Building 62 Renovations, Indian Head, MD

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DR22B0010
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AZ Repair Or Alteration Of Other Administrative Facilities And Service Buildings
Place of performance
Indian Head, Maryland 20640, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Baltimore District is soliciting competitive 8(a) firm-fixed-price contract proposals to complete full interior and exterior renovations to Building 62 at Naval Support Facility Indian Head in Indian Head, Maryland. The renovation of approximately 5,340 square feet will result in dry lab, office, and auxiliary spaces such as restrooms and a kitchen to accommodate operational needs. Proposals are due by May 6, 2022 and the period of performance is 365 calendar days after notice to proceed. Prior to commencing general renovation work, the selected contractor must complete hazardous material remediation as outlined in an approved plan following required surveys and reporting by licensed consultants and firms.

The solicitation is designated as an 8(a) small business set-aside. The primary NAICS code is 238210 and PSC code S206. According to the abstract of bids, the government estimate was $7,992,452 to $8,809,871 while the lowest bid of $7,300,900 was submitted by Addon Services, LLC. Work is to be performed at Naval Support Facility Indian Head located at 20640 Indian Head Highway, Indian Head, Maryland and must be completed within one year of notice to proceed.

Notice text

5 versions

Update #5 · Latest ·

Abstract of Bids

*******************************************************************************************************

AMD 0002- This amendment is to provide the following:

1. Provide responses to RFI's and to provide revised responses to previous RFI's.

*****************************************************************************************************************************************************

AMD 0001 - This amendment is to provide the following:

1. Provide Responses to Requests for Information (RFIs)
2. Extend the Bid Opening date from 29 April 2022 to 06 May 2022
3. Provide an updated Wage Determination dated 25 March 2022
4. Provide revised drawing sheets S-003, S-103 and S-301

To access the attachments, click the paper clip icon in the upper left hand corner on the pdf.

****************************************************************************************************************        The list of site visit attendees is provided.

****************************************************************************************************************

Building 62 Renovations, Indian Head, Maryland 

The proposed project will be a competitive 8(a), firm-fixed-price contract procured in accordance with FAR Part 14, Sealed Bidding, via an Invitation for Bid (IFB). 

The work includes full exterior and interior renovation of the entire existing Building 62 (approximately 5,340 SF) at Naval Support Facility Indian Head in Indian Head, MD. The renovation of Building 62 will result in the creation of dry lab and office spaces to accommodate operational needs of the Detection Group, Early Warning Lab, Fleet Support, Integration Lab Test & Evaluation, and Test Range. In addition to core spaces, auxiliary areas such as Restrooms, Kitchen, and Storage will be provided. An addition to the building will upgrade the building to meet ADA Standards. Exterior work will include site upgrades within 15 feet of the building to address existing water infiltration, utility upgrades and ADA requirements. Work includes, but is not limited to, interior systems, floor, and roof demolition, floor and roof replacement, elevator installation, new exterior doors and windows, new interior partitions, ceilings systems, wall and floor finishes, new HVAC and plumbing systems, new plumbing fixtures, new lighting and electrical fixture replacement, and reconstruction of existing vestibule.

The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas. The firm must produce a Hazardous Materials Report of the conditions and findings of all hazardous materials and assist the Contractor in completing the appropriate UFGS Hazardous Material Specification Sections. The Contractor must then engage a Hazardous Materials Remediation Company to create a Hazardous Materials Remediation Plan for submission to the Owner and the Contractor's Consulting Firm for review and approval prior to starting the Remediation portion of the Work. The Remediation Work must be performed by the Remediation Company in accordance with the specification sections produced by the Consulting Firm which will be engaged to monitor the project conditions and conduct a final survey to certify the project site free of hazardous materials prior to starting the remainder of the Work. Requirements shall be coordinated at the preconstruction meeting. The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report.

Update #4 ·

AMD 0002- This amendment is to provide the following:

1. Provide responses to RFI's and to provide revised responses to previous RFI's.

*****************************************************************************************************************************************************

AMD 0001 - This amendment is to provide the following:

1. Provide Responses to Requests for Information (RFIs)
2. Extend the Bid Opening date from 29 April 2022 to 06 May 2022
3. Provide an updated Wage Determination dated 25 March 2022
4. Provide revised drawing sheets S-003, S-103 and S-301

To access the attachments, click the paper clip icon in the upper left hand corner on the pdf.

****************************************************************************************************************        The list of site visit attendees is provided.

****************************************************************************************************************

Building 62 Renovations, Indian Head, Maryland 

The proposed project will be a competitive 8(a), firm-fixed-price contract procured in accordance with FAR Part 14, Sealed Bidding, via an Invitation for Bid (IFB). 

The work includes full exterior and interior renovation of the entire existing Building 62 (approximately 5,340 SF) at Naval Support Facility Indian Head in Indian Head, MD. The renovation of Building 62 will result in the creation of dry lab and office spaces to accommodate operational needs of the Detection Group, Early Warning Lab, Fleet Support, Integration Lab Test & Evaluation, and Test Range. In addition to core spaces, auxiliary areas such as Restrooms, Kitchen, and Storage will be provided. An addition to the building will upgrade the building to meet ADA Standards. Exterior work will include site upgrades within 15 feet of the building to address existing water infiltration, utility upgrades and ADA requirements. Work includes, but is not limited to, interior systems, floor, and roof demolition, floor and roof replacement, elevator installation, new exterior doors and windows, new interior partitions, ceilings systems, wall and floor finishes, new HVAC and plumbing systems, new plumbing fixtures, new lighting and electrical fixture replacement, and reconstruction of existing vestibule.

The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas. The firm must produce a Hazardous Materials Report of the conditions and findings of all hazardous materials and assist the Contractor in completing the appropriate UFGS Hazardous Material Specification Sections. The Contractor must then engage a Hazardous Materials Remediation Company to create a Hazardous Materials Remediation Plan for submission to the Owner and the Contractor's Consulting Firm for review and approval prior to starting the Remediation portion of the Work. The Remediation Work must be performed by the Remediation Company in accordance with the specification sections produced by the Consulting Firm which will be engaged to monitor the project conditions and conduct a final survey to certify the project site free of hazardous materials prior to starting the remainder of the Work. Requirements shall be coordinated at the preconstruction meeting. The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report.

Update #3 ·

AMD 0001 - This amendment is to provide the following:

1. Provide Responses to Requests for Information (RFIs)
2. Extend the Bid Opening date from 29 April 2022 to 06 May 2022
3. Provide an updated Wage Determination dated 25 March 2022
4. Provide revised drawing sheets S-003, S-103 and S-301

To access the attachments, click the paper clip icon in the upper left hand corner on the pdf.

****************************************************************************************************************        The list of site visit attendees is provided.

****************************************************************************************************************

Building 62 Renovations, Indian Head, Maryland 

The proposed project will be a competitive 8(a), firm-fixed-price contract procured in accordance with FAR Part 14, Sealed Bidding, via an Invitation for Bid (IFB). 

The work includes full exterior and interior renovation of the entire existing Building 62 (approximately 5,340 SF) at Naval Support Facility Indian Head in Indian Head, MD. The renovation of Building 62 will result in the creation of dry lab and office spaces to accommodate operational needs of the Detection Group, Early Warning Lab, Fleet Support, Integration Lab Test & Evaluation, and Test Range. In addition to core spaces, auxiliary areas such as Restrooms, Kitchen, and Storage will be provided. An addition to the building will upgrade the building to meet ADA Standards. Exterior work will include site upgrades within 15 feet of the building to address existing water infiltration, utility upgrades and ADA requirements. Work includes, but is not limited to, interior systems, floor, and roof demolition, floor and roof replacement, elevator installation, new exterior doors and windows, new interior partitions, ceilings systems, wall and floor finishes, new HVAC and plumbing systems, new plumbing fixtures, new lighting and electrical fixture replacement, and reconstruction of existing vestibule.

The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas. The firm must produce a Hazardous Materials Report of the conditions and findings of all hazardous materials and assist the Contractor in completing the appropriate UFGS Hazardous Material Specification Sections. The Contractor must then engage a Hazardous Materials Remediation Company to create a Hazardous Materials Remediation Plan for submission to the Owner and the Contractor's Consulting Firm for review and approval prior to starting the Remediation portion of the Work. The Remediation Work must be performed by the Remediation Company in accordance with the specification sections produced by the Consulting Firm which will be engaged to monitor the project conditions and conduct a final survey to certify the project site free of hazardous materials prior to starting the remainder of the Work. Requirements shall be coordinated at the preconstruction meeting. The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report.

Update #2 ·

The list of site visit attendees is provided.

****************************************************************************************************************

Building 62 Renovations, Indian Head, Maryland 

The proposed project will be a competitive 8(a), firm-fixed-price contract procured in accordance with FAR Part 14, Sealed Bidding, via an Invitation for Bid (IFB). 

The work includes full exterior and interior renovation of the entire existing Building 62 (approximately 5,340 SF) at Naval Support Facility Indian Head in Indian Head, MD. The renovation of Building 62 will result in the creation of dry lab and office spaces to accommodate operational needs of the Detection Group, Early Warning Lab, Fleet Support, Integration Lab Test & Evaluation, and Test Range. In addition to core spaces, auxiliary areas such as Restrooms, Kitchen, and Storage will be provided. An addition to the building will upgrade the building to meet ADA Standards. Exterior work will include site upgrades within 15 feet of the building to address existing water infiltration, utility upgrades and ADA requirements. Work includes, but is not limited to, interior systems, floor, and roof demolition, floor and roof replacement, elevator installation, new exterior doors and windows, new interior partitions, ceilings systems, wall and floor finishes, new HVAC and plumbing systems, new plumbing fixtures, new lighting and electrical fixture replacement, and reconstruction of existing vestibule.

The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas. The firm must produce a Hazardous Materials Report of the conditions and findings of all hazardous materials and assist the Contractor in completing the appropriate UFGS Hazardous Material Specification Sections. The Contractor must then engage a Hazardous Materials Remediation Company to create a Hazardous Materials Remediation Plan for submission to the Owner and the Contractor's Consulting Firm for review and approval prior to starting the Remediation portion of the Work. The Remediation Work must be performed by the Remediation Company in accordance with the specification sections produced by the Consulting Firm which will be engaged to monitor the project conditions and conduct a final survey to certify the project site free of hazardous materials prior to starting the remainder of the Work. Requirements shall be coordinated at the preconstruction meeting. The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report.

Update #1 ·

Building 62 Renovations, Indian Head, Maryland 

The proposed project will be a competitive 8(a), firm-fixed-price contract procured in accordance with FAR Part 14, Sealed Bidding, via an Invitation for Bid (IFB). 

The work includes full exterior and interior renovation of the entire existing Building 62 (approximately 5,340 SF) at Naval Support Facility Indian Head in Indian Head, MD. The renovation of Building 62 will result in the creation of dry lab and office spaces to accommodate operational needs of the Detection Group, Early Warning Lab, Fleet Support, Integration Lab Test & Evaluation, and Test Range. In addition to core spaces, auxiliary areas such as Restrooms, Kitchen, and Storage will be provided. An addition to the building will upgrade the building to meet ADA Standards. Exterior work will include site upgrades within 15 feet of the building to address existing water infiltration, utility upgrades and ADA requirements. Work includes, but is not limited to, interior systems, floor, and roof demolition, floor and roof replacement, elevator installation, new exterior doors and windows, new interior partitions, ceilings systems, wall and floor finishes, new HVAC and plumbing systems, new plumbing fixtures, new lighting and electrical fixture replacement, and reconstruction of existing vestibule.

The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas. The firm must produce a Hazardous Materials Report of the conditions and findings of all hazardous materials and assist the Contractor in completing the appropriate UFGS Hazardous Material Specification Sections. The Contractor must then engage a Hazardous Materials Remediation Company to create a Hazardous Materials Remediation Plan for submission to the Owner and the Contractor's Consulting Firm for review and approval prior to starting the Remediation portion of the Work. The Remediation Work must be performed by the Remediation Company in accordance with the specification sections produced by the Consulting Firm which will be engaged to monitor the project conditions and conduct a final survey to certify the project site free of hazardous materials prior to starting the remainder of the Work. Requirements shall be coordinated at the preconstruction meeting. The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Building 62 Renovations, Indian Head, MD Award Award Notice
Building 62 Renovations, Indian Head, MD This notice · Latest solicitation Solicitation
Building 62 Renovation, Indian Head, MD Original Pre-Solicitation