CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23B000014
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- King City, California 93930, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks engineering and construction services to repair 13 sites along the Nacimiento Fergusson Road within the Los Padres National Forest that were damaged during the 2021 heavy precipitation and flooding event. The Department of Transportation Federal Highway Administration will procure these services to address embankment failures, retaining walls, and culvert replacements along an 11-mile stretch of the roadway. Proposals are due by March 22, 2023, with an anticipated award date in April 2023 and construction completion by December 2023. Evaluation criteria will include technical approach, past performance, and price.
The opportunity is set aside for total small business concerns. Major work items include over 2,500 cubic yards of excavation/embankment construction, 2,200 square feet of mechanically stabilized earth walls, and over 700 tons of asphalt pavement. The anticipated budget range for repair services is between $10-20 million to be funded by Emergency Relief for Federally Owned Roads Program monies. Equipment usage is estimated at 120 hours and wet weather may preclude construction activities after mid-December.
Notice text
THIS IS NOT A REQUEST FOR BIDS
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME
PROJECT NUMBER: CA ERFO FS LSPDR 2021-1(1)
PROJECT NAME: NACIMIENTO-FERGUSSON ROAD
PROJECT DESCRIPTION: The Los Padres National Forest (LPNF) sustained significant damage to transportation facilities, including roadway embankments and drainage items during the 2021 Heavy Precipitation and Flooding event. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to repair the damaged facilities utilizing Emergency Repair for Federally Owned Roads (ERFO) funds.
The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA.
The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements.
SCOPE OF THE WORK:
The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design. Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated. Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites.
Items worth noting:
- The terrain is mountainous with steep slopes.
- The roadway widths vary from 16-ft to 24-ft.
- The road is currently closed to the public. However, residents along the route do have access.
- The roadway serves as the primary route between King City and the Pacific Coast.
- Access for the residents will be maintained during construction.
- Shoring is anticipated for MSE wall excavations and to allow access.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 1 (LPSM) of Removal of Existing Structures and Obstructions
- 2,500 CUYD of Excavation/Embankment Construction
- 2,200 SQFT of Mechanically Stabilized Earth wall
- 220 CUYD of Riprap
- 700 TON of Roadway Aggregate
- 650 TON of Asphalt Pavement
- 3 EACH of Concrete Headwall
- 150 LNFT of 24-inch Culvert
- 80 LNFT of 36-inch Culvert
- 150 LNFT of 78-inch Culvert
- 110 LNFT of 72-inch Culvert
- 9 EACH End Section for Culverts
- 120 hours of Equipment Hours
- 1 (LPSM) Traffic Control
ANTICIPATED SCHEDULE:
Advertise: March 2023
Award: April 2023
Construction: May 2023 – December 2023
ESTIMATED COST RANGE:
The anticipated cost range is between $10,000,000 and $20,000,000.
FUNDING SOURCE: Emergency Relief for Federally Owned (ERFO) Roads Program funds the project.
MISCELLANEOUS: Wet winter weather can be expected to commence in December making construction unlikely after the first half of the month.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA ERFO FS LSPDR 2021-1(1), Nacimiento-Fergusson Road | Award Notice | |
| CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road | Solicitation | |
| This notice | Pre-Solicitation | |
| CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| New Mexico Forest Engineering and Road Maintenance (FERM) | Forest Service | Total Small Business | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |