C130 Relocatable Simulator Shelter
Closed Solicitation Posted
- Solicitation number
- FA558720RN001
- Agency
- Air Forces Europe and Africa Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332311 Prefabricated Metal Building and Component Manufacturing
- Place of performance
- GBR
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Air Force, through the 48th Contracting Squadron, is seeking proposals for the delivery and installation of a complete and usable Relocatable Simulator Shelter at RAF Mildenhall in the United Kingdom. Offerors must provide pricing to supply, deliver, and install the shelter by April 12, 2021 in accordance with the Statement of Work. Proposals will be evaluated based on price and technical factors including meeting all specifications, ability to complete installation by the required date, and personnel qualifications. Proposals are due by June 23, 2020 with award intended to be made without discussions based on best value.
There is no set-aside designation for this procurement. The NAICS code is 238990 and PSC code R499 covers the simulator shelter and installation services. The project consists of installing a concrete slab and utilities by September 2020, delivering and beginning shelter installation in December 2020, and the simulator manufacturer completing installation by April 2021. The place of performance is RAF Mildenhall located at 3114 E 81st St, Tulsa, OK 74137.
Notice text
3 versions
Update #3 · Latest ·
The contractor shall deliver and install a complete and usable Relocatable Simulator Shelter (RSS) in accordance with the Statement of Work (SOW). The contractor shall provide all professional services, facilities, labor, equipment appliances, tools, materials, travel, installation services, reports, specifications, and drawings associated with the project.
The project will consist of 3 portions. The following are estimated dates:
September 2020 - Installation of slab and utilities
December 2020 - Deliver and begin installation of simulator shelter (which is what this solicitation is in support of)
April 2021 - Simulator manufacturer to install simulator
Note amendment 1 removed language stating the number of months required for completion and states that offerors must complete delivery and installation activities prior to 12 April.
Amendment 2 addressed minor typographical details.
Amendment 3 allows the submission of 35-paged proposals instead of the original 25.
Amendment 4 highlights the requirements to comply with MOD Building Regulations Compliance System Number: PI 02/10. While offerors were still required to comply with the regulation previously, this document needs to be highlighted to ensure US offerors are aware particularly of the requirement of appointing a Building Control Advisor as a third party in accordance with section 2.1. Additionally, offers will now be due on 29 June 2020 at 0900 British Local Time. Changes are highlighted in all updated documents.
Update #2 ·
The contractor shall deliver and install a complete and usable Relocatable Simulator Shelter (RSS) in accordance with the Statement of Work (SOW). The contractor shall provide all professional services, facilities, labor, equipment appliances, tools, materials, travel, installation services, reports, specifications, and drawings associated with the project.
The project will consist of 3 portions. The following are estimated dates:
September 2020 - Installation of slab and utilities
December 2020 - Deliver and begin installation of simulator shelter (which is what this solicitation is in support of)
April 2021 - Simulator manufacturer to install simulator
Note amendment 1 removed language stating the number of months required for completion and states that offerors must complete delivery and installation activities prior to 12 April.
Amendment 2 addressed minor typographical details.
Amendment 3 allows the submission of 35-paged proposals instead of the original 25.
Update #1 ·
The contractor shall deliver and install a complete and usable Relocatable Simulator Shelter (RSS) in accordance with the Statement of Work (SOW). The contractor shall provide all professional services, facilities, labor, equipment appliances, tools, materials, travel, installation services, reports, specifications, and drawings associated with the project.
The project will consist of 3 portions. The following are estimated dates:
September 2020 - Installation of slab and utilities
December 2020 - Deliver and begin installation of simulator shelter (which is what this solicitation is in support of)
April 2021 - Simulator manufacturer to install simulator
Attachments
| File | Type | Posted |
|---|---|---|
| FA558720RN001 amd 4.pdf | ||
| 20190918 MOD Building Regs Policy Instruction 02-10.pdf | ||
| Statement of Workv2.pdf | ||
| FA558720RN001 amd 3.pdf | ||
| Response to Q and As 9 June.docx | DOCX document | |
| FA558720RN001 amd 2.pdf | ||
| FA558720RN001 amd 1.pdf | ||
| Statement of Work.pdf | ||
| FA558720RN001.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity