H.08.01 Building 62- MDE Stamped Plans 20-SF-0096_MDE Drawings Complete.pdf

PDF 22 MB Posted

Attached to
Building 62 Renovations, Indian Head, MD Federal contract opportunity
Solicitation number
W912DR22B0010
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

This document outlines a federal contract opportunity for Building 62 Renovations in Indian Head, Maryland. The proposed project involves a competitive 8(a) firm-fixed-price contract to conduct full exterior and interior renovation of an existing 5,340 square foot building to accommodate operational needs. Renovations will include systems demolition and replacement, elevator installation, door and window replacements, new partitions, ceilings, finishes, HVAC, plumbing, lighting and electrical systems. The contractor must engage consultants to conduct hazardous material surveys and produce a report and remediation plan to address lead paint, mold, and suspected asbestos containing materials prior to commencement of work. The contract bid and work will include the surveys, reports, remediation, and certification of a hazardous material free site. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Baltimore under solicitation number W912DR22B0010.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-180

C

C-403234

C-IH

C-IH

C-46

C-95

C-96

C-81

C-IH

C-IH

C-IH

C-IH

C-77

C-IH

C-78

I

H

C-166

C-165

C- IH

C-40

C-157

C-188

C-189

C-148

T-96

T-53

T-95

T

T- 52

T

T- IH

T-50

T-19

T- 51

T-35

T-36

T-38

T-40

T-73

T-54

PB33

PB34

VICINITY MAP

SCALE: NOT TO SCALE

EPROJECT WORK ORDER - WO 1610011

N

ISSUE DATE:

ISSUE :

N40080-17-D-0018

N4008018F4705CONTRACT TASK ORDER:

CONTRACT NO.:

13 JULY 2020

FOR OFFICIAL USE ONLY

MDE FINAL REVIEW

NAVFAC COMMAND

COMMANDER NAVFAC / B.L.T.L.

DESIGN ARCHITECT

DESIGN STRUCTURAL

DESIGN MECHANICAL

DESIGN ELECTRICAL

DESIGN CIVIL

DESIGN FIRE PROTECTION

INTERIOR DESIGN

GEOTECHNICAL

NAVAL SUPPORT FACILITY (NSF) INDIAN HEAD, MD

BUILDING 62 RENOVATION

LOCATION MAP

SCALE: NOT TO SCALE

N

SITE LOCATION PLAN

SCALE: NOT TO SCALE

N

PROJECT VICINITY

NSF

INDIAN

HEAD

INDIAN HEAD HWY

MD 210

BUILDING 62

NSF INDIAN HEAD

ENTRANCE AND

VISTORS CENTER

INDIAN HEAD HWY

MD 210

STRAUSS AVE

GATE

HOUSE

BUILDING 62

S

P

A

T

T

E

R

S

O

N

R

D

T

T

E

R

S

T

O

R

R

E

N

E

STRAUSS

AVE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

MDE PERMIT PACKAGE, MDE NO. 20-SF-0096

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

DESIGN COMPLIES WITH ENERGY INDEPENDENCE AND SECURITIES ACT, SECTION 438

RESPONSIBLE PERSON

G-001

REVIEWED AND APPROVED FOR SEDIMENT

CONTROL AND STORMWATER MANAGEMENT

UNDER SECTIONS 4-106 AND 4-205

BY:

DATE:

MARYLAND DEPARTMENT OF THE ENVIRONMENT

SEDIMENT & STORMWATER PLAN REVIEW DIVISION

DANIEL LAIRD

NOVEMBER 18, 2020

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 09 OCT 2019

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

A

B

C

D

D E P A R

TM

E N T O F

TH

E

N A V Y

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

1 2 3 4 5

RTA SUBMITTAL

:2 :2

P M

G-002

IN

DI

AN

H

EA

D, M

D.

019-Z101

N40080-018

WO1610011

DW RK JT

IN

DE

X O F

DR

AW

IN

GS

N C

SW

I H

EO

DT

D BU

IL

D

IN

G

R

EN

O

VA

TI

O

N

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

, W

AS

H

IN

G

TO

N W

AS

H

IN

G

TO

N

D.

C

TH

E N

AV

Y

YA

R D

MECHANICAL

019-Z204 M-001 LEGEND

019-Z205 M-002 GENERAL NOTES

019-Z206 MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

019-Z207 MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN

019-Z208 MD103 ROOF MECHANICAL DEMOLITION PLAN

019-Z209 MH101 FIRST FLOOR DUCT PLAN

019-Z210 MH102 SECOND FLOOR DUCT PLAN

019-Z211 MH103 ROOF PLAN

019-Z212 M-301 MECHANICAL SECTION VIEWS

019-Z213 M-302 MECHANICAL SECTION VIEWS

019-Z214 M-501 DETAILS

019-Z215 M-502 DETAILS

019-Z216 M-503 DETAILS

019-Z217 M-504 DETAILS

019-Z218 M-601 SCHEDULES

019-Z219 M-602 SCHEDULES

019-Z220 M-603 RTU-1 AIRFLOW DIAGRAM

019-Z221 M-801 CONTROL DIAGRAMS

019-Z222 M-802 SEQUENCE OF OPERATIONS

019-Z223 M-803 SEQUENCE OF OPERATIONS

019-Z224 M-804 BAS POINT FUNCTION SCHEDULE

019-Z225 M-805 BAS POINT FUNCTION SCHEDULE

ELECTRICAL

019-Z226 E-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES

019-Z227 ED-101 REFLECTED CEILING PLAN - DEMOLITION

019-Z228 ED-110 POWER PLAN - DEMOLITION

019-Z229 ED-801 PANELBOARD SCHEDULES - DEMOLITION

019-Z230 E-101 LIGHTING FLOOR PLANS - NEW WORK

019-Z231 E-110 POWER PLAN - NEW WORK

019-Z232 E-111 ROOF PLAN - POWER AND LIGHTING - NEW WORK

019-Z233 E-400 ENLARGED PLAN

019-Z234 E-501 ELECTRICAL DETAILS

019-Z235 E-601 ONE-LINE DIAGRAMS

019-Z236 E-602 GROUNDING / BONDING RISER DETAILS

019-Z237 E-801 PANELBOARD SCHEDULES - NEW WORK

019-Z238 E-802 ELECTRICAL/MECHANICAL CONNECTION SCHEDULE

PLUMBING

019-Z239 P-001 PLUMBING LEGEND

019-Z240 PD101 PLUMBING FIRST FLOOR DEMOLITION PLAN

019-Z241 PD102 PLUMBING SECOND FLOOR DEMOLITION PLAN

019-Z242 PL101 FIRST FLOOR DRAINAGE PLAN

019-Z243 PL102 SECOND FLOOR DRAINAGE PLAN

019-Z244 PL103 ROOF PIPING PLAN

019-Z245 PP101 FIRST FLOOR PIPING PLAN

019-Z268 PP102 SECOND FLOOR PIPING PLAN

019-Z246 P-401 PLUMBING ENLARGED PLANS

019-Z247 P-402 PLUMBING ENLARGED PLANS

019-Z248 P-501 PLUMBING DETAILS

019-Z249 P-502 PLUMBING DETAILS

019-Z250 P-601 PLUMBING SCHEDULES

019-Z251 P-901 PLUMBING RISER DIAGRAMS

TELCOM

019-Z252 T-001 NETWORK AND TELECOMMUNICATIONS LEGENDS, ABBREVIATIONS & SYMBOLS

019-Z253 TD-101 TELECOMMUNICATIONS SYSTEMS FLOOR PLANS - DEMOLITION

019-Z254 T-101 TELECOMMUNICATIONS FLOOR PLANS - NEW WORK

019-Z255 T-501 TELECOMMUNICATIONS DETAIL

019-Z256 T-601 COPPER, CATV, & FIBER OPTICS PATHWAY DIAGRAM

FIRE ALARM

019-Z257 FA-001 FIRE ALARM AND MASS NOTIFICATION GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS

019-Z258 FAD-101 FIRE ALARM AND MASS NOTIFICATION FIRST FLOOR DEMOLITION PLAN

019-Z259 FAD-102 FIRE ALARM AND MASS NOTIFICATION SECOND FLOOR DEMOLITION PLAN

019-Z260 FA-101 FIRE ALARM AND MASS NOTIFICATION FIRST FLOOR PLAN

019-Z261 FA-102 FIRE ALARM AND MASS NOTIFICATION SECOND FLOOR PLAN

019-Z262 FA-501 FIRE ALARM AND MASS NOTIFICATION DETAILS

019-Z263 FA-502 FIRE ALARM AND MASS NOTIFICATION MATRIX OF OPERATIONS

FIRE PROTECTION

019-Z264 FX-001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

019-Z265 FX-101 FIRE SUPPRESSION FIRST FLOOR PLAN

019-Z266 FX-102 FIRE SUPPRESSION SECOND FLOOR PLAN

019-Z267 FX-501 FIRE SUPPRESSION DETAILS

ARCHITECTURE

019-Z134 A-001 ARCHITECTURAL LEGENDS AND NOTES

019-Z135 A-010 ACCESSIBILITY STANDARDS

019-Z136 AD101 FIRST FLOOR DEMOLITION PLAN

019-Z137 AD102 SECOND FLOOR DEMOLITION PLAN

019-Z138 AD103 ROOF DEMOLITION PLAN

019-Z139 AD201 NORTH AND WEST ELEVATIONS DEMOLITION

019-Z140 AD202 SOUTH AND EAST ELEVATIONS DEMOLITION

019-Z141 AD301 DEMOLITION SECTION A

019-Z142 A-101 FIRST FLOOR PLAN

019-Z143 A-102 SECOND FLOOR PLAN

019-Z144 A-103 ROOF PLAN

019-Z145 A-105 FIRST FLOOR REFLECTED CEILING PLAN

019-Z146 A-106 SECOND FLOOR REFLECTED CEILING PLAN

019-Z147 A-201 NORTH ELEVATION

019-Z148 A-202 WEST ELEVATION

019-Z149 A-203 SOUTH ELEVATION

019-Z150 A-204 EAST ELEVATION

019-Z151 A-301 BUILDING SECTION

019-Z152 A-302 BUILDING SECTION

019-Z153 A-303 BUILDING SECTION

019-Z154 A-304 BUILDING SECTION

019-Z155 A-305 BUILDING SECTION

019-Z156 A-307 VERTICAL CIRCULATION PLANS & SECTIONS

019-Z157 A-308 VERTICAL CIRCULATION SECTIONS - ELEVATOR

019-Z158 A-401 WALL SECTIONS

019-Z159 A-402 WALL SECTIONS

019-Z160 A-403 WALL SECTIONS

019-Z161 A-406 WALL SECTIONS

019-Z162 A-410 ENLARGED PLANS / TOILET ROOM PLANS

019-Z163 A-411 ENLARGED PLANS/ EXTERIOR STAIR

019-Z164 A-501 CEILING DETAILS

019-Z165 A-502 ELEVATOR DETAILS

019-Z166 A-503 FOLDING PARTITION DETAILS

019-Z167 A-504 STAIR DETAILS

019-Z168 A-505 STAIR DETAILS

019-Z169 A-506 EXTERIOR DETAILS

019-Z170 A-509 ROOF DETAILS

019-Z171 A-510 ROOF DETAILS

019-Z172 A-601 DOOR SCHEDULES

019-Z173 A-701 GENERAL WALL TYPES

019-Z174 A-702 GENERAL WALL HEAD DETAILS

019-Z175 A-801 3D VIEW

019-Z176 A-802 3D VIEW

INTERIORS

019-Z177 I-101 FIRST FLOOR FINISH & SIGNAGE PLAN

019-Z178 I-102 SECOND FLOOR FINISH & SIGNAGE PLAN

019-Z179 I-111 FIRST FLOOR FURNITURE, FIXTURES & EQUIPMENT PLAN

019-Z180 I-112 SECOND FLOOR FURNITURE, FIXTURES & EQUIPMENT PLAN

019-Z181 I-201 INTERIOR MILLWORK & FINISH ELEVATIONS

019-Z182 I-202 INTERIOR MILLWORK SECTIONS

019-Z183 I-301 FURNITURE TYPICALS

019-Z184 I-501 SIGNAGE DETAILS

019-Z185 I-502 SIGNAGE SCHEDULE & DETAILS

019-Z186 I-601 FINISH MATERIAL LEGEND

019-Z187 I-602 ROOM FINISH SCHEDULE

STRUCTURAL

019-Z188 S-001 GENERAL NOTES

019-Z189 S-002 GENERAL NOTES, DESIGN CRITERIA & ABBREVIATIONS

019-Z190 S-003 SNOW DRIFT LOADS & GRAPHICS LEGEND

019-Z191 S-004 SOIL BORING DETAILS

019-Z192 S-101 FOUNDATION & FIRST FLOOR SLAB PLAN

019-Z193 S-102 SECOND FLOOR FRAMING PLAN

019-Z194 S-103 MAIN ROOF FRAMING PLAN

019-Z195 S-301 BUILDING SECTIONS

019-Z196 S-501 TYPICAL CONCRETE DETAILS

019-Z197 S-502 TYPICAL CONCRETE, FOUNDATION & FALL ARREST DETAILS

019-Z198 S-503 TYPICAL MASONRY DETAILS

019-Z199 S-504 TYPICAL STEEL DETAILS

019-Z200 S-510 SECTIONS & DETAILS

019-Z201 S-511 SECTIONS & DETAILS

019-Z202 S-512 SECTIONS & DETAILS

019-Z203 S-601 SCHEDULES

GENERAL

019-Z100 G-001 COVER SHEET

019-Z101 G-002 INDEX OF DRAWINGS

019-Z102 G-003 GENERAL PROJECT NOTES, ABBREVIATIONS, & GENERAL LEGENDS

LIFE SAFETY

019-Z103 LS-100 CODE COMPLIANCE PLAN

019-Z104 LS-101 FIRST FLOOR LIFE SAFETY PLAN

019-Z105 LS-102 SECOND FLOOR LIFE SAFETY PLAN

CIVIL

019-Z106 C-001 CIVIL NOTES, LEGENDS, AND ABBREVIATIONS

019-Z107 C-100 EXISTING CONDITIONS PLAN

019-Z108 CD101 DEMOLITION PLAN

019-Z109 CD102 DEMOLITION PLAN

019-Z110 CS101 SITE LAYOUT PLAN

019-Z111 CS102 SITE LAYOUT PLAN

019-Z112 CG101 SITE GRADING PLAN

019-Z113 CG102 SITE GRADING PLAN

019-Z114 CG201 EROSION AND SEDIMENT CONTROL PHASE 1 PLAN

019-Z115 CG202 EROSION AND SEDIMENT CONTROL PHASE 1 PLAN

019-Z116 CG203 EROSION AND SEDIMENT CONTROL PHASE 2 PLAN

019-Z117 CG204 EROSION AND SEDIMENT CONTROL PHASE 2 PLAN

019-Z118 CG301 EROSION AND SEDIMENT CONTROL NOTES

019-Z119 CG302 EROSION AND SEDIMENT CONTROL NOTES

019-Z120 CG303 EROSION AND SEDIMENT CONTROL NOTES

019-Z121 CG304 EROSION AND SEDIMENT CONTROL NOTES

019-Z122 CG305 EROSION AND SEDIMENT CONTROL NOTES

019-Z123 CG501 EROSION AND SEDIMENT CONTROL DETAILS

019-Z124 CG502 EROSION AND SEDIMENT CONTROL DETAILS

019-Z125 CG503 STORMWATER MANAGEMENT PLAN AND DETAILS

019-Z126 C-501 SITE DETAILS

019-Z127 C-502 SITE DETAILS

019-Z128 C-503 SITE DETAILS

019-Z129 C-504 SITE DETAILS

019-Z130 CU101 UTILITY PLAN

019-Z131 CU201 UTILITY PROFILE

LANDSCAPE

019-Z132 L-101 LANDSCAPING PLAN

019-Z133 L-102 LANDSCAPING PLAN

M

AR

K D

E S C

R

IP

TI

O

N D

AT

E

AP

PR

0% S

U

BM

IT

TA

L 0 8

.2 2.

R

TA

S

U

BM

IT

T A

L 1 0

.0 9.

MDE SUBMITTAL

M D

E #2

0-

SF

-0

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

PLAN REVIEW DIVISION

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

C-001

CIVIL ABBREVIATIONS

APPROX

ASPHLT

BLDG

CLR

COMM

CONC

COR

DEMO

DIA

DIP

DOM

DWG

ELEC

EX/EXIST

FT

HORIZ

IN

IP

LF

MAX

MIN

MHWL

MLWL

NTS

OP

PERF

PVMT

SCE

SF

TYP

UDG

VERT

CIVIL LEGEND & SYMBOLS

GENERAL NOTES

EXISTING SYMBOL REMOVAL SYMBOL PROPOSED SYMBOL DESCRIPTIONAPPROXIMATE

ASPHALT

BUILDING

CLEARANCE

COMMUNICATIONS

CONCRETE

CONTRACTING OFFICER'S

REPRESENTATIVE

DEMOLITION

DIAMETER

DUCTILE IRON PIPE

DOMESTIC

DRAWING

ELECTRICAL

EXISTING

FEET, FOOT

HORIZONTAL

INCH

INLET PROTECTION

LINEAR FEET

MAXIMUM

MINIMUM

MEAN HIGH WATER LEVEL

MEAN LOW WATER LEVEL

NOT TO SCALE

OUTLET PROTECTION

PERFORATED

PAVEMENT

STANDARD

CONSTRUCTION ENTRANCE

SILT FENCE

TYPICAL

UNDERGROUND

VERTICAL

POTABLE WATER LINE

CONCRETE PAVEMENT

LIMITS OF DISTURBANCE

1. THE CONTRACTOR MUST VERIFY FIELD CONDITIONS PRIOR TO CONSTRUCTION

AND NOTIFY THE COR IF FIELD CONDITIONS DIFFER.

2. ALL CONSTRUCTION MUST CONFORM TO THE PROJECT SPECIFICATIONS AND

NAVFAC STANDARDS. DEVIATION FROM THESE STANDARDS AND

SPECIFICATIONS MUST FIRST BE APPROVED BY THE COR.

3. EXISTING UTILITIES ARE BASED UPON A UTILITY SURVEY CONDUCTED BY

BOWMAN CONSULTING IN MAY 2019. THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXACT LOCATION AND DEPTH OF ALL EXISTING UTILITIES

WITHIN THE LIMITS OF WORK BEFORE COMMENCING WORK AND FOR REPAIRING

ANY DAMAGES WHICH OCCUR BY FAILURE TO LOCATE OR PRESERVE THESE

UTILITIES DURING CONSTRUCTION OPERATIONS. IF UTILITIES OTHER THAN

THOSE SHOWN HEREIN ARE ENCOUNTERED, THE CONTRACTOR SHALL

IMMEDIATELY NOTIFY THE COR AND TAKE THE NECESSARY STEPS TO PROTECT

THE UTILITY AND ENSURE THE CONTINUANCE OF SERVICE.

4. CONTRACTOR SHALL COORDINATE WITH NAVFAC AND THE INDIAN HEAD

DEPARTMENT OF PUBLIC WORKS PERSONNEL FOR LOCATING ALL EXISTING

UTILITIES PRIOR TO EXCAVATION. IN ADDITION TO THE COORDINATION

MENTIONED, THE CONTRACTOR SHALL ALSO HIRE A UTILITY LOCATOR.

5. ALL DISTURBED AREAS NOT STABILIZED WITH STRUCTURES, PAVING, STONE, OR

PLANTING SHALL BE STABILIZED WITH FOUR INCHES OF TOPSOIL, SEED, MULCH,

AND WATER TO ESTABLISH AN ADEQUATE GROWTH OF GRASS. FOR VEGETATIVE

STABILIZATION METHODS AND REQUIREMENTS, REFER TO THE 2011 MARYLAND

STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.

6. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AT ALL TIMES AND SHALL

PROVIDE ALL NEEDED LABOR, EQUIPMENT, AND MATERIALS TO PROTECT THE

PROJECT SITE FROM PONDING WATER AND FLOODING.

7. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB OR EDGE OF PAVEMENT,

UNLESS NOTED OTHERWISE.

8. NUMERICAL DIMENSIONS SHOWN SHALL SUPERSEDE ANY DISCREPANCY IN THE

SCALING OF THE DRAWINGS.

9. CONTRACTOR SHALL ARRANGE A PRECONSTRUCTION MEETING WITH THE

CONTRACTING OFFICER AND DESIGNER PRIOR TO COMMENCEMENT OF WORK.

10. ALL EXISTING SHRUBS, PLANT MATERIAL, RAILINGS, AND CINDER BLOCKS WITHIN

CONSTRUCTION LIMITS ARE TO BE REMOVED.

11. THE DISTURBED AREA FOR THIS SITE IS 13,620 SF (0.3 AC).

12. THE PROPOSED IMPERVIOUS AREA FOR THIS SITE IS 3,646 SF (0.08 AC).

13. THE GREEN AREA TO BE STABILIZED FOR THIS SITE IS 8,070 (0.2 AC).

14. TOTAL CUT VOLUME FOR THIS SITE IS 169 CY. TOTAL FILL VOLUME FOR THIS SITE

IS 139 CY. NET CUT IS 30 CY.

15. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING VEHICLES

AND EQUIPMENT OF MUD PRIOR TO ENTERING PARKING LOTS AND ROADWAYS.

IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO CLEAN PARKING LOTS AND

ROADWAYS OF MUD AND/OR ALLY DUST AND TO ENSURE THAT PARKING LOTS

AND ROADWAYS ARE KEPT CLEAN AND DUST FREE AT ALL TIMES.

16. THE CONTRACTOR SHALL DISPOSE OF ALL DEBRIS AND CONSTRUCTION

MATERIAL IN AN APPROVED OFF-SITE WASTE DISPOSAL FACILITY.

PARKING WHEELSTOP

FIRE HYDRANT

EDGE OF ASPHALT PVMT

REMOVE CONC PVMT

X

REMOVE TREE

REMOVE ASPHALT PVMT

REMOVE RETAINING WALL

REMOVE CONC STAIRS

TEST PIT

TP-1

SILT FENCE

SUPER SILT FENCE

SF

SSF

EROSION & SEDIMENT CONTROL LEGEND

PROPOSED SYMBOL DESCRIPTION

CONSTRUCTION ENTRANCE

SIP

OP

STANDARD INLET PROTECTION

OUTLET PROTECTION

CONTOUR

MILL ASPHALT

APPROXIMATE LIMITS OF

ASPHALT OVERLAY

U

UNDERGROUND UTILITY

OHU

OVERHEAD UTILITIES

FIRE SERVICE LINE

SURVEY NOTES

1. EXISTING CONDITIONS INFORMATION IS BASED ON RECORD MAPPING PROVIDED

BY THE GOVERNMENT, FIELD OBSERVATIONS FROM SEPTEMBER 2018, AND A

TOPOGRAPHIC SURVEY CONDUCTED BY BOWMAN CONSULTING IN MAY 2019.

2. NOTIFY THE COR IMMEDIATELY IF CONDITIONS DIFFER FROM WHAT IS SHOWN ON

PLANS.

3. NORTH MERIDIAN INFORMATION IS MARYLAND STATE GRID NAD 83 AND IS BASED

ON A GPS SURVEY COMPLETED ON MAY 6, 2019 BY BOWMAN CONSULTING GROUP.

