Attachment 8 REQUEST FOR INFORMATION 2.pdf
PDF 79 KB Posted
- Attached to
- BULL COMPLEX SUPPRESSION ROAD REPAIR Federal contract opportunity
- Solicitation number
- 12363N23R4010
- Issued by
- Department of Agriculture Forest Service
About this file
This document provides details for the Bull Complex Suppression Road Repair federal contract opportunity. The project consists of restoration work including soil erosion and pollution control, culvert removal and disposal, aggregate surfacing, ditch reconditioning, roadway reconditioning, culvert installation, and sign installation. The work location is on the Mt. Hood National Forest in Oregon. Contractors must furnish all labor, supervision, equipment, materials, transportation, and incidentals to complete the specified work. The estimated start date is May 15, 2023. The point of contact is Peter Huppi and can be reached at (503) 668-1784. This is a small business set aside opportunity with a size standard of $11.5 million. The NAICS code is 115310.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDED Solicitation 12363N23R4010 Bull Complex Suppression Road Repair.pdf | ||
| Amendment 2 Bull Complex Suppression Repair.pdf | ||
| Attachment 7 Table 703.pdf | ||
| Amendment 1 Bull Complex Suppression Repair.pdf | ||
| Attachment 6 REQUEST FOR INFORMATION.pdf | ||
| Attachment 4 Service Contract Act Wage Determination.pdf | ||
| Attachment 1 FSSS BCSR.pdf | ||
| Attachment 5 Technical Eval Questionnaire_Past Perf.pdf | ||
| Attachment 3 FireProtectionandSuppression r6_fS_6300_52.pdf | ||
| Attachment 2 BCSR Plan Set.pdf | ||
| Solicitation_1449 Bull Complex.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 8 BULL COMPLEX SUPPRESSION ROAD REPAIR
REQUEST FOR INFORMATION #2
RFI 12: With regard to Pay Item 15713
Will ditch checks be required at all culvert and stream locations throughout the entire 49.20 miles of Roadway Reconditioning?
ANSWER:
One ditch check for each live stream crossing for all 8.3 miles of ditch reconditioning.
RFI 13: With regard to Pay Item 15713
If so, does the Government know the culvert/stream locations and quantities?
Not at this time.
RFI 14:
Are there any weed-free or other material specs to follow for erosion control products?
Certified Weed free products. (See Attachment 9)
RFI 15:
Is there a required seed mix specification?
ANSWER:
There are no specific requirements for seed mix needing to be applied to the project. However, the seed mix shall match the existing vegetation.
ATTACHMENT 8 BULL COMPLEX SUPPRESSION ROAD REPAIR