash(1)_Pavement_Design_Sealed.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/12/20

1 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000042

Division: Central Federal Lands

State: CA County: Imperial

Federal Land: Lower Colorado Basin, Region 8, Yuma Area Office Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/10/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Pyramid Construction and Aggregates, Inc. $1,619,259.96 839 Dogwood Road Heber, CA 92249

ARROW INDIAN CONTRACTORS, INC. $1,826,851.86

449 S. 48th St. Ste 101 Scottsdale, AZ 85281

Gutierrez Canales Engineering, PC $1,874,202.86 1851 W. 24th Street, Suite 201 Yuma, AZ 85364

Hat Creek Construction & Materials, Inc. $1,999,205.00 24339 Highway 89 N Burney, CA 96013

Desert Talon Contracting, Inc. $2,043,217.40 1636 E 20th Street Yuma, AZ 85365

Command Performance Constructors, Inc. $2,075,525.01 3346 Olive Ave Signal Hill, CA 90755

J. Francis Company $2,468,960.00 766 Palmyrita Ave Suite C Riverside, CA 92557

Stormwater Plans, LLC dba SWP Contracting and Paving $2,492,525.00 5624 N. 54th Avenue Glendale, AZ 85301

Martin Brothers Construction $2,526,764.00 8801 Folsom Blvd Suite 260 Sacramento, CA 95826

Contract Specialist

11/12/2020

2 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000042

Division: Central Federal Lands

State: CA County: Imperial

Federal Land: Lower Colorado Basin, Region 8, Yuma Area Office Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/10/20

Vance Corporation

3 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000042

Division: Central Federal Lands

State: CA County: Imperial

Federal Land: Lower Colorado Basin, Region 8, Yuma Area Office Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/10/20

$2,560,560.00 17761 Slover Ave Bloomington, CA 92316

4 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000042

Division: Central Federal Lands

State: CA County: Imperial

Federal Land: Lower Colorado Basin, Region 8, Yuma Area Office Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/10/20

Contractor Comment Bid Amount Responsive

V. Lopez Jr. and Sons Gen Engr. Inc. $2,846,172.59 200 E Fesler St. #101 Santa Maria, CA 93454

CUTTING EDGE CONCRETE SERVICES, INC $3,252,632.20

18020 National Trails Highway Oro Grande, CA 92368

LB Civil Construction, Inc. $3,703,085.00 324 E Valley Pkwy San Diego, CA 92025

Engineer's Estimate $1,748,000.00

5 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

Pyramid Construction and Aggregates, Inc. Lump Sum $20,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $46,353.02 Gutierrez Canales Engineering, PC Lump Sum $36,995.00 Hat Creek Construction & Materials, Inc. Lump Sum $198,000.00 Desert Talon Contracting, Inc. Lump Sum $60,000.00 Command Performance Constructors, Inc. Lump Sum $20,000.00 J. Francis Company Lump Sum $280,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $360,000.00 Martin Brothers Construction Lump Sum $255,000.00 Vance Corporation Lump Sum $300,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. Lump Sum $118,085.00 CUTTING EDGE CONCRETE SERVICES, INC Lump Sum $245,000.00 LB Civil Construction, Inc. Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $177,957.00

A0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Pyramid Construction and Aggregates, Inc. $8,000.00 $19,584.00

ARROW INDIAN CONTRACTORS, INC. $22,672.24 $55,501.64

Gutierrez Canales Engineering, PC $25,435.87 $62,267.01 Hat Creek Construction & Materials, Inc. $10,000.00 $24,480.00 Desert Talon Contracting, Inc. $26,000.00 $63,648.00 Command Performance Constructors, Inc. $4,084.97 $10,000.01 J. Francis Company $15,000.00 $36,720.00 Stormwater Plans, LLC dba SWP Contracting and Paving $30,000.00 $73,440.00 Martin Brothers Construction $10,500.00 $25,704.00 Vance Corporation $25,000.00 $61,200.00 V. Lopez Jr. and Sons Gen Engr. Inc. $27,926.88 $68,365.00

CUTTING EDGE CONCRETE SERVICES, INC $10,000.00 $24,480.00

LB Civil Construction, Inc. $60,000.00 $146,880.00 Engineer's Estimate 2.448 MILE $3,500.00 $8,568.00

A0030 15301-0000 CONTRACTOR QUALITY CONTROL

Pyramid Construction and Aggregates, Inc. Lump Sum $4,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $19,797.36 Gutierrez Canales Engineering, PC Lump Sum $37,264.00 Hat Creek Construction & Materials, Inc. Lump Sum $135,000.00 Desert Talon Contracting, Inc. Lump Sum $62,500.00 Command Performance Constructors, Inc. Lump Sum $12,000.00 J. Francis Company Lump Sum $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Martin Brothers Construction Lump Sum $163,000.00 Vance Corporation Lump Sum $50,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. Lump Sum $167,453.93 CUTTING EDGE CONCRETE SERVICES, INC Lump Sum $107,000.00 LB Civil Construction, Inc. Lump Sum $80,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

6 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0040 15401-0000 CONTRACTOR TESTING

Pyramid Construction and Aggregates, Inc. Lump Sum $157,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $26,835.96 Gutierrez Canales Engineering, PC Lump Sum $41,100.00 Hat Creek Construction & Materials, Inc. Lump Sum $166,000.00 Desert Talon Contracting, Inc. Lump Sum $50,000.00 Command Performance Constructors, Inc. Lump Sum $60,000.00 J. Francis Company Lump Sum $25,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 Martin Brothers Construction Lump Sum $138,717.00 Vance Corporation Lump Sum $50,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. Lump Sum $55,935.00 CUTTING EDGE CONCRETE SERVICES, INC Lump Sum $127,000.00 LB Civil Construction, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0050 15501-0000 CONSTRUCTION SCHEDULE

Pyramid Construction and Aggregates, Inc. Lump Sum $6,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $11,078.35 Gutierrez Canales Engineering, PC Lump Sum $3,400.00 Hat Creek Construction & Materials, Inc. Lump Sum $10,000.00 Desert Talon Contracting, Inc. Lump Sum $2,000.00 Command Performance Constructors, Inc. Lump Sum $1,500.00 J. Francis Company Lump Sum $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $6,000.00 Martin Brothers Construction Lump Sum $9,360.00 Vance Corporation Lump Sum $10,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. Lump Sum $3,107.50 CUTTING EDGE CONCRETE SERVICES, INC Lump Sum $25,000.00 LB Civil Construction, Inc. Lump Sum $1,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0060 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Pyramid Construction and Aggregates, Inc. $5.00 $400.00

ARROW INDIAN CONTRACTORS, INC. $57.94 $4,635.20

Gutierrez Canales Engineering, PC $20.26 $1,620.80 Hat Creek Construction & Materials, Inc. $11.00 $880.00 Desert Talon Contracting, Inc. $75.00 $6,000.00 Command Performance Constructors, Inc. $18.00 $1,440.00 J. Francis Company $10.00 $800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $1,200.00 Martin Brothers Construction $21.00 $1,680.00 Vance Corporation $10.00 $800.00 V. Lopez Jr. and Sons Gen Engr. Inc. $43.51 $3,480.80

CUTTING EDGE CONCRETE SERVICES, INC $15.00 $1,200.00

LB Civil Construction, Inc. $45.00 $3,600.00 Engineer's Estimate 80 LNFT $10.00 $800.00

7 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Pyramid Construction and Aggregates, Inc. $5.00 $3,250.00

ARROW INDIAN CONTRACTORS, INC. $18.13 $11,784.50

Gutierrez Canales Engineering, PC $20.74 $13,481.00 Hat Creek Construction & Materials, Inc. $9.00 $5,850.00 Desert Talon Contracting, Inc. $20.00 $13,000.00 Command Performance Constructors, Inc. $10.00 $6,500.00 J. Francis Company $5.00 $3,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10.00 $6,500.00 Martin Brothers Construction $21.00 $13,650.00 Vance Corporation $10.00 $6,500.00 V. Lopez Jr. and Sons Gen Engr. Inc. $6.22 $4,043.00

CUTTING EDGE CONCRETE SERVICES, INC $10.00 $6,500.00

LB Civil Construction, Inc. $9.50 $6,175.00 Engineer's Estimate 650 LNFT $6.00 $3,900.00

A0080 15802-0000 WATERING FOR DUST CONTROL

Pyramid Construction and Aggregates, Inc. Lump Sum $8,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $20,435.16 Gutierrez Canales Engineering, PC Lump Sum $9,919.00 Hat Creek Construction & Materials, Inc. Lump Sum $25,000.00 Desert Talon Contracting, Inc. Lump Sum $20,000.00 Command Performance Constructors, Inc. Lump Sum $25,000.00 J. Francis Company Lump Sum $120,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $52,500.00 Martin Brothers Construction Lump Sum $49,000.00 Vance Corporation Lump Sum $80,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. Lump Sum $41,951.25 CUTTING EDGE CONCRETE SERVICES, INC Lump Sum $91,000.00 LB Civil Construction, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $41,000.00

A0090 20301-2400 REMOVAL OF SIGN

Pyramid Construction and Aggregates, Inc. $100.00 $1,500.00

ARROW INDIAN CONTRACTORS, INC. $375.95 $5,639.25

Gutierrez Canales Engineering, PC $316.93 $4,753.95 Hat Creek Construction & Materials, Inc. $100.00 $1,500.00 Desert Talon Contracting, Inc. $70.00 $1,050.00 Command Performance Constructors, Inc. $100.00 $1,500.00 J. Francis Company $200.00 $3,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $2,250.00 Martin Brothers Construction $161.00 $2,415.00 Vance Corporation $150.00 $2,250.00 V. Lopez Jr. and Sons Gen Engr. Inc. $31.08 $466.20

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $7,500.00

LB Civil Construction, Inc. $245.00 $3,675.00 Engineer's Estimate 15 EACH $300.00 $4,500.00

8 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 20302-0400 REMOVAL OF CURB, ASPHALT

Pyramid Construction and Aggregates, Inc. $4.00 $6,400.00

ARROW INDIAN CONTRACTORS, INC. $6.10 $9,760.00

Gutierrez Canales Engineering, PC $3.14 $5,024.00 Hat Creek Construction & Materials, Inc. $2.00 $3,200.00 Desert Talon Contracting, Inc. $5.00 $8,000.00 Command Performance Constructors, Inc. $3.00 $4,800.00 J. Francis Company $10.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7.00 $11,200.00 Martin Brothers Construction $11.00 $17,600.00 Vance Corporation $5.00 $8,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $4.35 $6,960.00

CUTTING EDGE CONCRETE SERVICES, INC $7.50 $12,000.00

LB Civil Construction, Inc. $12.00 $19,200.00 Engineer's Estimate 1,600 LNFT $5.00 $8,000.00

A0110 20302-1200 REMOVAL OF GUARDRAIL

Pyramid Construction and Aggregates, Inc. $10.00 $16,000.00

ARROW INDIAN CONTRACTORS, INC. $4.88 $7,808.00

Gutierrez Canales Engineering, PC $18.75 $30,000.00 Hat Creek Construction & Materials, Inc. $9.00 $14,400.00 Desert Talon Contracting, Inc. $19.50 $31,200.00 Command Performance Constructors, Inc. $6.00 $9,600.00 J. Francis Company $15.00 $24,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4.50 $7,200.00 Martin Brothers Construction $4.05 $6,480.00 Vance Corporation $7.00 $11,200.00 V. Lopez Jr. and Sons Gen Engr. Inc. $7.46 $11,936.00

CUTTING EDGE CONCRETE SERVICES, INC $37.00 $59,200.00

LB Civil Construction, Inc. $19.00 $30,400.00 Engineer's Estimate 1,600 LNFT $5.00 $8,000.00

A0120 20402-0000 SUBEXCAVATION

Pyramid Construction and Aggregates, Inc. $105.00 $26,250.00

ARROW INDIAN CONTRACTORS, INC. $48.79 $12,197.50

Gutierrez Canales Engineering, PC $216.98 $54,245.00 Hat Creek Construction & Materials, Inc. $145.00 $36,250.00 Desert Talon Contracting, Inc. $145.00 $36,250.00 Command Performance Constructors, Inc. $25.00 $6,250.00 J. Francis Company $130.00 $32,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $20,000.00 Martin Brothers Construction $85.00 $21,250.00 Vance Corporation $50.00 $12,500.00 V. Lopez Jr. and Sons Gen Engr. Inc. $186.45 $46,612.50

CUTTING EDGE CONCRETE SERVICES, INC $150.00 $37,500.00

LB Civil Construction, Inc. $350.00 $87,500.00 Engineer's Estimate 250 CUYD $40.00 $10,000.00

9 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0130 30202-2000 ROADWAY AGGREGATE, METHOD 2

Pyramid Construction and Aggregates, Inc. $21.00 $13,230.00

ARROW INDIAN CONTRACTORS, INC. $36.59 $23,051.70

Gutierrez Canales Engineering, PC $67.42 $42,474.60 Hat Creek Construction & Materials, Inc. $83.00 $52,290.00 Desert Talon Contracting, Inc. $88.00 $55,440.00 Command Performance Constructors, Inc. $35.00 $22,050.00 J. Francis Company $90.00 $56,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50.00 $31,500.00 Martin Brothers Construction $101.00 $63,630.00 Vance Corporation $75.00 $47,250.00 V. Lopez Jr. and Sons Gen Engr. Inc. $149.16 $93,970.80

CUTTING EDGE CONCRETE SERVICES, INC $90.00 $56,700.00

LB Civil Construction, Inc. $100.00 $63,000.00 Engineer's Estimate 630.0 TON $60.00 $37,800.00

A0140 30301-6000 ROADWAY RECONDITIONING

Pyramid Construction and Aggregates, Inc. $26,145.00 $64,002.96

ARROW INDIAN CONTRACTORS, INC. $9,716.68 $23,786.43

Gutierrez Canales Engineering, PC $42,532.68 $104,120.00 Hat Creek Construction & Materials, Inc. $10,000.00 $24,480.00 Desert Talon Contracting, Inc. $67,000.00 $164,016.00 Command Performance Constructors, Inc. $142,565.36 $349,000.00 J. Francis Company $60,000.00 $146,880.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45,000.00 $110,160.00 Martin Brothers Construction $122,000.00 $298,656.00 Vance Corporation $75,000.00 $183,600.00 V. Lopez Jr. and Sons Gen Engr. Inc. $24,860.00 $60,857.28

CUTTING EDGE CONCRETE SERVICES, INC $59,400.00 $145,411.20

LB Civil Construction, Inc. $225,000.00 $550,800.00 Engineer's Estimate 2.448 MILE $10,000.00 $24,480.00

A0150 30401-5000 FULL DEPTH RECLAMATION, METHOD 2 (4-INCH DEPTH)

Pyramid Construction and Aggregates, Inc. $17,250.00 $20,010.00

ARROW INDIAN CONTRACTORS, INC. $64,158.97 $74,424.41

Gutierrez Canales Engineering, PC $34,689.66 $40,240.01 Hat Creek Construction & Materials, Inc. $42,000.00 $48,720.00 Desert Talon Contracting, Inc. $12,500.00 $14,500.00 Command Performance Constructors, Inc. $50,000.00 $58,000.00 J. Francis Company $20,000.00 $23,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85,000.00 $98,600.00 Martin Brothers Construction $8,150.00 $9,454.00 Vance Corporation $65,000.00 $75,400.00 V. Lopez Jr. and Sons Gen Engr. Inc. $9,043.87 $10,490.89

CUTTING EDGE CONCRETE SERVICES, INC $57,000.00 $66,120.00

LB Civil Construction, Inc. $40,000.00 $46,400.00 Engineer's Estimate 1.160 MILE $40,000.00 $46,400.00

10 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0160 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH

Pyramid Construction and Aggregates, Inc. $17,250.00 $22,218.00

ARROW INDIAN CONTRACTORS, INC. $57,895.19 $74,569.00

Gutierrez Canales Engineering, PC $40,806.68 $52,559.00 Hat Creek Construction & Materials, Inc. $60,000.00 $77,280.00 Desert Talon Contracting, Inc. $11,800.00 $15,198.40 Command Performance Constructors, Inc. $60,000.00 $77,280.00 J. Francis Company $45,000.00 $57,960.00 Stormwater Plans, LLC dba SWP Contracting and Paving $105,000.00 $135,240.00 Martin Brothers Construction $7,500.00 $9,660.00 Vance Corporation $70,000.00 $90,160.00 V. Lopez Jr. and Sons Gen Engr. Inc. $10,750.26 $13,846.33

CUTTING EDGE CONCRETE SERVICES, INC $67,000.00 $86,296.00

LB Civil Construction, Inc. $35,000.00 $45,080.00 Engineer's Estimate 1.288 MILE $50,000.00 $64,400.00

A0170 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Pyramid Construction and Aggregates, Inc. $103.80 $695,460.00

ARROW INDIAN CONTRACTORS, INC. $117.51 $787,317.00

Gutierrez Canales Engineering, PC $117.57 $787,719.00 Hat Creek Construction & Materials, Inc. $100.00 $670,000.00 Desert Talon Contracting, Inc. $104.00 $696,800.00 Command Performance Constructors, Inc. $125.00 $837,500.00 J. Francis Company $100.00 $670,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $737,000.00 Martin Brothers Construction $139.00 $931,300.00 Vance Corporation $100.00 $670,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $172.96 $1,158,832.00

CUTTING EDGE CONCRETE SERVICES, INC $195.00 $1,306,500.00

LB Civil Construction, Inc. $175.00 $1,172,500.00 Engineer's Estimate 6,700.0 TON $110.00 $737,000.00

A0180 40601-0000 FOG SEAL

Pyramid Construction and Aggregates, Inc. $100.00 $2,500.00

ARROW INDIAN CONTRACTORS, INC. $789.22 $19,730.50

Gutierrez Canales Engineering, PC $648.84 $16,221.00 Hat Creek Construction & Materials, Inc. $500.00 $12,500.00 Desert Talon Contracting, Inc. $1,000.00 $25,000.00 Command Performance Constructors, Inc. $1,500.00 $37,500.00 J. Francis Company $1,700.00 $42,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $275.00 $6,875.00 Martin Brothers Construction $927.00 $23,175.00 Vance Corporation $421.00 $10,525.00 V. Lopez Jr. and Sons Gen Engr. Inc. $1,243.00 $31,075.00

CUTTING EDGE CONCRETE SERVICES, INC $850.00 $21,250.00

LB Civil Construction, Inc. $500.00 $12,500.00 Engineer's Estimate 25.0 TON $900.00 $22,500.00

11 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0190 41101-1000 PRIME COAT, METHOD 1

Pyramid Construction and Aggregates, Inc. $100.00 $4,900.00

ARROW INDIAN CONTRACTORS, INC. $1,650.41 $80,870.09

Gutierrez Canales Engineering, PC $853.31 $41,812.19 Hat Creek Construction & Materials, Inc. $500.00 $24,500.00 Desert Talon Contracting, Inc. $700.00 $34,300.00 Command Performance Constructors, Inc. $1,200.00 $58,800.00 J. Francis Company $2,000.00 $98,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $29,400.00 Martin Brothers Construction $1,213.00 $59,437.00 Vance Corporation $720.00 $35,280.00 V. Lopez Jr. and Sons Gen Engr. Inc. $1,243.00 $60,907.00

CUTTING EDGE CONCRETE SERVICES, INC $950.00 $46,550.00

LB Civil Construction, Inc. $550.00 $26,950.00 Engineer's Estimate 49.0 TON $900.00 $44,100.00

A0200 41105-0000 BLOTTER

Pyramid Construction and Aggregates, Inc. $50.00 $14,250.00

ARROW INDIAN CONTRACTORS, INC. $121.98 $34,764.30

Gutierrez Canales Engineering, PC $34.15 $9,732.75 Hat Creek Construction & Materials, Inc. $25.00 $7,125.00 Desert Talon Contracting, Inc. $65.00 $18,525.00 Command Performance Constructors, Inc. $100.00 $28,500.00 J. Francis Company $200.00 $57,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $4,275.00 Martin Brothers Construction $45.00 $12,825.00 Vance Corporation $20.00 $5,700.00 V. Lopez Jr. and Sons Gen Engr. Inc. $95.23 $27,140.55

CUTTING EDGE CONCRETE SERVICES, INC $75.00 $21,375.00

LB Civil Construction, Inc. $30.00 $8,550.00 Engineer's Estimate 285.0 TON $50.00 $14,250.00

A0210 41201-0000 TACK COAT

Pyramid Construction and Aggregates, Inc. $100.00 $2,500.00

ARROW INDIAN CONTRACTORS, INC. $1,032.31 $25,807.75

Gutierrez Canales Engineering, PC $648.84 $16,221.00 Hat Creek Construction & Materials, Inc. $500.00 $12,500.00 Desert Talon Contracting, Inc. $1,000.00 $25,000.00 Command Performance Constructors, Inc. $1,700.00 $42,500.00 J. Francis Company $1,000.00 $25,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $275.00 $6,875.00 Martin Brothers Construction $750.00 $18,750.00 Vance Corporation $720.00 $18,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $1,243.00 $31,075.00

CUTTING EDGE CONCRETE SERVICES, INC $950.00 $23,750.00

LB Civil Construction, Inc. $550.00 $13,750.00 Engineer's Estimate 25.0 TON $900.00 $22,500.00

12 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 60901-2300 CURB, ASPHALT, 6-INCH DEPTH (CALTRANS Type A)

Pyramid Construction and Aggregates, Inc. $10.00 $16,350.00

ARROW INDIAN CONTRACTORS, INC. $42.69 $69,798.15

Gutierrez Canales Engineering, PC $16.33 $26,699.55 Hat Creek Construction & Materials, Inc. $12.00 $19,620.00 Desert Talon Contracting, Inc. $15.00 $24,525.00 Command Performance Constructors, Inc. $14.00 $22,890.00 J. Francis Company $40.00 $65,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10.00 $16,350.00 Martin Brothers Construction $15.00 $24,525.00 Vance Corporation $8.00 $13,080.00 V. Lopez Jr. and Sons Gen Engr. Inc. $62.15 $101,615.25

CUTTING EDGE CONCRETE SERVICES, INC $45.00 $73,575.00

LB Civil Construction, Inc. $20.00 $32,700.00 Engineer's Estimate 1,635 LNFT $20.00 $32,700.00

A0230 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS

Pyramid Construction and Aggregates, Inc. $50.00 $62,500.00

ARROW INDIAN CONTRACTORS, INC. $48.79 $60,987.50

Gutierrez Canales Engineering, PC $93.84 $117,300.00 Hat Creek Construction & Materials, Inc. $44.00 $55,000.00 Desert Talon Contracting, Inc. $100.00 $125,000.00 Command Performance Constructors, Inc. $100.00 $125,000.00 J. Francis Company $40.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $56,250.00 Martin Brothers Construction $41.00 $51,250.00 Vance Corporation $190.00 $237,500.00 V. Lopez Jr. and Sons Gen Engr. Inc. $233.68 $292,100.00

CUTTING EDGE CONCRETE SERVICES, INC $95.00 $118,750.00

LB Civil Construction, Inc. $65.00 $81,250.00 Engineer's Estimate 1,250.0 LNFT $50.00 $62,500.00

A0240 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Pyramid Construction and Aggregates, Inc. $6,400.00 $51,200.00

ARROW INDIAN CONTRACTORS, INC. $6,112.40 $48,899.20

Gutierrez Canales Engineering, PC $7,877.50 $63,020.00 Hat Creek Construction & Materials, Inc. $4,300.00 $34,400.00 Desert Talon Contracting, Inc. $7,500.00 $60,000.00 Command Performance Constructors, Inc. $3,500.00 $28,000.00 J. Francis Company $2,000.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7,500.00 $60,000.00 Martin Brothers Construction $5,100.00 $40,800.00 Vance Corporation $8,035.00 $64,280.00 V. Lopez Jr. and Sons Gen Engr. Inc. $9,695.40 $77,563.20

CUTTING EDGE CONCRETE SERVICES, INC $3,900.00 $31,200.00

LB Civil Construction, Inc. $5,400.00 $43,200.00 Engineer's Estimate 8 EACH $6,000.00 $48,000.00

13 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0250 61920-2000 REMOVE AND RESET GATE (SPECIAL)

Pyramid Construction and Aggregates, Inc. $10,000.00 $10,000.00

ARROW INDIAN CONTRACTORS, INC. $4,879.27 $4,879.27

Gutierrez Canales Engineering, PC $4,768.00 $4,768.00 Hat Creek Construction & Materials, Inc. $5,000.00 $5,000.00 Desert Talon Contracting, Inc. $3,000.00 $3,000.00 Command Performance Constructors, Inc. $1,000.00 $1,000.00 J. Francis Company $2,000.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6,000.00 $6,000.00 Martin Brothers Construction $4,500.00 $4,500.00 Vance Corporation $5,250.00 $5,250.00 V. Lopez Jr. and Sons Gen Engr. Inc. $6,215.00 $6,215.00

CUTTING EDGE CONCRETE SERVICES, INC $7,500.00 $7,500.00

LB Civil Construction, Inc. $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $1,200.00 $1,200.00

A0260 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Pyramid Construction and Aggregates, Inc. $100.00 $4,000.00

ARROW INDIAN CONTRACTORS, INC. $228.57 $9,142.80

Gutierrez Canales Engineering, PC $192.80 $7,712.00 Hat Creek Construction & Materials, Inc. $105.00 $4,200.00 Desert Talon Contracting, Inc. $125.00 $5,000.00 Command Performance Constructors, Inc. $100.00 $4,000.00 J. Francis Company $250.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $6,600.00 Martin Brothers Construction $150.00 $6,000.00 Vance Corporation $240.00 $9,600.00 V. Lopez Jr. and Sons Gen Engr. Inc. $158.40 $6,336.00

CUTTING EDGE CONCRETE SERVICES, INC $145.00 $5,800.00

LB Civil Construction, Inc. $130.00 $5,200.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

A0270 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Pyramid Construction and Aggregates, Inc. $187.00 $7,480.00

ARROW INDIAN CONTRACTORS, INC. $209.77 $8,390.80

Gutierrez Canales Engineering, PC $176.70 $7,068.00 Hat Creek Construction & Materials, Inc. $140.00 $5,600.00 Desert Talon Contracting, Inc. $220.00 $8,800.00 Command Performance Constructors, Inc. $165.00 $6,600.00 J. Francis Company $500.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $180.00 $7,200.00 Martin Brothers Construction $215.00 $8,600.00 Vance Corporation $225.00 $9,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $176.00 $7,040.00

CUTTING EDGE CONCRETE SERVICES, INC $165.00 $6,600.00

LB Civil Construction, Inc. $175.00 $7,000.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

14 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0280 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Pyramid Construction and Aggregates, Inc. $315.00 $12,600.00

ARROW INDIAN CONTRACTORS, INC. $347.61 $13,904.40

Gutierrez Canales Engineering, PC $242.53 $9,701.20 Hat Creek Construction & Materials, Inc. $210.00 $8,400.00 Desert Talon Contracting, Inc. $300.00 $12,000.00 Command Performance Constructors, Inc. $200.00 $8,000.00 J. Francis Company $500.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $190.00 $7,600.00 Martin Brothers Construction $245.00 $9,800.00 Vance Corporation $250.00 $10,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $235.40 $9,416.00

CUTTING EDGE CONCRETE SERVICES, INC $225.00 $9,000.00

LB Civil Construction, Inc. $325.00 $13,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

A0290 62301-0000 GENERAL LABOR

Pyramid Construction and Aggregates, Inc. $90.00 $3,600.00

ARROW INDIAN CONTRACTORS, INC. $105.59 $4,223.60

Gutierrez Canales Engineering, PC $91.80 $3,672.00 Hat Creek Construction & Materials, Inc. $75.00 $3,000.00 Desert Talon Contracting, Inc. $125.00 $5,000.00 Command Performance Constructors, Inc. $60.00 $2,400.00 J. Francis Company $120.00 $4,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $3,200.00 Martin Brothers Construction $84.00 $3,360.00 Vance Corporation $150.00 $6,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $86.07 $3,442.80

CUTTING EDGE CONCRETE SERVICES, INC $90.00 $3,600.00

LB Civil Construction, Inc. $120.00 $4,800.00 Engineer's Estimate 40 HOUR $65.00 $2,600.00

A0300 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Pyramid Construction and Aggregates, Inc. $100.00 $4,000.00

ARROW INDIAN CONTRACTORS, INC. $204.58 $8,183.20

Gutierrez Canales Engineering, PC $116.45 $4,658.00 Hat Creek Construction & Materials, Inc. $100.00 $4,000.00 Desert Talon Contracting, Inc. $128.00 $5,120.00 Command Performance Constructors, Inc. $70.00 $2,800.00 J. Francis Company $150.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00 Martin Brothers Construction $151.00 $6,040.00 Vance Corporation $180.00 $7,200.00 V. Lopez Jr. and Sons Gen Engr. Inc. $94.76 $3,790.40

CUTTING EDGE CONCRETE SERVICES, INC $160.00 $6,400.00

LB Civil Construction, Inc. $210.00 $8,400.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

15 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0310 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Pyramid Construction and Aggregates, Inc. $125.00 $5,000.00

ARROW INDIAN CONTRACTORS, INC. $244.17 $9,766.80

Gutierrez Canales Engineering, PC $205.50 $8,220.00 Hat Creek Construction & Materials, Inc. $135.00 $5,400.00 Desert Talon Contracting, Inc. $128.00 $5,120.00 Command Performance Constructors, Inc. $70.00 $2,800.00 J. Francis Company $300.00 $12,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $185.00 $7,400.00 Martin Brothers Construction $212.00 $8,480.00 Vance Corporation $400.00 $16,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $247.50 $9,900.00

CUTTING EDGE CONCRETE SERVICES, INC $245.00 $9,800.00

LB Civil Construction, Inc. $330.00 $13,200.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00

A0320 63301-0000 SIGN SYSTEM

Pyramid Construction and Aggregates, Inc. $300.00 $6,000.00

ARROW INDIAN CONTRACTORS, INC. $390.34 $7,806.80

Gutierrez Canales Engineering, PC $438.40 $8,768.00 Hat Creek Construction & Materials, Inc. $1,000.00 $20,000.00 Desert Talon Contracting, Inc. $450.00 $9,000.00 Command Performance Constructors, Inc. $640.00 $12,800.00 J. Francis Company $300.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $350.00 $7,000.00 Martin Brothers Construction $151.00 $3,020.00 Vance Corporation $450.00 $9,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $7.60 $152.00

CUTTING EDGE CONCRETE SERVICES, INC $1,000.00 $20,000.00

LB Civil Construction, Inc. $1,700.00 $34,000.00 Engineer's Estimate 20 EACH $600.00 $12,000.00

A0330 63308-0000 OBJECT MARKER (Type P (CA))

Pyramid Construction and Aggregates, Inc. $125.00 $1,250.00

ARROW INDIAN CONTRACTORS, INC. $292.75 $2,927.50

Gutierrez Canales Engineering, PC $328.80 $3,288.00 Hat Creek Construction & Materials, Inc. $100.00 $1,000.00 Desert Talon Contracting, Inc. $350.00 $3,500.00 Command Performance Constructors, Inc. $20.00 $200.00 J. Francis Company $200.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $265.00 $2,650.00 Martin Brothers Construction $242.00 $2,420.00 Vance Corporation $350.00 $3,500.00 V. Lopez Jr. and Sons Gen Engr. Inc. $275.00 $2,750.00

CUTTING EDGE CONCRETE SERVICES, INC $450.00 $4,500.00

LB Civil Construction, Inc. $510.00 $5,100.00 Engineer's Estimate 10 EACH $200.00 $2,000.00

16 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 63309-0000 DELINEATOR (CALTRANS Type L-1)

Pyramid Construction and Aggregates, Inc. $100.00 $400.00

ARROW INDIAN CONTRACTORS, INC. $304.95 $1,219.80

Gutierrez Canales Engineering, PC $342.50 $1,370.00 Hat Creek Construction & Materials, Inc. $100.00 $400.00 Desert Talon Contracting, Inc. $370.00 $1,480.00 Command Performance Constructors, Inc. $150.00 $600.00 J. Francis Company $200.00 $800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $275.00 $1,100.00 Martin Brothers Construction $252.00 $1,008.00 Vance Corporation $300.00 $1,200.00 V. Lopez Jr. and Sons Gen Engr. Inc. $275.00 $1,100.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $2,000.00

LB Civil Construction, Inc. $350.00 $1,400.00 Engineer's Estimate 4 EACH $60.00 $240.00

A0350 63309-0000 DELINEATOR (CALTRANS CLASS 2, TYPE F)

Pyramid Construction and Aggregates, Inc. $100.00 $3,500.00

ARROW INDIAN CONTRACTORS, INC. $292.75 $10,246.25

Gutierrez Canales Engineering, PC $328.80 $11,508.00 Hat Creek Construction & Materials, Inc. $100.00 $3,500.00 Desert Talon Contracting, Inc. $350.00 $12,250.00 Command Performance Constructors, Inc. $150.00 $5,250.00 J. Francis Company $150.00 $5,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $265.00 $9,275.00 Martin Brothers Construction $243.00 $8,505.00 Vance Corporation $121.00 $4,235.00 V. Lopez Jr. and Sons Gen Engr. Inc. $275.00 $9,625.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $17,500.00

LB Civil Construction, Inc. $510.00 $17,850.00 Engineer's Estimate 35 EACH $50.00 $1,750.00

A0360 63315-0000 RUMBLE STRIP (TRANSVERSE)

Pyramid Construction and Aggregates, Inc. $1,000.00 $18,000.00

ARROW INDIAN CONTRACTORS, INC. $243.96 $4,391.28

Gutierrez Canales Engineering, PC $274.00 $4,932.00 Hat Creek Construction & Materials, Inc. $400.00 $7,200.00 Desert Talon Contracting, Inc. $600.00 $10,800.00 Command Performance Constructors, Inc. $80.00 $1,440.00 J. Francis Company $200.00 $3,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $3,960.00 Martin Brothers Construction $252.00 $4,536.00 Vance Corporation $175.00 $3,150.00 V. Lopez Jr. and Sons Gen Engr. Inc. $550.00 $9,900.00

CUTTING EDGE CONCRETE SERVICES, INC $275.00 $4,950.00

LB Civil Construction, Inc. $220.00 $3,960.00 Engineer's Estimate 18.0 SQYD $35.00 $630.00

17 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0370 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Pyramid Construction and Aggregates, Inc. $0.55 $75,350.00

ARROW INDIAN CONTRACTORS, INC. $0.39 $53,430.00

Gutierrez Canales Engineering, PC $0.04 $5,480.00 Hat Creek Construction & Materials, Inc. $0.44 $60,280.00 Desert Talon Contracting, Inc. $0.45 $61,650.00 Command Performance Constructors, Inc. $0.50 $68,500.00 J. Francis Company $1.00 $137,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.35 $47,950.00 Martin Brothers Construction $0.12 $16,440.00 Vance Corporation $0.55 $75,350.00 V. Lopez Jr. and Sons Gen Engr. Inc. $0.22 $30,140.00

CUTTING EDGE CONCRETE SERVICES, INC $0.40 $54,800.00

LB Civil Construction, Inc. $0.40 $54,800.00 Engineer's Estimate 137,000 LNFT $0.20 $27,400.00

A0380 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Pyramid Construction and Aggregates, Inc. $0.45 $3,375.00

ARROW INDIAN CONTRACTORS, INC. $0.39 $2,925.00

Gutierrez Canales Engineering, PC $0.44 $3,300.00 Hat Creek Construction & Materials, Inc. $0.38 $2,850.00 Desert Talon Contracting, Inc. $0.45 $3,375.00 Command Performance Constructors, Inc. $0.15 $1,125.00 J. Francis Company $3.00 $22,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.35 $2,625.00 Martin Brothers Construction $0.08 $600.00 Vance Corporation $0.50 $3,750.00 V. Lopez Jr. and Sons Gen Engr. Inc. $0.39 $2,925.00

CUTTING EDGE CONCRETE SERVICES, INC $0.75 $5,625.00

LB Civil Construction, Inc. $1.15 $8,625.00 Engineer's Estimate 7,500 LNFT $0.15 $1,125.00

A0390 63405-0700 PAVEMENT MARKINGS, TYPE B, "STOP" WORD MESSAGE

Pyramid Construction and Aggregates, Inc. $200.00 $800.00

ARROW INDIAN CONTRACTORS, INC. $195.18 $780.72

Gutierrez Canales Engineering, PC $219.25 $877.00 Hat Creek Construction & Materials, Inc. $400.00 $1,600.00 Desert Talon Contracting, Inc. $250.00 $1,000.00 Command Performance Constructors, Inc. $250.00 $1,000.00 J. Francis Company $500.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $700.00 Martin Brothers Construction $101.00 $404.00 Vance Corporation $400.00 $1,600.00 V. Lopez Jr. and Sons Gen Engr. Inc. $220.00 $880.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $2,000.00

LB Civil Construction, Inc. $110.00 $440.00 Engineer's Estimate 4 EACH $500.00 $2,000.00

18 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0400 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Pyramid Construction and Aggregates, Inc. $25.00 $2,500.00

ARROW INDIAN CONTRACTORS, INC. $18.30 $1,830.00

Gutierrez Canales Engineering, PC $44.29 $4,429.00 Hat Creek Construction & Materials, Inc. $20.00 $2,000.00 Desert Talon Contracting, Inc. $50.00 $5,000.00 Command Performance Constructors, Inc. $8.00 $800.00 J. Francis Company $20.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10.00 $1,000.00 Martin Brothers Construction $23.56 $2,356.00 Vance Corporation $50.00 $5,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $19.89 $1,989.00

CUTTING EDGE CONCRETE SERVICES, INC $55.00 $5,500.00

LB Civil Construction, Inc. $60.00 $6,000.00 Engineer's Estimate 100 EACH $25.00 $2,500.00

A0410 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Pyramid Construction and Aggregates, Inc. $25.00 $2,500.00

ARROW INDIAN CONTRACTORS, INC. $42.69 $4,269.00

Gutierrez Canales Engineering, PC $76.14 $7,614.00 Hat Creek Construction & Materials, Inc. $25.00 $2,500.00 Desert Talon Contracting, Inc. $138.00 $13,800.00 Command Performance Constructors, Inc. $10.00 $1,000.00 J. Francis Company $30.00 $3,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50.00 $5,000.00 Martin Brothers Construction $25.29 $2,529.00 Vance Corporation $50.00 $5,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $12.43 $1,243.00

CUTTING EDGE CONCRETE SERVICES, INC $65.00 $6,500.00

LB Civil Construction, Inc. $95.00 $9,500.00 Engineer's Estimate 100 EACH $30.00 $3,000.00

A0420 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Pyramid Construction and Aggregates, Inc. $80.00 $4,800.00

ARROW INDIAN CONTRACTORS, INC. $109.79 $6,587.40

Gutierrez Canales Engineering, PC $156.58 $9,394.80 Hat Creek Construction & Materials, Inc. $55.00 $3,300.00 Desert Talon Contracting, Inc. $295.00 $17,700.00 Command Performance Constructors, Inc. $20.00 $1,200.00 J. Francis Company $100.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $5,100.00 Martin Brothers Construction $116.00 $6,960.00 Vance Corporation $100.00 $6,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $74.58 $4,474.80

CUTTING EDGE CONCRETE SERVICES, INC $90.00 $5,400.00

LB Civil Construction, Inc. $150.00 $9,000.00 Engineer's Estimate 60 EACH $50.00 $3,000.00

19 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0430 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

Pyramid Construction and Aggregates, Inc. $30.00 $600.00

ARROW INDIAN CONTRACTORS, INC. $73.19 $1,463.80

Gutierrez Canales Engineering, PC $158.10 $3,162.00 Hat Creek Construction & Materials, Inc. $100.00 $2,000.00 Desert Talon Contracting, Inc. $196.00 $3,920.00 Command Performance Constructors, Inc. $100.00 $2,000.00 J. Francis Company $500.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $300.00 Martin Brothers Construction $76.00 $1,520.00 Vance Corporation $150.00 $3,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $807.95 $16,159.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $10,000.00

LB Civil Construction, Inc. $250.00 $5,000.00 Engineer's Estimate 20 EACH $50.00 $1,000.00

A0440 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

Pyramid Construction and Aggregates, Inc. $100.00 $2,000.00

ARROW INDIAN CONTRACTORS, INC. $73.19 $1,463.80

Gutierrez Canales Engineering, PC $158.10 $3,162.00 Hat Creek Construction & Materials, Inc. $200.00 $4,000.00 Desert Talon Contracting, Inc. $196.00 $3,920.00 Command Performance Constructors, Inc. $100.00 $2,000.00 J. Francis Company $500.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $300.00 Martin Brothers Construction $76.00 $1,520.00 Vance Corporation $200.00 $4,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $932.25 $18,645.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $10,000.00

LB Civil Construction, Inc. $250.00 $5,000.00 Engineer's Estimate 20 EACH $50.00 $1,000.00

A0450 63502-3300 TEMPORARY TRAFFIC CONTROL, PORTABLE RUMBLE STRIP

Pyramid Construction and Aggregates, Inc. $6,000.00 $24,000.00

ARROW INDIAN CONTRACTORS, INC. $365.95 $1,463.80

Gutierrez Canales Engineering, PC $790.50 $3,162.00 Hat Creek Construction & Materials, Inc. $2,000.00 $8,000.00 Desert Talon Contracting, Inc. $1,000.00 $4,000.00 Command Performance Constructors, Inc. $300.00 $1,200.00 J. Francis Company $1,000.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,700.00 $10,800.00 Martin Brothers Construction $1,517.00 $6,068.00 Vance Corporation $9,000.00 $36,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $4,350.50 $17,402.00

CUTTING EDGE CONCRETE SERVICES, INC $500.00 $2,000.00

LB Civil Construction, Inc. $3,500.00 $14,000.00 Engineer's Estimate 4 EACH $1,250.00 $5,000.00

20 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0460 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Pyramid Construction and Aggregates, Inc. $200.00 $10,000.00

ARROW INDIAN CONTRACTORS, INC. $73.19 $3,659.50

Gutierrez Canales Engineering, PC $227.98 $11,399.00 Hat Creek Construction & Materials, Inc. $450.00 $22,500.00 Desert Talon Contracting, Inc. $485.00 $24,250.00 Command Performance Constructors, Inc. $30.00 $1,500.00 J. Francis Company $200.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $8,250.00 Martin Brothers Construction $72.00 $3,600.00 Vance Corporation $750.00 $37,500.00 V. Lopez Jr. and Sons Gen Engr. Inc. $62.15 $3,107.50

CUTTING EDGE CONCRETE SERVICES, INC $300.00 $15,000.00

LB Civil Construction, Inc. $310.00 $15,500.00 Engineer's Estimate 50 EACH $350.00 $17,500.00

A0470 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Pyramid Construction and Aggregates, Inc. $100.00 $108,000.00

ARROW INDIAN CONTRACTORS, INC. $60.71 $65,566.80

Gutierrez Canales Engineering, PC $63.02 $68,061.60 Hat Creek Construction & Materials, Inc. $85.00 $91,800.00 Desert Talon Contracting, Inc. $101.00 $109,080.00 Command Performance Constructors, Inc. $60.00 $64,800.00 J. Francis Company $110.00 $118,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $86,400.00 Martin Brothers Construction $85.00 $91,800.00 Vance Corporation $120.00 $129,600.00 V. Lopez Jr. and Sons Gen Engr. Inc. $104.41 $112,762.80

CUTTING EDGE CONCRETE SERVICES, INC $140.00 $151,200.00

LB Civil Construction, Inc. $80.00 $86,400.00 Engineer's Estimate 1,080.0 HOUR $65.00 $70,200.00

A0480 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Pyramid Construction and Aggregates, Inc. $100.00 $54,000.00

ARROW INDIAN CONTRACTORS, INC. $56.11 $30,299.40

Gutierrez Canales Engineering, PC $86.31 $46,607.40 Hat Creek Construction & Materials, Inc. $105.00 $56,700.00 Desert Talon Contracting, Inc. $175.00 $94,500.00 Command Performance Constructors, Inc. $60.00 $32,400.00 J. Francis Company $220.00 $118,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $95.00 $51,300.00 Martin Brothers Construction $122.00 $65,880.00 Vance Corporation $160.00 $86,400.00 V. Lopez Jr. and Sons Gen Engr. Inc. $126.79 $68,466.60

CUTTING EDGE CONCRETE SERVICES, INC $165.00 $89,100.00

LB Civil Construction, Inc. $120.00 $64,800.00 Engineer's Estimate 540.0 HOUR $75.00 $40,500.00

21 out of 21Source Selection Information - See FAR 2.101 & 3.104

Project No: CA FTBR SENATOR WASH (1)

Project Name: Ferguson Road to Imperial Dam

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0490 63701-0000 FIELD OFFICE

Pyramid Construction and Aggregates, Inc. $18,000.00 $18,000.00

ARROW INDIAN CONTRACTORS, INC. $12,198.16 $12,198.16

Gutierrez Canales Engineering, PC $13,700.00 $13,700.00 Hat Creek Construction & Materials, Inc. $15,000.00 $15,000.00 Desert Talon Contracting, Inc. $8,000.00 $8,000.00 Command Performance Constructors, Inc. $4,500.00 $4,500.00 J. Francis Company $52,500.00 $52,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70,000.00 $70,000.00 Martin Brothers Construction $13,500.00 $13,500.00 Vance Corporation $40,000.00 $40,000.00 V. Lopez Jr. and Sons Gen Engr. Inc. $10,441.20 $10,441.20

CUTTING EDGE CONCRETE SERVICES, INC $57,000.00 $57,000.00

LB Civil Construction, Inc. $80,000.00 $80,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00

Total Schedule - All Items

Pyramid Construction and Aggregates, Inc. $1,619,259.96

ARROW INDIAN CONTRACTORS, INC. $1,826,851.86

Gutierrez Canales Engineering, PC $1,874,202.86 Hat Creek Construction & Materials, Inc. $1,999,205.00 Desert Talon Contracting, Inc. $2,043,217.40 Command Performance Constructors, Inc. $2,075,525.01 J. Francis Company $2,468,960.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,492,525.00 Martin Brothers Construction $2,526,764.00 Vance Corporation $2,560,560.00 V. Lopez Jr. and Sons Gen Engr. Inc. $2,846,172.59

CUTTING EDGE CONCRETE SERVICES, INC $3,252,632.20

LB Civil Construction, Inc. $3,703,085.00 Engineer's Estimate $1,748,000.00