4. VERTICAL DATUM IS NAVD 88 AND IS BASED ON THE SAME GPS SURVEY

DESCRIBED IN NOTE 3. THE CONTOUR INTERVAL IS 1 FOOT.

POST INDICATOR VALVE

TP

A-2A-2

TREE PROTECTION

EARTH DIKE

ASPHALT PAVEMENT

STORM DRAIN LINE

SANITARY SEWER LINE

EXTERIOR LIGHTING

FLAGPOLE

STATIC DISPLAY

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

1. NO EXCESS FILL, CONSTRUCTION MATERIAL, OR DEBRIS SHALL BE STOCKPILED

OR STORED IN NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS,

WATERWAYS, OR THE 100-YEAR FLOODPLAIN.

2. PLACE MATERIALS IN A LOCATION AND MANNER WHICH DOES NOT ADVERSELY

IMPACT SURFACE OR SUBSURFACE WATER FLOW INTO OR OUT OF NONTIDAL

WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR

FLOODPLAIN.

3. DO NOT USE THE EXCAVATED MATERIAL AS BACKFILL IF IT CONTAINS WASTE

METAL PRODUCTS, UNSIGHTLY DEBRIS, TOXIC MATERIAL, OR ANY OTHER

DELETERIOUS SUBSTANCE. IF ADDITIONAL BACKFILL IS REQUIRED, USE CLEAN

MATERIAL FREE OF WASTE METAL PRODUCTS, UNSIGHTLY DEBRIS, TOXIC

MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE.

4. PLACE HEAVY EQUIPMENT ON MATS OR SUITABLY OPERATE THE EQUIPMENT TO

PREVENT DAMAGE TO NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS,

WATERWAYS, OR THE 100-YEAR FLOODPLAIN.

5. REPAIR AND MAINTAIN ANY SERVICEABLE STRUCTURE OR FILL SO THERE IS NO

PERMANENT LOSS OF NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, OR

WATERWAYS, OR PERMANENT MODIFICATION OF THE 100-YEAR FLOODPLAIN IN

EXCESS OF THAT LOST UNDER THE ORIGINALLY AUTHORIZED STRUCTURE OR

FILL.

6. RECTIFY ANY NONTIDAL WETLANDS, WETLAND BUFFERS, WATERWAYS, OR

100-YEAR FLOODPLAIN TEMPORARILY IMPACTED BY ANY CONSTRUCTION.

7. ALL STABILIZATION IN THE NONTIDAL WETLAND AND NONTIDAL WETLAND

BUFFER SHALL CONSIST OF THE FOLLOWING SPECIES: ANNUAL RYEGRASS

(LOLIUM MULTIFLORUM), MILLET (SETARIA ITALICA), BARLEY (HORDEUM SP.),

OATS (UNIOLA SP.), AND/OR RYE (SECALE CEREALE). THESE SPECIES WILL

ALLOW FOR THE STABILIZATION OF THE SITE WHILE ALSO ALLOWING FOR THE

VOLUNTARY REVEGETATION OF NATURAL WETLAND SPECIES. OTHER

NON-PERSISTENT VEGETATION MAY BE ACCEPTABLE, BUT MUST BE APPROVED

BY THE NONTIDAL WETLANDS AND WATERWAYS DIVISION. KENTUCKY 31

FESCUE SHALL NOT BE UTILIZED IN WETLAND OR BUFFER AREAS. THE AREA

SHOULD BE SEEDED AND MULCHED TO REDUCE EROSION AFTER

CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED.

8. AFTER INSTALLATION HAS BEEN COMPLETED, MAKE POST-CONSTRUCTION

GRADES AND ELEVATIONS THE SAME AS THE ORIGINAL GRADES AND

ELEVATIONS IN TEMPORARILY IMPACTED AREAS.

9. TO PROTECT AQUATIC SPECIES, IN-STREAM WORK IS PROHIBITED AS

DETERMINED BY THE CLASSIFICATION OF THE STREAM:

· USE I WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE

PERIOD MARCH 1 THROUGH JUNE 15, INCLUSIVE, DURING ANY YEAR.

· USE III WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING

THE PERIOD OCTOBER 1 THROUGH APRIL 30, INCLUSIVE, DURING ANY

YEAR.

· USE IV WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING

THE PERIOD MARCH 1 THROUGH MAY 31, INCLUSIVE, DURING ANY YEAR.

10. STORMWATER RUNOFF FROM IMPERVIOUS SURFACES SHALL BE CONTROLLED

TO PREVENT THE WASHING OF DEBRIS INTO THE WATERWAY.

11. CULVERTS SHALL BE CONSTRUCTED AND ANY RIPRAP PLACED SO AS NOT TO

OBSTRUCT THE MOVEMENT OF AQUATIC SPECIES, UNLESS THE PURPOSE OF

THE ACTIVITY IS TO IMPOUND WATER.

BEST MANAGEMENT PRACTICES FOR WORKING IN

NONTIDAL WETLANDS, WETLAND BUFFERS,

WATERWAYS, AND 100-YEAR FLOODPLAINS

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

T

O

M

V

E

R

SAND

RIPRAP

SAND

PAVED

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

PARKING

BLDG 62

22 Spaces

C

O

N

F

E

R

E

N

I

V

E

E

D

G

F

G

R

A

V

E

L

G

A B

I

W

L L

C

H

A

L

N

K

WALL

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

S

T

E

P

S

W x

W x

4" PVC

INV=21.36

W x

R

P

W x

W x

W x

W x

W x

N

P

W

N

P

W

N

P

W

W x

W x

W x

W x

W x

W x

N

P

W

N

P

W

N

P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND CONSIDERED

TO BE APPROXIMATE.

C-100

EXISTING CONDITIONS

SCALE: 1"=20'

0 20' 40'10'

A1

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

MHWL= 2.34

MLWL= 0.15

100' BUFFER FROM

MHW ELEVATION

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

SAND

RIPRAP

SAND

PAVED

GRASS

GRASS

BLDG 62

E

D

G

R

A

V

E

L

G

A B

I

L L

C

H

A

N

K

WALL

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

S

T

E

P

S

X

X

X

X

X

X

X

X

X

X

R

P

X

X

X

X X

X

X

T1

T2

T3

T4

T5

T6

T7

T8

T9

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

SHEET KEYNOTES

LIMITS OF DISTURBANCE

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE.

2. ALL EXISTING SHRUBS, PLANT MATERIAL,

RAILINGS, AND CINDER BLOCKS WITHIN

CONSTRUCTION LIMITS ARE TO BE REMOVED.

3. CONTRACTOR SHALL EVALUATE CONDITION

OF EX. WATERPROOFING AND COORDINATE

WITH COR TO DETERMINE IF NEW

WATERPROOFING IS REQUIRED. SEE

ARCHITECTURAL PLANS AND SPECS.

MATCHLINE

SEE SHEET CD102

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CD101

DEMO AND REMOVE EXISTING ASPHALT PVMT

DEMO AND REMOVE EXISTING CONC

RETAINING WALL

REMOVE FRENCH DRAIN PIPING AND RIP RAP

DEMO AND REMOVE CONC PVMT TO

NEAREST JOINT

REMOVE TREE (TYP)

REMOVE METAL RAIL

REMOVE WHEELSTOP (TYP)

DEMO AND REMOVE EXISTING CONC LANDING.

SITE DEMOLITION PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

REMOVE EXISTING PAVEMENT STRIPING

WITHIN LIMITS OF ASPHALT PAVEMENT

REMOVAL.

REMOVE COMMEMORATIVE PLAQUES ON

EXISTING WALL AND SALVAGE. COORDINATE

WITH COR ON PROPOSED LOCATION.

REMOVE AND SALVAGE STATIC DISPLAY AND

RETURN TO GOVERNMENT. SEE L-101 FOR

SUGGESTED LOCATION.

EXISTING CONCRETE WALL TO REMAIN.

PLAN NORTH

DEMO AND REMOVE EXISTING CONC STAIRS.

SEE ARCHITECTURAL DRAWINGS.

DEMO AND REMOVE TOP OF EXISTING WALL

AS NECESSARY TO ACHIEVE SIDEWALK

ELEVATIONS.

TREE AND SHRUB REMOVAL

TOTAL TREES/SHRUBS REMOVED: 17

SPECIES

ID

T1

T2

T3

T4

T5

T6

T7

T8

T9

REQUIRED TREES TO BE REPLACED: 7

2" TREE OF HEAVEN

3" HICKORY

UNKNOWN TREE

UNKNOWN TREE

UNKNOWN TREE

20" BRADFORD PEAR

UNKNOWN 16" TREE

12" LOCUST

18" LOCUST

REMOVE AND SALVAGE FLAGPOLE. SEE L-101

FOR SUGGESTED LOCATION.

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

100' BUFFER FROM

MHWL ELEVATION

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

GRASS

GRASS

PARKING

C

O

N

F

E

R

E

N

I

V

E

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

X

X

X

X

X

X

X X

X

X

T7

T8

T9

T10

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

SHEET KEYNOTES

LIMITS OF DISTURBANCE

GENERAL SHEET NOTES

1. EXISTING CONDITIONS BASED ON RECORD

MAPPING PROVIDED BY THE GOVERNMENT

AND FIELD OBSERVATIONS FROM

SEPTEMBER 2018 AND ARE CONSIDERED

APPROXIMATE.

2. ALL EXISTING SHRUBS, PLANT MATERIAL,

RAILINGS, AND CINDER BLOCKS WITHIN

CONSTRUCTION LIMITS ARE TO BE REMOVED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CD102

DEMO AND REMOVE EXISTING ASPHALT

PAVEMENT

REMOVE TREE (TYP)

MILL 1" ASPHALT. SEE B1/C-502

REMOVE WHEELSTOP (TYP)

REMOVE EXISTING PAVEMENT STRIPING WITHIN

LIMITS OF ASPHALT PAVEMENT REMOVAL.

SITE FEATURE TO REMAIN

SITE DEMOLITION PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

MATCHLINE

SEE SHEET CD101

PLAN NORTH

REMOVE AND SALVAGE STATIC DISPLAY AND

RETURN TO GOVERNMENT. SEE L-102 FOR

SUGGESTED LOCATION.

TREE AND SHRUB REMOVAL

TOTAL TREES/SHRUBS REMOVED: 1

SPECIES

ID

T10

REQUIRED TREES TO BE REPLACED: 1

UNKNOWN TREE

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

100' BUFFER FROM

MHW ELEVATION

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

82 FT ATFP SETBACK

SAND

RIPRAP

SAND

PAVED

GRASS

BLDG 62

E

D

G

R

A

V

E

L

G

A B

I

L L

C

H

A

N

K

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

A

L

I

G

N

A

L

I

G

N

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

SHEET KEYNOTES

PATIO AREA. SEE C2/C-501.

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE.

2. DEPLOYABLE FLOOD PROTECTION SHALL BE

A WATER ACTIVATED, SELF SUPPORTING,

TEMPORARY BARRIER STRUCTURE THAT

CAN BE DEPLOYED AND ERECTED ALONG

THE PATH OF THE FLOODWATERS TO

PREVENT FLOODWATERS FROM REACHING

THE AREA BEHIND THE STRUCTURE. THE

BARRIER SHALL HAVE A PROTECTION

HEIGHT OF UP TO 5'-0". THE BARRIERS ARE

INTENDED TO BE INTERCONNECTED WITH

HEAVY DUTY VELCRO AND ABLE TO BE

SHAPED TO TURN CORNERS AND BENDS.

PRODUCT TO BE REUSABLE AND

CONSTRUCTED USING PVC COATED

POLYESTER FABRIC, RESISTANT TO

ABRASION WITH GALVANIZED METAL PLATE

BALLAST WEIGHTS. PRODUCT SHALL BE FM

APPROVED AND US ARMY CORPS OF

ENGINEERS TESTED AND APPROVED.

CONTRACTOR SHALL PROVIDE TECHNICAL

DATA FOR GOVERNMENT APPROVAL.

CONCRETE SIDEWALK TO TIE IN TO EXISTING

SIDEWALK IN LINE AND AT GRADE. SEE C4/C-501.

BUILDING ENTRANCES (TYP). SEE

ARCHITECTURAL DRAWINGS FOR EXACT

LOCATION.

EXTEND CONCRETE SIDEWALK TO BUILDING

WALL. SEE C2/C-501 AND STRUCTURAL

DRAWINGS.

CONCRETE STAIRS. SEE A-411 AND A1/C-501.

SITE LAYOUT PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

CONCRETE PAVEMENT TO TIE IN TO EXISTING

GRAVEL ROAD.

CS101

MATCHLINE

SEE SHEET CS102

NEW CANOPY. SEE ARCHITECTURAL DRAWINGS.

PLAN NORTH

PROVIDE TEMPORARY DEPLOYABLE FLOOD

PROTECTION.

EXTEND CONCRETE SIDEWALK TO TOP

LANDING IN LINE AND AT GRADE. SEE

C2/C-501.

APPROXIMATE LOCATION OF WALL

MOUNTED EXTERIOR LIGHT FIXTURE. SEE

E-101.

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

R5.00'

GRASS

GRASS

PARKING

C

O

N

F

E

R

E

N

I

V

E

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

A

L

I

G

N

SHEET KEYNOTES

ONE (1) 8'X18' PARKING

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE.

2. DEMOLITION AND CONSTRUCTION OF

CONCRETE SIDEWALK SHALL BE PHASED TO

MAINTAIN EMERGENCY ACCESS TO BUILDING

#100. CONTRACTOR SHALL COORDINATE

EMERGENCY ACCESS WITH COR AND

GOVERNMENT.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

C

R50.00'

WHEEL STOP (TYP). SEE B1/C-504.

APPROXIMATE LIMITS OF ASPHALT OVERLAY.

SEE B1/C-502.

SITE FEATURE TO REMAIN.

TIE IN TO EXISTING ASPHALT IN LINE AND AT

GRADE.

NEW ASPHALT PAVEMENT. SEE A4/C-501.

REMOVABLE BOLLARDS (TYP OF 5) SPACED

6' APART ON CENTER. SEE DETAIL A1/C-502.

VEHICULAR CONCRETE PAVEMENT. SEE

D4/C-501.

9 EDGE OF EXISTING ASPHALT PAVEMENT

SITE LAYOUT PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

CS102

MATCHLINE

SEE SHEET CS101

BOLLARD. MAINTAIN 3' CLEARANCE AROUND

FIRE HYDRANT. SEE DETAIL A5/C-502.

PLAN NORTH

ONE (1) 11'X18' HANDICAP VAN

ACCESSIBLE PARKING. SEE C3/C-503.

5' STRIPING. SEE DETAIL C3/C-503.

SIGNAGE FOR RESERVED PARKING. SEE

DETAILS A3/C-503 AND A5/C-503.

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

SAND

RIPRAP

SAND

PAVED

GRASS

BLDG 62

E

D

G

R

A

V

E

L

G

A B

I

L L

C

H

A

N

K

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

R

M

T

B

R

R

T

W

SD1

SD2

SD3

SD5

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

W x

W x

W x

N

P

W

W x

W x

W

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N P

W

N P

W

N

P

W

N P

W

N

P

W

N P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

SHEET KEYNOTES

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. PROVIDE POSITIVE SLOPE AWAY FROM

BUILDING 62.

3. CONTRACTOR TO NOTIFY COR PRIOR TO

CONSTRUCTION IF PROPOSED GRADING

CANNOT BE ACHIEVED BASED ON FIELD

SURVEY EXISTING CONDITIONS.

4. FOLLOWING INITIAL DISTURBANCE OR

REDISTURBANCE, PERMANENT

STABILIZATION SHALL BE COMPLETED WITHIN

THREE (3) CALENDAR DAYS AS TO THE

SURFACE OF ALL SLOPES STEEPER THAN 3

HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN

(7) DAYS AS TO ALL OTHER DISTURBED OR

GRADED AREAS ON THE PROJECT SITE NOT

UNDER ACTIVE GRADING.

* DENOTES ELEVATION OF NEW SIDEWALK TO

MATCH ELEVATION OF EXISTING SIDEWALK

OR EXISTING GRADE. CONTRACTOR TO

VERIFY ELEVATION PRIOR TO INSTALLATION

OF SIDEWALK.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG101

PATIO SHALL MEET FFE OF BLDG 62.

MEET EXISTING SIDEWALK IN LINE AND AT

GRADE.

DRAIN INLET. SEE B3/C-502.

DI #A3, INV. = 18.5

49 LF 15" HDPE STORM SEWER. SEE THIS

SHEET FOR SCHEDULE.

CONCRETE SIDEWALK SHALL MEET FFE OF

BLDG 62.

SITE GRADING PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

MATCHLINE

SEE SHEET CG102

DRAIN INLET.

DI #A2, INV. = 18.20; INV.= 16.15

STORM STRUCTURE SCHEDULE

11 LF 8" HDPE @ 4.72%

SD1

23 LF 8" HDPE @ 1.30%

SD2

16 LF 8" HDPE @ 0.90%

SD3

NOT USED.

9 10" HDPE STORM SEWER

EXTEND TO DOWNSPOUT. SEE PLUMBING

DRAWINGS.

78 LF 10" HDPE @ 0.50%

SD4

SD4

6.6 LF 3" HDPE @ 3.78%

SD5

DRAIN INLET. SEE B3/C-502.

DI #B2, INV. = 4.90

DRAIN INLET. SEE B3/C-502.

DI #B1, INV. = 4.50

PLAN NORTH

60 LF 6" HDPE UNDERDRAIN. SEE D1/C-502.

CONCRETE END WALL. DI #B0, INV. = 4.33

SEE A4/CG501

SD6

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

OUTLET PROTECTION III. SEE A3/CG501.

L=5'-0", W=6'-0", CL I RIPRAP

32 LF 10" HDPE @ 0.50%

SD6

MHWL= 2.34

MLWL= 0.15

100' BUFFER FROM

MHW ELEVATION

OUTLET PROTECTION III. SEE A3/CG501.

L=5'-0", W=2'-0", CL I RIPRAP

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

N

F

E

R

E

N

I

V

E

R

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

W x

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

SHEET KEYNOTES

ASPHALT PAVEMENT SHALL MEET EXISTING

LINE AND GRADE AT PARKING LOT. MATCH

EXISTING CROSS SLOPE OF PARKING LOT.

12-INCH GRAVEL TRANSITION STRIP.

SEE A3/CG503

GENERAL SHEET NOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG102

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. PROVIDE POSITIVE SLOPE AWAY FROM

BUILDING 62.

3. FOLLOWING INITIAL DISTURBANCE OR

REDISTURBANCE, PERMANENT

STABILIZATION SHALL BE COMPLETED WITHIN

THREE (3) CALENDAR DAYS AS TO THE

SURFACE OF ALL SLOPES STEEPER THAN 3

HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN

(7) DAYS AS TO ALL OTHER DISTURBED OR

GRADED AREAS ON THE PROJECT SITE NOT

UNDER ACTIVE GRADING.

4. ASPHALT OVERLAY SHALL MAINTAIN EXISTING

DRAINAGE PATTERN AND POSITIVE

DRAINAGE.

* DENOTES ELEVATION OF NEW SIDEWALK OR

NEW ASPHALT PVMT TO MATCH ELEVATION

OF EXISTING SIDEWALK, EXISTING ASPHALT

PVMT OR EXISTING GRADE. CONTRACTOR TO

VERIFY ELEVATION PRIOR TO INSTALLATION.

SITE GRADING PLAN

SCALE: 1"=10'

0 10' 20'5'

A1

MATCHLINE

SEE SHEET CG101

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

SAND

RIPRAP

SAND

PAVED

GRASS

BLDG 62

E

D

G

R

A

V

E

L

G

A B

I

L L

C

H

A

N

K

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

S

F

S

F

S

F

S

F

S

F

S

F

S

S

F

T

P

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

W x

W x

4" PVC

INV=21.36

W x

N

P

W

R

P

W x

W x

W

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N P

W

N P

W

N

P

W

N P

W

N

P

W

N P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

TO SF:

A=0.10 AC.

TO SSF:

A=0.04 AC.

TO SSF:

A=0.02 AC.

TO SSF:

A=0.18 AC.

SHEET KEYNOTES

SILT FENCE. SEE C3/CG501.

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. CONTRACTOR SHALL NOT STOCKPILE

ON-SITE AND WILL REMOVE ANY STOCKPILE

SOIL EACH DAY.

3. SAME DAY STABILIZATION TO REFERENCE

MDE GENERAL NOTE #8 ON SHEET CG301.

ONLY WORK THAT CAN BE COMPLETED

DURING THE SAME WORKING DAY SHALL BE

COMPLETED. CONTRACTOR SHALL STABILIZE

THE DISTURBED AREA AT THE END OF EACH

WORKING DAY.

MATCHLINE

SEE SHEET CG202

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG201

SUPER SILT FENCE. SEE C5/CG501.

LIMITS OF DISTURBANCE

EROSION AND SEDIMENT CONTROL PHASE I

SCALE: 1"=10'

0 10' 20'5'

A1

TREE PROTECTION. SEE C1/CG502, C2/CG502,

A1/CG502, A3/CG502.

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

SILT FENCE

SUPER SILT FENCE

SF

SSF

EROSION & SEDIMENT CONTROL LEGEND

PROPOSED SYMBOL DESCRIPTION

CONSTRUCTION ENTRANCE

SIP

ROP

STANDARD INLET PROTECTION

ROCK OUTLET PROTECTION

TP

TREE PROTECTION

LOD

LIMITS OF DISTURBANCE (LOD)

SAME DAY STABILIZATION

SAME DAY STABILIZATION

N O

C

O N

T R

A C

T O

R

E

R O

S I O

N

A

D

I M

E N

T

C O

N T

R O

L

W

I L

L

B

E

S

T R

I C

T L

Y

E

N F

O R

C E

D

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

GRASS

PARKING

C

O

N

F

E

R

E

N

I

V

E

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

S

F

S

F

S

F

S

F

S

F

S

I

P

T

P

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

W x

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

TO SSF:

A=0.18 AC.

TO SF:

A=0.02 AC.

MATCHLINE

SEE SHEET CG201

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG202

SHEET KEYNOTES

SILT FENCE. SEE C3/CG501.1

CONSTRUCTION ENTRANCE. SEE C1/CG501.

LIMITS OF DISTURBANCE

EROSION AND SEDIMENT CONTROL PHASE I

SCALE: 1"=10'

0 10' 20'5'

A1

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

N O

C

O N

T R

A C

T O

R

E

R O

S I O

N

A

D

I M

E N

T

C O

N T

R O

L

W

I L

L

B

E

S

T R

I C

T L

Y

E

N F

O R

C E

D

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. EXISTING ASPHALT PAVEMENT BENEATH SCE

SHALL BE BROKEN UP PRIOR TO

INSTALLATION OF SCE AND REPLACED.

3. CONTRACTOR SHALL NOT STOCKPILE

ON-SITE AND WILL REMOVE ANY STOCKPILE

SOIL EACH DAY.

4. SAME DAY STABILIZATION TO REFERENCE

MDE GENERAL NOTE #8 ON SHEET CG301.

ONLY WORK THAT CAN BE COMPLETED

DURING THE SAME WORKING DAY SHALL BE

COMPLETED. CONTRACTOR SHALL STABILIZE

THE DISTURBED AREA AT THE END OF EACH

WORKING DAY.

SILT FENCE

SUPER SILT FENCE

SF

SSF

EROSION & SEDIMENT CONTROL LEGEND

PROPOSED SYMBOL DESCRIPTION

CONSTRUCTION ENTRANCE

SIP

ROP

STANDARD INLET PROTECTION

ROCK OUTLET PROTECTION

TP

TREE PROTECTION

LOD

LIMITS OF DISTURBANCE (LOD)

SAME DAY STABILIZATION

SAME DAY STABILIZATION

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

PAVED

BLDG 62

E

D

G

R

A

V

E

L

S

I

P

S

F

S

F

S

F

S

F

S

F

S

F

S

I

P

S

I

P

S

I

P

R

R

R

T

W

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

W x

W x

W x

N

P

W

W x

W x

W

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N P

W

N P

W

N

P

W

N P

W

N

P

W

N P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

TO SIP:

A=0.05 AC.

TO SIP:

A=0.01 AC.

TO SIP:

A=0.02 AC.

TO SIP:

A=0.10 AC.

SHEET KEYNOTES

STANDARD INLET PROTECTION. SEE A1/CG501

(TYPE A)

ROCK OUTLET PROTECTION. SEE A3/CG501.

LIMITS OF DISTURBANCE

SILT FENCE. SEE C3/CG501

SUPER SILT FENCE. SEE C5/CG501

PERIMETER DIKE/SWALE (PDS-1). SEE C6/CG501

RAIN GARDEN FACILITY, RG-1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG203

EROSION AND SEDIMENT CONTROL PHASE 2

SCALE: 1"=10'

0 10' 20'5'

A1

MATCHLINE

SEE SHEET CG204

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

SILT FENCE

SUPER SILT FENCE

SF

SSF

EROSION & SEDIMENT CONTROL LEGEND

PROPOSED SYMBOL DESCRIPTION

CONSTRUCTION ENTRANCE

SIP

ROP

STANDARD INLET PROTECTION

(TYPE A OR B)

ROCK OUTLET PROTECTION

TP

TREE PROTECTION

LOD

LIMITS OF DISTURBANCE (LOD)

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. EXISTING ASPHALT PAVEMENT BENEATH SCE

SHALL BE BROKEN UP PRIOR TO

INSTALLATION OF SCE AND REPLACE UPON

SCE REMOVAL.

3. SAME DAY STABILIZATION TO REFERENCE

MDE GENERAL NOTE #8 ON SHEET CG301.

4. MICRO-BIORETENTION TO BE CONSTRUCTED

IN A 3-DAY NOAA DRY WEATHER FORECAST.

ONLY WORK THAT CAN BE COMPLETED

DURING THE SAME WORKING DAY SHALL BE

COMPLETED. CONTRACTOR SHALL STABILIZE

THE DISTURBED AREA AT THE END OF EACH

WORKING DAY.

N O

C

O N

T R

A C

T O

R

E

R O

S I O

N

A

D

I M

E N

T

C O

N T

R O

L

W

I L

L

B

E

S

T R

I C

T L

Y

E

N F

O R

C E

D

PERIMETER DIKE/SWALE

(PDS-1)

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

PARKING

C

O

N

F

E

R

E

N

I

V

E

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L

L

S

F

S

F

S

F

S

F

S

F

S

I

P

R

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

W x

N

P

W

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

N

P

W

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

TO SIP:

A=0.10 AC.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG204

SHEET KEYNOTES

CONSTRUCTION ENTRANCE. SEE C1/CG501.

LIMITS OF DISTURBANCE

EROSION AND SEDIMENT CONTROL PHASE 2

SCALE: 1"=10'

0 10' 20'5'

A1

MATCHLINE

SEE SHEET CG203

PLAN NORTH

PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.

MARYLAND LICENSE NO.: 45292

EXPIRATION DATE: 05-21-2022

PROFESSIONAL CERTIFICATION:

SILT FENCE

SUPER SILT FENCE

SF

SSF

EROSION & SEDIMENT CONTROL LEGEND

PROPOSED SYMBOL DESCRIPTION

CONSTRUCTION ENTRANCE

SIP

ROP

STANDARD INLET PROTECTION

(TYPE A OR B)

ROCK OUTLET PROTECTION

TP

TREE PROTECTION

LOD

LIMITS OF DISTURBANCE (LOD)

N O

C

O N

T R

A C

T O

R

E

R O

S I O

N

A

D

I M

E N

T

C O

N T

R O

L

W

I L

L

B

E

S

T R

I C

T L

Y

E

N F

O R

C E

D

GENERAL SHEET NOTES

1. EXISTING CONDITIONS ARE BASED ON

RECORD MAPPING PROVIDED BY THE

GOVERNMENT AND FIELD OBSERVATIONS

FROM SEPTEMBER 2018 AND ARE

CONSIDERED APPROXIMATE. UTILITY AND

TOPOGRAPHIC SURVEYS WERE CONDUCTED

BY BOWMAN CONSULTING IN MAY 2019.

2. EXISTING ASPHALT PAVEMENT BENEATH SCE

SHALL BE BROKEN UP PRIOR TO

INSTALLATION OF SCE AND REPLACE UPON

SCE REMOVAL.

3. SAME DAY STABILIZATION TO REFERENCE

MDE GENERAL NOTE #8 ON SHEET CG301.

ONLY WORK THAT CAN BE COMPLETED

DURING THE SAME WORKING DAY SHALL BE

COMPLETED. CONTRACTOR SHALL STABILIZE

THE DISTURBED AREA AT THE END OF EACH

WORKING DAY.

4. MICRO-BIORETENTION TO BE CONSTRUCTED

IN A 3-DAY NOAA DRY WEATHER FORECAST.

APPROVED

BY: DANIEL LAIRD

MD DEPT ENVIRONMENT

SEDIMENT & STORMWATER

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D , W

A S

H

IN

G

TO

N

B

R E

N O

V A

TI

O

N M

D E

-S F-

R

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

S

U B

M I T

T A

L

R T

A

S

U B

M I T

T A

L

CG301

STANDARD EROSION AND SEDIMENT

CONTROL NOTES

SEQUENCE OF CONSTRUCTION

PHASE I:

1. CONTRACTOR TO CALL MDE AND SCHEDULE AN ON-SITE PRECONSTRUCTION

MEETING IN ACCORDANCE WITH MDE STANDARD EROSION AND SEDIMENT

CONTROL NOTE #1.

2. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES INCLUDING;

CONSTRUCTION ENTRANCES, SILT FENCE, SUPER SILT FENCE AND EARTH DIKES.

COMMENCE WITH SITE DEMOLITION WORK.

PHASE II:

1. INSTALL NEW SITE UTILITIES, INCLUDING STORM SEWER, FIRE LATERAL, DOMESTIC

WATER, SANITARY SEWER, AND FIRE HYDRANT. STORM SEWER TO BE INSTALLED

FROM DOWNSTREAM TO UPSTREAM. INSTALL INLET PROTECTION AS THE STORM

DRAIN CONSTRUCTION PROGRESSES.

2. PERFORM SITE GRADING OF PROJECT AREA.

3. INSTALL EXTERIOR CONCRETE STAIRS AND CONCRETE WALLS. INSTALL CONCRETE

SIDEWALK ON BOTH FIRST AND SECOND FLOORS, AND CONCRETE PATIO ON THE

SECOND FLOOR. INSTALL RIGID CONCRETE PAVEMENT. INSTALL NEW ASPHALT

PAVEMENT FOR PARKING.

4. INSTALL RAIN GARDEN (RG-1) FACILITY. MAINTAIN SILT FENCE AS SHOWN ON

PHASE 2 PLAN, CG203. RAIN GARDEN SHALL NOT BE INSTALLED UNTIL ALL

CONTRIBUTING DRAINAGE AREAS HAVE BEEN FULLY STABILIZED AND WRITTEN

APPROVAL IS PROVIDED BY THE COR.

5. PROVIDE PAVEMENT MARKINGS

6. RESTORE AND STABILIZE ALL REMAINING DISTURBED AREAS.

7. REMOVE ALL DEBRIS AND WASTE WITHIN LIMITS OF THE SITE.

8. UPON SITE STABILIZATION AND AFTER OBTAINING THE APPROVAL OF THE MDE

INSPECTOR, REMOVE ANY REMAINING SEDIMENT CONTROL MEASURES AND

STABILIZE THOSE AREAS.

9. CONTRACTOR SHALL VERIFY CONSTRUCTION OF RAIN GARDEN (RG-1) AND

NON-ROOF TOP DISCONNECT WITH AS-BUILT AND SHALL BE SUBMITTED TO MDE

FOR REVIEW AND APPROVAL.

MDE REQUIRES THAT THESE NOTES, IN THEIR ENTIRETY, BE INCLUDED ON THE EROSION

AND SEDIMENT CONTROL PLAN. IT IS RECOGNIZED THAT NOT EVERY NOTE MAY APPLY TO

ALL PROJECTS. THE REQUIREMENT OF ANY INDIVIDUAL NOTE NOT APPLICABLE TO THE

SUBJECT PROJECT IS NOT BINDING UPON THE APPLICANT OR THE APPLICANT'S

CONTRACTOR.

1. THE CONTRACTOR SHALL NOTIFY MDE AT (410) 537-3510 SEVEN (7) DAYS BEFORE

COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, SHALL

BE REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING BETWEEN PROJECT

REPRESENTATIVES AND A REPRESENTATIVE OF MDE.

D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL

STRUCTURE(S).

E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.

F. PRIOR TO FINAL ACCEPTANCE.

16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE STABILIZED

WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR OTHER APPROVED

STABILIZATION MEASURES.

17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), THE CONTRACTOR SHALL

APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES

TO THE FACE OF THE STOCKPILE WITHIN THREE (3) CALENDAR DAYS OF ACTIVITY HAVING CEASED ON

THE RESPECTIVE FACE. FOR SLOPES 3:1 OR FLATTER, THE CONTRACTOR SHALL APPLY

STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN SEVEN (7) CALENDAR DAYS OF

ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE.

18. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATIONFOR

FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO PREVENT WATER

FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE END OF A RAINFALL EVENT.

DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS FORTY-EIGHT (48) HOURS

AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNED TO HAVE STANDING WATER

SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT.

A. AREA DISTURBED: 0.31 ACRES

B. TOTAL CUT: 169 CUBIC YARDS

C. TOTAL FILL: 139 CUBIC YARDS

D. OFF-SITE WASTE/BORROW AREA LOCATION: TBD

21. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN

THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL DEPTH OF THE TRAP OR BASIN.

TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR BASIN BOTTOM TO THE CREST OF THE OUTLET.

22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN PUMPING SEDIMENT LADEN WATER, THE DISCHARGE SHALL BE DIRECTED TO AN MDE APPROVED SEDIMENT TRAPPING DEVICE PRIOR TO

RELEASE FROM THE SITE. A SUMP PIT MAY BE USED IF SEDIMENT TRAPS THEMSELVES ARE BEING

PUMPED OUT.

23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE AND HAVE

ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED AREAS USING SOD OR AN

APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL AMENDMENTS AND AN APPROVED

ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE USED IN SEEDING SEASON WHERE THE SLOPE

DOES NOT EXCEED 10% AND GRADING HAS BEEN DONE TO PROMOTE SHEET FLOW DRAINAGE. AREAS

BROUGHT TO FINISHED GRADE DURING THE SEEDING SEASON SHALL BE PERMANENTLY STABILIZED AS

SOON AS POSSIBLE, BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR

SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN (7) CALENDAR DAYS FOR FLATTER

SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE DURING THE MONTHS OF NOVEMBER

THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS FOUND TO BE IMPRACTICAL, TEMPORARY SEED

AND ANCHORED STRAW MULCH SHALL BE APPLIED TO DISTURBED AREAS. THE FINAL PERMANENT

STABILIZATION OF SUCH PROPERTY SHALL BE APPLIED BY MARCH 15 OR EARLIER IF GROUND AND

WEATHER CONDITIONS ALLOW.

24. TEMPORARY SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITH PERMISSION OF THE MDE

INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF PERMANENT

STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF SEDIMENT CONTROL

DEVICES, THE AREA DISTURBED BY REMOVAL SHALL BE STABILIZED WITH TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL. STORMWATER MANAGEMENT STRUCTURES USED

TEMPORARILY FOR SEDIMENT CONTROL SHALL BE CONVERTED TO THE PERMANENT CONFIGURATION

WITHIN THIS TIME PERIOD AS WELL.

25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY SHALL HAVE PRIOR APPROVAL BY

MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES; OTHERWISE APPROVAL SHALL BE

GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND BORROW AREAS OFF-SITE SHALL BE PROTECTED

BY SEDIMENT CONTROL MEASURES AND STABILIZED.

26. SITE INFORMATION:

A. THE REQUIRED PRE-CONSTRUCTION MEETING.

B. FOLLOWING THE INSTALLATION OF SEDIMENT CONTROL MEASURES.

C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED

INTO PERMANENT STORMWATER MANAGEMENT STRUCTURES) AT THE

REQUIRED INSPECTION POINTS (SEE INSPECTION CHECKLIST ON PLAN).

NOTIFICATION PRIOR TO COMMENCING CONSTRUCTION OF EACH STEP IS

MANDATORY.

2. THE CONTRACTOR SHALL NOTIFY MDE IN WRITING AND BY TELEPHONE AT

THE FOLLOWING POINTS:

19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND TRAPS MAY

NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST CONFORM TO LOCAL

ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL CHECK WITH LOCAL BUILDING

OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE SAFETY FENCE IS DEEMED APPROPRIATE

AND LOCAL ORDINANCES DO NOT SPECIFY FENCING SIZES AND TYPES, THE FOLLOWING SHALL BE USED

AS A MINIMUM STANDARD: THE SAFETY FENCE SHALL BE MADE OF WELDED WIRE AND AT LEAST 42 INCHES

HIGH, HAVE POSTS SPACED NO FARTHER APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN

2 INCHES IN WIDTH AND 4 INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE SHALL

BE MAINTAINED AND IN GOOD CONDITION AT ALL TIMES.

20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS SHALL

HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW POINTS.

3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY

LOG BOOKS, AND TEST REPORTS SHALL BE AVAILABLE AT THE SITE FOR INSPECTION BY DULY

AUTHORIZED OFFICIALS OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.

4. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES

PER THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM

INSPECTED AND APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND

DISTURBANCES. MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE

IN THE FIELD WITH THE APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR SHALL

ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT

CONTROL DEVICES AND SHALL NOT REMOVE ANY EROSION OR SEDIMENT CONTROL

MEASURE WITHOUT PRIOR PERMISSION FROM MDE INSPECTOR. THE CONTRACTOR SHALL

OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR MODIFICATIONS TO THE EROSION AND

SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF CONSTRUCTION.

5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT

CONTROL MEASURES, IF DEEMED NECESSARY.

6. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS

TO PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS

DEPOSITED ONTO PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY.

7. THE CONTRACTOR SHALL INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE

OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME

AS THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.

8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN

ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR AREAS

WITHIN THE DELINEATED LIMIT OF DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48

HOURS PRIOR TO THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVED:

9. ALL WATER REMOVED FROM EXCAVATED AREAS SHALL BE PASSED THROUGH AN MDE

APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO

DISCHARGE TO A FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.

10. CONCRETE WASHOUT STRUCTURES SHALL BE USED WHEN CONCRETE TRUCKS, DRUMS,

PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.

11. CONSTRUCTION ACTIVITIES PRODUCING DUST SHALL IMPLEMENT CONTROL MEASURES TO

AVOID THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING

OFF-SITE OR TO AREAS WITHOUT TREATMENT.

12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY

STABILIZATION SHALL BE COMPLETED WITHIN:

13. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE 2011

MARYLAND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .