Bull complex suppression road repair
Closed Solicitation Posted
- Solicitation number
- 12363N23R4010
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 115310 Support Activities for Forestry
- Place of performance
- Estacada, Oregon, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks restoration services for roads impacted by wildfires on the Mt. Hood National Forest in Oregon. The USDA Forest Service is seeking a contractor to perform work including soil erosion controls, culvert installation and removal, aggregate surfacing, ditch and roadway reconditioning, and signage installation along 45 miles of roads around the burn scar of the Bull Fire Complex. Contractors must furnish all labor, equipment, materials and supervision to complete the work between May and November 2023, with a point of contact of Peter Huppi. Proposals are evaluated based on past performance and technical evaluation criteria, with an amended deadline of May 18, 2023.
This is a 100% set-aside for small businesses with a NAICS code of 115310 for forest and conservation work, and size standard of $11.5M. The place of performance is Estacada, OR. Key details include a period of performance from May 15 to November 1, 2023, with an estimated budget between $500,000-$1M. Seven technical questions were released seeking additional information on April 19, 2023.
Notice text
BULL COMPLEX SUPPRESSION ROAD REPAIR 12363N23R4010
PROJECT DESCRIPTION: The Bull Complex Suppression Repair project consists of the restoration of road surfaces and drainage capacities around the burn scar of the Bull Fire Complex. Work to include but not limited to: soil erosion and pollution control, culvert removal and disposal, aggregate surfacing, ditch reconditioning, roadway reconditioning, culvert installation, and sign installation.
PROJECT LOCATION: This project is located on the Clackamas River Ranger District on the Mt. Hood National Forest.
Driving Instructions: From the Clackamas River Ranger Station (16400 Champion Way, Sandy, OR 97055), head southwest on Champion Way toward 362nd Ave and turn right on 362nd Ave for 1.8 miles. Turn right onto OR-211 S for 3.9 Miles and continue onto OR-211 S/OR-224 for 28.5 miles until reaching the first work location at Timber Lake CCC Compound. Continue 1.62 miles to JCT of NFSR 5700-000 and NFSR 4600-000. This JCT is located 36.0 miles from Clackamas River Ranger Station. Stay right to access NFSR 4600-000; continue along NFSR 4600-000 for 3.6 miles to access NFSR 6300-000 MP 0.00.
NFSR 4600-000 @ MP 0.00 (45.07934, -122.04256)
NFSR 6300-000 @ MP 0.00 (45.03364, -122.05938)
NFSR 6300-000 @ MP 6.00 (44.96657, -121.04480)
Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 15, 2023. Engineering point of contact is Peter Huppi, telephone: (503) 668-1784. Product Service Code: Z2LB. NAICS 115310 with size standard $11.5 mil. This project is set aside 100% for small business.
Attachments
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bull complex suppression road repair | Solicitation | |
| Bull complex suppression road repair | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity