This amendment modifies the solicitation for the Building 62 Renovations project at Naval Support Facility Indian Head in Maryland. The full renovation and upgrade of the existing 5,340 square foot Building 62 will provide dry lab, office, and auxiliary spaces. Exterior work includes site upgrades within 15 feet of the building to address water infiltration and ADA compliance. Interior work involves demolition, new flooring and roofing, elevator installation, doors, windows, partitions, ceiling, wall and floor finishes, HVAC, plumbing, fixtures, lighting and electrical systems. Responses are provided to previous requests for information regarding abandoned pile cap drawings, citizenship requirements for workers, and deployable flood barrier specifications and needs. Hazardous materials including lead, mold and suspected asbestos must be surveyed, reported, remediated and certified according to an approved plan by licensed firms prior to commencing other work. Bids are due by a competitive 8(a) sealed bid process through the Army Corps of Engineers, Baltimore District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract of Bids W912DR22B0010 BLDG 62 Renovations, Indian Head, MD.pdf | ||
| B.08.03 AMD 0001 W912DR22B0010_4-26-22.pdf | ||
| B.06.04_B62 Site Visit Sign-in 20220405.pdf | ||
| H.08.01 Building 62- MDE Stamped Plans 20-SF-0096_MDE Drawings Complete.pdf | ||
| H.08.04 Building 62- IH B62 RTA Specs Volume 2 2022-01-25.pdf | ||
| Solicitation W912DR22B0010 Bldg 62 Renovations.pdf | ||
| H.08.04 Building 62- IH B62 RTA Specs Volume 1 2022-01-25.pdf | ||
| H.08.01 Building 62- IH B62 RTA Conformed Drawing Set w MDE 2022-01-24.pdf | ||
| H.08.04 Building 62 IH B62 RTA CID PACKAGE - No FFE Costs 2022-02-24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: Building 62 Renovations, Indian Head, Maryland.
The purpose of this Amendment (0002) is to:
1. Provide responses to RFI's and to provide revised responses to previous RFIs.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0010
X 9B. DATED (SEE ITEM 11)
17-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR22B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0002
Responses to Requests for Information (RFI)
Q1. If contractor is required to dispose of discovered ordinance, is the contractor required to prepare a COE site safety submission plan?
A1. If disposal of MEC and/or MPPEH is required, Contractor shall provide a site safety submission plan for review and approval by the Government. Site safety submission plan shall comply with the requirements of the ESS (see attachment to RFI #9693629 response) and NAVSEA OP-5 regarding the handling and disposal of MEC and
MPPEH.
Q2. Will the government quantify an estimated number of ordinance that will require this action in order to provide a unit cost estimate?
A2. Estimated number of ordinance will not be provided. Refer to Section 1.6 “Previous Studies of Extent of MEC and/or MPPEH Contamination” of the ESS (see attachment to RFI #9693629 response) for additional information regarding extent of MEC and /or MPPEH contamination within the project site.
Q3. Alternatively, in relation to ordinance disposal and the occurrence of this low probability event, will the government allow discovery of ordinance to be considered differing site condition, thus allowing each occurrence to be more accurately priced?
A3. Contractor shall base their bid on the information provided in the ESS (see attachment to RFI #9693629 response). Any contract changes for additional costs due to discovery of ordinance will be evaluated and processed on a case-by-case basis as outlined in the contract documents.
Revised Responses to Previous Requests for Information
Q4: RFI #9681094: Key note 12 indicates to demo “as required” abandoned in place pile cap to construct slab and below grade utilities. Please provide as-built pile cap, foundation, and slab drawings so “as required” demo of pile cap can be determined.
A4: See attached Drawing 2010 from “New Range Battery Bomb Proof” project (dated 17 August 1904) for best available, additional information.
Q5: RFI #9693720: Is this project US citizens only?
A5: Non-U.S. citizens can work on this project. Non-U.S. citizens will be required to follow the same base access procedures as U.S. citizens. However, additional documentation, such as an EAD or Green Card, will need to be provided by non-U.S. citizens.
Q6: RFI #9693744: Regarding deployable flood barriers:
a. Can you provide a specification for the deployable flood barriers. Additionally, can you provide a base flood elevation (BFE), Critical Nature Classification & the protection height requires of the barriers.
b. Deployable flood barriers are shown for the second floor doors. Please confirm if that is necessary.
c. Will 1st floor entrances require interior slab drain systems and sump pump back-up
W912DR22B0010
A6: See below:
a. Requirements for “deployable floor barriers” are provided on Drawing CS-101, General Sheet Note #2.
b. Deployable flood barriers are not required for second floor doors.
c. No.